CR0-310 - a Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-310 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CANDIDATE EXAMINER

CR0-310 - a Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Required Actions For A Failed LPI Train Alternate Path:

Ves Facility JPM #:

KIA Ratinq(s):

System: EPE 011 KIA: EA1.04 Rating: 4.4/4.4 Task Standard:

1A and 1B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1LP-17 is closed after 1A LPI pump fails.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-310 - a Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:

1 . RECALL Snap 208

2. IMPORT files for CR0-310
3. WHEN directed by Lead Examiner, Go to RUN

CR0-310 - a Page 4 of 8 Tools/Equipment/Procedures Needed:

EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52 with outstanding IAATs.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly.

INITIATING CUES:

The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

CR0-310 - a Page 5 of 8 ST ART TIME: _ __

I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier). - SAT STANDARD: Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is< ::::200 psig - UNSAT Continue to Step 19.

COMMENTS:

STEP 2: Step 19 IAAT RCS Pressure is < LPI pump shutoff head,

- SAT THEN perform Steps 20 - 21 STANDARD: Continue to Step 20.

- UN SAT COMMENTS:

  • CRITICAL TASK STEP 3: Step 20 Perform the following:
  • *Start 1A LPI Pump

- SAT STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.

Places 1A LPI Pump switch to START and observes Red light on and UNSAT white light off.

Continue to Step 21.

COMMENTS:

I

CR0-310 - a Paae 6 of 8

  • CRITICAL TASK STEP 4: Step 21 Perform the following:
  • *Start 1 B LPI Pump

- SAT STANDARD: Determine that 1LP-18 is open by observing the red open light is lit located on 1 UB2.

Places 1B LPI pump switch to ST ART and observes Red light on and white light off. - UN SAT Go back to Step 52.

COMMENTS:

STEP 5: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD: Checks IAAT steps to determine if any apply

- SAT Determines that IAAT Step 25 now applies Continue to Step 25.

- UNSAT Evaluator Note: 1A LP/ Pump fails while operating.

COMMENTS:

STEP 6: Step 25 CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1B LPI pump is operating, THEN close 1LP-17.

- SAT STANDARD: Determine the1A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP-17.

- UN SAT Cue: Another Operator will continue with this procedure.

COMMENTS:

I END TASK STOP TIME: _ _ _ __

CR0-310 - a Page 7 of 8 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Student verifies 1LP-17 is open and Starts 1A LPI P 4 Student verifies 1LP-18 is open and Starts 1B LPIP 6 Student closes 1LP-17 when 1A LPI P fails

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly.

INITIATING CUES:

The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

CR0-407 - b Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER

CR0-407 - b Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Establish EFDW flow through Startup valves Alternate Path:

Yes Facility JPM #:

CR0-015 KIA Rating(s):

System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:

EFDW flow is established to the affected header through the startup valve.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

EOP Rule 3, (Loss of Main or Emergency FDW)

EOP Rule 7, (SG Feed Control)

EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating:. SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ ---------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-407 - b Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 209

2. IMPORT files for CR0-407
3. WHEN directed by Lead Examiner, go to RUN

CR0-407 - b Page 4 of 12 Tools/Equipment/Procedures Needed

  • EOP Encl 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CR0-407 - b Page 5 of 12 START TIME: _ __

STEP 1: Performs a Symptom Check STANDARD: Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater

- SAT EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.

- UNSAT COMMENTS:

STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

STANDARD: Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated. - SAT (OP/2/A/6102/018)

Candidate will perform RNO step and GO TO step 3.

- UNSAT COMMENTS:

STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency),

AND any of the following exist:

  • RCS pressure reaches 2300 psig OR NOT limit
  • Pzr level reaches 375" [340" ace]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling). - SAT STANDARD: Candidate determines Rule 4 is not required.

Continue to Step 4. - UNSAT COMMENTS:

STEP4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.

STANDARD: Observes MD EFDWP & TD EFDWP running with switch lights on and SAT normal discharge pressure.

Continue to Step 5.

- UNSAT COMMENTS:

CR0-407 - b Page 6 of 12 STEP 5: Rule 3: Step 5 Verify any EFDW Pump is operating.

STANDARD: Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have

- SAT normal discharge pressure.

Continue to Step 6.

- UNSAT COMMENTS:

STEP 6: Rule 3: Step 6 GO TO step 37.

- SAT STANDARD: GO TO step 37.

COMMENTS:

- UNSAT STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 - 42.

ALTERNATE PATH

- SAT STANDARD: Determines that 1FDW-315 is NOT controlling properly (1 A SG level is

< 30" and decreasing). Concludes that 1FDW-315 has failed closed.

UNSAT Continue to Step 38.

COMMENTS:

STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL.

STANDARD: Place 1FDW-315 in MANUAL by depressing the AIM pushbutton on the

- SAT Moore controller.

Continue to Step 39.

- UNSAT COMMENTS:

CR0-407 - b Page 7 of 12 STEP 9: Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL.

STANDARD: Determine that 1FDW-315 will NOT control in MANAUL. SAT Perform RNO, GO TO Step 41.

Continue to step 41

- UNSAT COMMENTS:

STEP 10: Rule 3: Step 41 Notify CR SRO that Encl 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.

STANDARD: Removes Encl. 5.27 from EOP and initiates. - SAT EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27.

COMMENTS: - UNSAT STEP 11: Encl 5.27: Step 1 Identify the failure:

1FDW-315 has Failed CLOSED [GO TO Step 2]

- SAT STANDARD: Candidate determines the next procedural step from table in Step 1.

Continue to Step 2.

- UNSAT COMMENTS:

STEP 12: Encl 5.27: Step 2 Verify 1A MD EFDWP is operating STANDARD: Candidate verifies 1A MD EFDWP is operating. Verify red light on and green light off and normal discharge pressure. - SAT Continue to Step 3.

COMMENTS: - UNSAT

CR0-407 - b Page 8 of 12 STEP 13: Encl 5.27: Steps 3 *CRITICAL STEP Stop 1A MD EFDWP STANDARD: *Candidate places switch to OFF.

Verify red light off and white light illuminated. - SAT Continue to Step 4.

COMMENTS: - UNSAT STEP 14: Encl 5.27: Step 4 Verify 1B MD EFDWP is operating.

STANDARD: Candidate verifies 1B MD EFDWP is operating. - SAT Verify red light on and green light off and normal discharge pressure.

Continue to Step 5.

- UNSAT COMMENTS:

STEP 15: Encl 5.27: Step 5 *CRITICAL STEP Place 1 TD EFDW Pump in PULL TO LOCK STANDARD: *Candidate places the U1 TD EFDW Pump in PULL to LOCK.

Candidate verifies red light is out and green light is lit. - SAT Continue to Step 6.

COMMENTS: - UNSAT STEP 16: Encl 5.27: Step 6 CRITICAL STEP Place 1FDW-35 in HAND and set demand to 0%

STANDARD: Candidate places 1FDW-35 in HAND and uses toggle switch to reduce demand to 0%. - SAT Continue to Step 7.

COMMENTS: - UNSAT

CR0-407 - b Page 9 of 12 STEP 17: Encl 5.27: Step 7 *CRITICAL STEP Close 1 FDW-33 STANDARD: *Candidate closes SU Control Block Valve (1 FDW-33).

Candidate verifies red light is out and green light is lit. - SAT Continue to Step 8.

COMMENTS: - UNSAT STEP 18: Encl 5.27: Step 8 Verify 1A MD EFDWP will be used.

STANDARD: Candidate determines that the 1A MD EFDWP will be used.

- SAT Continue to Step 9.

EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP.

- UNSAT COMMENTS:

STEP 19: Encl 5.27: Step 9 *CRITICAL STEP Open 1 FDW-374 STANDARD: *Candidate locates and opens 1FDW-374.

Candidate observes green closed light off and red open light on.

- SAT Continue to Step 10.

COMMENTS:

- UNSAT STEP 20: Encl 5.27: Step 1O Verify the following:

  • ; FDW-36 closed
  • 1FDW-38 open STANDARD: Candidate locates and closes 1FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication. - SAT Candidate locates and opens 1FDW-38 and observes green closed light off and red open light lit on 1VB3 or uses OAC indication.

- UNSAT Continue to Step 11.

COMMENTS:

CR0-407 - b Page 10 of 12 STEP 21: Encl 5.27: Step 11 *CRITICAL STEP Start 1A MD EFDWP STANDARD: *Candidate places 1A MD EFDWP switch to RUN. - SAT Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.

Continue to Step 12. - UNSAT COMMENTS:

NOTE:

Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge.

Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge.

- SAT STEP 22: Encl 5.27: Step 12 Verify either of the following exists:

  • HPI Forced Cooling is maintaining core cooling
  • CBP Feed providing SG feed - UNSAT STANDARD: Candidate determines that neither condition is met and goes to the RNO.

Continue to Step 12 RNO.

COMMENTS:

STEP 23: Encl 5.27: Step 12 RNO *CRITICAL STEP IF any SG is being fed, THEN perform the following:

  • *Throttle 1FDW-35 to establish a maxim um of 100 gpm .
  • *Throttle 1FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control)

Notify CR SRO of SG Feed Status STANDARD: Candidate throttles 1FDW-35 to attain - 100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1FDW-35as necessary to establish - 25" S/U level (per Rule 7 table 4) - SAT Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e.

when using the S/U CVs) is 25" S/U level since RCS temperature is - UNSAT

>500°F.

EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1FDW-35 must be open and SG level increasing.

EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

END TASK

CR0-407 - b Page 11 of 12 STOP TIME: _ _ _ __

CRITICAL STEP EXPLANATIONS STEP # Explanation 1O This step is required to ensure the correct procedure is used.

13 This step is required to ensure the valves will operate.

15 This step is required to ensure the valves will operate.

16 This step is required to align the MD EFDWP to the S/U header.

17 This step is required to align the MD EFDWP to the S/U header.

19 This step is required to align the MD EFDWP to the S/U header.

21 This step is required to start the 1A MD EFDWP and provide a SG feed source.

23 This step is required to establish flow to the 1A SG.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CR0-602 - c Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-602 LIVE BUS TRANSFER OF MFB POWER FROM CT 1 TO CT 4 CANDIDATE EXAMINER

CR0-602 - c Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path:

No Facility JPM #:

New KIA Rating(s):

System: 062 KIA: A4.01 Rating: 3.3/3.1 Task Standard:

Perform a live bus transfer from CT 4 to CT 1 by procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-602 - c Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 212
2. Go to RUN
3. SELECT Chessell to Source Range

CR0-602 - c Page 4 of 14 Tools/Equipment/Procedures Needed:

  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES:

The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.

CR0-602 - c Page 5 of 14 ST ART TIME: _ __

I STEP 1: Step 2.4 Energize 4160V Standby Buses:

Step 2.4.1

- SAT Notify all three Units that the Standby Bus is about to be powered from CT4.

STANDARD: Use the control room phone and notify all three ONS Units that the

- UNSAT Standby Bus is about to be powered from CT 4.

COMMENTS:

STEP 2: Step 2.4.2 CRITICAL STEP Place CT 4 BUS 1 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "MAN". - SAT COMMENTS:

- UN SAT STEP 3: Step 2.4.3 CRITICAL STEP Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON".

STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". - SAT COMMENTS: UNSAT

CR0-602 - c p aqe 6 0 f 14 STEP 4: Step 2.4.4 CRITICAL STEP Close SK 1 CT 4 STBY BUS 1 FEEDER breaker.

STANDARD: Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and SAT the red close light illuminates.

- UNSAT COMMENTS:

STEP 5: Step 2.4.5 Verify::::: 4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS."

STANDARD: Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOLTS" on - SAT gauge located on 2AB3.

- UNSAT COMMENTS:

STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF".

STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on - SAT 2AB3, to "OFF".

- UN SAT COMMENTS:

CR0-602 - c p aqe 7 0 f14 STEP 7: Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to - SAT "AUTO".

- UNSAT COMMENTS:

STEP 8: Step 2.4.8 CRITICAL STEP Place CT4 BUS 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to SAT "MAN".

COMMENTS:

- UN SAT STEP 9: Step 2.4.9 CRITICAL STEP Place STBY BUS 2 SYNCHRONIZING SWITCH to "ON".

STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". SAT COMMENTS:

- UN SAT

CR0-602 - c Paqe 8 of 14 STEP 10: Step 2.4.10 CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER.

STANDARD: Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates. SAT

- UNSAT COMMENTS:

STEP 11: Step 2.4.11 Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS."

STANDARD: Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS" using - SAT gauge located on 2AB3 COMMENTS:

- UNSAT STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to "OFF".

- SAT STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF".

COMMENTS: - UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO".

- SAT STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO".

- UNSAT COMMENTS:

CR0-602 - c p age 9 0 f 14 I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 CRITICAL STEP (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened.

STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: SAT Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN".

- UN SAT STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN".

COMMENTS:

STEP 15: Step 2.5.1B CRITICAL STEP Place STANDBY 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates ST AND BY 2 AUTO/MAN switch, located on 1AB1, to "MAN". - SAT

- UNSAT COMMENTS:

STEP 16: Step 2.5.1C Place MFB 1 AUTO/MAN switch in "MAN".

- SAT STANDARD: Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in "MAN".

- UNSAT COMMENTS:

CR0-602 - c p age 10 0 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate determines that the MFB 2 AUTO/MAN switch, located on - SAT 1AB1, is in "MAN".

- UN SAT COMMENTS:

STEP 18: Step 2.5.1E CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR).

STANDARD: Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white - SAT open light illuminates.

- UNSAT COMMENTS:

STEP 19: Step 2.5.1 F CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ).

STANDARD: Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light - SAT illuminates.

- UN SAT COMMENTS:

CR0-602 - c p aqe 11 0 f 14 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR).

STANDARD: Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white - SAT open light illuminates.

- UNSAT COMMENTS:

STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2).

STANDARD: Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light - SAT illuminates.

- UNSAT COMMENTS:

STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to - SAT "AUTO".

- UN SAT COMMENTS:

CR0-602 - c Page 12 of 14 STEP 23: Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to SAT "AUTO".

UNSAT COMMENTS: Examiner Cue: Another operator will continue with this procedure.

END TASK STOP TIME: _ _ _ __

CR0-602 - c Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Step is required to energize the STBY Bus.

3 Step is required to energize the STBY Bus.

4 Step is required to energize the STBY Bus.

8 Step is required to energize the STBY Bus.

9 Step is required to energize the STBY Bus.

10 Step is required to energize the STBY Bus.

14 Step is required to energize the MFB from the STBY Bus.

15 Step is required to energize the MFB from the STBY Bus.

18 Step is required to energize the MFB from the STBY Bus.

19 Step is required to energize the MFB from the STBY Bus.

20 Step is required to energize the MFB from the STBY Bus.

21 Step is required to energize the MFB from the STBY Bus.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES:

The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4.

CR0-111 - d Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER

CR0-111 - d Page 2 of 10 REGION II

(

INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Withdrawal of Safety Rod Group 1 to 50%

Alternate Path:

Yes Facility JPM #:

CR0-111 KIA Rating(s):

System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:

Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _X:..:__ In-Plant _ __ Perform X Simulate

References:

OP/1/A/1105/019 (Rev 023) (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-111 - d Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 206
2. IMPORT CR0-111 Simulator files
3. Go To RUN
4. Select SR/WR on NI recorder

CR0-111 - d Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure =530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)

Control Room SRO directs you to:

  • Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System)

Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

CR0-111 - d Page 5of10 START TIME: _ __

I STEP 1: Step 3.1 Perform the following: (R.M.)

  • Ensure RUN is ON .
  • Ensure SINGLE SELECT SWITCH to ALL .

STANDARD: Determine control rod speed switch is selected to RUN by observing light - SAT indication on the Diamond.

Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond.

- UNSAT COMMENTS:

STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:

- SAT

  • Appropriate ranged Nls
  • Startup Rate STANDARD: As CRDs are withdrawn monitor the above indications.

- UNSAT COMMENTS:

CR0-111 - d Page 6 of 10 I NOTE: When LATCH AUTO is selected, the following automatically occurs: *CRITICAL STEP

  • Group/Rod inserts to latch rods (CRD TRAVEL "In" light ON)
  • Group/Rod withdraws to test for latching (CRD TRAVEL "Out" light ON)
  • Group/Rod inserts (CRD TRAVEL "In" light ON)
  • Group In Limit light on Diamond will momentarily extinguish then illuminate .

STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.)

3.3.1 Ensure GROUP SELECT SWITCH to 1.

3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9}

3.3.4 If Manual Latch and Pl Alignment is desired, perform the following:

(Per initiating cue, Manual is NOT desired)

- SAT 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:

A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:

>- Verify LATCH AUTO is OFF.

>- Verify Group 1 0% lights are ON. (Pl Panel)

>- Verify Group 1 APl/RPI indications agree. (Pl Panel) - UNSAT STANDARD: *Rotate GROUP SELECT SWITCH to 1.

Determine that only Group 1 CONTROL ON lights are "ON" on the Pl panel.

  • Depress the LATCH AUTO pushbutton.

WHEN Auto Latch is complete:

  • Verify LATCH AUTO is OFF .
  • Verify Group 1 0% lights are ON. (Pl Panel)
  • Verify Group 1 APl/RPI indications agree using the position switch on the Pl Panel.

COMMENTS:

CR0-111 - d Page 7 of 10 I STEP 4: Step 3.4 Select FAULT RESET

- SAT STANDARD: Depress FAULT RESET pushbutton on the diamond panel.

COMMENTS:

- UNSAT STEP 5: Step 3.5 *CRITICAL STEP Select Group 1, as follows: (R.M.)

~ Ensure GROUP SELECT SWITCH to 1.

~ Ensure only Group 1 CONTROL ON lights are ON. (Pl panel}

~ Ensure Group 1 at 50%. (R.M.) - SAT

~ Place GROUP SELECT SWITCH to OFF.

STANDARD: Ensure GROUP SELECT SWITCH to 1.

Determine that only Group 1 CONTROL ON lights are ON on the Pl panel.

- UNSAT

Manually Trip the Rx when two or more CROM stator temperatures are<::

180°F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)

ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.

COMMENTS:

CR0-111 - d Page 8 of 10 I AL TERNA TE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.

CRITICAL STEP STEP 6: Manually Trip the Rx when two or more CROM stator temperatures are ;:::

180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)

STANDARD: Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed SAT Operator Memory Items)

EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase. At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. UNSAT COMMENTS:

END OF TASK TIME STOP: _ __

CR0-111 - d Page 9 of 10 CRITICAL STEP EXPLANATIONS

. EP # Explanation 3 This step is required to withdraw group 1 control rods.

5 This step is required to withdraw group 1 control rods.

6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)

Control Room SRO directs you to:

  • Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System)

Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

CR0-225 - e Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER

CR0-225 - e Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align letdown with 1HP-14 failed in 'Bleed" Alternate Path:

No Facility JPM #:

CR0-225 KIA Rating(s):

System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:

Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -=-X.:..-_ In-Plant _ __ Perform X Simulate

References:

AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control.

Validation Time: 14 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~*!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-225 - e Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207

2. IMPORT CR0-225 Simulator files
3. WHEN directed by Lead Examiner, Go To RUN

CR0-225 - e Page 4 of 11 Tools/Equipment/Procedures Needed

  • EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
  • AP/1/A/1700/002 (Excessive RCS Leakage)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP.

INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.

CR0-225 - e Page 5 of 11 START TIME: _ __

I STEP 1: Step 4.155 Verify 1A LD Filter in service.

STANDARD: Student observes 1B Letdown (LO) Filter is in service and the 1A LD

- SAT Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO.

COMMENTS:

- UNSAT STEP 2: Step 4.155 RNO CRITICAL STEP

1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/A)
2. Open 1HP-17 STANDARD: Student recognizes that 1A LD Filter is Available.
  • Student opens 1H P-17.

- SAT COMMENTS:

- UNSAT STEP 3: Step 4.156 Close 1HP-6 STANDARD: Student closes 1HP-6

- SAT COMMENTS:

- UNSAT

CR0-225 - e Page 6 of 11 I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285')

STEP 4: Step 4.157 Adjust 1HP-7, as needed, to control: - SAT

  • BLEED flow out of failed 1HP-14
  • Pzr level STANDARD: Student adjusts 1HP-7 as necessary to control PZR level.

- UNSAT COMMENTS:

STEP 5: Step 4.158 CRITICAL STEP Dispatch an operator to open 1H P-196 STANDARD: Student dispatches an AO to open 1HP-196 SAT BOOTH CUE: Open 1HP-196 with Manual Valves COMMENTS:

- UNSAT

CR0-225 - e Page 7 of 11 I STEP 6: Step 4.159 Verify CC System in Operation.

- SAT STANDARD: Student observes:

  • At least one CC pump in operation
  • CC return flow is > 575 gpm COMMENTS: - UNSAT STEP 7: Step 4.160 Position the standby HPI pump switch to OFF.

- SAT STANDARD: Student places the standby (1 B) HPIP switch to OFF COMMENTS:

UNSAT STEP 8: Step 4.161 Initiate monitoring RCP parameters.

- SAT STANDARD: Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.

Booth Cue: Notify the student that 1HP-196 is open.

- UNSAT COMMENTS:

CR0-225 - e Page 8 of 11 I STEP 9: Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW. - SAT STANDARD: Student throttles 1HP-31 to establish 12-15 gpm.

COMMENTS:

- UNSAT STEP 10: Step 4.163 CRITICAL STEP When 1HP-196 is open, THEN close 1CS-26.

- SAT STANDARD: Student closes 1CS-26.

COMMENTS:

- UNSAT STEP 11: Step 4.164 Close the following;

- SAT

- UNSAT COMMENTS:

STEP 12: Step 4.165 Open 1HP-6

- SAT STANDARD: Student opens 1HP-6.

COMMENTS:

- UNSAT

CR0-225 - e Page 9 of 11 I STEP 13: Step 4.166 Throttle 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.

- SAT STANDARD: Student throttles open 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.

COMMENTS:

- UNSAT STEP 14: Step 4.167 Adjust 1HP-7 to establish desired letdown flow. - SAT STANDARD: Student throttles open 1HP-7 to establish == 75 gpm letdown flow.

COMMENTS:

- UNSAT STEP 15: Step 4.168 CRITICAL TASK Position the standby HPI pump switch to AUTO

- SAT STANDARD: Student places the standby (18) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.

COMMENTS: - UNSAT END TASK TIME STOP: _ __

CR0-225 - e Page 10 of 11 CRITICAL STEP EXPLANATIONS

_ j EP # Explanation 2 1HP-17 must be opened to align the alternate letdown flow path.

5 1HP-196 must be open for the alternate letdown flow path.

10 1CS-26 is closed to isolate the flow path going to the BHUTs.

15 The standby H Pl P ( 1B) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.

e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP.

INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.

CR0-408a- f Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a START FOURTH REACTOR COOLANT PUMP CANDIDATE:-----------------

EXAMINER:-----------------

CR0-408a - f Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Start the fourth RCP Alternate Path:

Yes Facility JPM #:

CR0-038a KIA Rating(s):

System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:

182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location: Preferred Evaluation Method:

Simulator --=-X-'-- In-Plant _ __ Perform _X_ Simulate

References:

OP/1/N1102/001 (Controlling Procedure for Unit Startup)

OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP)

AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

ARG 1SA-2 I E-2 (RC Pump Vibrations Emergency High)

Validation Time: 18 minutes Time Critical: No

=========================================================================

Candidate: Time Start:

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CR0-408a - f Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 21 O
2. Import files for CR0-408a
3. Ensure all breaker flags are set to current plant conditions
4. When directed by lead examiner, Go to Run.

CR0-408a - f Page 4 of 11 Tools/Equipment/Procedures Needed:

OP/1/A/1102/001 (Controlling Procedure for Unit Startup)

OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP)

ARG 1SA-2 I D-2 (RC Pump Vibration High)

ARG 1SA-2 I E-2 (RC Pump Vibration Emergency High)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.

CR0-408a - f Page 5 of 11 START TIME: _ __

I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page.

- SAT STANDARD: Announces "Starting 182 RCP" using the plant page system.

COMMENTS: - UNSAT STEP 2: Step 2.1.2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6

- SAT STANDARD: Reads IAAT step and determines it does not currently apply COMMENTS: - UNSAT I NOTE: AC Oil Lift Pump may take> 2 minutes to develop adequate discharge pressure. I *CRITICAL STEP STEP 3: Step 2.1.3 IF available, start AC Oil Lift Pump on 182 RCP.

STANDARD: Determines AC Oil Lift Pump is available and:

  • *Rotates AC Oil Lift Pump switch to start

- SAT

  • Observes red light on and green light off
  • Monitors discharge pressure status on OAC
  • Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6

- UNSAT COMMENTS:

CR0-408a - f Page 6 of 11 STEP 4: Step 2.1.6 *CRITICAL STEP WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1B2 RCP.

STANDARD: Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1B2 RCP as follows:

  • Verify red lights on and green light off - SAT
  • Verify starting current
  • Verify OAC indications support pump start

- UNSAT COMMENTS:

STEP 5: Step 2.1.7 After RCP is at full speed, perform the following:

A. Ensure the following stopped

  • AC Oil Lift Pump
  • DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to - SAT "OFF"

- UNSAT STANDARD: Once 1B2 RCP is at rated speed,

  • Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1SA-9 I D-2 (RC Pump Vibration High) and 1SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm ~30 sec after starting 182 RCP.

COMMENTS:

CR0-408a - f Page 7 of 11 STEP 6: 1SA-9 I D-2 (RC Pump Vibration High) 1SA-9 I E-2 (RC Pump Vibration Emergency High)

Step 3.1 Use one of the following means to verify RCP vibration conditions:

  • Verify vibration readings on RCP OAC Display Group RCP .
  • IF the OAC is unavailable, verify the alarm by referring to RCP - SAT Vibration Monitoring Chart Recorder.

STANDARD: Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. - UNSAT EXAMINER NOTE: The Candidate may refer to either 1SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration). ARG guidance is similar in either case.

COMMENTS:

STEP 7: 1SA-9 I D-2 (RC Pump Vibration High)

Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies: SAT STANDARD: Candidate determines that 1B1 RCP vibrations are not increasing and Step 3.2 does not apply.

Candidate continues to Step 3.3. - UNSAT EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm. (1 SA-9 I E-2)

COMMENTS:

CR0-408a - f Page 8 of 11 STEP 8: 1SA-9 I D-2 (RC Pump Vibration High)

Step 3.3 1SA-9 I E-2 (RC Pump Vibration Emergency High)

Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

- SAT STANDARD: Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP.

- UNSAT EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16.

COMMENTS:

STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria),

THEN perform Steps 4.2 - 4.11 .

- SAT STANDARD: Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.

COMMENTS: - UNSAT STEP 10: Step 4.2 Verify MODE 1 or 2 STANDARD: Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. - SAT COMMENTS:

- UNSAT

CR0-408a - f Page 9 of 11 STEP 11: Step 4.2 RNO CRITICAL STEP Stop the affected RCP.

STANDARD: Candidate stops the 182 RCP.

SAT EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS: UN SAT END TASK STOP TIME: _ _ _ __

CR0-408a - f Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)

INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.

CR0-508 - g Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CANDIDATE EXAMINER

CR0-508 - g Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Pump the Quench Tank Alternate Path:

No Facility JPM #:

CR0-508 KIA Rating(s):

System: 007 KIA: A1.01 Rating: 2.9/3.1 Task Standard:

Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ __ Perform X Simulate

References:

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___,!_ _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-508 - g Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 211
2. Place TIO sheet tags on QT Drain Pump and Component Drain Pump.
3. Update Boron Status board to show last 1A BHUT boron sample as being > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old.
4. Provide a copy of OP/1/A/1104/017 Encl 4.1 with the following:
  • Limits & Precautions
  • Steps 1.1 through 1.4 signed off.
5. Go to RUN

CR0-508 - g Page 4 of 9 Tools/Equipment/Procedures Needed:

  • OP/1/A/1104/017 Limits & Precautions
  • OP/1/A/1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • Unit 1 is Shutdown
  • Unit 1 Quench Tank level is:::::: 86"
  • Quench Tank is aligned to 1A BHUT
  • Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75"

CR0-508 - g Page 5 of 9 START TIME: _ __

STEP 1: Step 2.1 CRITICAL STEP Ensure open:

_ 1CS-5 (COMPONENT DRN PUMP SUCTION)

_ 1CS-6 (COMPONENT DRN PUMP SUCTION)

- SAT STANDARD: Candidate ensures 1CS-5 and 1CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF.

- UNSAT Candidate continues to Step 2.2.

COMMENTS:

STEP 2: Step 2.2 IF QT level will be maintained in normal operating band:

2.2.1 IF desired, start COMPONENT DRAIN PUMP.

2.2.2 IF desired, start QUENCH TANK DRAIN PUMP.

STANDARD: Candidate recognizes from the Initial Conditions that this step is N/A and - SAT moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is80-100" when RCS - UNSAT pressure> 45 psig per L&P 2.4 of OP/1/A/1104/017.

COMMENTS:

STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:

_2.3.1 Ensure RCS pressure < 45 psig.

- SAT STANDARD: Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig.

Candidate continues to Step 2.3.2.

- UNSAT COMMENTS:

I

CR0-508 - g Paqe 6 of 9 CRITICAL STEP STEP 4: Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD: *Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.

EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the _SAT pump at == 80".

EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to _UNSAT complete the task. The candidate's instructions were to use both.

COMMENTS:

CRITICAL STEP STEP 5: Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD: *Candidate places the QUENCH TANK DRAIN PUMP switch in the _SAT BYPASS position.

EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The _UNSAT candidate's instructions were to use both.

EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank.

COMMENTS:

STEP 6: Step 2.3.4 CRITICAL STEP At desired level (==75'), perform the following:

  • Ensure stopped COMPONENT DRAIN PUMP
  • Ensure stopped QUENCH TANK DRAIN PUMP

_SAT STANDARD: Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP.

_UNSAT COMMENTS:

I

CR0-508 - g p age 7 0 f 9 CRITICAL STEP STEP 7: Step 2.4.

Perform the following:

_Close 1CS-5 (COMPONENT DRN PUMP SUCTION)

_Close 1CS-6 (COMPONENT DRN PUMP SUCTION)

- SAT STANDARD: Candidate closes 1CS-5 and 1CS-6 by placing each control switch in the closed position. The green closed light illuminates and the red open light extinguishes.

- UNSAT COMMENTS:

STEP 8: Step 2.5.

IF 1A BHUT boron sample> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old AND QT pumped to 1A BHUT, perform the following:

_2.5.1 Verify closed 1CS-46 (1 A RC BLEED XFER PUMP DISCHARGE).

_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

_2.5.3 Start 1A BLEED TRANSFER PUMP.

BOOTH CUE: When called report as NEO: "Using Time Compression, I am standing by to read 1A Bleed Transfer Pump discharge pressure at (1 CS-PG-0084)".

- SAT STANDARD: Candidate verifies 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off. - UN SAT Candidate dispatches NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off.

EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.

COMMENTS:

END OF TASK STOP TIME: _ _ _ __

CR0-508 - g Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Step required to align the flow path from the QT to 1A SHUT 4 This step is required to begin the level decrease in the Quench Tank.

5 This step is required to begin the level decrease in the Quench Tank.

6 This step stops the QT Drain Pump and the Component Drain Pump when the QT is ::::: 75 inches 7 This step isolates the flow path from the QT to 1A SHUT

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is== 86" Quench Tank is aligned to 1A BHUT .1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPENENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at== 75"

CR0-80ia - h Page 1 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-801a ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CANDIDATE EXAMINER

CR0-801a - h Page 2 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path:

Yes Facility JPM #:

CR0-801 KIA Rating(s):

System: 075 KIA: A2.01 Rating: 3.0* /3.2 Task Standard:

CCW Intake Canal is aligned for recirc Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x....__ In-Plant _ __ Perform X Simulate

References:

AP/1/A/1700/13 (CCW Dam Failure)

Validation Time: 15 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-801a - h Page 3 of 18 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall snap 214
2. Import simulator files for CR0-801 a
3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.
4. Go to RUN as directed by examiner
5. When asked to dispatch an operator to close the breaker for 1CCW-12 (at step 17)

Fire Timer #1 and inform student that using time compression the breaker is closed.

CR0-801a - h Page 4 of 18 Tools/Equipment/Procedures Needed:

  • AP/1/A/1700/013 (Dam Failure)

READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Security reports that a failure of the Newry Dam has occurred.
  • The CCW Intake Canal is intact
  • Subsequent Actions of AP/1/A/1700/013 (Dam Failure) have been completed up to step 4.4.

INITIATING CUE:

The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

CR0-801a - h Page 5 of 18 ST ART TIME: _ __

STEP 1: Step 4.4 CRITICAL STEP Depress the "CCW DAM FAILURE" pushbutton.

STANDARD: The "CCW DAM FAILURE" pushbutton is located by the student on - SAT 1AB3 and depressed.

COMMENTS:

- UNSAT STEP 2: Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms.

- SAT STANDARD: An individual is dispatched to report damage to the ControLRooms.

Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam

- UNSAT COMMENTS:

STEP 3: Step 4.6 GO TO step 4.49 - SAT STANDARD: Student goes to step 4.49 COMMENTS: - UNSAT

CR0-801a - h Page 6 of 18 STEP 4: Step 4.49 *CRITICAL STEP

  • Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored

- SAT STANDARD: *The control switches for RCPs 1A1, 1A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.

CR SRO notified of RCP status

- UNSAT COMMENTS:

STEP 5: Step 4.50 Stop all CCW pumps.

STANDARD: 1A, 1B, 1C, and 1D CCW Pump switches are located by the student on - SAT 1AB3.

Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.

COMMENTS:

- UNSAT STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES).

STANDARD: Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and - SAT indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.

COMMENTS:

- UNSAT

CR0-801a - h Page 7 of 18 l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13):

1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) (01 D0281)

- SAT 1 CCW-25 (Condenser 1C2 Outlet) (01 D0283)

STANDARD: The student monitors the Operator Aid Computer to verify the following:

- UNSAT 1 CCW-20 (Condenser 1A1 Outlet) closed (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 181 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 182 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1C2 Outlet) closed (01 D0283)

COMMENTS:

STEP 8: Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.

  • 1CCW-25 STANDARD: An operator is dispatched to place the condenser outlet valves* in HAND.

- UNSAT Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND.

COMMENTS:

CR0-801a - h Page 8 of 18 I STEP 9: Step 4.54 Verify CCW-8 is open.

- SAT STANDARD: CCW-8 switch and indication is located by the student on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS: - UNSAT STEP 10: Step 4.55 Notify Unit 2 that emergency CCW siphon flow has been established on Unit 1.

- SAT STANDARD: Unit 2 Control Room is notified that siphon flow has been established on Unit 1.

Examiner/Booth Cue: When candidate contacts Unit 2, acknowledge the notification that CCW siphon flow has been established on Unit 1. - UNSAT COMMENTS:

STEP 11: Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).

- SAT STANDARD: Operator(s) are dispatched to perform Enclosure 5.2.

Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2

- UN SAT COMMENTS:

CR0-801a - h Page 9 of 18 STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.

- SAT STANDARD: Student continues to step 4.58.

Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.

- UNSAT COMMENTS:

STEP 13: Step 4.58 Determine which CCW Pump will be started.

SAT STANDARD: The student determines from the turnover that the "1C" CCWP will be started COMMENTS:

- UN SAT STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.

- SAT STANDARD: Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

- UN SAT

CR0-801a - h Page 10 of 18 STEP 15: Step 4.60 Verify the 1A or 1B CCW Pump is to be started.

- SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.

COMMENTS:

- UNSAT STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed.

1CCW-12 1CCW-13 - SAT STANDARD: The student notes that the discharge valve for the 1C CCW pump (1CCW-12} is not closed and proceeds to the RNO.

- UNSAT COMMENTS:

STEP 17: Step 4.63 RNO Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed}

- SAT STANDARD: The student dispatches an operator to locally close 1CCW-12 from the breaker switch (1XS3-2E).

BOOTH CUE: When an operator is dispatched, fire TIMER #1, then inform candidate that 1CCW-12 is closed (use time compression)

- UN SAT COMMENTS:

CR0-801a - h Page 11 of 18 ALTERNATE PATH STEP 18: Step 4.64 Start the selected CCW Pump.

- SAT STANDARD: *The student starts 1C CCW pump by rotating the control switch to the CLOSE position.

"1 C" CCW Pump will NOT start. Since there is no guidance in the RNO column, the student will continue to step 4.65

_UNSAT COMMENTS:

STEP 19: Step 4.65 Verify the started CCW Pump Discharge valve opened.

- SAT STANDARD: The "1C" CCW Pump did not start and the discharge valve(1CCW-12}

did not open. Since this step cannot be performed, the student will proceed to the RNO column

- UNSAT COMMENTS:

STEP 20: Step 4.65 RNO

1. Stop th.e operating CCW pump
2. GO TO Step 4.58 to attempt to start a different CCW pump

- SAT STANDARD: The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1D CCW pump.

- UN SAT COMMENTS:

CR0-801a- h Page 12 of 18 STEP 21: Step 4.58 Determine which CCW Pump will be started.

- SAT STANDARD: The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:

- UNSAT STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.

- SAT STANDARD: Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

- UN SAT STEP 23: Step 4.60 Verify the 1A or 1B CCW Pump is to be started.

- SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.

COMMENTS:

- UN SAT

CR0-801a - h Page 13 of 18 STEP 24: Step 4.63 Verify both of the following CCW pump discharge valves are closed.

1CCW-12 1CCW-13 - SAT STANDARD: Both valves are determined to be closed. It is critical to ensure both valves are closed however they may have been closed at step 17 of this JPM and therefore already be closed at this step. IF CCW-12 or CCW-13 are open when reaching this step, closing them at this step is critical. - UNSAT COMMENTS:

STEP 25: Step 4.64 *CRITICAL STEP Start the selected CCW Pump.

STANDARD: *The student starts 1D CCW pump by rotating the control switch to the - SAT CLOSE position.

Student observes that the 1CCW-13 begins to open and the 1D CCW pump will start.

- UNSAT COMMENTS:

STEP 26: Step 4.65 Verify the started CCW Pump Discharge valve opened.

- SAT STANDARD: Determine that the "1 D" CCW Pump discharge valve (1 CCW-13) indicates Open.

COMMENTS:

- UNSAT

CR0-801a - h Page 14 of 18 STEP 27: Step 4.66 Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP.

- SAT STANDARD: The student ensures the CCWP LOAD SHED DEFEAT switch is in the "1 D" CCW Pump position

- UNSAT COMMENTS:

STEP 28: Step 4.67 Verify CCW-9 opens.

STANDARD: The student locates CCW-9 switch and indication on 2AB3 verifying red - SAT "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS:

- UN SAT STEP 29: Step 4.68 Verify CCW-8 is closed.

STANDARD: CCW-8 switch and indication are located by the student on 2AB3 - SAT verifying green "CLOSED" indication illuminated and red "OPEN" indication extinguished.

COMMENTS:

- UNSAT

CR0-801a - h Page 15 of 18 STEP 30: Step 4.69 Verify an operator has been dispatched to open 1DP-FSC (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

- SAT STANDARD: An operator has not yet been dispatched so the student proceeds to the RNO.

COMMENTS:

_UNSAT STEP 31: Step 4.69 RNO Dispatch an operator to open 1DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

- SAT STANDARD: Operator dispatched.

Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8

- UN SAT COMMENTS:

STEP 32: Step 4.70 Ensure the discharge valves on all stopped CCW Pumps are closed.

CCW-10 (1A CCW PUMP DISCHARGE VLV)

CCW-11 (18 CCW PUMP DISCHARGE VLV) - SAT CCW-12 (1C CCW PUMP DISCHARGE VLV)

STANDARD: CCW pump discharge valve indications are located by the student on 1AB3.

- UNSAT Valves associated with tripped CCW pumps (white lights lit) will have the green "CLOSED" indication illuminated.

COMMENTS:

CR0-801a - h Page 16 of 18 STEP 33: Step 4.71 Notify Unit 2 and 3 to ensure all Unit 2 and 3 CCW pump discharge valves are closed.

STANDARD: Unit 2 and 3 are notified to ensure their CCW Pump Discharge valves are closed.

SAT EXAMINER CUE: Another operator will continue with this procedure.

UNSAT COMMENTS:

END TASK TIME STOP: _ __

CR0-801a - h Page 17 of 18 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is critical because depressing this pushbutton trips all operating CCW Pumps and sets up system logic for CCW recirculation flow.

4 This step is critical because RCPs must be stopped to reduce primary heat load.

25 This step is critical because the pump provides the necessary recirculation flow.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)

INITIAL CONDITIONS:

Security reports that a failure of the Newry Darn has occurred.

The CCW Intake Canal is intact Subsequent Actions of AP/1/A/1700/013 (Darn Failure) have been completed up to step 4.4.

INITIATING CUE:

The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

A0-710 - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER

A0-710 - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the 1A Reactor Building Hydrogen Analyzer In Service Alternate Path:

No Facility JPM #:

A0-010 KIA Rating(s):

System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:

Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _x_ Perform Simulate _x_

References:

EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Validation Time: 12 minutes Time Critical:Yes

=========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

A0-710 - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None

A0-710 - i Page 4 of 12 Tools/Equipment/Procedures Needed .2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A LOCA has occurred on Unit 1.

Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

START TIME: _ __

NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.

STEP 1: Step 1 At 1A H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range .

- SAT

  • Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following:

_ 1PR-83 (BYP TO POST AC 1SV220) - UN SAT

_ 1 PR-86 (BYP TO POST AC 1SV221)

STANDARD: Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "A").

Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.

Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:

Train A

  • PR-83 (Bypass to Post Accident Sample Panel)
  • PR-86 (Bypass from Post Accident Sample Panel)

Cue: Indication is as you see it COMMENTS:

NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.

STEP 2: Step 2 At 1B H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range .

- SAT

  • Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following:

_ 1 PR-89 (BYP TO POST AC 1SV220) - UN SAT

_ 1PR-92 (BYP TO POST AC 1SV221)

STANDARD: Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "B").

Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.

Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:

Train A

  • PR-89 (Bypass to Post Accident Sample Panel)
  • PR-92 (Bypass from Post Accident Sample Panel)

Cue: Indication is as you see it COMMENTS:

STEP 3: Step 3 Notify Control Room to perform thefollowing: CRITICAL STEP

  • Open 1 PR-87 and 1 PR-90 STANDARD: Unit 1Control Room personnel are notified to open 1PR-81, 1PR-84, 1PR-87, and 1PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.

Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. SAT COMMENTS:

UNSAT

CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.

It should return down scale to the correct reading in"' 3 minutes.

STEP 4: Step 4 At 1A H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.

_SAT

  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

_UNSAT

  • PR-71 (Top of Containment Sample) for Train 'A' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode.

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed.

Cue: Control is from the remote panel.

Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%

hydrogen concentration COMMENTS:

CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.

It should return down scale to the correct reading in"' 3 minutes.

STEP 5: Step 5 At 1B H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I STANDBY I ANALYZE switch to ANALYZE .

- SAT

  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

- UNSAT

  • PR-76 (Top of Containment Sample) for Train 'B' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode .

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed .

Cue: Control is from the remote panel.

Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%

hydrogen concentration COMMENTS:

STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates< 2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train.

_ 1A RB Hydrogen Analyzer Train

- SAT STANDARD: ALARM RESET Pushbutton is depressed for both trains.

Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on - UNSAT both trains.

Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.

COMMENTS:

STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1A Hydrogen Analyzer Train is in service.

SAT STANDARD: Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service.

Cue: Control room acknowledges Hydrogen Analyzers is in service. - UN SAT COMMENTS:

STEP 6: Step 8 EXIT this enclosure.

STANDARD: Procedure is exited.

- SAT COMMENTS:

- UN SAT END TASK STOP TIME: _ _ _ __

CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Opens the block valves to the 1A and 1B H2 analyzer.

4 Starts the Analyzer pump and the sampling process for the 1A H2 Analyzer 5 Starts the Analyzer pump and the sampling process for the 1B H2 Analyzer

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A LOCA has occurred on Unit 1.

Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

CR0-805 - j Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 OATC Actions for Control Room Evacuation CANDIDATE EXAMINER

CR0-805 - j Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Remove Control Power Fuses and Open Breakers as directed by AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Alternate Path:

No Facility JPM #:

A0-805 KIA Rating(s):

System: BWI A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:

Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _x_ Perform Simulate _x_

References:

AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Validation Time: 25 minutes Time Critical: No

=========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.!_ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CR0-805 - j Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS None

CR0-805 - j Page 4 of 11 Tools/Equipment/Procedures Needed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5. (OATC Actions for Control Room Evacuation)

CR0-805 - j Page 5 of 11 START TIME: _ __

EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM.

STEP 1: Step 10 CRITICAL STEP Remove all control power fuses from 38 HPI Pump at 3TE-9 (T-3/L45).

STANDARD: Candidate locates the 4160V breaker cabinet for the 38 HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 2: Step 11 CRITICAL STEP Remove all control power fuses from 3C HPI Pump at 3TD-9 (T-3/L44).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 6 of 11 STEP 3: Step 12 CRITICAL STEP Remove all control power fuses from 3B RBS Pump at 3TD-11 (T-3/L44).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 4: Step 13 CRITICAL STEP Remove all control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 7 of 11 STEP 5: Step 10 CRITICAL STEP Remove all control power fuses from 3A RBS Pump at 3TC-1 O (T-3/L43).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 6: Step 15 CRITICAL STEP Open the following breakers (U3 Equip Rm):

- UNSAT STANDARD: Candidate locates the following breakers and positions the handles to the OPEN position:

Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM.

COMMENTS:

CR0-805 - j Page 8 of 11 STEP 7: Step 16 CRITICAL STEP Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 8: Step 17 CRITICAL STEP Remove all control power fuses from 382 RC PUMP beaker at 3TB-9 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 382 RC Pump and indicates that the upper compartment door would be opened

- UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 9 of 11 STEP 9: Step 18 CRITICAL STEP Remove all control power fuses from 3A 1 RC PUMP beaker at 3T A-3 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A 1 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 10: Step 19 CRITICAL STEP Remove all control power fuses from 381 RC PUMP beaker at 3TA-4 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 381 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

Examinet Cue: Another operator will continue with this procedure END TASK

CR0-805 - j Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP# Explanation All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5.(0ATC Actions for Control Room Evacuation)

A0-427 - k Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-427 Reset an Emergency Feedwater Pump Turbine CANDIDATE EXAMINER

A0-427 - k Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Reset the TDEFWP Alternate Path:

NO Facility JPM #:

A0-027 KIA Rating(s):

System: 061 KIA: A2.04 Rating: 3.4/3.8 Task Standard:

Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _ _ In-Plant _"'""'X'-- Perform Simulate _x_

References:

Rule 3 (Loss of Main or Emergency FDW)

EOP Enclosure 5.26 (Manual Start of TDEFDWP)

Validation Time: 8 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

A0-427 - k Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE

A0-427 - k Page 4 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)

READ TO OPERATOR DIRECTIONS TO CANDIDATE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.

A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.

A0-427 - k Page 5 of 10 START TIME: _ __

STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located) - SAT Verify TDEFDWP trip device tripped.

STANDARD: Candidate determines from the Initial Conditions that Unit 2 TD EFDW - UNSAT pump is tripped.

Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".

COMMENTS:

STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK.

- SAT STANDARD: Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK.

Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. - UNSAT COMMENTS:

STEP 3: Step 3 CRITICAL STEP Push reset lever toward turbine shaft until engaged:

STANDARD: Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. - SAT Cue: Indicate to candidate that the reset lever is engaged.

COMMENTS: - UN SAT STEP 4: Step 4 CRITICAL STEP Rotate spindle fully clockwise.

- SAT STANDARD: Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop.

Cue: Indicate to candidate that the spindle is in its full clockwise position. - UN SAT COMMENTS:

A0-427 - k Page 6 of 10 STEP 5: Step 5 CRITICAL STEP Rotate spindle fully counter-clockwise.

- SAT STANDARD: Candidate observes spring plate in its full up position.

Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.

- UNSAT COMMENTS:

STEP 6: Step 6 Rotate spindle % turn clockwise.

- SAT STANDARD: Candidate rotates spindle % turn clockwise.

Cue: Indicate to candidate that the spindle is 14 turn from full counterclockwise position. - UNSAT COMMENTS:

STEP 7: Step 7 Notify CRO to place TDEFDWP switch in RUN: - SAT STANDARD: Candidate notifies Unit 2 CRO by phone/radio to place Unit 2 TD EFDW pump switch in RUN:

- UN SAT Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.

COMMENTS:

STEP 8: Step 8

- SAT Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD: Candidate locates 2MS-93 and determines the valve is Open.

- UNSAT Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible.

COMMENTS:

A0-427 - k Page 7 of 10 STEP 9: Step 8 RNO GO TO Step 11 - SAT STANDARD: Candidate goes to step 11.

- UNSAT COMMENTS:

STEP 10: Step 11 Verify TDEFDWP running - SAT STANDARD: Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.

- UNSAT Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.

COMMENTS:

STEP 10: Step 12 EXIT this enclosure - SAT STANDARD: Candidate exits the enclosure Cue: Indicate to candidate that this task is complete. - UN SAT COMMENTS:

END TASK TIME STOP: _ __

A0-427 - k Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP# Explanation 3 This step is required to reset 2MS-94 4 This step is required to reset 2MS-94 5 This step is required to reset 2MS-94

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.

A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.