Pages that link to "05000302/LER-1986-001"
Jump to navigation
Jump to search
The following pages link to 05000302/LER-1986-001:
Displayed 50 items.
- 05000302/LER-1983-012, Forwards LER 83-012/03L-0 (← links)
- 05000302/LER-1983-009, Forwards LER 83-009/03L-0 (← links)
- 05000302/LER-1982-005, Forwards LER 82-005/03L-0 (← links)
- 05000302/LER-1982-007, Forwards LER 82-007/03L-0 (← links)
- 05000302/LER-1982-006, Forwards LER 82-006/03L-0 (← links)
- 05000302/LER-1994-006, Forwards Corrected Page One of LER 94-006-06 Which Had Typo in Block 7, Rept Number (← links)
- 05000302/LER-1996-003, Submits LER 96-003-00 Re GL 96-01 Testing Deficiencies.Fpc Review & Corrective Action Expected Prior to Startup from Current Outage R-1.Suppl Reporting Related Logic Sys Testing Deficiencies Expected by 970630 (← links)
- 05000302/LER-1996-018, Forwards Suppl LER 96-018-01 Identifying Changes Resulting from Comprehensive Review of Flow Diagrams,Procedure,Design Basis Documents & Licensing Basis Info Required to Be Performed IAW Original LER (← links)
- 05000302/LER-1994-009, Forwards LER 94-009-02 Re Unauthorized Tests on Makeup Tank Level/H Pressure.Suppl Identifies 940904 Test,Incorporates Root Causes of Related Concerns Along W/Associated CAs & Provides Update to Previously Described Actions (← links)
- 05000302/LER-1997-003, Forwards LER 97-003-03 Re GL 96-01 Testing Deficiencies (← links)
- 05000302/LER-1995-019, Submits Corrective Action Date Affected by Current Forced Outage Re LER 95-019-00,issued 951026 (← links)
- 05000302/LER-1998-009, Forwards LER 98-009-00,which Discusses Personnel Error During Troubleshooting Activities on EFIC Sys That Caused Main Steam Line Isolaton & Resulted in Manual Reactor Trip. Rept Submitted Per 10CFR50.73(a)(2)(iv) (← links)
- 05000302/LER-1979-005, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Necess (← links)
- 05000302/LER-1998-001, Forwards LER 98-001-00,discussing Impact HELB Would Have on Sys,Structures & Components Inside Containment,Per 10CFR50.73 (← links)
- 05000302/LER-1997-036, Forwards LER 97-036-00,discussing Discrepancy Where Overload Relays for Makeup & Purification Sys High Pressure Injection Valves Were Not Set in Automatic Reset Mode of Operation (← links)
- 05000302/LER-1997-035, Forwards LER 97-035-00 Re Discovery of Inability to Provide RCS Inventory Makeup During Postulated App R Event. Commitments Made by Util,Encl (← links)
- 05000302/LER-1997-034, Forwards LER 97-034-00,which Discusses Nonconservative Assumption Used in Breaker Setpoint Calculations That Could Prevent Motor Operated Equipment from Starting During Bus Overvoltage Conditions (← links)
- 05000302/LER-1997-018, Informs That Mod to Preclude Chiller Failure Noted in LER 97-018-00 Will Not Be Completed Until 971120 (← links)
- 05000302/LER-1997-032, Forwards LER 97-032-00,which Discusses Discrepancy Where non-safety Related Solenoid Valve Was Receiving Power from Safety Related Distribution Panel W/O Appropriate Electrical Separation or Isolation.Condition Contrary to Desi (← links)
- 05000302/LER-1997-046, Forwards LER 97-046-00,discussing Condition Where Circuits Required for Operation of EDG Exciters Were Not Protected from Effects of Postulated App R Fire in MCR or Csr.Rept Submitted Per 10CFR50.73 (← links)
- 05000302/LER-1997-031, Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00 (← links)
- 05000302/LER-1997-043, Forwards LER 97-043-00,discussing Condition Where Trip Set Points for Control Complex Chiller Motor Overloads Were Set Below Vendor Recommended Set Point (← links)
- 05000302/LER-1997-044, Forwards LER 97-044-00,re Condition Where long-time Overcurrent Trip Setpoint for Feeder Breaker to Es MCC 3AZ Was Set Too Low (← links)
- 05000302/LER-1998-013, Forwards LER 98-013-00,discussing Personnel Errors That Resulted in Surveillance Procedures Not Verifying Certain Valves to Be in Correct Position Once Every 31 Days as Required by ITS SRs (← links)
- 05000302/LER-1997-045, Forwards LER 97-045-00,discussing Condition Re Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirement.No Commitment Made in LER (← links)
- 05000302/LER-1997-019, Forwards LER 97-019-01 Re Elevated EDG Supply Air Temps Due to EDG Radiator Air Recirculation Effect.Util Revising Commitment Due Date from Prior to Entry Into Mode 4 to 980228.Commitment Encl (← links)
- 05000302/LER-1988-018, Responds to Violations Noted in Insp Rept 50-302/88-26. Corrective actions:LER-88-018 Submitted to Rept Event Re Containment Air Lock Seal Leakage Tests (← links)
- 05000302/LER-1983-016, Forwards LER 83-016/03L-0 (← links)
- 05000302/LER-1998-002, Forwards LER 98-002-00 Discussing 500kV Backfeed Not Meeting Basis Requirements as Qualified Source of off-site Power During Previous Plant Outages.Commitments Made by Util,Encl (← links)
- 05000302/LER-1996-023, Forwards Suppl to LER 96-023-00 to Provide Update to Actions to Prevent Recurrence.Suppl Changes Commitment Made in LER 96-023-00 to Revise Improved Tech Specs (← links)
- 05000302/LER-1997-041, Forwards LER 97-041-00 Re Condition Where Control Complex Chiller May Be Rendered Unavailable Due to Design Error. Commitments Made by Util,Encl (← links)
- 05000302/LER-1997-040, Corrected Page 1 of LER 97-040-00,adding Rept Date in Block 7.On 971110,inadequate Engineering Documentation for safety- Related Large Bore Piping Analysis & Pipe Supports Noted. Caused by Personnel Error (← links)
- 05000302/LER-1997-039, Corrected Page 1 to LER 97-039-00,adding Rept Date in Block 7.On 971108,unqualified Matl Discovered Left in Reactor Bldg During Const.Caused by Personnel Error.Polystyrene Permanently Installed (← links)
- ML20209B975 (redirect page) (← links)
- 05000302/LER-1986-001, Advises That Suppl to LER 86-001-01 Re Reactor Coolant Pump Shaft Failure on 860101 Delayed Until 870331 Due to Extended Plant Outages During Last 3 Months (redirect page) (← links)
- 05000302/LER-1977-104, Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months (← links)
- 05000302/LER-1987-005, Informs That LER 87-005-00 Re Deficiency Identified on 870129 in Surveillance Testing of Certain Engineered Safeguards Actuation Logic,Will Be Submitted by 870313. Delay Due to Complexity of Sys & Specific Deficiences Noted (← links)
- 05000302/LER-1987-007, Extends Projected Due Date for Suppl to LER 87-007-00 from 870730 to 871030.Extra Time Needed for Satisfactory Analysis of Event (← links)
- 05000302/LER-1997-025, Provides NRC W/Results of SW Study Florida Power Committed to Send Prior to 980828,in LAR & LER 97-025-02,dtd 980708 for Info Only (← links)
- 05000302/LER-1998-008, Forwards LER 98-008-00 Discussing Three Components in Nuclear Svcs & Decay Heat Seawater Sys That Did Not Meet Requirements of ASME Code Section Xi.Rept Is Being Submitted IAW 10CFR50.73 (← links)
- 05000302/LER-1997-042, Forwards LER 97-042-01,which Discussed Inadequate Engineering Evaluation That Resulted in Loss of One Diverse RCS Leak Detection Capability.Long Term Resolution to Subject Condition,Provided (← links)
- 05000302/LER-1989-009, Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns (← links)
- 05000302/LER-1989-016, Advises That LER-89-016 Re Environ Qualification Items Delayed Until 890630.Several Addl Items Identified & Being Incorporated (← links)
- 05000302/LER-1989-008, Forwards LER 89-008-01 & Proposed Draft FSAR Change. Reanalysis in LER Initiated to Evaluate Consequences of Operation W/Steam Drain Trap Isolation Valves Open for All Events.Revised FSAR Pages Will Be Incorporated in Rev 12 (← links)
- 05000302/LER-1986-018, Advises That No Addl Info Under LER 86-018 Will Be Submitted (← links)
- 05000302/LER-1989-013, Corrected LER 89-013-01:on 890409,when Time Delay Satisfied & Voltage Had Not Recovered,Emergency Diesel Generator Start Signal Was Initiated.Caused by Degraded Voltage on Engineered Safeguard 4,160 Volt Buses (← links)
- 05000302/LER-1998-007, Forwards LER 98-007-00 Re Missed Sys Pressure Tests of ASME Code Class 3 Components.Commitments Made by Util,Attached (← links)
- 05000302/LER-1987-025, Requests 30-day Extension Until 871216 for Submittal of LER 87-025 & Security Rept 87-S02-00.Significance of Event Requires More Thorough Investigation than Already Completed (← links)
- 05000302/LER-1983-034, Forwards Revised Commitments Re Insp Repts 50-302/79-04, 50-302/81-11 & 50-302/85-18 & LER 83-34.Plant Procedures Revised to Route All PRRs & MAR Through Nuclear Safety Organization for Approval of Safety Evaluations (← links)
- 05000302/LER-1987-019, Advises That Ncor 87-131, Tech Specs Require Testing Emergency Diesel Generator Above Design Load Limits, Will Not Be Submitted as LER 87-019 by 871002 Due to Confirmed Reportability on 870914.Due Date Will Be 871014 (← links)