Pages that link to "IR 05000312/1988041"
Jump to navigation
Jump to search
The following pages link to IR 05000312/1988041:
Displayed 33 items.
- ML20210M567 (← links)
- ML20210M537 (← links)
- PNO-V-87-008, on 870202,valve Opened Which Permitted Less than 50 Gallons of Primary Coolant to Enter Spray Sys & Flow Out Lower Header Ring.Caused by Movats Maint Personnel Error While Testing Valve Operator.Areas Decontaminated (← links)
- ML20210B825 (← links)
- ML20209J412 (← links)
- ML20209J323 (← links)
- ML20209J280 (← links)
- ML20209J081 (← links)
- ML20209J073 (← links)
- PNO-V-87-026A, on 870402,licensee Informed NRC That Stop Work Order for Plant safety-related Welding Work Partially Lifted After New Weld Filler Matl W/Proper Documentation Procured.Welding Will Be Resumed Using New Matl (← links)
- PNO-V-87-026, on 870326,licensee QA Manager Issued Stop Work Order for All safety-related Welding.Audit Disclosed 92% of Weld Filler Matl Available Had Documentation Deficiencies. Internal Task Force Formed to Assess Deficiencies (← links)
- PNO-V-86-047B, on 860725,licensee Secured from Unusual Event After Establishing Temporary Compensatory Measures.Util Plans to Return Diesel Generator a to Svc by 860730. Replacement for DHR Pump B Procured (← links)
- PNO-V-86-047A, on 860622,both Trains of Decay Heat Sys Declared Inoperable.Caused by Leak on Pump B Casing & Train a Emergency Diesel Out of Svc for Insp.Pump in Standby Condition & Diesel Will Return to Svc in Approx 8 Days (← links)
- PNO-V-85-037A, initial Investigation Results Indicated Mode of Failure of High Point Vent Loop B Was Fatigue Cracking. Caused by Inadequate Class 2 Piping Support.Investigation Expanded to Include Walkdown,Per IE Bulletin 79-14 (← links)
- PNO-V-85-037, on 850623,unisolable 20 Gpm Reactor Coolant Leak Occurred.Caused by Cracked Weld in 1-inch Diameter High Point Vent Line from Rcs.No Personnel Contamination or Radioactive Release from Reactor Bldg Occurred (← links)
- PNO-V-85-033A, Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined (← links)
- PNO-V-85-033, on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage (← links)
- IR 05000312/1982027 (← links)
- IR 05000312/1982029 (← links)
- IR 05000312/1982020 (← links)
- IR 05000312/1990014 (← links)
- IR 05000312/1990011 (← links)
- IR 07100024/2012004 (← links)
- IR 05000312/1982025 (← links)
- IR 05000312/1982022 (← links)
- IR 05000312/1993006 (← links)
- IR 05000312/1993004 (← links)
- IR 05000312/1982026 (← links)
- IR 05000312/1982024 (← links)
- IR 05000312/1982023 (← links)
- IR 05000312/1982021 (← links)
- IR 05000312/1982008 (← links)
- IR 05000312/1982018 (← links)