CR0-310 -a Page 2 of 8 1 A and 1 B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1 LP-17 is closed after 1 A LPI pump fails. Preferred Evaluation Location:
CR0-310 -a Page 2 of 8 1 A and 1 B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1 LP-17 is closed after 1 A LPI pump fails. Preferred Evaluation Location:
Preferred Evaluation Method: Simulator
Preferred Evaluation Method: Simulator
_x_ In-Plant
_x_ In-Plant __ Perform X Simulate  
__ Perform X Simulate  


==References:==
==References:==
Line 31: Line 30:
_ _______________  
_ _______________  
! __ _ NAME SIGNATURE DATE ====================================================================================
! __ _ NAME SIGNATURE DATE ====================================================================================
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS: 1 . RECALL Snap 208 2. IMPORT files for CR0-310 3. WHEN directed by Lead Examiner, Go to RUN CR0-310 -a Page 3 of 8 Tools/Equipment/Procedures Needed: EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE:
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS: 1 . RECALL Snap 208 2. IMPORT files for CR0-310 3. WHEN directed by Lead Examiner, Go to RUN CR0-310 -a Page 3 of 8 Tools/Equipment/Procedures Needed: EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE: CR0-310 -a Page 4 of 8 I will explain the initial conditions, and state the task to be performed.
CR0-310 -a Page 4 of 8 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Line 40: Line 38:
* The LOCA CD Tab in progress.
* The LOCA CD Tab in progress.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* RCS pressure is decreasing rapidly.
* RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
ST ART TIME: __ _ I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier).
ST ART TIME: __ _ I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier).
STANDARD:
STANDARD:
Line 68: Line 65:
* The LOCA CD Tab in progress.
* The LOCA CD Tab in progress.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* RCS pressure is decreasing rapidly.
* RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 CR0-407 -b Page 1 of 12 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Establish EFDW flow through Startup valves Alternate Path: Yes Facility JPM #: CR0-015 KIA Rating(s):
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 CR0-407 -b Page 1 of 12 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Establish EFDW flow through Startup valves Alternate Path: Yes Facility JPM #: CR0-015 KIA Rating(s):
System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:
System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:
CR0-407 -b Page 2 of 12 EFDW flow is established to the affected header through the startup valve. Preferred Evaluation Location:
CR0-407 -b Page 2 of 12 EFDW flow is established to the affected header through the startup valve. Preferred Evaluation Location:
Simulator
Simulator
_x_ In-Plant
_x_ In-Plant __  
__  


==References:==
==References:==


EOP Rule 3, (Loss of Main or Emergency FDW) EOP Rule 7, (SG Feed Control)
EOP Rule 3, (Loss of Main or Emergency FDW) EOP Rule 7, (SG Feed Control) EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow) Validation Time: 10 minutes Preferred Evaluation Method: Perform X Simulate Time Critical:
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow) Validation Time: 10 minutes Preferred Evaluation Method: Perform X Simulate Time Critical:
NO ====================================================================================
NO ====================================================================================
Candidate:
Candidate:
Time Start: ___ _ NAME Time Finish: __ _ Performance Rating:.
Time Start: ___ _ NAME Time Finish: __ _ Performance Rating:. SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:
SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:
____________
____________
_
_
Line 99: Line 92:
STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
STANDARD:
STANDARD:
Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated.  
Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated. (OP/2/A/6102/018)
(OP/2/A/6102/018)
Candidate will perform RNO step and GO TO step 3. COMMENTS:
Candidate will perform RNO step and GO TO step 3. COMMENTS:
STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency),
STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency), AND any of the following exist:
AND any of the following exist:
* RCS pressure reaches 2300 psig OR NOT limit
* RCS pressure reaches 2300 psig OR NOT limit
* Pzr level reaches 375" [340" ace] THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).
* Pzr level reaches 375" [340" ace] THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).
Line 132: Line 123:
Removes Encl. 5.27 from EOP and initiates.
Removes Encl. 5.27 from EOP and initiates.
EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27. COMMENTS:
EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27. COMMENTS:
STEP 11: Encl 5.27: Step 1 Identify the failure:
STEP 11: Encl 5.27: Step 1 Identify the failure: 1FDW-315 has Failed CLOSED [GO TO Step 2] STANDARD:
1FDW-315 has Failed CLOSED [GO TO Step 2] STANDARD:
Candidate determines the next procedural step from table in Step 1. Continue to Step 2. COMMENTS:
Candidate determines the next procedural step from table in Step 1. Continue to Step 2. COMMENTS:
STEP 12: Encl 5.27: Step 2 Verify 1 A MD EFDWP is operating STANDARD:
STEP 12: Encl 5.27: Step 2 Verify 1 A MD EFDWP is operating STANDARD:
Line 154: Line 144:
CR0-407 -b Page 8 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -
CR0-407 -b Page 8 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -
STEP 17: Encl 5.27: Step 7 Close 1 FDW-33 STANDARD:  
STEP 17: Encl 5.27: Step 7 Close 1 FDW-33 STANDARD:  
*Candidate closes SU Control Block Valve (1 FDW-33).
*Candidate closes SU Control Block Valve (1 FDW-33). Candidate verifies red light is out and green light is lit. Continue to Step 8. COMMENTS:
Candidate verifies red light is out and green light is lit. Continue to Step 8. COMMENTS:
STEP 18: Encl 5.27: Step 8 Verify 1 A MD EFDWP will be used. STANDARD:
STEP 18: Encl 5.27: Step 8 Verify 1 A MD EFDWP will be used. STANDARD:
Candidate determines that the 1A MD EFDWP will be used. Continue to Step 9. EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP. COMMENTS:
Candidate determines that the 1A MD EFDWP will be used. Continue to Step 9. EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP. COMMENTS:
STEP 19: Encl 5.27: Step 9 Open 1 FDW-37 4 STANDARD:  
STEP 19: Encl 5.27: Step 9 Open 1 FDW-37 4 STANDARD:  
*Candidate locates and opens 1 FDW-374.
*Candidate locates and opens 1 FDW-374. Candidate observes green closed light off and red open light on. Continue to Step 10. COMMENTS:
Candidate observes green closed light off and red open light on. Continue to Step 10. COMMENTS:
STEP 20: Encl 5.27: Step 1 O Verify the following:  
STEP 20: Encl 5.27: Step 1 O Verify the following:  
* ; FDW-36 closed
* ; FDW-36 closed
Line 176: Line 164:
Candidate determines that neither condition is met and goes to the RNO. Continue to Step 12 RNO. COMMENTS:
Candidate determines that neither condition is met and goes to the RNO. Continue to Step 12 RNO. COMMENTS:
STEP 23: Encl 5.27: Step 12 RNO IF any SG is being fed, THEN perform the following:  
STEP 23: Encl 5.27: Step 12 RNO IF any SG is being fed, THEN perform the following:  
* *Throttle 1 FDW-35 to establish a maxim um of 100 gpm . * *Throttle 1 FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control)
* *Throttle 1 FDW-35 to establish a maxim um of 100 gpm . * *Throttle 1 FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control) Notify CR SRO of SG Feed Status STANDARD:
Notify CR SRO of SG Feed Status STANDARD:
Candidate throttles 1 FDW-35 to attain -100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW-35as necessary to establish  
Candidate throttles 1 FDW-35 to attain -100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW-35as necessary to establish  
-25" S/U level (per Rule 7 table 4) Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e. when using the S/U CVs) is 25" S/U level since RCS temperature is >500°F. EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1 FDW-35 must be open and SG level increasing.
-25" S/U level (per Rule 7 table 4) Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e. when using the S/U CVs) is 25" S/U level since RCS temperature is >500°F. EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1 FDW-35 must be open and SG level increasing.
Line 183: Line 170:
COMMENTS:
COMMENTS:
END TASK CR0-407 -b Page 10 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
END TASK CR0-407 -b Page 10 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
STOP TIME: ____ _ CRITICAL STEP EXPLANATIONS STEP # Explanation 1 O This step is required to ensure the correct procedure is used. 13 This step is required to ensure the valves will operate.
STOP TIME: ____ _ CRITICAL STEP EXPLANATIONS STEP # Explanation 1 O This step is required to ensure the correct procedure is used. 13 This step is required to ensure the valves will operate. 15 This step is required to ensure the valves will operate. 16 This step is required to align the MD EFDWP to the S/U header. 17 This step is required to align the MD EFDWP to the S/U header. 19 This step is required to align the MD EFDWP to the S/U header. CR0-407 -b Page 11 of 12 21 This step is required to start the 1A MD EFDWP and provide a SG feed source. 23 This step is required to establish flow to the 1 A SG.
15 This step is required to ensure the valves will operate.
16 This step is required to align the MD EFDWP to the S/U header. 17 This step is required to align the MD EFDWP to the S/U header. 19 This step is required to align the MD EFDWP to the S/U header. CR0-407 -b Page 11 of 12 21 This step is required to start the 1A MD EFDWP and provide a SG feed source. 23 This step is required to establish flow to the 1 A SG.
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
* The reactor has just tripped from 25% power
* The reactor has just tripped from 25% power
Line 193: Line 178:
Preferred Evaluation Location:
Preferred Evaluation Location:
Simulator
Simulator
_x_ In-Plant
_x_ In-Plant __  
__  


==References:==
==References:==


CR0-602 -c Page 2 of 14 Preferred Evaluation Method: Perform X Simulate OP/O/A/1106/019 (Keowee Hydro At Oconee),
CR0-602 -c Page 2 of 14 Preferred Evaluation Method: Perform X Simulate OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
Validation Time: 15 minutes Time Critical:
Validation Time: 15 minutes Time Critical:
NO ====================================================================================
NO ====================================================================================
Line 209: Line 192:
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS:  
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS:  
: 1. RECALL Snap 212 2. Go to RUN 3. SELECT Chessell to Source Range CR0-602 -c Page 3 of 14 Tools/Equipment/Procedures Needed: CR0-602 -c Page 4 of 14
: 1. RECALL Snap 212 2. Go to RUN 3. SELECT Chessell to Source Range CR0-602 -c Page 3 of 14 Tools/Equipment/Procedures Needed: CR0-602 -c Page 4 of 14
* OP/O/A/1106/019 (Keowee Hydro At Oconee),
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
READ TO OPERATOR DIRECTION TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Line 218: Line 199:
* KHU-2 has been started by the Keowee operator.
* KHU-2 has been started by the Keowee operator.
* It is desired to energize the MFB from CT 4
* It is desired to energize the MFB from CT 4
* OP/O/A/1106/019 (Keowee Hydro At Oconee),
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee),
Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.
ST ART TIME: __ _ I STEP 1: Step 2.4 Energize 4160V Standby Buses: Step 2.4.1 Notify all three Units that the Standby Bus is about to be powered from CT4. STANDARD:
ST ART TIME: __ _ I STEP 1: Step 2.4 Energize 4160V Standby Buses: Step 2.4.1 Notify all three Units that the Standby Bus is about to be powered from CT4. STANDARD:
Use the control room phone and notify all three ONS Units that the Standby Bus is about to be powered from CT 4. COMMENTS:
Use the control room phone and notify all three ONS Units that the Standby Bus is about to be powered from CT 4. COMMENTS:
Line 228: Line 207:
STEP 3: Step 2.4.3 Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON". STANDARD:
STEP 3: Step 2.4.3 Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON". STANDARD:
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:  
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:  
--SAT CR0-602 -c Page 5 of 14 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT STEP 4: Step 2.4.4 Close SK 1 CT 4 STBY BUS 1 FEEDER breaker.
--SAT CR0-602 -c Page 5 of 14 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT STEP 4: Step 2.4.4 Close SK 1 CT 4 STBY BUS 1 FEEDER breaker. STANDARD:
STANDARD:
Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.
Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.
COMMENTS:
COMMENTS:
STEP 5: Step 2.4.5 Verify:::::
STEP 5: Step 2.4.5 Verify:::::
4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS." STANDARD:
4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS." STANDARD:
Verify"'
Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOL TS" on gauge located on 2AB3. COMMENTS:
4160V on STANDBY BUS 1 "STANDBY BUS 1 VOL TS" on gauge located on 2AB3. COMMENTS:
STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF". STANDARD:
STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF". STANDARD:
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF". COMMENTS:
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF". COMMENTS:
Line 255: Line 232:
-UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO". SAT -STANDARD:
-UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO". SAT -STANDARD:
Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO". UNSAT -COMMENTS:
Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO". UNSAT -COMMENTS:
I CAUTION:
I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened. STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN". STANDARD:
E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened. STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN". STANDARD:
Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN". COMMENTS:
Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN". COMMENTS:
STEP 15: Step 2.5.1B Place STANDBY 2 AUTO/MAN switch in "MAN". STANDARD:
STEP 15: Step 2.5.1B Place STANDBY 2 AUTO/MAN switch in "MAN". STANDARD:
Line 265: Line 241:
CR0-602 -c age 0 p 10 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN". STANDARD:
CR0-602 -c age 0 p 10 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN". STANDARD:
Candidate determines that the MFB 2 AUTO/MAN switch, located on -SAT 1 AB1, is in "MAN". UN SAT -COMMENTS:
Candidate determines that the MFB 2 AUTO/MAN switch, located on -SAT 1 AB1, is in "MAN". UN SAT -COMMENTS:
STEP 18: Step 2.5.1E CRITICAL STEP Open E11 (MFB1 STARTUP FDR). STANDARD:
STEP 18: Step 2.5.1E CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR). STANDARD:
Candidate rotates E11 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
UNSAT -COMMENTS:
UNSAT -COMMENTS:
STEP 19: Step 2.5.1 F CRITICAL STEP Close S11 (STBY BUS1 TO MFB1 ). STANDARD:
STEP 19: Step 2.5.1 F CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ). STANDARD:
Candidate rotates S11 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
UN SAT -COMMENTS:
UN SAT -COMMENTS:
CR0-602 -c p 1 f 14 aqe 1 0 STEP 20: Step 2.5.1G CRITICAL STEP Open E21 (MFB2 STARTUP FDR). STANDARD:
CR0-602 -c p 1 f 14 aqe 1 0 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR). STANDARD:
Candidate rotates E21 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
UNSAT -COMMENTS:
UNSAT -COMMENTS:
STEP 21: Step 2.5.1H CRITICAL STEP Close S21 (STBY BUS2 TO MFB2). STANDARD:
STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2). STANDARD:
Candidate rotates S21 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
UNSAT -COMMENTS:
UNSAT -COMMENTS:
STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO". STANDARD:
STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO". STANDARD:
Line 287: Line 263:
* KHU-2 has been started by the Keowee operator.
* KHU-2 has been started by the Keowee operator.
* It is desired to energize the MFB from CT 4
* It is desired to energize the MFB from CT 4
* OP/O/A/1106/019 (Keowee Hydro At Oconee),
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4. c REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 CR0-111 -d Page 1 of 10 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER   
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee),
Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4. c REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 CR0-111 -d Page 1 of 10 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER   
( Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Withdrawal of Safety Rod Group 1 to 50% Alternate Path: Yes Facility JPM #: CR0-111 KIA Rating(s):
( Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Withdrawal of Safety Rod Group 1 to 50% Alternate Path: Yes Facility JPM #: CR0-111 KIA Rating(s):
System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:
System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:
CR0-111 -d Page 2 of 10 Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18. Preferred Evaluation Location:
CR0-111 -d Page 2 of 10 Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18. Preferred Evaluation Location:
Preferred Evaluation Method: Simulator
Preferred Evaluation Method: Simulator
_X:..:__
_X:..:__ In-Plant __ _ Perform X Simulate  
In-Plant
__ _ Perform X Simulate  


==References:==
==References:==
Line 311: Line 283:
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
= 339°F RCS pressure  
= 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:
= 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
* Perform an Automatic Latch of Group 1 Control Rods
* Perform an Automatic Latch of Group 1 Control Rods
* Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
* Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
START TIME: __ _ I STEP 1: Step 3.1 Perform the following:  
START TIME: __ _ I STEP 1: Step 3.1 Perform the following: (R.M.)
(R.M.)
* Ensure RUN is ON .
* Ensure RUN is ON .
* Ensure SINGLE SELECT SWITCH to ALL . STANDARD:
* Ensure SINGLE SELECT SWITCH to ALL . STANDARD:
Determine control rod speed switch is selected to RUN by observing light indication on the Diamond.
Determine control rod speed switch is selected to RUN by observing light indication on the Diamond. Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond. COMMENTS:
Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond.
COMMENTS:
STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:
STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:
* CRD position
* CRD position
Line 335: Line 302:
* Group/Rod inserts (CRD TRAVEL "In" light ON)
* Group/Rod inserts (CRD TRAVEL "In" light ON)
* RPI resets .
* RPI resets .
* Group In Limit light on Diamond will momentarily extinguish then illuminate  
* Group In Limit light on Diamond will momentarily extinguish then illuminate . STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.) 3.3.1 Ensure GROUP SELECT SWITCH to 1. 3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9} 3.3.4 If Manual Latch and Pl Alignment is desired, perform the following: (Per initiating cue, Manual is NOT desired) 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:
. STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows:  
(R.M.) 3.3.1 Ensure GROUP SELECT SWITCH to 1. 3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9} 3.3.4 If Manual Latch and Pl Alignment is desired, perform the following:  
(Per initiating cue, Manual is NOT desired) 3.3.4 If Auto Latch and Pl Alignment  
: desired, perform the following:
A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:  
A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:  
>-Verify LATCH AUTO is OFF. >-Verify Group 1 0% lights are ON. (Pl Panel) >-Verify Group 1 APl/RPI indications agree. (Pl Panel) STANDARD:  
>-Verify LATCH AUTO is OFF. >-Verify Group 1 0% lights are ON. (Pl Panel) >-Verify Group 1 APl/RPI indications agree. (Pl Panel) STANDARD:  
Line 350: Line 313:
I STEP 4: Step 3.4 Select FAULT RESET STANDARD:
I STEP 4: Step 3.4 Select FAULT RESET STANDARD:
Depress FAULT RESET pushbutton on the diamond panel. COMMENTS:
Depress FAULT RESET pushbutton on the diamond panel. COMMENTS:
STEP 5: Step 3.5 Select Group 1, as follows:  
STEP 5: Step 3.5 Select Group 1, as follows: (R.M.) Ensure GROUP SELECT SWITCH to 1. Ensure only Group 1 CONTROL ON lights are ON. (Pl panel} Ensure Group 1 at 50%. (R.M.) Place GROUP SELECT SWITCH to OFF. STANDARD:
(R.M.) Ensure GROUP SELECT SWITCH to 1. Ensure only Group 1 CONTROL ON lights are ON. (Pl panel} Ensure Group 1 at 50%. (R.M.) Place GROUP SELECT SWITCH to OFF. STANDARD:
Ensure GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are ON on the Pl panel. *Begin withdrawing Group 1 Control Rods to 50% Manually Trip the Rx when two or more CROM stator temperatures are<:: 180&deg;F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.
Ensure GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are ON on the Pl panel. *Begin withdrawing Group 1 Control Rods to 50% Manually Trip the Rx when two or more CROM stator temperatures are<:: 180&deg;F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.
COMMENTS:
COMMENTS:
Line 359: Line 321:
Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase.
Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase.
At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. COMMENTS:
At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. COMMENTS:
END OF TASK TIME STOP: __ _ CR0-111 -d Page 8 of 10 CRITICAL STEP SAT UNSAT CRITICAL STEP EXPLANATIONS  
END OF TASK TIME STOP: __ _ CR0-111 -d Page 8 of 10 CRITICAL STEP SAT UNSAT CRITICAL STEP EXPLANATIONS . EP # Explanation 3 This step is required to withdraw group 1 control rods. 5 This step is required to withdraw group 1 control rods. CR0-111 -d Page 9 of 10 6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.
. EP # Explanation 3 This step is required to withdraw group 1 control rods. 5 This step is required to withdraw group 1 control rods. CR0-111 -d Page 9 of 10 6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
= 339&deg;F RCS pressure  
= 339&deg;F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:
= 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
* Perform an Automatic Latch of Group 1 Control Rods
* Perform an Automatic Latch of Group 1 Control Rods
* Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
* Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 CR0-225 -e Page 1 of 11 Align letdown with 1 HP-14 failed in 11Bleed11 CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Align letdown with 1 HP-14 failed in 'Bleed" Alternate Path: No Facility JPM #: CR0-225 KIA Rating(s):
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 CR0-225 -e Page 1 of 11 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Align letdown with 1 HP-14 failed in 'Bleed" Alternate Path: No Facility JPM #: CR0-225 KIA Rating(s):
System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:
System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:
CR0-225 -e Page 2 of 11 Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location:
CR0-225 -e Page 2 of 11 Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location:
Preferred Evaluation Method: Simulator  
Preferred Evaluation Method: Simulator  
-=-X.:..-_
-=-X.:..-_
In-Plant
In-Plant __ _ Perform X Simulate  
__ _ Perform X Simulate  


==References:==
==References:==


AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control.
AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control. Validation Time: 14 min. Time Critical:
Validation Time: 14 min. Time Critical:
No ====================================================================================
No ====================================================================================
Candidate:
Candidate:
Line 387: Line 344:
Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207 2. IMPORT CR0-225 Simulator files 3. WHEN directed by Lead Examiner, Go To RUN CR0-225 -e Page 3 of 11 Tools/Equipment/Procedures Needed
Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207 2. IMPORT CR0-225 Simulator files 3. WHEN directed by Lead Examiner, Go To RUN CR0-225 -e Page 3 of 11 Tools/Equipment/Procedures Needed
* EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
* EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
* AP/1/A/1700/002 (Excessive RCS Leakage)
* AP/1/A/1700/002 (Excessive RCS Leakage) READ TO OPERATOR DIRECTIONS TO STUDENT CR0-225 -e Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTIONS TO STUDENT CR0-225 -e Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
Line 394: Line 350:
* AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
* AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
* Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
* Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
START TIME: __ _ I STEP 1: Step 4.155 Verify 1 A LD Filter in service.
START TIME: __ _ I STEP 1: Step 4.155 Verify 1 A LD Filter in service. STANDARD:
STANDARD:
Student observes 1 B Letdown (LO) Filter is in service and the 1 A LD Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO. COMMENTS:
Student observes 1 B Letdown (LO) Filter is in service and the 1 A LD Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO. COMMENTS:
STEP 2: Step 4.155 RNO 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure.  
STEP 2: Step 4.155 RNO 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/ A) 2. Open 1HP-17 STANDARD:
(N/ A) 2. Open 1HP-17 STANDARD:
Student recognizes that 1 A LD Filter is Available.  
Student recognizes that 1 A LD Filter is Available.  
*Student opens 1 H P-17. COMMENTS:
*Student opens 1 H P-17. COMMENTS:
Line 404: Line 358:
Student closes 1 HP-6 COMMENTS:
Student closes 1 HP-6 COMMENTS:
CR0-225 -e Page 5 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
CR0-225 -e Page 5 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285') STEP 4: Step 4.157 Adjust 1 HP-7, as needed, to control:  
I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285') STEP 4: Step 4.157 Adjust 1 HP-7, as needed, to control: *BLEED flow out of failed 1 HP-14
*BLEED flow out of failed 1 HP-14
* Pzr level STANDARD:
* Pzr level STANDARD:
Student adjusts 1 HP-7 as necessary to control PZR level. COMMENTS:
Student adjusts 1 HP-7 as necessary to control PZR level. COMMENTS:
Line 454: Line 407:
Task: Start the fourth RCP Alternate Path: Yes Facility JPM #: CR0-038a KIA Rating(s):
Task: Start the fourth RCP Alternate Path: Yes Facility JPM #: CR0-038a KIA Rating(s):
System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:
System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a  
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a -f Page 2 of 11 182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location:
-f Page 2 of 11 182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location:
Simulator  
Simulator  
--=-X-'--
--=-X-'--In-Plant __ _  
In-Plant
__ _  


==References:==
==References:==


OP/1/N1102/001 (Controlling Procedure for Unit Startup)
OP/1/N1102/001 (Controlling Procedure for Unit Startup) OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP) AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP) AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
ARG 1 SA-2 I E-2 (RC Pump Vibrations Emergency High) Validation Time: 18 minutes Preferred Evaluation Method: Perform _X_ Simulate Time Critical:
ARG 1 SA-2 I E-2 (RC Pump Vibrations Emergency High) Validation Time: 18 minutes Preferred Evaluation Method: Perform _X_ Simulate Time Critical:
No =====================================================================================
No =====================================================================================
Line 473: Line 422:
___ _ NAME SIGNATURE DATE =====================================================================================
___ _ NAME SIGNATURE DATE =====================================================================================
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS  
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS  
: 1. Recall Snap 21 O 2. Import files for CR0-408a  
: 1. Recall Snap 21 O 2. Import files for CR0-408a 3. Ensure all breaker flags are set to current plant conditions  
: 3. Ensure all breaker flags are set to current plant conditions  
: 4. When directed by lead examiner, Go to Run. CR0-408a -f Page 3 of 11 Tools/Equipment/Procedures Needed: OP/1/A/1102/001 (Controlling Procedure for Unit Startup) OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) ARG 1 SA-2 I D-2 (RC Pump Vibration High) ARG 1 SA-2 I E-2 (RC Pump Vibration Emergency High) READ TO OPERATOR DIRECTION TO TRAINEE CR0-408a -f Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
: 4. When directed by lead examiner, Go to Run. CR0-408a  
-f Page 3 of 11 Tools/Equipment/Procedures Needed: OP/1/A/1102/001 (Controlling Procedure for Unit Startup)
OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) ARG 1 SA-2 I D-2 (RC Pump Vibration High) ARG 1 SA-2 I E-2 (RC Pump Vibration Emergency High) READ TO OPERATOR DIRECTION TO TRAINEE CR0-408a  
-f Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure  
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=
= 1660 psig slowly increasing RCS Temperature=
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.
START TIME: __ _ I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page. STANDARD:
START TIME: __ _ I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page. STANDARD:
Line 495: Line 439:
I CR0-408a -f Page 5 of 11 SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
I CR0-408a -f Page 5 of 11 SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
STEP 4: Step 2.1.6 WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1 B2 RCP. STANDARD:
STEP 4: Step 2.1.6 WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1 B2 RCP. STANDARD:
Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1 B2 RCP as follows:  
Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1 B2 RCP as follows: * *Rotate 1 B2 RCP switch to ST ART
* *Rotate 1 B2 RCP switch to ST ART
* Verify red lights on and green light off
* Verify red lights on and green light off
* Verify starting current
* Verify starting current
Line 506: Line 449:
Once 1 B2 RCP is at rated speed,
Once 1 B2 RCP is at rated speed,
* Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1 SA-9 I D-2 (RC Pump Vibration High) and 1 SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm sec after starting 182 RCP. COMMENTS:
* Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1 SA-9 I D-2 (RC Pump Vibration High) and 1 SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm sec after starting 182 RCP. COMMENTS:
CR0-408a  
CR0-408a -f Page 6 of 11 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -
-f Page 6 of 11 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -
STEP 6: 1 SA-9 I D-2 (RC Pump Vibration High) 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.1 Use one of the following means to verify RCP vibration conditions:
STEP 6: 1 SA-9 I D-2 (RC Pump Vibration High) 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.1 Use one of the following means to verify RCP vibration conditions:
* Verify vibration readings on RCP OAC Display Group RCP .
* Verify vibration readings on RCP OAC Display Group RCP .
Line 514: Line 456:
Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. EXAMINER NOTE: The Candidate may refer to either 1 SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration).
Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. EXAMINER NOTE: The Candidate may refer to either 1 SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration).
ARG guidance is similar in either case. COMMENTS:
ARG guidance is similar in either case. COMMENTS:
STEP 7: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure),
STEP 7: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies:
swap Vibration Monitor power supplies:
STANDARD:
STANDARD:
Candidate determines that 1 B1 RCP vibrations are not increasing and Step 3.2 does not apply. Candidate continues to Step 3.3. EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm.  
Candidate determines that 1 B1 RCP vibrations are not increasing and Step 3.2 does not apply. Candidate continues to Step 3.3. EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm.  
Line 523: Line 464:
STANDARD:
STANDARD:
Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP. EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16. COMMENTS:
Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP. EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16. COMMENTS:
STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria),
STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria), THEN perform Steps 4.2 -4.11 . STANDARD:
THEN perform Steps 4.2 -4.11 . STANDARD:
Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.
Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.
COMMENTS:
COMMENTS:
Line 533: Line 473:
Candidate stops the 182 RCP. EXAMINER CUE: Another operator will continue with this procedure.
Candidate stops the 182 RCP. EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS:
COMMENTS:
END TASK STOP TIME: ____ _ CR0-408a -f Page 9 of 11 CRITICAL STEP SAT UN SAT CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP CR0-408a -f Page 10 of 11 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure  
END TASK STOP TIME: ____ _ CR0-408a -f Page 9 of 11 CRITICAL STEP SAT UN SAT CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP CR0-408a -f Page 10 of 11 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=
= 1660 psig slowly increasing RCS Temperature=
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.
CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CR0-508 -g Page 1 of 9 Task: Pump the Quench Tank Alternate Path: No Facility JPM #: CR0-508 KIA Rating(s):
CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CR0-508 -g Page 1 of 9 Task: Pump the Quench Tank Alternate Path: No Facility JPM #: CR0-508 KIA Rating(s):
Line 540: Line 479:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 -g Page 2 of 9 Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches. Preferred Evaluation Location:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 -g Page 2 of 9 Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches. Preferred Evaluation Location:
Preferred Evaluation Method: Simulator
Preferred Evaluation Method: Simulator
_x_ In-Plant
_x_ In-Plant __ _ Perform X Simulate  
__ _ Perform X Simulate  


==References:==
==References:==
Line 561: Line 499:
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
* Unit 1 is Shutdown
* Unit 1 is Shutdown
* Unit 1 Quench Tank level is::::::
* Unit 1 Quench Tank level is:::::: 86"
86"
* Quench Tank is aligned to 1 A BHUT
* Quench Tank is aligned to 1 A BHUT
* Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at::::::
* Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75" START TIME: __ _ STEP 1: Step 2.1 Ensure open: _ 1 CS-5 (COMPONENT DRN PUMP SUCTION) _ 1 CS-6 (COMPONENT DRN PUMP SUCTION) STANDARD:
75" START TIME: __ _ STEP 1: Step 2.1 Ensure open: _ 1 CS-5 (COMPONENT DRN PUMP SUCTION) _ 1 CS-6 (COMPONENT DRN PUMP SUCTION)
STANDARD:
Candidate ensures 1 CS-5 and 1 CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF. Candidate continues to Step 2.2. COMMENTS:
Candidate ensures 1 CS-5 and 1 CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF. Candidate continues to Step 2.2. COMMENTS:
STEP 2: Step 2.2 IF QT level will be maintained in normal operating band: 2.2.1 IF desired, start COMPONENT DRAIN PUMP. 2.2.2 IF desired, start QUENCH TANK DRAIN PUMP. STANDARD:
STEP 2: Step 2.2 IF QT level will be maintained in normal operating band: 2.2.1 IF desired, start COMPONENT DRAIN PUMP. 2.2.2 IF desired, start QUENCH TANK DRAIN PUMP. STANDARD:
Line 573: Line 508:
COMMENTS:
COMMENTS:
STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:
STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:
_2.3.1 Ensure RCS pressure  
_2.3.1 Ensure RCS pressure < 45 psig. STANDARD:
< 45 psig. STANDARD:
Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig. Candidate continues to Step 2.3.2. COMMENTS:
Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig. Candidate continues to Step 2.3.2. COMMENTS:
I CR0-508 -g Page 5 of 9 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
I CR0-508 -g Page 5 of 9 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Line 583: Line 517:
*Candidate places the QUENCH TANK DRAIN PUMP switch in the BYPASS position.
*Candidate places the QUENCH TANK DRAIN PUMP switch in the BYPASS position.
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The candidate's instructions were to use both. EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank. COMMENTS:
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The candidate's instructions were to use both. EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank. COMMENTS:
STEP 6: Step 2.3.4 At desired level (==75'),
STEP 6: Step 2.3.4 At desired level (==75'), perform the following:
perform the following:
* Ensure stopped COMPONENT DRAIN PUMP
* Ensure stopped COMPONENT DRAIN PUMP
* Ensure stopped QUENCH TANK DRAIN PUMP STANDARD:
* Ensure stopped QUENCH TANK DRAIN PUMP STANDARD:
Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP. COMMENTS:
Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP. COMMENTS:
CR0-508 -g Paqe 6 of 9 CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CR0-508 -g age 0 p 7 f 9 STEP 7: Step 2.4. CRITICAL STEP Perform the following:
CR0-508 -g Paqe 6 of 9 CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CR0-508 -g age 0 p 7 f 9 STEP 7: Step 2.4. CRITICAL STEP Perform the following:
_Close 1 CS-5 (COMPONENT DRN PUMP SUCTION)
_Close 1 CS-5 (COMPONENT DRN PUMP SUCTION) _Close 1 CS-6 (COMPONENT DRN PUMP SUCTION) SAT STANDARD:
_Close 1 CS-6 (COMPONENT DRN PUMP SUCTION)
SAT STANDARD:
Candidate closes 1 CS-5 and 1 CS-6 by placing each control switch in the -closed position.
Candidate closes 1 CS-5 and 1 CS-6 by placing each control switch in the -closed position.
The green closed light illuminates and the red open light extinguishes.
The green closed light illuminates and the red open light extinguishes.
Line 608: Line 539:
CCW Intake Canal is aligned for recirc Preferred Evaluation Location:
CCW Intake Canal is aligned for recirc Preferred Evaluation Location:
Simulator
Simulator
_x....__
_x....__ In-Plant __ _  
In-Plant
__ _  


==References:==
==References:==


AP/1/A/1700/13 (CCW Dam Failure)
AP/1/A/1700/13 (CCW Dam Failure) Validation Time: 15 min. CR0-801a -h Page 2 of 18 Preferred Evaluation Method: Perform X Simulate Time Critical:
Validation Time: 15 min. CR0-801a -h Page 2 of 18 Preferred Evaluation Method: Perform X Simulate Time Critical:
No ====================================================================================
No ====================================================================================
Candidate:
Candidate:
Line 623: Line 551:
___ _ NAME SIGNATURE DATE ====================================================================================
___ _ NAME SIGNATURE DATE ====================================================================================
Comments SIMULATOR OPERATOR INSTRUCTIONS: 1 . Recall snap 214 2. Import simulator files for CR0-801 a CR0-801a -h Page 3 of 18 3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.  
Comments SIMULATOR OPERATOR INSTRUCTIONS: 1 . Recall snap 214 2. Import simulator files for CR0-801 a CR0-801a -h Page 3 of 18 3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.  
: 4. Go to RUN as directed by examiner  
: 4. Go to RUN as directed by examiner 5. When asked to dispatch an operator to close the breaker for 1 CCW-12 (at step 17) Fire Timer #1 and inform student that using time compression the breaker is closed.
: 5. When asked to dispatch an operator to close the breaker for 1 CCW-12 (at step 17) Fire Timer #1 and inform student that using time compression the breaker is closed.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
* AP/1/A/1700/013 (Dam Failure)
* AP/1/A/1700/013 (Dam Failure) READ TO OPERATOR DIRECTIONS TO STUDENT: CR0-801a -h Page 4 of 18 I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTIONS TO STUDENT:
CR0-801a -h Page 4 of 18 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Line 643: Line 568:
STEP 3: Step 4.6 GO TO step 4.49 STANDARD:
STEP 3: Step 4.6 GO TO step 4.49 STANDARD:
Student goes to step 4.49 COMMENTS:
Student goes to step 4.49 COMMENTS:
CR0-801a  
CR0-801a -h Page 5 of 18 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
-h Page 5 of 18 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STEP 4: Step 4.49 *Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored STANDARD:  
STEP 4: Step 4.49 *Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored STANDARD:  
*The control switches for RCPs 1A1, 1 A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.
*The control switches for RCPs 1A1, 1 A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.
Line 651: Line 575:
1 A, 1 B, 1 C, and 1 D CCW Pump switches are located by the student on 1AB3. Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.
1 A, 1 B, 1 C, and 1 D CCW Pump switches are located by the student on 1AB3. Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.
COMMENTS:
COMMENTS:
STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES).
STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES). STANDARD:
STANDARD:
Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.
Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.
COMMENTS:
COMMENTS:
CR0-801a  
CR0-801a -h Page 6 of 18 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -SAT -UNSAT -
-h Page 6 of 18 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -SAT -UNSAT -
l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13): 1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1 A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1 C1 Outlet) (01 D0281) 1 CCW-25 (Condenser 1 C2 Outlet) (01 D0283) STANDARD:
l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13): 1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1 A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1 C1 Outlet) (01 D0281) 1 CCW-25 (Condenser 1 C2 Outlet) (01 D0283) STANDARD:
The student monitors the Operator Aid Computer to verify the following:
The student monitors the Operator Aid Computer to verify the following:
Line 677: Line 599:
STANDARD:
STANDARD:
Operator(s) are dispatched to perform Enclosure 5.2. Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2 COMMENTS:
Operator(s) are dispatched to perform Enclosure 5.2. Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2 COMMENTS:
CR0-801a  
CR0-801a -h Page 8 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -
-h Page 8 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -
STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.
STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.
STANDARD:
STANDARD:
Student continues to step 4.58. Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.
Student continues to step 4.58. Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.
COMMENTS:
COMMENTS:
STEP 13: Step 4.58 Determine which CCW Pump will be started.
STEP 13: Step 4.58 Determine which CCW Pump will be started. STANDARD:
STANDARD:
The student determines from the turnover that the "1C" CCWP will be started COMMENTS:
The student determines from the turnover that the "1C" CCWP will be started COMMENTS:
STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.
STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.
Line 691: Line 611:
COMMENTS:
COMMENTS:
CR0-801a -h Page 9 of 18 SAT --UNSAT SAT UN SAT -SAT -UN SAT -
CR0-801a -h Page 9 of 18 SAT --UNSAT SAT UN SAT -SAT -UN SAT -
STEP 15: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started.
STEP 15: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:
STANDARD:
Student determines from initiating cue that the 1 C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
Student determines from initiating cue that the 1 C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:
STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:
Line 710: Line 629:
STEP 20: Step 4.65 RNO 1. Stop th.e operating CCW pump 2. GO TO Step 4.58 to attempt to start a different CCW pump STANDARD:
STEP 20: Step 4.65 RNO 1. Stop th.e operating CCW pump 2. GO TO Step 4.58 to attempt to start a different CCW pump STANDARD:
The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1 D CCW pump. COMMENTS:
The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1 D CCW pump. COMMENTS:
CR0-801a  
CR0-801a -h Page 11 of 18 SAT -_UNSAT SAT -UNSAT -SAT -UN SAT -
-h Page 11 of 18 SAT -_UNSAT SAT -UNSAT -SAT -UN SAT -
STEP 21: Step 4.58 Determine which CCW Pump will be started. STANDARD:
STEP 21: Step 4.58 Determine which CCW Pump will be started.
STANDARD:
The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:
The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:
STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.
STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.
Line 719: Line 636:
Student places all Unit 1 CCW Pump switches in the tripped position.
Student places all Unit 1 CCW Pump switches in the tripped position.
COMMENTS:
COMMENTS:
STEP 23: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started.
STEP 23: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:
STANDARD:
Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
CR0-801a-h Page 12 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UN SAT -
CR0-801a-h Page 12 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UN SAT -
Line 761: Line 677:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER A0-710 -i Page 1 of 12 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Place the 1 A Reactor Building Hydrogen Analyzer In Service Alternate Path: No Facility JPM #: A0-010 KIA Rating(s):
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER A0-710 -i Page 1 of 12 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Place the 1 A Reactor Building Hydrogen Analyzer In Service Alternate Path: No Facility JPM #: A0-010 KIA Rating(s):
System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:
System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:
A0-710 -i Page 2 of 12 Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes.
A0-710 -i Page 2 of 12 Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes. Preferred Evaluation Location:
Preferred Evaluation Location:
Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_  
Preferred Evaluation Method: Simulator In-Plant
_x_ Perform Simulate
_x_  


==References:==
==References:==
Line 775: Line 688:
____________
____________
_ NAME SIGNATURE DATE =====================================================================================
_ NAME SIGNATURE DATE =====================================================================================
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None A0-710 -i Page 3 of 12 Tools/Equipment/Procedures Needed A0-710 -i Page 4 of 12 Enclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure.  
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None A0-710 -i Page 3 of 12 Tools/Equipment/Procedures Needed A0-710 -i Page 4 of 12 Enclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)
(Not Critical)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
Line 805: Line 717:
Unit 1 Control Room personnel are notified to open 1 PR-81, 1 PR-84, 1 PR-87, and 1 PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.
Unit 1 Control Room personnel are notified to open 1 PR-81, 1 PR-84, 1 PR-87, and 1 PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.
Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. COMMENTS:
Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. COMMENTS:
CRITICAL STEP SAT UNSAT NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes.
CRITICAL STEP SAT UNSAT NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 4: Step 4 At 1 A H2 ANALYZER (RP), perform the following:
STEP 4: Step 4 At 1 A H2 ANALYZER (RP), perform the following:
* Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
* Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
* Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.
* Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.
Line 816: Line 727:
* REMOTE SELECTOR Pushbutton is depressed.
* REMOTE SELECTOR Pushbutton is depressed.
Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
CRITICAL STEP _SAT _UNSAT CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes.
CRITICAL STEP _SAT _UNSAT CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 5: Step 5 At 1 B H2 ANALYZER (RP), perform the following:
STEP 5: Step 5 At 1 B H2 ANALYZER (RP), perform the following:
* Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
* Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
* Position OFF I STANDBY I ANALYZE switch to ANALYZE . Depress REMOTE SELECTOR pushbutton to ensure control is -SAT
* Position OFF I STANDBY I ANALYZE switch to ANALYZE . Depress REMOTE SELECTOR pushbutton to ensure control is -SAT
Line 826: Line 736:
* Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
* Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
* REMOTE SELECTOR Pushbutton is depressed  
* REMOTE SELECTOR Pushbutton is depressed . Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
. Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates<
STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates<
2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train. _ 1A RB Hydrogen Analyzer Train SAT -STANDARD:
2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train. _ 1A RB Hydrogen Analyzer Train SAT -STANDARD:
ALARM RESET Pushbutton is depressed for both trains. Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on -UNSAT both trains. Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.
ALARM RESET Pushbutton is depressed for both trains. Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on -UNSAT both trains. Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.
COMMENTS:
COMMENTS:
STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1 B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1 A Hydrogen Analyzer Train is in service.
STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1 B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1 A Hydrogen Analyzer Train is in service. SAT STANDARD:
SAT STANDARD:
Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service. Cue: Control room acknowledges Hydrogen Analyzers is in service. -UN SAT COMMENTS:
Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service.
Cue: Control room acknowledges Hydrogen Analyzers is in service.  
-UN SAT COMMENTS:
STEP 6: Step 8 EXIT this enclosure.
STEP 6: Step 8 EXIT this enclosure.
STANDARD:
STANDARD:
Line 849: Line 755:
System: BW I A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:
System: BW I A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:
Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location:
Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location:
Preferred Evaluation Method: Simulator In-Plant
Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_  
_x_ Perform Simulate
_x_  


==References:==
==References:==
Line 890: Line 794:
* 3XS2-F3D (3LP-22 Bkr) (38 LPI BWST Suction)
* 3XS2-F3D (3LP-22 Bkr) (38 LPI BWST Suction)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction)
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction) STANDARD:
STANDARD:
Candidate locates the following breakers and positions the handles to the OPEN position:
Candidate locates the following breakers and positions the handles to the OPEN position:
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS2-F3D (3LP-22 8kr) (38 LPI 8WST Suction)
* 3XS2-F3D (3LP-22 8kr) (38 LPI 8WST Suction)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction)
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction) Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM. COMMENTS:
Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM. COMMENTS:
CR0-805 -j Page 7 of 11 CRITICAL STEP SAT --UNSAT CRITICAL STEP SAT -UNSAT -
CR0-805 -j Page 7 of 11 CRITICAL STEP SAT --UNSAT CRITICAL STEP SAT -UNSAT -
STEP 7: Step 16 Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House) STANDARD:
STEP 7: Step 16 Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House) STANDARD:
Line 918: Line 820:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location:
Simulator
Simulator
__ In-Plant
__ In-Plant _"'""'X'--
_"'""'X'--


==References:==
==References:==


Rule 3 (Loss of Main or Emergency FDW) EOP Enclosure 5.26 (Manual Start of TDEFDWP)
Rule 3 (Loss of Main or Emergency FDW) EOP Enclosure 5.26 (Manual Start of TDEFDWP) Validation Time: 8 min. A0-427 -k Page 2 of 10 Preferred Evaluation Method: Perform Simulate _x_ Time Critical:
Validation Time: 8 min. A0-427 -k Page 2 of 10 Preferred Evaluation Method: Perform Simulate
_x_ Time Critical:
No ====================================================================================
No ====================================================================================
Candidate:
Candidate:
Line 932: Line 831:
_
_
___ _ NAME SIGNATURE DATE ====================================================================================
___ _ NAME SIGNATURE DATE ====================================================================================
Comments SIMULATOR OPERATOR INSTRUCTIONS NONE A0-427 -k Page 3 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)
Comments SIMULATOR OPERATOR INSTRUCTIONS NONE A0-427 -k Page 3 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP) READ TO OPERATOR DIRECTIONS TO CANDIDATE A0-427 -k Page 4 of 10 I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTIONS TO CANDIDATE A0-427 -k Page 4 of 10 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM, including any required communications.
All control room steps shall be performed for this JPM, including any required communications.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
Unit 2 TD EFDW Pump is tripped.
Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.
Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.
START TIME: __ _ STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located)
START TIME: __ _ STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located) Verify TDEFDWP trip device tripped. STANDARD:
Verify TDEFDWP trip device tripped.
Candidate determines from the Initial Conditions that Unit 2 TD EFDW pump is tripped. Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".
STANDARD:
Candidate determines from the Initial Conditions that Unit 2 TD EFDW pump is tripped.
Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".
COMMENTS:
COMMENTS:
STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK. STANDARD:
STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK. STANDARD:
Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK. Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. COMMENTS:
Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK. Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. COMMENTS:
STEP 3: Step 3 Push reset lever toward turbine shaft until engaged:
STEP 3: Step 3 Push reset lever toward turbine shaft until engaged: STANDARD:
STANDARD:
Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. Cue: Indicate to candidate that the reset lever is engaged. COMMENTS:
Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged.
Cue: Indicate to candidate that the reset lever is engaged.
COMMENTS:
STEP 4: Step 4 Rotate spindle fully clockwise.
STEP 4: Step 4 Rotate spindle fully clockwise.
STANDARD:
STANDARD:
Line 971: Line 862:
COMMENTS:
COMMENTS:
STEP 8: Step 8 Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD:
STEP 8: Step 8 Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD:
Candidate locates 2MS-93 and determines the valve is Open. Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible.
Candidate locates 2MS-93 and determines the valve is Open. Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible. COMMENTS:
COMMENTS:
A0-427 -k Page 6 of 10 CRITICAL STEP SAT -UNSAT --SAT UNSAT -SAT -UN SAT -SAT -UNSAT -
A0-427 -k Page 6 of 10 CRITICAL STEP SAT -UNSAT --SAT UNSAT -SAT -UN SAT -SAT -UNSAT -
STEP 9: Step 8 RNO GO TO Step 11 STANDARD:
STEP 9: Step 8 RNO GO TO Step 11 STANDARD:
Candidate goes to step 11. COMMENTS:
Candidate goes to step 11. COMMENTS:
STEP 10: Step 11 Verify TDEFDWP running STANDARD:
STEP 10: Step 11 Verify TDEFDWP running STANDARD:
Candidate observes indications such as turbine shaft rotating, discharge  
Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.
: pressure, and hydraulic oil pressure to determine that it is operating.
Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.
Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.
COMMENTS:
COMMENTS:
Line 985: Line 874:
COMMENTS:
COMMENTS:
END TASK TIME STOP: __ _ ------A0-427 -k Page 7 of 10 SAT UNSAT SAT UNSAT SAT UN SAT STEP# 3 4 5 CRITICAL STEP EXPLANATIONS Explanation This step is required to reset 2MS-94 This step is required to reset 2MS-94 This step is required to reset 2MS-94 A0-427 -k Page 9 of 10 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
END TASK TIME STOP: __ _ ------A0-427 -k Page 7 of 10 SAT UNSAT SAT UNSAT SAT UN SAT STEP# 3 4 5 CRITICAL STEP EXPLANATIONS Explanation This step is required to reset 2MS-94 This step is required to reset 2MS-94 This step is required to reset 2MS-94 A0-427 -k Page 9 of 10 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
Unit 2 TD EFDW Pump is tripped.
Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.
Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.}}
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.}}

Revision as of 06:10, 9 July 2018

Oconee Exam 2014-301 Draft Sim IN-Plant JPMs
ML15092A759
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/02/2015
From:
Division of Reactor Safety II
To:
References
Download: ML15092A759 (125)


Text

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-310 CR0-310 -a Page 1 of 8 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Required Actions For A Failed LPI Train Alternate Path: Ves Facility JPM #: KIA Ratinq(s):

System: EPE 011 KIA: EA1.04 Rating: 4.4/4.4 Task Standard:

CR0-310 -a Page 2 of 8 1 A and 1 B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1 LP-17 is closed after 1 A LPI pump fails. Preferred Evaluation Location:

Preferred Evaluation Method: Simulator

_x_ In-Plant __ Perform X Simulate

References:

EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes Time Critical:

NO ====================================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: __ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_ _______________

! __ _ NAME SIGNATURE DATE ====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS: 1 . RECALL Snap 208 2. IMPORT files for CR0-310 3. WHEN directed by Lead Examiner, Go to RUN CR0-310 -a Page 3 of 8 Tools/Equipment/Procedures Needed: EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE: CR0-310 -a Page 4 of 8 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52 with outstanding IAATs.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

ST ART TIME: __ _ I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier).

STANDARD:

Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is< ::::200 psig Continue to Step 19. COMMENTS:

STEP 2: Step 19 IAAT RCS Pressure is < LPI pump shutoff head, THEN perform Steps 20 -21 STANDARD:

Continue to Step 20. COMMENTS:

STEP 3: Step 20 Perform the following:

  • Open 1 LP-17 * *Start 1 A LPI Pump STANDARD:

Determine that 1 LP-17 is open by observing the Red open light is lit located on 1 UB2. Places 1A LPI Pump switch to START and observes Red light on and white light off. Continue to Step 21. COMMENTS:

I ----SAT CR0-310 -a Page 5 of 8 UNSAT SAT UN SAT *CRITICAL TASK SAT -UNSAT -

CR0-310 -a Paae 6 of 8 *CRITICAL TASK STEP 4: Step 21 Perform the following:

Determine that 1 LP-18 is open by observing the red open light is lit -located on 1 UB2. Places 1 B LPI pump switch to ST ART and observes Red light on and UN SAT white light off. -Go back to Step 52. COMMENTS:

STEP 5: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD:

Checks IAAT steps to determine if any apply Determines that IAAT Step 25 now applies -SAT Continue to Step 25. UNSAT -Evaluator Note: 1 A LP/ Pump fails while operating.

COMMENTS:

STEP 6: Step 25 CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1 B LPI pump is operating, THEN close 1 LP-17. SAT -STANDARD:

Determine the1A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP-17. UN SAT -Cue: Another Operator will continue with this procedure.

COMMENTS:

I END TASK STOP TIME: ____ _

CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Student verifies 1 LP-17 is open and Starts 1 A LPI P 4 Student verifies 1 LP-18 is open and Starts 1 B LPIP 6 Student closes 1 LP-17 when 1 A LPI P fails CR0-310 -a Page 7 of 8 a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 CR0-407 -b Page 1 of 12 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Establish EFDW flow through Startup valves Alternate Path: Yes Facility JPM #: CR0-015 KIA Rating(s):

System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:

CR0-407 -b Page 2 of 12 EFDW flow is established to the affected header through the startup valve. Preferred Evaluation Location:

Simulator

_x_ In-Plant __

References:

EOP Rule 3, (Loss of Main or Emergency FDW) EOP Rule 7, (SG Feed Control) EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow) Validation Time: 10 minutes Preferred Evaluation Method: Perform X Simulate Time Critical:

NO ====================================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: __ _ Performance Rating:. SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE ====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 209 2. IMPORT files for CR0-407 3. WHEN directed by Lead Examiner, go to RUN CR0-407 -b Page 3 of 12 Tools/Equipment/Procedures Needed

  • EOP Encl 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE CR0-407 -b Page 4 of 12 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check START TIME: __ _ STEP 1: Performs a Symptom Check STANDARD:

Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.

COMMENTS:

STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

STANDARD:

Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated. (OP/2/A/6102/018)

Candidate will perform RNO step and GO TO step 3. COMMENTS:

STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency), AND any of the following exist:

  • RCS pressure reaches 2300 psig OR NOT limit
  • Pzr level reaches 375" [340" ace] THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).

STANDARD:

Candidate determines Rule 4 is not required.

Continue to Step 4. COMMENTS:

STEP4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs. STANDARD:

Observes MD EFDWP & TD EFDWP running with switch lights on and normal discharge pressure.

Continue to Step 5. COMMENTS:

CR0-407 -b Page 5 of 12 SAT --UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -

STEP 5: Rule 3: Step 5 Verify any EFDW Pump is operating.

STANDARD:

Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have normal discharge pressure.

Continue to Step 6. COMMENTS:

STEP 6: Rule 3: Step 6 GO TO step 37. STANDARD:

GO TO step 37. COMMENTS:

STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 -42. ALTERNATE PATH STANDARD:

Determines that 1 FDW-315 is NOT controlling properly (1 A SG level is < 30" and decreasing).

Concludes that 1 FDW-315 has failed closed. Continue to Step 38. COMMENTS:

STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL. STANDARD:

Place 1 FDW-315 in MANUAL by depressing the AIM pushbutton on the Moore controller.

Continue to Step 39. COMMENTS:

CR0-407 -b Page 6 of 12 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT SAT -UNSAT -

STEP 9: Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL. STANDARD:

Determine that 1 FDW-315 will NOT control in MANAUL. Perform RNO, GO TO Step 41. Continue to step 41 COMMENTS:

STEP 10: Rule 3: Step 41 Notify CR SRO that Encl 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.

STANDARD:

Removes Encl. 5.27 from EOP and initiates.

EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27. COMMENTS:

STEP 11: Encl 5.27: Step 1 Identify the failure: 1FDW-315 has Failed CLOSED [GO TO Step 2] STANDARD:

Candidate determines the next procedural step from table in Step 1. Continue to Step 2. COMMENTS:

STEP 12: Encl 5.27: Step 2 Verify 1 A MD EFDWP is operating STANDARD:

Candidate verifies 1 A MD EFDWP is operating.

Verify red light on and green light off and normal discharge pressure.

Continue to Step 3. COMMENTS:

CR0-407 -b Page 7 of 12 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -

STEP 13: Encl 5.27: Steps 3 Stop 1 A MD EFDWP STANDARD:

  • Candidate places switch to OFF. Verify red light off and white light illuminated.

Continue to Step 4. COMMENTS:

STEP 14: Encl 5.27: Step 4 Verify 1 B MD EFDWP is operating.

STANDARD:

Candidate verifies 1 B MD EFDWP is operating.

Verify red light on and green light off and normal discharge pressure.

Continue to Step 5. COMMENTS:

STEP 15: Encl 5.27: Step 5 Place 1 TD EFDW Pump in PULL TO LOCK STANDARD:

  • Candidate places the U1 TD EFDW Pump in PULL to LOCK. Candidate verifies red light is out and green light is lit. Continue to Step 6. COMMENTS:

STEP 16: Encl 5.27: Step 6 Place 1 FDW-35 in HAND and set demand to 0% STANDARD:

Candidate places 1 FDW-35 in HAND and uses toggle switch to reduce demand to 0%. Continue to Step 7. COMMENTS:

CR0-407 -b Page 8 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -

STEP 17: Encl 5.27: Step 7 Close 1 FDW-33 STANDARD:

  • Candidate closes SU Control Block Valve (1 FDW-33). Candidate verifies red light is out and green light is lit. Continue to Step 8. COMMENTS:

STEP 18: Encl 5.27: Step 8 Verify 1 A MD EFDWP will be used. STANDARD:

Candidate determines that the 1A MD EFDWP will be used. Continue to Step 9. EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP. COMMENTS:

STEP 19: Encl 5.27: Step 9 Open 1 FDW-37 4 STANDARD:

  • Candidate locates and opens 1 FDW-374. Candidate observes green closed light off and red open light on. Continue to Step 10. COMMENTS:

STEP 20: Encl 5.27: Step 1 O Verify the following:

  • ; FDW-36 closed
  • 1 FDW-38 open STANDARD:

Candidate locates and closes 1 FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication.

Candidate locates and opens 1 FDW-38 and observes green closed light off and red open light lit on 1 VB3 or uses OAC indication.

Continue to Step 11. COMMENTS:

CR0-407 -b Page 9 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -SAT -UNSAT -

STEP 21: Encl 5.27: Step 11 Start 1A MD EFDWP STANDARD:

  • Candidate places 1A MD EFDWP switch to RUN. Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.

Continue to Step 12. COMMENTS:

NOTE: Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge. ' Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge. STEP 22: Encl 5.27: Step 12 Verify either of the following exists:

  • HPI Forced Cooling is maintaining core cooling
  • CBP Feed providing SG feed STANDARD:

Candidate determines that neither condition is met and goes to the RNO. Continue to Step 12 RNO. COMMENTS:

STEP 23: Encl 5.27: Step 12 RNO IF any SG is being fed, THEN perform the following:

  • *Throttle 1 FDW-35 to establish a maxim um of 100 gpm . * *Throttle 1 FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control) Notify CR SRO of SG Feed Status STANDARD:

Candidate throttles 1 FDW-35 to attain -100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW-35as necessary to establish

-25" S/U level (per Rule 7 table 4) Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e. when using the S/U CVs) is 25" S/U level since RCS temperature is >500°F. EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1 FDW-35 must be open and SG level increasing.

EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

END TASK CR0-407 -b Page 10 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -

STOP TIME: ____ _ CRITICAL STEP EXPLANATIONS STEP # Explanation 1 O This step is required to ensure the correct procedure is used. 13 This step is required to ensure the valves will operate. 15 This step is required to ensure the valves will operate. 16 This step is required to align the MD EFDWP to the S/U header. 17 This step is required to align the MD EFDWP to the S/U header. 19 This step is required to align the MD EFDWP to the S/U header. CR0-407 -b Page 11 of 12 21 This step is required to start the 1A MD EFDWP and provide a SG feed source. 23 This step is required to establish flow to the 1 A SG.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-602 LIVE BUS TRANSFER OF MFB POWER FROM CT 1 TO CT 4 CR0-602 -c Page 1 of 14 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path: No Facility JPM #: New KIA Rating(s):

System: 062 KIA: A4.01 Rating: 3.3/3.1 Task Standard:

Perform a live bus transfer from CT 4 to CT 1 by procedure.

Preferred Evaluation Location:

Simulator

_x_ In-Plant __

References:

CR0-602 -c Page 2 of 14 Preferred Evaluation Method: Perform X Simulate OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

Validation Time: 15 minutes Time Critical:

NO ====================================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: __ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_ _ _______________

! __ _ NAME SIGNATURE DATE ====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 212 2. Go to RUN 3. SELECT Chessell to Source Range CR0-602 -c Page 3 of 14 Tools/Equipment/Procedures Needed: CR0-602 -c Page 4 of 14
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

READ TO OPERATOR DIRECTION TO TRAINEE: I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.

ST ART TIME: __ _ I STEP 1: Step 2.4 Energize 4160V Standby Buses: Step 2.4.1 Notify all three Units that the Standby Bus is about to be powered from CT4. STANDARD:

Use the control room phone and notify all three ONS Units that the Standby Bus is about to be powered from CT 4. COMMENTS:

STEP 2: Step 2.4.2 Place CT 4 BUS 1 AUTO/MAN switch in "MAN". STANDARD:

Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "MAN". COMMENTS:

STEP 3: Step 2.4.3 Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON". STANDARD:

Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:

--SAT CR0-602 -c Page 5 of 14 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT STEP 4: Step 2.4.4 Close SK 1 CT 4 STBY BUS 1 FEEDER breaker. STANDARD:

Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.

COMMENTS:

STEP 5: Step 2.4.5 Verify:::::

4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS." STANDARD:

Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOL TS" on gauge located on 2AB3. COMMENTS:

STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF". STANDARD:

Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF". COMMENTS:

CR0-602 -c p 6 f 14 aqe 0 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -

STEP 7: Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in "AUTO". STANDARD:

Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "AUTO". COMMENTS:

STEP 8: Step 2.4.8 Place CT4 BUS 2 AUTO/MAN switch in "MAN". STANDARD:

Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "MAN". COMMENTS:

STEP 9: Step 2.4.9 Place STBY BUS 2 SYNCHRONIZING SWITCH to "ON". STANDARD:

Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:

--SAT CR0-602 -c p 7 f14 aqe 0 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -

CR0-602 -c Paqe 8 o f 4 1 STEP 10: Step 2.4.10 CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER. STANDARD:

Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.

SAT -UNSAT -COMMENTS:

STEP 11: Step 2.4.11 Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS." STANDARD:

Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOL TS" using -SAT gauge located on 2AB3 COMMENTS:

UNSAT -STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to "OFF". SAT STANDARD:

Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on -2AB3, to "OFF". COMMENTS:

-UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO". SAT -STANDARD:

Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO". UNSAT -COMMENTS:

I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened. STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN". STANDARD:

Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN". COMMENTS:

STEP 15: Step 2.5.1B Place STANDBY 2 AUTO/MAN switch in "MAN". STANDARD:

Candidate rotates ST AND BY 2 AUTO/MAN switch, located on 1 AB1, to "MAN". COMMENTS:

STEP 16: Step 2.5.1C Place MFB 1 AUTO/MAN switch in "MAN". STANDARD:

Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in "MAN". COMMENTS:

CR0-602 -c p 9 f 14 age 0 CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -

CR0-602 -c age 0 p 10 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN". STANDARD:

Candidate determines that the MFB 2 AUTO/MAN switch, located on -SAT 1 AB1, is in "MAN". UN SAT -COMMENTS:

STEP 18: Step 2.5.1E CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR). STANDARD:

Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white -SAT open light illuminates.

UNSAT -COMMENTS:

STEP 19: Step 2.5.1 F CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ). STANDARD:

Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.

UN SAT -COMMENTS:

CR0-602 -c p 1 f 14 aqe 1 0 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR). STANDARD:

Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white -SAT open light illuminates.

UNSAT -COMMENTS:

STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2). STANDARD:

Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.

UNSAT -COMMENTS:

STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO". STANDARD:

Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1 AB1, to -SAT "AUTO". UN SAT -COMMENTS:

STEP 23: Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in "AUTO". STANDARD:

Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to "AUTO". COMMENTS:

Examiner Cue: Another operator will continue with this procedure.

END TASK STOP TIME: ____ _ CR0-602 -c Page 12 of 14 SAT UNSAT CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Step is required to energize the STBY Bus. 3 Step is required to energize the STBY Bus. 4 Step is required to energize the STBY Bus. 8 Step is required to energize the STBY Bus. 9 Step is required to energize the STBY Bus. 10 Step is required to energize the STBY Bus. 14 Step is required to energize the MFB from the STBY Bus. 15 Step is required to energize the MFB from the STBY Bus. 18 Step is required to energize the MFB from the STBY Bus. 19 Step is required to energize the MFB from the STBY Bus. 20 Step is required to energize the MFB from the STBY Bus. 21 Step is required to energize the MFB from the STBY Bus. CR0-602 -c Page 13 of 14 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4. c REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 CR0-111 -d Page 1 of 10 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER

( Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Withdrawal of Safety Rod Group 1 to 50% Alternate Path: Yes Facility JPM #: CR0-111 KIA Rating(s):

System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:

CR0-111 -d Page 2 of 10 Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18. Preferred Evaluation Location:

Preferred Evaluation Method: Simulator

_X:..:__ In-Plant __ _ Perform X Simulate

References:

OP/1/A/1105/019 (Rev 023) (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 min. Time Critical:

No ====================================================================================

Candidate:

Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE ====================================================================================

Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 206 2. IMPORT CR0-111 Simulator files 3. Go To RUN 4. Select SR/WR on NI recorder CR0-111 -d Page 3 of 10 Tools/Equipment/Procedures Needed CR0-111 -d Page 4 of 10 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature

= 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:

  • Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

START TIME: __ _ I STEP 1: Step 3.1 Perform the following: (R.M.)

  • Ensure RUN is ON .
  • Ensure SINGLE SELECT SWITCH to ALL . STANDARD:

Determine control rod speed switch is selected to RUN by observing light indication on the Diamond. Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond. COMMENTS:

STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:

  • Appropriate ranged Nls
  • Startup Rate STANDARD:

As CRDs are withdrawn monitor the above indications.

COMMENTS:

CR0-111 -d Page 5of10 SAT -UNSAT -SAT -UNSAT -

I NOTE: When LATCH AUTO is selected, the following automatically occurs:

  • Group/Rod inserts to latch rods (CRD TRAVEL "In" light ON)
  • Group/Rod withdraws to test for latching (CRD TRAVEL "Out" light ON)
  • Group/Rod inserts (CRD TRAVEL "In" light ON)
  • Group In Limit light on Diamond will momentarily extinguish then illuminate . STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.) 3.3.1 Ensure GROUP SELECT SWITCH to 1. 3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9} 3.3.4 If Manual Latch and Pl Alignment is desired, perform the following: (Per initiating cue, Manual is NOT desired) 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:

A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:

>-Verify LATCH AUTO is OFF. >-Verify Group 1 0% lights are ON. (Pl Panel) >-Verify Group 1 APl/RPI indications agree. (Pl Panel) STANDARD:

  • Rotate GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are "ON" on the Pl panel. *Depress the LATCH AUTO pushbutton.

WHEN Auto Latch is complete:

  • Verify LATCH AUTO is OFF .
  • Verify Group 1 0% lights are ON. (Pl Panel)
  • Verify Group 1 APl/RPI indications agree using the position switch on the Pl Panel. COMMENTS:

CR0-111 -d Page 6 of 10 *CRITICAL STEP SAT -UNSAT -

I STEP 4: Step 3.4 Select FAULT RESET STANDARD:

Depress FAULT RESET pushbutton on the diamond panel. COMMENTS:

STEP 5: Step 3.5 Select Group 1, as follows: (R.M.) Ensure GROUP SELECT SWITCH to 1. Ensure only Group 1 CONTROL ON lights are ON. (Pl panel} Ensure Group 1 at 50%. (R.M.) Place GROUP SELECT SWITCH to OFF. STANDARD:

Ensure GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are ON on the Pl panel. *Begin withdrawing Group 1 Control Rods to 50% Manually Trip the Rx when two or more CROM stator temperatures are<:: 180°F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.

COMMENTS:

CR0-111 -d Page 7 of 10 SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -

I AL TERNA TE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.

STEP 6: Manually Trip the Rx when two or more CROM stator temperatures are ;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) STANDARD:

Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase.

At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. COMMENTS:

END OF TASK TIME STOP: __ _ CR0-111 -d Page 8 of 10 CRITICAL STEP SAT UNSAT CRITICAL STEP EXPLANATIONS . EP # Explanation 3 This step is required to withdraw group 1 control rods. 5 This step is required to withdraw group 1 control rods. CR0-111 -d Page 9 of 10 6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature

= 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:

  • Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 CR0-225 -e Page 1 of 11 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Align letdown with 1 HP-14 failed in 'Bleed" Alternate Path: No Facility JPM #: CR0-225 KIA Rating(s):

System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:

CR0-225 -e Page 2 of 11 Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location:

Preferred Evaluation Method: Simulator

-=-X.:..-_

In-Plant __ _ Perform X Simulate

References:

AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control. Validation Time: 14 min. Time Critical:

No ====================================================================================

Candidate:

Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE ====================================================================================

Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207 2. IMPORT CR0-225 Simulator files 3. WHEN directed by Lead Examiner, Go To RUN CR0-225 -e Page 3 of 11 Tools/Equipment/Procedures Needed

  • EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
  • AP/1/A/1700/002 (Excessive RCS Leakage) READ TO OPERATOR DIRECTIONS TO STUDENT CR0-225 -e Page 4 of 11 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.

START TIME: __ _ I STEP 1: Step 4.155 Verify 1 A LD Filter in service. STANDARD:

Student observes 1 B Letdown (LO) Filter is in service and the 1 A LD Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO. COMMENTS:

STEP 2: Step 4.155 RNO 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/ A) 2. Open 1HP-17 STANDARD:

Student recognizes that 1 A LD Filter is Available.

  • Student opens 1 H P-17. COMMENTS:

STEP 3: Step 4.156 Close 1HP-6 STANDARD:

Student closes 1 HP-6 COMMENTS:

CR0-225 -e Page 5 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -

I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285') STEP 4: Step 4.157 Adjust 1 HP-7, as needed, to control: *BLEED flow out of failed 1 HP-14

  • Pzr level STANDARD:

Student adjusts 1 HP-7 as necessary to control PZR level. COMMENTS:

STEP 5: Step 4.158 Dispatch an operator to open 1 H P-196 STANDARD:

Student dispatches an AO to open 1 HP-196 BOOTH CUE: Open 1 HP-196 with Manual Valves COMMENTS:

CR0-225 -e Page 6 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -

I STEP 6: Step 4.159 Verify CC System in Operation.

STANDARD:

Student observes:

  • At least one CC pump in operation
  • CC return flow is > 575 gpm COMMENTS:

STEP 7: Step 4.160 Position the standby HPI pump switch to OFF. STANDARD:

Student places the standby (1 B) HPIP switch to OFF COMMENTS:

STEP 8: Step 4.161 Initiate monitoring RCP parameters.

STANDARD:

Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.

Booth Cue: Notify the student that 1 HP-196 is open. COMMENTS:

CR0-225 -e Page 7 of 11 SAT -UNSAT -SAT -UNSAT SAT -UNSAT -

I STEP 9: Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW. STANDARD:

Student throttles 1 HP-31 to establish 12-15 gpm. COMMENTS:

STEP 10: Step 4.163 When 1HP-196 is open, THEN close 1CS-26. STANDARD:

Student closes 1 CS-26. COMMENTS:

STEP 11: Step 4.164 Close the following;

Student verifies closed 1 CS-27, 1 CS-32, and 1 CS-37. COMMENTS:

STEP 12: Step 4.165 Open 1HP-6 STANDARD:

Student opens 1 HP-6. COMMENTS:

CR0-225 -e Page 8 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -

I STEP 13: Step 4.166 Throttle 1HP-31 to establish==

32 gpm SEAL INLET HOR FLOW. STANDARD:

Student throttles open 1 HP-31 to establish==

32 gpm SEAL INLET HOR FLOW. COMMENTS:

STEP 14: Step 4.167 Adjust 1HP-7 to establish desired letdown flow. STANDARD:

Student throttles open 1 HP-7 to establish

== 75 gpm letdown flow. COMMENTS:

STEP 15: Step 4.168 Position the standby HPI pump switch to AUTO STANDARD:

Student places the standby (18) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.

COMMENTS:

END TASK TIME STOP: __ _ CR0-225 -e Page 9 of 11 SAT -UNSAT -SAT -UNSAT -CRITICAL TASK SAT -UNSAT -

CRITICAL STEP EXPLANATIONS

_ j EP # Explanation 2 1 HP-17 must be opened to align the alternate letdown flow path. 5 1 HP-196 must be open for the alternate letdown flow path. 10 1 CS-26 is closed to isolate the flow path going to the BHUTs. CR0-225 -e Page 10 of 11 15 The standby H Pl P ( 1 B) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155. e REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a START FOURTH REACTOR COOLANT PUMP CR0-408a-f Page 1 of 11 CANDIDATE:-----------------

EXAMINER:-----------------

Task: Start the fourth RCP Alternate Path: Yes Facility JPM #: CR0-038a KIA Rating(s):

System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a -f Page 2 of 11 182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location:

Simulator

--=-X-'--In-Plant __ _

References:

OP/1/N1102/001 (Controlling Procedure for Unit Startup) OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP) AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

ARG 1 SA-2 I E-2 (RC Pump Vibrations Emergency High) Validation Time: 18 minutes Preferred Evaluation Method: Perform _X_ Simulate Time Critical:

No =====================================================================================

Candidate:

Time Start: NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: __ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE =====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 21 O 2. Import files for CR0-408a 3. Ensure all breaker flags are set to current plant conditions
4. When directed by lead examiner, Go to Run. CR0-408a -f Page 3 of 11 Tools/Equipment/Procedures Needed: OP/1/A/1102/001 (Controlling Procedure for Unit Startup) OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) ARG 1 SA-2 I D-2 (RC Pump Vibration High) ARG 1 SA-2 I E-2 (RC Pump Vibration Emergency High) READ TO OPERATOR DIRECTION TO TRAINEE CR0-408a -f Page 4 of 11 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=

471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.

START TIME: __ _ I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page. STANDARD:

Announces "Starting 182 RCP" using the plant page system. COMMENTS:

STEP 2: Step 2.1.2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6 STANDARD:

Reads IAAT step and determines it does not currently apply COMMENTS:

I NOTE: AC Oil Lift Pump may take> 2 minutes to develop adequate discharge pressure.

STEP 3: Step 2.1.3 IF available, start AC Oil Lift Pump on 182 RCP. STANDARD:

Determines AC Oil Lift Pump is available and: * *Rotates AC Oil Lift Pump switch to start

  • Observes red light on and green light off
  • Monitors discharge pressure status on OAC
  • Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6 COMMENTS:

I CR0-408a -f Page 5 of 11 SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -

STEP 4: Step 2.1.6 WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1 B2 RCP. STANDARD:

Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1 B2 RCP as follows: * *Rotate 1 B2 RCP switch to ST ART

  • Verify red lights on and green light off
  • Verify starting current
  • Verify OAC indications support pump start COMMENTS:

STEP 5: Step 2.1.7 After RCP is at full speed, perform the following:

A. Ensure the following stopped

  • AC Oil Lift Pump
  • DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" STANDARD:

Once 1 B2 RCP is at rated speed,

  • Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1 SA-9 I D-2 (RC Pump Vibration High) and 1 SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm sec after starting 182 RCP. COMMENTS:

CR0-408a -f Page 6 of 11 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -

STEP 6: 1 SA-9 I D-2 (RC Pump Vibration High) 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.1 Use one of the following means to verify RCP vibration conditions:

  • Verify vibration readings on RCP OAC Display Group RCP .
  • IF the OAC is unavailable, verify the alarm by referring to RCP Vibration Monitoring Chart Recorder.

STANDARD:

Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. EXAMINER NOTE: The Candidate may refer to either 1 SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration).

ARG guidance is similar in either case. COMMENTS:

STEP 7: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies:

STANDARD:

Candidate determines that 1 B1 RCP vibrations are not increasing and Step 3.2 does not apply. Candidate continues to Step 3.3. EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm.

(1 SA-9 I E-2) COMMENTS:

CR0-408a -f Page 7 of 11 SAT -UNSAT -SAT -UNSAT -

STEP 8: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.3 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

STANDARD:

Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP. EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16. COMMENTS:

STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria), THEN perform Steps 4.2 -4.11 . STANDARD:

Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.

COMMENTS:

STEP 10: Step 4.2 Verify MODE 1 or 2 STANDARD:

Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. COMMENTS:

CR0-408a -f Page 8 of 11 SAT --UNSAT SAT -UNSAT -SAT -UNSAT -

STEP 11: Step 4.2 RNO Stop the affected RCP. STANDARD:

Candidate stops the 182 RCP. EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME: ____ _ CR0-408a -f Page 9 of 11 CRITICAL STEP SAT UN SAT CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP CR0-408a -f Page 10 of 11 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=

471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.

CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CR0-508 -g Page 1 of 9 Task: Pump the Quench Tank Alternate Path: No Facility JPM #: CR0-508 KIA Rating(s):

System: 007 KIA: A1.01 Rating: 2.9/3.1 Task Standard:

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 -g Page 2 of 9 Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches. Preferred Evaluation Location:

Preferred Evaluation Method: Simulator

_x_ In-Plant __ _ Perform X Simulate

References:

Validation Time: 10 minutes Time Critical:

NO ====================================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_ _______________

__,! ___ _ NAME SIGNATURE DATE ====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 211 2. Place TIO sheet tags on QT Drain Pump and Component Drain Pump. CR0-508 -g Page 3 of 9 3. Update Boron Status board to show last 1 A BHUT boron sample as being > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old. 4. Provide a copy of OP/1/A/1104/017 Encl 4.1 with the following:
  • Limits & Precautions
  • Steps 1.1 through 1.4 signed off. 5. Go to RUN Tools/Equipment/Procedures Needed:
  • OP/1/A/1104/017 Limits & Precautions
  • OP/1/A/1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE CR0-508 -g Page 4 of 9 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS

  • Unit 1 is Shutdown
  • Unit 1 Quench Tank level is:::::: 86"
  • Quench Tank is aligned to 1 A BHUT
  • Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75" START TIME: __ _ STEP 1: Step 2.1 Ensure open: _ 1 CS-5 (COMPONENT DRN PUMP SUCTION) _ 1 CS-6 (COMPONENT DRN PUMP SUCTION) STANDARD:

Candidate ensures 1 CS-5 and 1 CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF. Candidate continues to Step 2.2. COMMENTS:

STEP 2: Step 2.2 IF QT level will be maintained in normal operating band: 2.2.1 IF desired, start COMPONENT DRAIN PUMP. 2.2.2 IF desired, start QUENCH TANK DRAIN PUMP. STANDARD:

Candidate recognizes from the Initial Conditions that this step is N/A and moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is80-100" when RCS pressure>

45 psig per L&P 2.4 of OP/1/A/1104/017.

COMMENTS:

STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:

_2.3.1 Ensure RCS pressure < 45 psig. STANDARD:

Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig. Candidate continues to Step 2.3.2. COMMENTS:

I CR0-508 -g Page 5 of 9 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -

I STEP 4: Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD:

  • Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.

EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the pump at == 80". EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to complete the task. The candidate's instructions were to use both. COMMENTS:

STEP 5: Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD:

  • Candidate places the QUENCH TANK DRAIN PUMP switch in the BYPASS position.

EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The candidate's instructions were to use both. EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank. COMMENTS:

STEP 6: Step 2.3.4 At desired level (==75'), perform the following:

  • Ensure stopped COMPONENT DRAIN PUMP
  • Ensure stopped QUENCH TANK DRAIN PUMP STANDARD:

Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP. COMMENTS:

CR0-508 -g Paqe 6 of 9 CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CR0-508 -g age 0 p 7 f 9 STEP 7: Step 2.4. CRITICAL STEP Perform the following:

_Close 1 CS-5 (COMPONENT DRN PUMP SUCTION) _Close 1 CS-6 (COMPONENT DRN PUMP SUCTION) SAT STANDARD:

Candidate closes 1 CS-5 and 1 CS-6 by placing each control switch in the -closed position.

The green closed light illuminates and the red open light extinguishes.

UNSAT COMMENTS:

-STEP 8: Step 2.5. IF 1A BHUT boron sample> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old AND QT pumped to 1A BHUT, perform the following:

_2.5.1 Verify closed 1 CS-46 (1 A RC BLEED XFER PUMP DISCHARGE).

_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

_2.5.3 Start 1 A BLEED TRANSFER PUMP. BOOTH CUE: When called report as NEO: "Using Time Compression, I am standing by to read 1 A Bleed Transfer Pump discharge pressure at (1 CS-PG-0084)".

SAT -STANDARD:

Candidate verifies 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off. -UN SAT Candidate dispatches NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off. EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.

COMMENTS:

END OF TASK STOP TIME: ____ _

CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Step required to align the flow path from the QT to 1 A SHUT 4 This step is required to begin the level decrease in the Quench Tank. 5 This step is required to begin the level decrease in the Quench Tank. CR0-508 -g Page 8 of 9 6 This step stops the QT Drain Pump and the Component Drain Pump when the QT is ::::: 75 inches 7 This step isolates the flow path from the QT to 1 A SHUT CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is== 86" Quench Tank is aligned to 1A BHUT Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPENENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at== 75" g REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-801a CR0-80ia -h Page 1 of 18 ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path: Yes Facility JPM #: CR0-801 KIA Rating(s):

System: 075 KIA: A2.01 Rating: 3.0* /3.2 Task Standard:

CCW Intake Canal is aligned for recirc Preferred Evaluation Location:

Simulator

_x....__ In-Plant __ _

References:

AP/1/A/1700/13 (CCW Dam Failure) Validation Time: 15 min. CR0-801a -h Page 2 of 18 Preferred Evaluation Method: Perform X Simulate Time Critical:

No ====================================================================================

Candidate:

Time Start: _____ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE ====================================================================================

Comments SIMULATOR OPERATOR INSTRUCTIONS: 1 . Recall snap 214 2. Import simulator files for CR0-801 a CR0-801a -h Page 3 of 18 3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.

4. Go to RUN as directed by examiner 5. When asked to dispatch an operator to close the breaker for 1 CCW-12 (at step 17) Fire Timer #1 and inform student that using time compression the breaker is closed.

Tools/Equipment/Procedures Needed:

  • AP/1/A/1700/013 (Dam Failure) READ TO OPERATOR DIRECTIONS TO STUDENT: CR0-801a -h Page 4 of 18 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:

  • Security reports that a failure of the Newry Dam has occurred.
  • The CCW Intake Canal is intact
  • Subsequent Actions of AP/1/A/1700/013 (Dam Failure) have been completed up to step 4.4. INITIATING CUE: The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1 C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

ST ART TIME: __ _ STEP 1: Step 4.4 Depress the "CCW DAM FAILURE" pushbutton.

STANDARD:

The "CCW DAM FAILURE" pushbutton is located by the student on 1 AB3 and depressed.

COMMENTS:

STEP 2: Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms. STANDARD:

An individual is dispatched to report damage to the ControLRooms.

Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam COMMENTS:

STEP 3: Step 4.6 GO TO step 4.49 STANDARD:

Student goes to step 4.49 COMMENTS:

CR0-801a -h Page 5 of 18 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -

STEP 4: Step 4.49 *Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored STANDARD:

  • The control switches for RCPs 1A1, 1 A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.

CR SRO notified of RCP status COMMENTS:

STEP 5: Step 4.50 Stop all CCW pumps. STANDARD:

1 A, 1 B, 1 C, and 1 D CCW Pump switches are located by the student on 1AB3. Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.

COMMENTS:

STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES). STANDARD:

Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.

COMMENTS:

CR0-801a -h Page 6 of 18 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -SAT -UNSAT -

l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13): 1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1 A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1 C1 Outlet) (01 D0281) 1 CCW-25 (Condenser 1 C2 Outlet) (01 D0283) STANDARD:

The student monitors the Operator Aid Computer to verify the following:

1 CCW-20 (Condenser 1A1 Outlet) closed (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 181 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 182 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1 C2 Outlet) closed (01 D0283) COMMENTS:

STEP 8: Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.

An operator is dispatched to place the condenser outlet valves* in HAND. Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND. COMMENTS:

CR0-801a -h Page 7 of 18 SAT -UNSAT -SAT -UNSAT -

I STEP 9: Step 4.54 Verify CCW-8 is open. STANDARD:

CCW-8 switch and indication is located by the student on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS:

STEP 10: Step 4.55 Notify Unit 2 that emergency CCW siphon flow has been established on Unit 1. STANDARD:

Unit 2 Control Room is notified that siphon flow has been established on Unit 1. Examiner/Booth Cue: When candidate contacts Unit 2, acknowledge the notification that CCW siphon flow has been established on Unit 1. COMMENTS:

STEP 11: Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).

STANDARD:

Operator(s) are dispatched to perform Enclosure 5.2. Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2 COMMENTS:

CR0-801a -h Page 8 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -

STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.

STANDARD:

Student continues to step 4.58. Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.

COMMENTS:

STEP 13: Step 4.58 Determine which CCW Pump will be started. STANDARD:

The student determines from the turnover that the "1C" CCWP will be started COMMENTS:

STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.

STANDARD:

Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

CR0-801a -h Page 9 of 18 SAT --UNSAT SAT UN SAT -SAT -UN SAT -

STEP 15: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:

Student determines from initiating cue that the 1 C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:

STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:

The student notes that the discharge valve for the 1 C CCW pump (1CCW-12}

is not closed and proceeds to the RNO. COMMENTS:

STEP 17: Step 4.63 RNO Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed} STANDARD:

The student dispatches an operator to locally close 1 CCW-12 from the breaker switch (1XS3-2E).

BOOTH CUE: When an operator is dispatched, fire TIMER #1, then inform candidate that 1CCW-12 is closed (use time compression)

COMMENTS:

CR0-801a -h Page 10 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -

ALTERNATE PATH STEP 18: Step 4.64 Start the selected CCW Pump. STANDARD:

  • The student starts 1 C CCW pump by rotating the control switch to the CLOSE position.

"1 C" CCW Pump will NOT start. Since there is no guidance in the RNO column, the student will continue to step 4.65 COMMENTS:

STEP 19: Step 4.65 Verify the started CCW Pump Discharge valve opened. STANDARD:

The "1C" CCW Pump did not start and the discharge valve(1CCW-12}

did not open. Since this step cannot be performed, the student will proceed to the RNO column COMMENTS:

STEP 20: Step 4.65 RNO 1. Stop th.e operating CCW pump 2. GO TO Step 4.58 to attempt to start a different CCW pump STANDARD:

The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1 D CCW pump. COMMENTS:

CR0-801a -h Page 11 of 18 SAT -_UNSAT SAT -UNSAT -SAT -UN SAT -

STEP 21: Step 4.58 Determine which CCW Pump will be started. STANDARD:

The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:

STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.

STANDARD:

Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

STEP 23: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:

Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:

CR0-801a-h Page 12 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UN SAT -

STEP 24: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:

Both valves are determined to be closed. It is critical to ensure both valves are closed however they may have been closed at step 17 of this JPM and therefore already be closed at this step. IF CCW-12 or CCW-13 are open when reaching this step, closing them at this step is critical.

COMMENTS:

STEP 25: Step 4.64 Start the selected CCW Pump. STANDARD:

  • The student starts 1 D CCW pump by rotating the control switch to the CLOSE position.

Student observes that the 1 CCW-13 begins to open and the 1 D CCW pump will start. COMMENTS:

STEP 26: Step 4.65 Verify the started CCW Pump Discharge valve opened. STANDARD:

Determine that the "1 D" CCW Pump discharge valve (1 CCW-13) indicates Open. COMMENTS:

CR0-801a -h Page 13 of 18 SAT --UNSAT *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -

STEP 27: Step 4.66 Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP. STANDARD:

The student ensures the CCWP LOAD SHED DEFEAT switch is in the "1 D" CCW Pump position COMMENTS:

STEP 28: Step 4.67 Verify CCW-9 opens. STANDARD:

The student locates CCW-9 switch and indication on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS:

STEP 29: Step 4.68 Verify CCW-8 is closed. STANDARD:

CCW-8 switch and indication are located by the student on 2AB3 verifying green "CLOSED" indication illuminated and red "OPEN" indication extinguished.

COMMENTS:

CR0-801a -h Page 14 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UNSAT -

STEP 30: Step 4.69 Verify an operator has been dispatched to open 1 DP-FSC (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

STANDARD:

An operator has not yet been dispatched so the student proceeds to the RNO. COMMENTS:

STEP 31: Step 4.69 RNO Dispatch an operator to open 1 DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

STANDARD:

Operator dispatched.

Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8 COMMENTS:

STEP 32: Step 4.70 Ensure the discharge valves on all stopped CCW Pumps are closed. CCW-10 (1A CCW PUMP DISCHARGE VLV) CCW-11 (18 CCW PUMP DISCHARGE VLV) CCW-12 (1C CCW PUMP DISCHARGE VLV) STANDARD:

CCW pump discharge valve indications are located by the student on 1AB3. Valves associated with tripped CCW pumps (white lights lit) will have the green "CLOSED" indication illuminated.

COMMENTS:

CR0-801a -h Page 15 of 18 SAT -_UNSAT SAT -UN SAT -SAT -UNSAT -

STEP 33: Step 4.71 Notify Unit 2 and 3 to ensure all Unit 2 and 3 CCW pump discharge valves are closed. STANDARD:

Unit 2 and 3 are notified to ensure their CCW Pump Discharge valves are closed. EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

END TASK TIME STOP: __ _ CR0-801a -h Page 16 of 18 SAT UNSAT CRITICAL STEP EXPLANATIONS STEP # Explanation CR0-801a -h Page 17 of 18 1 This step is critical because depressing this pushbutton trips all operating CCW Pumps and sets up system logic for CCW recirculation flow. 4 This step is critical because RCPs must be stopped to reduce primary heat load. 25 This step is critical because the pump provides the necessary recirculation flow.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS:

Security reports that a failure of the Newry Darn has occurred.

The CCW Intake Canal is intact Subsequent Actions of AP/1/A/1700/013 (Darn Failure) have been completed up to step 4.4. INITIATING CUE: The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1 C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER A0-710 -i Page 1 of 12 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Place the 1 A Reactor Building Hydrogen Analyzer In Service Alternate Path: No Facility JPM #: A0-010 KIA Rating(s):

System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:

A0-710 -i Page 2 of 12 Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes. Preferred Evaluation Location:

Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_

References:

EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Validation Time: 12 minutes Time Critical:Yes

=========================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:

____________

_ NAME SIGNATURE DATE =====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None A0-710 -i Page 3 of 12 Tools/Equipment/Procedures Needed A0-710 -i Page 4 of 12 Enclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS A LOCA has occurred on Unit 1. Engineered Safeguards Channels 1 and 2 have actuated.

Enclosure 5.1 (ES Actuation) of the EOP is being completed.

The 1 A and 1 B RB Hydrogen Analyzer Train is aligned in the standby mode. INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

START TIME: __ _ NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West. STEP 1: Step 1 At 1 A H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range . -SAT
  • Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following: _ 1 PR-83 (BYP TO POST AC 1 SV220) -UN SAT _ 1 PR-86 (BYP TO POST AC 1 SV221) STANDARD:

Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "A"). Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale. Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves: Train A

  • PR-83 (Bypass to Post Accident Sample Panel)
  • PR-86 (Bypass from Post Accident Sample Panel) Cue: Indication is as you see it COMMENTS:

NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West. STEP 2: Step 2 At 1 B H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range . SAT -* Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following:

_ 1 PR-89 (BYP TO POST AC 1 SV220) -UN SAT _ 1 PR-92 (BYP TO POST AC 1 SV221) STANDARD:

Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "B"). Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale. Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves: Train A

  • PR-89 (Bypass to Post Accident Sample Panel)
  • PR-92 (Bypass from Post Accident Sample Panel) Cue: Indication is as you see it COMMENTS:

STEP 3: Step 3 Notify Control Room to perform thefollowing:

  • Open 1 PR-81 and 1 PR-84
  • Open 1 PR-87 and 1 PR-90 STANDARD:

Unit 1 Control Room personnel are notified to open 1 PR-81, 1 PR-84, 1 PR-87, and 1 PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.

Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. COMMENTS:

CRITICAL STEP SAT UNSAT NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 4: Step 4 At 1 A H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.
  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel. STANDARD:

SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

  • PR-71 (Top of Containment Sample) for Train 'A' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode. Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed.

Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:

CRITICAL STEP _SAT _UNSAT CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 5: Step 5 At 1 B H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I STANDBY I ANALYZE switch to ANALYZE . Depress REMOTE SELECTOR pushbutton to ensure control is -SAT
  • from the Remote Panel. STANDARD:

SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve: UNSAT

  • PR-76 (Top of Containment Sample) for Train 'B' -Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode .
  • Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed . Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:

STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates<

2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train. _ 1A RB Hydrogen Analyzer Train SAT -STANDARD:

ALARM RESET Pushbutton is depressed for both trains. Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on -UNSAT both trains. Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.

COMMENTS:

STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1 B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1 A Hydrogen Analyzer Train is in service. SAT STANDARD:

Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service. Cue: Control room acknowledges Hydrogen Analyzers is in service. -UN SAT COMMENTS:

STEP 6: Step 8 EXIT this enclosure.

STANDARD:

Procedure is exited. SAT -COMMENTS:

UN SAT -END TASK STOP TIME: ____ _

CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Opens the block valves to the 1 A and 1 B H2 analyzer.

4 Starts the Analyzer pump and the sampling process for the 1 A H2 Analyzer 5 Starts the Analyzer pump and the sampling process for the 1 B H2 Analyzer CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS A LOCA has occurred on Unit 1. Engineered Safeguards Channels 1 and 2 have actuated.

Enclosure 5.1 (ES Actuation) of the EOP is being completed.

The 1 A and 1 B RB Hydrogen Analyzer Train is aligned in the standby mode. INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 OATC Actions for Control Room Evacuation CANDIDATE EXAMINER CR0-805 -j Page 1 of 11 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 -j Page 2 of 11 Remove Control Power Fuses and Open Breakers as directed by AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Alternate Path: No Facility JPM #: A0-805 KIA Rating(s):

System: BW I A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:

Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location:

Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_

References:

AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Validation Time: 25 minutes Time Critical:

No =====================================================================================

Candidate:

Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:

____________

_ _ _______________

.! ___ _ NAME SIGNATURE DATE =====================================================================================

COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None CR0-805 -j Page 3 of 11 Tools/Equipment/Procedures Needed CR0-805 -j Page 4 of 11 AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5. (OATC Actions for Control Room Evacuation)

START TIME: __ _ CR0-805 -j Page 5 of 11 EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM. STEP 1: Step 10 CRITICAL STEP Remove all control power fuses from 38 HPI Pump at 3TE-9 (T-3/L45).

STANDARD:

Candidate locates the 4160V breaker cabinet for the 38 HPI Pump and indicates that the upper compartment door would be opened -SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT -blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 2: Step 11 CRITICAL STEP Remove all control power fuses from 3C HPI Pump at 3TD-9 (T-3/L44).

STANDARD:

Candidate locates the 4160V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened -SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT -blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 3: Step 12 Remove all control power fuses from 3B RBS Pump at 3TD-11 (T-3/L44).

STANDARD:

Candidate locates the 4160V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 4: Step 13 Remove all control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).

STANDARD:

Candidate locates the 4160V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 -j Page 6 of 11 CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -

STEP 5: Step 10 Remove all control power fuses from 3A RBS Pump at 3TC-1 O (T-3/L43).

STANDARD:

Candidate locates the 4160V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 6: Step 15 Open the following breakers (U3 Equip Rm):

Candidate locates the following breakers and positions the handles to the OPEN position:

  • 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction) Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM. COMMENTS:

CR0-805 -j Page 7 of 11 CRITICAL STEP SAT --UNSAT CRITICAL STEP SAT -UNSAT -

STEP 7: Step 16 Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House) STANDARD:

Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 8: Step 17 Remove all control power fuses from 382 RC PUMP beaker at 3TB-9 (U#3 6900v Switchgear House) STANDARD:

Candidate locates the 6900V breaker cabinet for the 382 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 -j Page 8 of 11 CRITICAL STEP SAT --UN SAT CRITICAL STEP SAT -UNSAT -

STEP 9: Step 18 Remove all control power fuses from 3A 1 RC PUMP beaker at 3T A-3 (U#3 6900v Switchgear House) STANDARD:

Candidate locates the 6900V breaker cabinet for the 3A 1 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 10: Step 19 Remove all control power fuses from 381 RC PUMP beaker at 3T A-4 (U#3 6900v Switchgear House) STANDARD:

Candidate locates the 6900V breaker cabinet for the 381 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

Examinet Cue: Another operator will continue with this procedure END TASK CR0-805 -j Page 9 of 11 CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -

STEP# CRITICAL STEP EXPLANATIONS Explanation CR0-805 -j Page 10 of 11 All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-427 A0-427 -k Page 1 of 10 Reset an Emergency Feedwater Pump Turbine CANDIDATE EXAMINER Task: Reset the TDEFWP Alternate Path: NO Facility JPM #: A0-027 KIA Rating(s):

System: 061 KIA: A2.04 Rating: 3.4/3.8 Task Standard:

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location:

Simulator

__ In-Plant _"'""'X'--

References:

Rule 3 (Loss of Main or Emergency FDW) EOP Enclosure 5.26 (Manual Start of TDEFDWP) Validation Time: 8 min. A0-427 -k Page 2 of 10 Preferred Evaluation Method: Perform Simulate _x_ Time Critical:

No ====================================================================================

Candidate:

Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:

____________

_

___ _ NAME SIGNATURE DATE ====================================================================================

Comments SIMULATOR OPERATOR INSTRUCTIONS NONE A0-427 -k Page 3 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP) READ TO OPERATOR DIRECTIONS TO CANDIDATE A0-427 -k Page 4 of 10 I will explain the initial conditions, and state the task to be performed.

All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.

START TIME: __ _ STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located) Verify TDEFDWP trip device tripped. STANDARD:

Candidate determines from the Initial Conditions that Unit 2 TD EFDW pump is tripped. Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".

COMMENTS:

STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK. STANDARD:

Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK. Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. COMMENTS:

STEP 3: Step 3 Push reset lever toward turbine shaft until engaged: STANDARD:

Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. Cue: Indicate to candidate that the reset lever is engaged. COMMENTS:

STEP 4: Step 4 Rotate spindle fully clockwise.

STANDARD:

Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop. Cue: Indicate to candidate that the spindle is in its full clockwise position.

COMMENTS:

A0-427 -k Page 5 of 10 SAT --UNSAT SAT -UNSAT -CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -

STEP 5: Step 5 Rotate spindle fully counter-clockwise.

STANDARD:

Candidate observes spring plate in its full up position.

Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.

COMMENTS:

STEP 6: Step 6 Rotate spindle % turn clockwise.

STANDARD:

Candidate rotates spindle % turn clockwise.

Cue: Indicate to candidate that the spindle is 14 turn from full counterclockwise position.

COMMENTS:

STEP 7: Step 7 Notify CRO to place TDEFDWP switch in RUN: STANDARD:

Candidate notifies Unit 2 CRO by phone/radio to place Unit 2 TD EFDW pump switch in RUN: Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.

COMMENTS:

STEP 8: Step 8 Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD:

Candidate locates 2MS-93 and determines the valve is Open. Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible. COMMENTS:

A0-427 -k Page 6 of 10 CRITICAL STEP SAT -UNSAT --SAT UNSAT -SAT -UN SAT -SAT -UNSAT -

STEP 9: Step 8 RNO GO TO Step 11 STANDARD:

Candidate goes to step 11. COMMENTS:

STEP 10: Step 11 Verify TDEFDWP running STANDARD:

Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.

Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.

COMMENTS:

STEP 10: Step 12 EXIT this enclosure STANDARD:

Candidate exits the enclosure Cue: Indicate to candidate that this task is complete.

COMMENTS:

END TASK TIME STOP: __ _ ------A0-427 -k Page 7 of 10 SAT UNSAT SAT UNSAT SAT UN SAT STEP# 3 4 5 CRITICAL STEP EXPLANATIONS Explanation This step is required to reset 2MS-94 This step is required to reset 2MS-94 This step is required to reset 2MS-94 A0-427 -k Page 9 of 10 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.