IR 05000443/2014006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 33: Line 33:
Inspection Plan cc w/encl: Distribution via ListServ  
Inspection Plan cc w/encl: Distribution via ListServ  


ML14239A182 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PCataldo/per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14 Distribution w/encl: (via e-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP B. Reyes, DRP P. Cataldo, DRP, SRI C. Newport, DRP, RI A. Cass, DRP, Resident AA A. Bowers, RI, OEDO R. J. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource Page 1 of 2 08/25/2014 08:58:13Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSeabrookInspection / Activity Plan 07/01/2014
ML14239A182 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PCataldo/per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14 Distribution w/encl: (via e-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP B. Reyes, DRP P. Cataldo, DRP, SRI C. Newport, DRP, RI A. Cass, DRP, Resident AA A. Bowers, RI, OEDO R. J. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource Page 1 of 2 08/25/2014 08:58:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SeabrookInspection / Activity Plan 07/01/2014
-12/31/2015 TRI FI-TRIENNIAL FIRE PROTECTION 41 IPFire Protection [Triennial]7111105T07/07/201407/11/201471152B-PI&R BIENNIAL 21 IPProblem Identification and Resolution71152B10/06/2014 10/10/2014 1 IPProblem Identification and Resolution71152B10/20/2014 10/24/201471124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/18/2014 08/22/2014ASR-PI&R SAMPLE - ASR MONITORING 21 IPProblem Identification and Resolution7115210/20/2014 10/24/2014EP EXER-EP EXERCISE INSPECTION 21 IPExercise Evaluation - Hostile Action (HA) Event711140711/03/201411/07/2014 3-23EXM-INITIAL OL EXAM 31 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U0191502/17/2015 03/20/2015 1 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U0191503/23/2015 04/04/201571151-71151 PI VERIFY IP 71124.01, 02 & 05 11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/08/2014 12/12/2014 1 IPOccupational ALARA Planning and Controls71124.0212/08/2014 12/12/2014 1 IPRadiation Monitoring Instrumentation71124.0512/08/2014 12/12/2014 1 IP71151-OR01 12/08/2014 12/12/2014 1 IP71151-PR01 12/08/2014 12/12/2014 ISFSI-ISFSI OPERATIONAL INSPECTION 11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.103/01/2015 04/30/2015ASR-PI&R SAMPLE - ASR MONITORING 21 IPProblem Identification and Resolution7115203/02/2015 03/06/2015 MODS-PERMANENT PLANT MODIFICATIONS 31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/02/2015 03/06/2015 1 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/16/2015 03/20/201571124-RAD EFFLUENT CONTROL RETS 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0604/20/2015 04/23/20157111107T-TRIENNIAL HEAT SINK 11 IPHeat Sink Performance7111107T06/01/2015 06/05/201571124-REMP11 IPRadiological Environmental Monitoring Program71124.0707/06/2015 07/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2015 TRI FI-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T 07/07/201407/11/201471152B-PI&R BIENNIAL 2 1 IP Problem Identification and Resolution71152B 10/06/2014 10/10/2014 1 IP Problem Identification and Resolution71152B 10/20/2014 10/24/201471124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/18/2014 08/22/2014ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 10/20/2014 10/24/2014EP EXER-EP EXERCISE INSPECTION 2 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/03/201411/07/2014 3-23EXM-INITIAL OL EXAM 3 1 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U01915 02/17/2015 03/20/2015 1 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U01915 03/23/2015 04/04/201571151-71151 PI VERIFY IP 71124.01, 02 & 05 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/08/2014 12/12/2014 1 IP Occupational ALARA Planning and Controls71124.02 12/08/2014 12/12/2014 1 IP Radiation Monitoring Instrumentation71124.05 12/08/2014 12/12/2014 1 IP71151-OR01 12/08/2014 12/12/2014 1 IP71151-PR01 12/08/2014 12/12/2014 ISFSI-ISFSI OPERATIONAL INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2015 04/30/2015ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 03/02/2015 03/06/2015 MODS-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/02/2015 03/06/2015 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/16/2015 03/20/201571124-RAD EFFLUENT CONTROL RETS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 04/20/2015 04/23/20157111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 06/01/2015 06/05/201571124-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 07/06/2015 07/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 08/25/2014 08:58:13Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSeabrookInspection / Activity Plan 07/01/2014
Page 2 of 2 08/25/2014 08:58:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SeabrookInspection / Activity Plan 07/01/2014
-12/31/2015ASR-PI&R SAMPLE - ASR MONITORING 21 IPProblem Identification and Resolution7115209/14/2015 09/18/20157111108P-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/05/2015 10/16/20157111111B-REQUAL INSP W/ P/F RESULTS 21 IPLicensed Operator Requalification Program7111111B12/07/201512/11/201571124-HP 71124.01 02 03 04 11 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/2015 10/23/2015 1 IPOccupational ALARA Planning and Controls71124.0210/19/2015 10/23/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/2015 10/23/2015 1 IPOccupational Dose Assessment71124.0410/19/2015 10/23/2015 EP-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140211/02/201511/06/2015 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/02/201511/06/2015 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/02/201511/06/201571151-HP PI VERIFY RAD HAZARD ALARA 11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/07/2015 12/10/2015 1 IPPerformance Indicator Verification7115112/07/2015 12/10/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2015ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 09/14/2015 09/18/20157111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/05/2015 10/16/20157111111B-REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B 12/07/201512/11/201571124-HP 71124.01 02 03 04 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/02/201511/06/2015 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/02/201511/06/2015 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/02/201511/06/201571151-HP PI VERIFY RAD HAZARD ALARA 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/07/2015 12/10/2015 1 IP Performance Indicator Verification71151 12/07/2015 12/10/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 12:29, 9 July 2018

Seabrook ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000443/2014006
ML14239A182
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/02/2014
From: Dentel G T
Reactor Projects Branch 3
To: Dean Curtland
NextEra Energy Seabrook
DENTEL, GT
References
IR-2014-006
Download: ML14239A182 (5)


Text

September 2, 2014

Mr. Dean Curtland Site Vice President Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. Michael Ossing P.O. Box 300 Seabrook, NH 03874

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2014006)

Dear Mr. Curtland:

On August 14, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Seabrook was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Seabrook during the most recent quarter was within the Licensee Response Column of the (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. As part of our baseline inspection program, (ASR) non-conforming condition impacting safety-related reinforced concrete structures at Seabrook. This will be accomplished through scheduled six-month inspection activities using sampling guidance. In addition to baseline inspections, the NRC will perform IP 60855.1, provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12- Modifying Licenses with Regard to Reliable Spent Fuel Pool wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5233 with any questions you have regarding this letter.

Sincerely,/RA/ Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Docket No.: 50-443 License No.: NPF-86

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

ML14239A182 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PCataldo/per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14 Distribution w/encl: (via e-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP B. Reyes, DRP P. Cataldo, DRP, SRI C. Newport, DRP, RI A. Cass, DRP, Resident AA A. Bowers, RI, OEDO R. J. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource Page 1 of 2 08/25/2014 08:58:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SeabrookInspection / Activity Plan 07/01/2014

-12/31/2015 TRI FI-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T 07/07/201407/11/201471152B-PI&R BIENNIAL 2 1 IP Problem Identification and Resolution71152B 10/06/2014 10/10/2014 1 IP Problem Identification and Resolution71152B 10/20/2014 10/24/201471124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/18/2014 08/22/2014ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 10/20/2014 10/24/2014EP EXER-EP EXERCISE INSPECTION 2 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/03/201411/07/2014 3-23EXM-INITIAL OL EXAM 3 1 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U01915 02/17/2015 03/20/2015 1 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM U01915 03/23/2015 04/04/201571151-71151 PI VERIFY IP 71124.01, 02 & 05 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/08/2014 12/12/2014 1 IP Occupational ALARA Planning and Controls71124.02 12/08/2014 12/12/2014 1 IP Radiation Monitoring Instrumentation71124.05 12/08/2014 12/12/2014 1 IP71151-OR01 12/08/2014 12/12/2014 1 IP71151-PR01 12/08/2014 12/12/2014 ISFSI-ISFSI OPERATIONAL INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2015 04/30/2015ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 03/02/2015 03/06/2015 MODS-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/02/2015 03/06/2015 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/16/2015 03/20/201571124-RAD EFFLUENT CONTROL RETS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 04/20/2015 04/23/20157111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 06/01/2015 06/05/201571124-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 07/06/2015 07/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/25/2014 08:58:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SeabrookInspection / Activity Plan 07/01/2014

-12/31/2015ASR-PI&R SAMPLE - ASR MONITORING 2 1 IP Problem Identification and Resolution71152 09/14/2015 09/18/20157111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/05/2015 10/16/20157111111B-REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B 12/07/201512/11/201571124-HP 71124.01 02 03 04 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/02/201511/06/2015 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/02/201511/06/2015 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/02/201511/06/201571151-HP PI VERIFY RAD HAZARD ALARA 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/07/2015 12/10/2015 1 IP Performance Indicator Verification71151 12/07/2015 12/10/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.