Pages that link to "05000336/LER-1997-003, Corrected Page One to LER 97-003-01:on 961216,discovered Discrepancy in Plant Procedure Utilized to Perform Periodic Insp of Fire Protection Sys Smoke Detectors.Caused by Failure to Properly Incorporate Ts.Ts Partially Revised"
Jump to navigation
Jump to search
The following pages link to 05000336/LER-1997-003, Corrected Page One to LER 97-003-01:on 961216,discovered Discrepancy in Plant Procedure Utilized to Perform Periodic Insp of Fire Protection Sys Smoke Detectors.Caused by Failure to Properly Incorporate Ts.Ts Partially Revised:
Displayed 32 items.
- 05000423/LER-1997-063, Forwards LER 97-063-01,re Event Determined Reportable at Millstone Unit 3 on 971231.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-043, Forwards LER 97-043-00,documenting Condition Determined Reportable on 970630.List of Commitments Provided (← links)
- 05000336/LER-1997-022, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachment (← links)
- 05000423/LER-1997-060, Forwards LER 97-060-01,determined Reportable at Millstone Unit 3 on 971209,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl (← links)
- 05000245/LER-1997-014, Forwards Suppl LER 97-014-02,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Rept Includes Addl Deficiencies in IST Program That Have Been Identified as Reportable (← links)
- 05000245/LER-1997-031, Forwards LER 97-031-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970730.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-033, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) (← links)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-023, Updates NRC Staff Re Submittal of Suppl to LER 97-023-00 as Committed to by Facility for Unit 2 in LER 97-023-00.LER 50-336/97-023-00 Contained Listed Commitment for Unit 2 (← links)
- 05000423/LER-1997-044, Forwards LER 97-044-00,documenting Condition,Determined at Unit 3 on 970701.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-041, Forwards Revised Schedule for Completion of Commitment Identified in LER 97-041-00,submitted on 970813.Commitment to Define Operable Service Water Loop as Two Pumps Per Loop by 970930 Will Be Completed by 971122 (← links)
- ML20217F232 (← links)
- 05000423/LER-1997-034, Forwards LER 97-034-01,documenting Condition That Was Determined at Millstone,Unit 3 on 970918.Attachment 1 to Ltr Contains Commitments in Response to Event (← links)
- 05000423/LER-1997-048, Forwards LER 97-048-00 Documenting Condition That Was Determined at Millstone,Unit 3 on 970806.Attachment 1 Contains Commitments in Response to Event (← links)
- 05000336/LER-1997-027, Forwards LER 97-027-00,documenting Event That Occurred at Unit 2 on 970802.Commitment,listed (← links)
- 05000245/LER-1997-033, Forwards LER 97-033-00,documenting Event That Occurred at Unit 1 on 970801.Commitment Listed (← links)
- 05000245/LER-1997-032, Forwards LER 97-032-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970731,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1997-017, Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-049, Forwards LER 97-049-00,documenting Condition That Was Determined Reportable on 970925.Commitments in Response to Event Contained in Attachment 1 to Ltr (← links)
- 05000336/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 2 on 970830.Util Commitments Listed in Ltr (← links)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided (← links)
- 05000336/LER-1997-029, Forwards LER 97-029-00,documenting Condition That Was Identified at Plant Unit 2 on 970826.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-028, Forwards LER 97-028-00,documenting Condition Discovered at Plant on 970822.List of Commitments Provided (← links)
- 05000423/LER-1997-047, Forwards LER 97-047-00,documenting Condition,Determined at Unit 3 on 970815.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000245/LER-1997-034, Forwards LER 97-034-00 Documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970812.Listed Commitments Made within Ltr (← links)
- 05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 1 on 970724.Util Commitments Made within Ltr Listed (← links)
- 05000423/LER-1997-012, Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00 (← links)
- 05000423/LER-1997-046, Forwards LER 97-046-00,documenting Condition Determined at Unit 3 on 970523 & Later Determined to Be Reportable on 970711.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-040, Forwards LER 97-040-00,documenting Condition Determined on 970627.List of Commitments in Response to Event Encl (← links)
- 05000423/LER-1997-042, Forward LER 97-042-00,documenting Condition Determined to Be Reportable on 970703.List of Commitments Provided (← links)
- 05000423/LER-1997-045, Forwards LER 97-045-00,documenting Condition,Determined Reportable at Unit 3 on 970703.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)