ML17228A901: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED RIDSPROCESSING)
{{#Wiki_filter:ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRXBUTXON SYSTEM(RXDS)ACCESSION NBR:9411080181 DOC~DATE:94/11/02NOTARIZED:
REGULATORY INFORMATION DISTRXBUTXON SYSTEM (RXDS)ACCESSION NBR: 9411080181 DOC~DATE: 94/11/02 NOTARIZED:
YESFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&Light,Co.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFXLIATXON SAGER,D.A.
YES FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light, Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFXLIATXON SAGER,D.A.
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)DOCKET0500033505000389
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000335 05000389


==SUBJECT:==
==SUBJECT:==
Application foramendstolicensesDPR-67&NPF-16,upgrading TS3/4.6.2.1
Application for amends to licenses DPR-67&NPF-16,upgrading TS 3/4.6.2.1&3/4.6.2.3 by adapting combined spec for containment spray&cooling sys contained in std TS for C-E plants.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR i ENCL 3 SIZE:/TITLE: OR Submittal:
&3/4.6.2.3 byadaptingcombinedspecforcontainment spray&coolingsyscontained instdTSforC-Eplants.DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR iENCL3SIZE:/TITLE:ORSubmittal:
General Distribution NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRXS,J INTERNAL: ACRS NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD2-2 PD ILE CENTE~NRR D CH/HICB NRR/DS SA/S PLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
GeneralDistribution NOTES:RECIPIENT IDCODE/NAME PD2-2LANORRXS,JINTERNAL:
PLEASE HELP US TO REDUCE iVKSTE!CONTACT'I'HE DOCL'i!ENT CONTROL DESK, ROOM Pl-37 (EXT.504-0083)To ELI%)IRATE YOUR iAiI E r RoiI D!s rR!o U'I'IoN LIs'rs I:oR Doc!.'@EN I's Yo!.'oN"!'!
ACRSNRR/DE/EELB NRR/DRPWNRR/DSSA/SRXB OGC/HDS3EXTERNAL:
LD!TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 18 0
NOACCOPIESLTTRENCL1111661111111011RECIPIENT IDCODE/NAME PD2-2PDILECENTE~NRRDCH/HICBNRR/DSSA/SPLBNUDOCS-ABSTRACT NRCPDRCOPIESLTTRENCL111111111111NOTETOALL"RIDS"RECIPIENTS:
Florida Power&Light Company, P.O.Box 12S, Fort Pierce, FL34S54-0128 November 2, 1994 L-94-260 10 CFR'0.90 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and.Coolin S stems Pursuant to 10 CFR 50.90, Florida Power&Light Company (FPL)requests to amend Facility Operating Licenses DPR-67 and NPF-16 for St.Lucie Unit, 1 and Unit 2, respectively, by incorporating the attached Technical Specifications (TS)revisions.
PLEASEHELPUSTOREDUCEiVKSTE!CONTACT'I'HE DOCL'i!ENT CONTROLDESK,ROOMPl-37(EXT.504-0083)ToELI%)IRATEYOURiAiIErRoiID!srR!oU'I'IoNLIs'rsI:oRDoc!.'@EN I'sYo!.'oN"!'!
The proposed amendments will.upgrade existing TS 3/4.6.2.1 and TS 3/4.6.2.3 by adapting the combined specification for Containment Spray and Cooling Systems, contained in the Standard Technical Specifications for Combustion Engineering Plants, to the St.Lucie units.The changes account for plant specific differences and include all related requirements of NUREG-1432, Rev.0, specification 3.6.6A.Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).It is requested that the proposed amendments, if approved, be ,issued by January 31, 1995.Attachment 1 is an evaluation of the proposed changes.Attachment 2 is the"Determination of No Significant Hazards Consideration." Attachments 3 and 4 contain copies of the appropriate technical specifications pages marked up to show the proposed changes.The proposed amendments have been reviewed by the St.Lucie Facility Review Group and the FPL Company Nuclear Review Board.In accordance with 10 CFR 50.91 (b)(1), copies of the proposed amendments are being forwarded to the State Designee for the State of Florida.Please contact us if there are any questions about this submittal.
LD!TOTALNUMBEROFCOPIESREQUIRED:
Very truly yours, o D.A.ger Vice r sident St.c'e Plant 901 l 080 K B 1 941 102 PDR ADQCK 05000335 PDR an FPL Group companY y0'I 4'I St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Page 2 DAS/RLD Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC.Senior Resident Inspector, USNRC, St.Lucie Plant.Mr.W.A.Passetti, Florida Department of Health and Rehabilitative Services.
LTTR19ENCL18 0
y,(14, l I~>l~',i-:~f<t'I St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment, S ra and Coolin S stems L-94-260 Page 3 STATE OF FLORIDA))COUNTY OF ST LUCIE SS~D.A.Sager being first duly sworn, deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power&Light Company, the Licensee hereinr That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.D.A.er STATE OF FLORIDA COUNTY OF SC, I veil The foregoing instrument.
FloridaPower&LightCompany,P.O.Box12S,FortPierce,FL34S54-0128 November2,1994L-94-26010CFR'0.90U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555RE:St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment Sraand.CoolinSstemsPursuantto10CFR50.90,FloridaPower&LightCompany(FPL)requeststoamendFacilityOperating LicensesDPR-67andNPF-16forSt.LucieUnit,1andUnit2,respectively, byincorporating theattachedTechnical Specifications (TS)revisions.
was acknowledged before me this~day of No<fccsfa, 19 l4 by D.A.Sager, who is personally known to me and who did take an oath.Name of Notary Public My Commission expires R~klL l5 l598 Commission No.<<348 989 Ogglllll/lylll ega+e*e Oeg'lllllllmliloo St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems ATTACHMENT 1 EVALUATION OF PROPOSED TS CHANGES St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 1 of 8 EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL)requests that Appendix A of Facility Operating License DPR-67 for St.Lucie Unit 1 (PSL1)and NPF-16 for St.Lucie Unit 2 (PSL2)be changed to upgrade Technical Specifications (TS)3/4.6.2.1 and 3/4.6.2.3.
Theproposedamendments will.upgradeexistingTS3/4.6.2.1 andTS3/4.6.2.3 byadaptingthecombinedspecification forContainment SprayandCoolingSystems,contained intheStandardTechnical Specifications forCombustion Engineering Plants,totheSt.Lucieunits.Thechangesaccountforplantspecificdifferences andincludeallrelatedrequirements ofNUREG-1432, Rev.0,specification 3.6.6A.Accordingly, theproposalisconsistent withtheCommission's FinalPolicyStatement onTechnical Specifications Improvements (58FR39132).Itisrequested thattheproposedamendments, ifapproved, be,issuedbyJanuary31,1995.Attachment 1isanevaluation oftheproposedchanges.Attachment 2isthe"Determination ofNoSignificant HazardsConsideration."
The specifications apply to the Containment Spray and Containment Cooling Systems, respectively.
Attachments 3and4containcopiesoftheappropriate technical specifications pagesmarkeduptoshowtheproposedchanges.Theproposedamendments havebeenreviewedbytheSt.LucieFacilityReviewGroupandtheFPLCompanyNuclearReviewBoard.Inaccordance with10CFR50.91(b)(1),copiesoftheproposedamendments arebeingforwarded totheStateDesigneefortheStateofFlorida.Pleasecontactusifthereareanyquestions aboutthissubmittal.
This line-item improvement will clarify the actions required for inoperable equipment associated with the depressurization and cooling systems installed in the reactor containment building, and will provide consistency of operations between PSL1 and PSL2.The proposed changes will combine TS 3/4.6.2.1 and 3/4.6.2.3 into a single Limiting Condition for Operation (LCO)similar to specification 3.6.6A of the Standard Technical Specifications (STS)for Combustion Engineering Plants (NUREG-1432, Rev.0).The proposed LCO, accounting for plant specific differences, includes all related NUREG-1432 requirements.
Verytrulyyours,oD.A.gerVicersidentSt.c'ePlant901l080KB1941102PDRADQCK05000335PDRanFPLGroupcompanYy0'I 4'I St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Page2DAS/RLDAttachments cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRC.SeniorResidentInspector, USNRC,St.LuciePlant.Mr.W.A.Passetti, FloridaDepartment ofHealthandRehabilitative Services.
Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).PSL1 and PSL2 Pro osed Technical S ecification Chan es INDEX Pa e VI PSL1 and Pa e VII PSL2: The title"Containment Spray System" will be revised to read,"Containment Spray and Cooling Systems." The title"Containment Cooling System" and its reference page will be deleted.TS 3 4.6.2.1 Containment S ra S stem: The existing LCO requires two independent containment spray systems to be OPERABLE in MODES 1 and 2, and in MODE 3 when pressurizer pressure is>1750 psia.The wording for this LCO and the associated ACTION statement(s) for an inoperable spray train will be replaced in their entirety pursuant.to the bases and guidance provided in NUREG-1432, specification 3.6.6A, CONTAINMENT SPRAY AND COOLING SYSTEMS.The NUREG-1432 tabular arrangement of conditions, required actions, and action completion times will be restructured into the narrative form consistent with the PSL1 and PSL2 TS format.
y,(14,lI~>l~',i-:~f<t'I St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment, SraandCoolinSstemsL-94-260Page3STATEOFFLORIDA))COUNTYOFSTLUCIESS~D.A.Sagerbeingfirstdulysworn,deposesandsays:ThatheisVicePresident, St.LuciePlantfortheNuclearDivisionofFloridaPower&LightCompany,theLicenseehereinrThathehasexecutedtheforegoing document; thatthestatements madeinthisdocumentaretrueandcorrecttothebestofhisknowledge, information andbelief,andthatheisauthorized toexecutethedocumentonbehalfofsaidLicensee.
~~St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 2 of 8 The existing surveillance re uirements for the Containment Spray System will not be altered.However, the proposed specification will incorporate the surveillances required for the Containment Cooling System.The footnote"*", which provides an explanation of MODE 3 APPLICABILITY, will be deleted.The proposed LCO has been structured such that the footnote will not be necessary.
D.A.erSTATEOFFLORIDACOUNTYOFSC,IveilTheforegoing instrument.
TS 3 4.6.2.3 Containment Coolin S stem: This specification will be deleted in its entirety.Bases a es B 3 4 6-2 and B 3 4 6-3: Bases section 3/4.6.2.1 will be revised to reflect the bases for the proposed specification.
wasacknowledged beforemethis~dayofNo<fccsfa, 19l4byD.A.Sager,whoispersonally knowntomeandwhodidtakeanoath.NameofNotaryPublicMyCommission expiresR~klLl5l598Commission No.<<348989Ogglllll/lylll ega+e*eOeg'lllllllmliloo St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsATTACHMENT 1EVALUATION OFPROPOSEDTSCHANGES St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page1of8EVALUATION OFPROPOSEDTSCHANGESIntroduction FloridaPowerandLightCompany(FPL)requeststhatAppendixAofFacilityOperating LicenseDPR-67forSt.LucieUnit1(PSL1)andNPF-16forSt.LucieUnit2(PSL2)bechangedtoupgradeTechnical Specifications (TS)3/4.6.2.1 and3/4.6.2.3.
Bases section 3/4.6.2.3 will be deleted.The applicable TS pages have been marked-up to show the proposed changes, and are provided in Attachments 3 and 4 to this submittal.
Thespecifications applytotheContainment SprayandContainment CoolingSystems,respectively.
Back round The function of the Containment Spray (CS)System is to provide containment heat, removal and iodine removal during accident conditions.
Thisline-item improvement willclarifytheactionsrequiredforinoperable equipment associated withthedepressurization andcoolingsystemsinstalled inthereactorcontainment
It accomplishes its function through the use of two redundant spray trains which are capable of taking suction from the Refueling Water Tank (RWT)on a Containment Spray Actuation Signal (CSAS), automatically transferring suction to the containment sump on a Recirculation Actuation Signal (RAS), and transferring heat to the ultimate heat sink via the component cooling water (CCW)and intake cooling water (ICW)systems.Each train consists of a spray pump, shutdown cooling heat exchanger, piping, valves, and spray header;and is capable of satisfying at least 504 of accident heat removal requirements.
: building, andwillprovideconsistency ofoperations betweenPSL1andPSL2.TheproposedchangeswillcombineTS3/4.6.2.1 and3/4.6.2.3 intoasingleLimitingCondition forOperation (LCO)similartospecification 3.6.6AoftheStandardTechnical Specifications (STS)forCombustion Engineering Plants(NUREG-1432, Rev.0).TheproposedLCO,accounting forplantspecificdifferences, includesallrelatedNUREG-1432 requirements.
One train of the CS system, in conjunction with its Spray Additive/Iodine Removal System, can satisfy post-accident iodine removal requirements.
Accordingly, theproposalisconsistent withtheCommission's FinalPolicyStatement onTechnical Specifications Improvements (58FR39132).PSL1andPSL2ProosedTechnical Secification ChanesINDEXPaeVIPSL1andPaeVIIPSL2:Thetitle"Containment SpraySystem"willberevisedtoread,"Containment SprayandCoolingSystems."
In the event offsite power is lost, each train is powered by an emergency diesel generator.
Thetitle"Containment CoolingSystem"anditsreference pagewillbedeleted.TS34.6.2.1Containment SraSstem:TheexistingLCOrequirestwoindependent containment spraysystemstobeOPERABLEinMODES1and2,andinMODE3whenpressurizer pressureis>1750psia.ThewordingforthisLCOandtheassociated ACTIONstatement(s) foraninoperable spraytrainwillbereplacedintheirentiretypursuant.
The function of the Containment Cooling System is to provide containment heat removal during both normal operation and accident conditions.
tothebasesandguidanceprovidedinNUREG-1432, specification 3.6.6A,CONTAINMENT SPRAYANDCOOLINGSYSTEMS.TheNUREG-1432 tabulararrangement ofconditions, requiredactions,andactioncompletion timeswillberestructured intothenarrative formconsistent withthePSL1andPSL2TSformat.
It accomplishes its function through the use of two electrically and mechanically independent containment cooling 1" l II t St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L 94 260 Attachment 1 Page 3 of 8 trains.Four fan coolers, two per train, transfer heat to the ultimate heat sink via the CCW and ICW systems.Each train is capable of satisfying at least 50%of accident heat removal requirements, and each train is powered by an emergency diesel generator in the event offsite power is lost.Each fan is capable of auto-start on a Safety Injection Actuation Signal (SIAS).PSL1 and PSL2 each have a plant specific LCO (TS 3.6.1.5)which provides assurance that the average containment temperature will be maintained
~~St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page2of8Theexistingsurveillance reuirements fortheContainment SpraySystemwillnotbealtered.However,theproposedspecification willincorporate thesurveillances requiredfortheContainment CoolingSystem.Thefootnote"*",whichprovidesanexplanation ofMODE3APPLICABILITY, willbedeleted.TheproposedLCOhasbeenstructured suchthatthefootnotewillnotbenecessary.
<120'F for the purpose of preserving the validity of accident analyses assumptions, environmental qualification of equipment located inside containment, and assumptions made for stress analyses of reactor vessel supports.Each PSL unit also has a plant specific LCO for the Spray Additive/Iodine Removal System (TS 3.6.2.2)to ensure that sufficient additives are available for injection into the containment spray.Evaluation of the Chan es Pro osed for PSL1 and PSL2 LCO: The containment analyses for PSL1 and PSL2 demonstrate that the removal of design basis accident (DBA)heat loads can be accomplished by at least one train of the containment spray system in conjunction with one train of the containment cooling system;and that requirements for iodine removal from the containment atmosphere can be satisfied by a single CS train.The proposed LCO requires two containment spray trains and two containment cooling trains to be OPERABLE.Therefore, in the event of an accident and considering single failure criteria, the heat and iodine removal requirements will be satisfied.
TS34.6.2.3Containment CoolinSstem:Thisspecification willbedeletedinitsentirety.
The wording of the proposed LCO is the same as the STS.APPLICABILITY:
BasesaesB346-2andB346-3:Basessection3/4.6.2.1 willberevisedtoreflectthebasesfortheproposedspecification.
The proposed APPLICABILITY for the CS System is the same as existing LCO 3.6.2.1, e.g., MODES 1 and 2, and MODE 3 with pressurizer pressure~1750 psia.It is noted that the pressure criterion specified for MODE 3 operation is a plant specific difference from the generic STS.FPL desires to retain this previously approved stipulation since, during shutdown and cooldown of the reactor coolant system (RCS), the CS system must be removed from service during the preparations necessary for shutdown cooling operations.
Basessection3/4.6.2.3 willbedeleted.Theapplicable TSpageshavebeenmarked-up toshowtheproposedchanges,andareprovidedinAttachments 3and4tothissubmittal.
St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 4 of 8 FPL has evaluated the PSL1 and PSL2 containment pressure and temperature response to the limiting loss of coolant (LOCA)and main steam line break (MSLB)accidents during MODE 3 conditions.
BackroundThefunctionoftheContainment Spray(CS)Systemistoprovidecontainment heat,removalandiodineremovalduringaccidentconditions.
The results of this evaluation confirm that, with pressurizer pressure<1750 psia, containment design pressure and temperature will not be exceeded when two containment fan coolers are operable (both CS trains were assumed to be out of service).The proposed LCO requires two trains (two fan coolers per train)of containment cooling to be OPERABLE throughout the entire MODE 3 range of operation.
Itaccomplishes itsfunctionthroughtheuseoftworedundant spraytrainswhicharecapableoftakingsuctionfromtheRefueling WaterTank(RWT)onaContainment SprayActuation Signal(CSAS),automatically transferring suctiontothecontainment sumponaRecirculation Actuation Signal(RAS),andtransferring heattotheultimateheatsinkviathecomponent coolingwater(CCW)andintakecoolingwater(ICW)systems.Eachtrainconsistsofaspraypump,shutdowncoolingheatexchanger, piping,valves,andsprayheader;andiscapableofsatisfying atleast504ofaccidentheatremovalrequirements.
Therefore, retaining the previously approved, pressure dependent MODE 3 applicability for the CS System will afford a more efficient and timely transition to Shutdown Cooling System operation without loss of an acceptable ability to mitigate the postulated accidents.
OnetrainoftheCSsystem,inconjunction withitsSprayAdditive/Iodine RemovalSystem,cansatisfypost-accidentiodineremovalrequirements.
In addition, agreement with the applicability of related LCO 3.6.2.2 (Spray Additive/Iodine Removal System)will be preserved.
Intheeventoffsitepowerislost,eachtrainispoweredbyanemergency dieselgenerator.
The proposed APPLICABILITY for the Containment Cooling System is the same as existing LCO 3.6.2.3, e.g., MODES 1, 2, and 3.To verify that lower mode applicability should not be required;FPL has evaluated the PSL1 and PSL2 containment pressure and temperature response to the limiting LOCA and MSLB accidents for operations with the RCS temperature at 360'F.The results of this evaluation confirm that the containment design pressure and temperature will not be exceeded with both CS trains and all four fan coolers out of service.Operational MODES 4, 5 and 6 occur at RCS temperatures below 325 4F, and the impact on containment parameters from potential accidents will be further reduced in these lower modes.Therefore, FPL considers the proposed APPLICABILITY for the Containment Cooling System to be acceptable, and to be consistent with the STS.ACTION-i.a:
ThefunctionoftheContainment CoolingSystemistoprovidecontainment heatremovalduringbothnormaloperation andaccidentconditions.
With one CS train inoperable, proposed ACTION-1.a requires the inoperable train to be restored to OPERABLE status within 72 hours and within 10 days of initial discovery of failure to meet the LCO.In this condition, the remaining OPERABLE spray and cooling trains are capable of providing the iodine removal function and at least 100%of accident heat load removal.The 72 hour completion time takes into account the redundant heat and iodine removal capability afforded by the Containment Spray System, reasonable time for repairs, and the low probability of a DBA occurring during this period.The 10 days (from initial discovery St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 5 of 8 of failure to meet the LCO)portion of the completion time is based on engineering judgement, and clarifies that failure to completely satisfy the LCO for an excessive interval is not permitted.
Itaccomplishes itsfunctionthroughtheuseoftwoelectrically andmechanically independent containment cooling 1"lIIt St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL94260Attachment 1Page3of8trains.Fourfancoolers,twopertrain,transferheattotheultimateheatsinkviatheCCWandICWsystems.Eachtrainiscapableofsatisfying atleast50%ofaccidentheatremovalrequirements, andeachtrainispoweredbyanemergency dieselgenerator intheeventoffsitepowerislost.Eachfaniscapableofauto-start onaSafetyInjection Actuation Signal(SIAS).PSL1andPSL2eachhaveaplantspecificLCO(TS3.6.1.5)whichprovidesassurance thattheaveragecontainment temperature willbemaintained
It takes into account the low probability of coincident entry into two conditions in this specification (defined in proposed ACTION-1.c) coupled with the low probability of an accident occurring during this time.The proposed condition, required action, completion times, and their bases are equivalent to Action"A" of STS LCO 3.6.6A.If the inoperable spray train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-1.a requires the plant to be in MODE 3 within the next 6 hours and in MODE 4 within the following 54 hours.The proposed action will bring the plant to a MODE in which the LCO does not apply.The 6 hour completion time is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner, and without challenging plant systems;and it is consistent with PSL1 and PSL2 TS 3.0.3.The extended interval to reach MODE 4 includes additional time (48 hours)for restoration of the CS train, beyond the 6 hours typically allotted by TS 3.0.3 to enter this mode.This is reasonable when considering that the driving force for a release of radioactive material from the RCS is reduced in MODE 3.The proposed condition, required action, completion times, and their bases are equivalent to Action"B" of STS LCO 3.6.6A.ACTION-1.b:
<120'Fforthepurposeofpreserving thevalidityofaccidentanalysesassumptions, environmental qualification ofequipment locatedinsidecontainment, andassumptions madeforstressanalysesofreactorvesselsupports.
With one containment cooling train inoperable, proposed ACTION-1.b requires the inoperable train to be restored to OPERABLE status within 7 days, and within 10 days from initial discovery of failure to meet the LCO.In this condition, the remaining OPERABLE spray and cooling system components are capable of providing the iodine removal function and at least 1004 of the heat removal needs after an accident.The 7 day completion time takes into account the redundant heat removal capabilities afforded by the combinations of the CS System and the Containment Cooling System, and the low probability of a DBA occurring during this period.The 10 days (from initial discovery of failure to meet the LCO)portion of the completion time is based on engineering judgement, and clarifies that, failure to completely satisfy the LCO for an excessive interval is not permitted.
EachPSLunitalsohasaplantspecificLCOfortheSprayAdditive/Iodine RemovalSystem(TS3.6.2.2)toensurethatsufficient additives areavailable forinjection intothecontainment spray.Evaluation oftheChanesProosedforPSL1andPSL2LCO:Thecontainment analysesforPSL1andPSL2demonstrate thattheremovalofdesignbasisaccident(DBA)heatloadscanbeaccomplished byatleastonetrainofthecontainment spraysysteminconjunction withonetrainofthecontainment coolingsystem;andthatrequirements foriodineremovalfromthecontainment atmosphere canbesatisfied byasingleCStrain.TheproposedLCOrequirestwocontainment spraytrainsandtwocontainment coolingtrainstobeOPERABLE.
It takes into account the low probability of coincident entry into two conditions in this specification (defined in proposed ACTION-1.c), coupled with the St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 6 of 8 low probability of an accident occurring during this time.The proposed condition, required action, completion times, and their bases are equivalent to Action"C" of STS LCO 3.6.6A.If the inoperable containment cooling train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-1.b requires the plant to be in MODE 3 within the next 6 hours and in MODE 4 within the following 6 hours.The proposed action will bring the plant to a MODE in which the LCO does not apply.The allowed completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.The proposed condition, required action, completion times, and their bases are equivalent to Action"F" of STS LCO 3.6.6A;and are consistent with PSL1 and PSL2 TS 3.0.3.ACTION-1.c:
Therefore, intheeventofanaccidentandconsidering singlefailurecriteria, theheatandiodineremovalrequirements willbesatisfied.
With one CS train and one containment cooling train inoperable, proposed ACTION-1.c allows concurrent entry into ACTION-l.a and ACTION-l.b; and allows the action completion intervals to be tracked separately, starting from the time that each train was discovered inoperable.
ThewordingoftheproposedLCOisthesameastheSTS.APPLICABILITY:
The remaining OPERABLE spray and containment cooling system components are capable of providing the iodine removal function and 1004 of accident heat load removal.Considering the narrative format and existing structure of the PSL1 and PSL2 technical specifications, this action statement provides clarification that entry into both ACTIONS-1.a and 1.b within this LCO is permissible, and specifies how each action completion interval will be tracked.Proposed ACTION-l.c is consistent with Part 1.3,"Completion Times", of the STS"USE AND APPLICATION" section.ACTION-i.d:
TheproposedAPPLICABILITY fortheCSSystemisthesameasexistingLCO3.6.2.1,e.g.,MODES1and2,andMODE3withpressurizer pressure~1750psia.Itisnotedthatthepressurecriterion specified forMODE3operation isaplantspecificdifference fromthegenericSTS.FPLdesirestoretainthispreviously approvedstipulation since,duringshutdownandcooldownofthereactorcoolantsystem(RCS),theCSsystemmustberemovedfromserviceduringthepreparations necessary forshutdowncoolingoperations.
With two containment cooling trains inoperable, proposed ACTION-1.d requires at least one cooling train to be restored to OPERABLE status within 72 hours.In this condition, the OPERABLE spray trains are capable of providing the iodine removal function and the heat removal needs after an accident.FPL has evaluated this ,condition for the limiting LOCA and MSLB accidents postulated for the PSLl and PSL2 containment analyses, and has confirmed that two CS trains are capable of satisfying 1004 of the accident heat removal requirements.
St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page4of8FPLhasevaluated thePSL1andPSL2containment pressureandtemperature responsetothelimitinglossofcoolant(LOCA)andmainsteamlinebreak(MSLB)accidents duringMODE3conditions.
The 72 hour completion time takes into account the redundant heat removal capabilities afforded by the CS System, and the low probability of a DBA
Theresultsofthisevaluation confirmthat,withpressurizer pressure<1750psia,containment designpressureandtemperature willnotbeexceededwhentwocontainment fancoolersareoperable(bothCStrainswereassumedtobeoutofservice).
~F St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 7 of 8 occurring during this period.The proposed condition, required action, completion time, and their bases are equivalent to ACTION"D" of STS LCO 3.6.6A.If at least one inoperable containment cooling train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-l.d requires the plant to be in MODE 3 within the next 6 hours and in MODE 4 within the following 6 hours.The proposed action will bring the plant to a MODE in which the LCO does not apply.The allowed completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.The proposed condition, required action, completion times, and their bases are equivalent to Action"F" of STS LCO 3.6.6A;and are consistent with PSLl and PSL2 TS 3.0.3.ACTION-l.e:
TheproposedLCOrequirestwotrains(twofancoolerspertrain)ofcontainment coolingtobeOPERABLEthroughout theentireMODE3rangeofoperation.
With two CS trains inoperable or any combination of three or more trains inoperable, proposed ACTION-1.e requires LCO 3.0.3 to be entered immediately.
Therefore, retaining thepreviously
In this condition, the unit is outside the accident analyses for the applicable operational modes.The proposed condition(s), required action, completion time, and basis are equivalent to ACTION"E" of STS LCO 3.6.6A.ACTION<<2.a:
: approved, pressuredependent MODE3applicability fortheCSSystemwillaffordamoreefficient andtimelytransition toShutdownCoolingSystemoperation withoutlossofanacceptable abilitytomitigatethepostulated accidents.
With one containment cooling train inoperable during MODE 3 conditions with pressurizer pressure<1750 psia, ACTION-2.a requires the inoperable train to be restored to OPERABLE status within 72 hours.FPL has verified that, during these conditions, containment design pressure and temperature will not be exceeded when two containment fan coolers are operable (both CS trains out of service).Therefore, the action completion time is reasonable, taking into account the low probability of a DBA occurring during this period and the heat removal capability of the remaining OPERABLE fan coolers.If the inoperable containment cooling train cannot be restored to OPERABLE status within the required action completion time, ACTION-2.a requires the plant to be in MODE 4 within the next 6 hours.This proposed action will bring the plant to a mode in which the LCO does not apply, and is consistent with PSL1 and PSL2 TS 3.0.3.
Inaddition, agreement withtheapplicability ofrelatedLCO3.6.2.2(SprayAdditive/Iodine RemovalSystem)willbepreserved.
St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 8 of 8 ACTION-2.b:
TheproposedAPPLICABILITY fortheContainment CoolingSystemisthesameasexistingLCO3.6.2.3,e.g.,MODES1,2,and3.Toverifythatlowermodeapplicability shouldnotberequired; FPLhasevaluated thePSL1andPSL2containment pressureandtemperature responsetothelimitingLOCAandMSLBaccidents foroperations withtheRCStemperature at360'F.Theresultsofthisevaluation confirmthatthecontainment designpressureandtemperature willnotbeexceededwithbothCStrainsandallfourfancoolersoutofservice.Operational MODES4,5and6occuratRCStemperatures below3254F,andtheimpactoncontainment parameters frompotential accidents willbefurtherreducedintheselowermodes.Therefore, FPLconsiders theproposedAPPLICABILITY fortheContainment CoolingSystemtobeacceptable, andtobeconsistent withtheSTS.ACTION-i.a:
With two containment cooling trains inoperable during MODE 3 conditions with pressurizer pressure<1750 psia, ACTION-2.b requires LCO 3.0.3 to be entered immediately.
WithoneCStraininoperable, proposedACTION-1.a requirestheinoperable traintoberestoredtoOPERABLEstatuswithin72hoursandwithin10daysofinitialdiscovery offailuretomeettheLCO.Inthiscondition, theremaining OPERABLEsprayandcoolingtrainsarecapableofproviding theiodineremovalfunctionandatleast100%ofaccidentheatloadremoval.The72hourcompletion timetakesintoaccounttheredundant heatandiodineremovalcapability affordedbytheContainment SpraySystem,reasonable timeforrepairs,andthelowprobability ofaDBAoccurring duringthisperiod.The10days(frominitialdiscovery St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page5of8offailuretomeettheLCO)portionofthecompletion timeisbasedonengineering judgement, andclarifies thatfailuretocompletely satisfytheLCOforanexcessive intervalisnotpermitted.
Since the proposed LCO does not require the CS system to be OPERABLE with pressurizer pressure<1750 psia, the unit will be outside the containment analysis for this condition.
Ittakesintoaccountthelowprobability ofcoincident entryintotwoconditions inthisspecification (definedinproposedACTION-1.c) coupledwiththelowprobability ofanaccidentoccurring duringthistime.Theproposedcondition, requiredaction,completion times,andtheirbasesareequivalent toAction"A"ofSTSLCO3.6.6A.Iftheinoperable spraytraincannotberestoredtoOPERABLEstatuswithintherequiredcompletion time,proposedACTION-1.a requirestheplanttobeinMODE3withinthenext6hoursandinMODE4withinthefollowing 54hours.TheproposedactionwillbringtheplanttoaMODEinwhichtheLCOdoesnotapply.The6hourcompletion timeisreasonable, basedonoperating experience, toreachMODE3fromfullpowerconditions inanorderlymanner,andwithoutchallenging plantsystems;anditisconsistent withPSL1andPSL2TS3.0.3.TheextendedintervaltoreachMODE4includesadditional time(48hours)forrestoration oftheCStrain,beyondthe6hourstypically allottedbyTS3.0.3toenterthismode.Thisisreasonable whenconsidering thatthedrivingforceforareleaseofradioactive materialfromtheRCSisreducedinMODE3.Theproposedcondition, requiredaction,completion times,andtheirbasesareequivalent toAction"B"ofSTSLCO3.6.6A.ACTION-1.b:
The proposed action will bring the plant to an operational MODE in which the LCO do'es not apply.SURVEILLANCE REQUIREMENTS:
Withonecontainment coolingtraininoperable, proposedACTION-1.b requirestheinoperable traintoberestoredtoOPERABLEstatuswithin7days,andwithin10daysfrominitialdiscovery offailuretomeettheLCO.Inthiscondition, theremaining OPERABLEsprayandcoolingsystemcomponents arecapableofproviding theiodineremovalfunctionandatleast1004oftheheatremovalneedsafteranaccident.
The proposed surveillance requirements (SR)are equivalent to the surveillances identified in Specification 3.6.6A of the STS.It is noted that neither PSL1 nor PSL2 require a pre-filled spray header to ensure that spray flow will be admitted to the containment atmosphere within the time frame assumed in the safety analyses;therefore, SR 3.6.6A.4 of the STS is not applicable.
The7daycompletion timetakesintoaccounttheredundant heatremovalcapabilities affordedbythecombinations oftheCSSystemandtheContainment CoolingSystem,andthelowprobability ofaDBAoccurring duringthisperiod.The10days(frominitialdiscovery offailuretomeettheLCO)portionofthecompletion timeisbasedonengineering judgement, andclarifies that,failuretocompletely satisfytheLCOforanexcessive intervalisnotpermitted.
Conclusion The changes proposed for existing TS 3/4.6.2.1 and 3/4.6.2.3 have been verified to be consistent with the PSL1 and PSL2 safety analyses.The proposed restructured TS 3/4.6.2.1, considering plant specific differences, is equivalent to NUREG-1432, Revision 0, Specification 3.6.6A and its associated bases, and includes all related requirements for the Containment Spray and Containment Cooling Systems.Therefore, FPL considers the proposed amendment to be acceptable as a TS line item improvement for St.Lucie Unit 1 and Unit 2, consistent with the Commission's Final Policy Statement on Technical Specification Improvements (58 FR 39132).
Ittakesintoaccountthelowprobability ofcoincident entryintotwoconditions inthisspecification (definedinproposedACTION-1.c),
St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems ATTACHMENT 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-2 60 Attachment 2 Page 1 of 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination may be made that a proposed license amendment involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant increase in the probability or consequences of an accident previously evaluated; or (2)create the possibility of a new or different kind of accident from any accident previously evaluated; or (3)involve a significant reduction in a margin of safety.Each standard is discussed as follows: (1)Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.
coupledwiththe St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page6of8lowprobability ofanaccidentoccurring duringthistime.Theproposedcondition, requiredaction,completion times,andtheirbasesareequivalent toAction"C"ofSTSLCO3.6.6A.Iftheinoperable containment coolingtraincannotberestoredtoOPERABLEstatuswithintherequiredcompletion time,proposedACTION-1.b requirestheplanttobeinMODE3withinthenext6hoursandinMODE4withinthefollowing 6hours.TheproposedactionwillbringtheplanttoaMODEinwhichtheLCOdoesnotapply.Theallowedcompletion timesarereasonable, basedonoperating experience, toreachtherequiredplantconditions fromfullpowerconditions inanorderlymannerandwithoutchallenging plantsystems.Theproposedcondition, requiredaction,completion times,andtheirbasesareequivalent toAction"F"ofSTSLCO3.6.6A;andareconsistent withPSL1andPSL2TS3.0.3.ACTION-1.c:
The proposed amendment will upgrade the existing Limiting Conditions for Operation (LCOs)associated with the Containment Cooling and Spray Systems to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.The Containment Cooling and Spray Systems are not initiators of accidents previously evaluated, but are included as part of the success paths associated with mitigating various accidents and transients.
WithoneCStrainandonecontainment coolingtraininoperable, proposedACTION-1.c allowsconcurrent entryintoACTION-l.a andACTION-l.b; andallowstheactioncompletion intervals tobetrackedseparately, startingfromthetimethateachtrainwasdiscovered inoperable.
The redundancy afforded by Containment Cooling and Spray Systems in conjunction with the requirements of the proposed LCO assures that the safety function of these systems can be accomplished considering single failure criteria.Neither the design nor the safety function of the Containment Cooling and Spray Systems have been altered, and the proposed amendment does not change the applicable plant safety analyses.Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
Theremaining OPERABLEsprayandcontainment coolingsystemcomponents arecapableofproviding theiodineremovalfunctionand1004ofaccidentheatloadremoval.Considering thenarrative formatandexistingstructure ofthePSL1andPSL2technical specifications, thisactionstatement providesclarification thatentryintobothACTIONS-1.a and1.bwithinthisLCOispermissible, andspecifies howeachactioncompletion intervalwillbetracked.ProposedACTION-l.c isconsistent withPart1.3,"Completion Times",oftheSTS"USEANDAPPLICATION" section.ACTION-i.d:
(2)Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
Withtwocontainment coolingtrainsinoperable, proposedACTION-1.d requiresatleastonecoolingtraintoberestoredtoOPERABLEstatuswithin72hours.Inthiscondition, theOPERABLEspraytrainsarecapableofproviding theiodineremovalfunctionandtheheatremovalneedsafteranaccident.
The proposed amendment will not change the physical plant or the modes of operation defined in the facility license.The changes St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 2 Page 2 of 2 are administrative in nature in that they do not involve the addition of new equipment or the modification of existing equipment, nor do they otherwise alter the design of St.Lucie Unit 1&2 systems.Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
FPLhasevaluated this,condition forthelimitingLOCAandMSLBaccidents postulated forthePSLlandPSL2containment
(3)Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.The safety function of the Containment Cooling System is to provide containment heat removal during normal operation and accident conditions.
: analyses, andhasconfirmed thattwoCStrainsarecapableofsatisfying 1004oftheaccidentheatremovalrequirements.
The safety function of the Containment Spray System is to provide containment heat and iodine removal during accident conditions.
The72hourcompletion timetakesintoaccounttheredundant heatremovalcapabilities affordedbytheCSSystem,andthelowprobability ofaDBA
The proposed amendment, in conjunction with the redundancy afforded by the Containment Cooling and Spray system design, assures that these safety functions can be accomplished considering single-failure criteria.The bases for rec{uired actions and the action completion times specified for.inoperable Containment Cooling and Spray trains are consistent with the corresponding specifications in NUREG-1432.
~F St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page7of8occurring duringthisperiod.Theproposedcondition, requiredaction,completion time,andtheirbasesareequivalent toACTION"D"ofSTSLCO3.6.6A.Ifatleastoneinoperable containment coolingtraincannotberestoredtoOPERABLEstatuswithintherequiredcompletion time,proposedACTION-l.d requirestheplanttobeinMODE3withinthenext6hoursandinMODE4withinthefollowing 6hours.TheproposedactionwillbringtheplanttoaMODEinwhichtheLCOdoesnotapply.Theallowedcompletion timesarereasonable, basedonoperating experience, toreachtherequiredplantconditions fromfullpowerconditions inanorderlymannerandwithoutchallenging plantsystems.Theproposedcondition, requiredaction,completion times,andtheirbasesareequivalent toAction"F"ofSTSLCO3.6.6A;andareconsistent withPSLlandPSL2TS3.0.3.ACTION-l.e:
The safety analyses for applicable accidents and transients remain unchanged from those previously evaluated and reported in the Updated Final Safety Analysis Report.Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.Based on the above discussion and the supporting Evaluation of Technical Specification changes, FPL has determined that the proposed license amendment involves no significant hazards consideration.}}
WithtwoCStrainsinoperable oranycombination ofthreeormoretrainsinoperable, proposedACTION-1.e requiresLCO3.0.3tobeenteredimmediately.
Inthiscondition, theunitisoutsidetheaccidentanalysesfortheapplicable operational modes.Theproposedcondition(s),
requiredaction,completion time,andbasisareequivalent toACTION"E"ofSTSLCO3.6.6A.ACTION<<2.a:
Withonecontainment coolingtraininoperable duringMODE3conditions withpressurizer pressure<1750psia,ACTION-2.a requirestheinoperable traintoberestoredtoOPERABLEstatuswithin72hours.FPLhasverifiedthat,duringtheseconditions, containment designpressureandtemperature willnotbeexceededwhentwocontainment fancoolersareoperable(bothCStrainsoutofservice).
Therefore, theactioncompletion timeisreasonable, takingintoaccountthelowprobability ofaDBAoccurring duringthisperiodandtheheatremovalcapability oftheremaining OPERABLEfancoolers.Iftheinoperable containment coolingtraincannotberestoredtoOPERABLEstatuswithintherequiredactioncompletion time,ACTION-2.arequirestheplanttobeinMODE4withinthenext6hours.ThisproposedactionwillbringtheplanttoamodeinwhichtheLCOdoesnotapply,andisconsistent withPSL1andPSL2TS3.0.3.
St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 1Page8of8ACTION-2.b:
Withtwocontainment coolingtrainsinoperable duringMODE3conditions withpressurizer pressure<1750psia,ACTION-2.b requiresLCO3.0.3tobeenteredimmediately.
SincetheproposedLCOdoesnotrequiretheCSsystemtobeOPERABLEwithpressurizer pressure<1750psia,theunitwillbeoutsidethecontainment analysisforthiscondition.
Theproposedactionwillbringtheplanttoanoperational MODEinwhichtheLCOdo'esnotapply.SURVEILLANCE REQUIREMENTS:
Theproposedsurveillance requirements (SR)areequivalent tothesurveillances identified inSpecification 3.6.6AoftheSTS.ItisnotedthatneitherPSL1norPSL2requireapre-filled sprayheadertoensurethatsprayflowwillbeadmittedtothecontainment atmosphere withinthetimeframeassumedinthesafetyanalyses; therefore, SR3.6.6A.4oftheSTSisnotapplicable.
Conclusion ThechangesproposedforexistingTS3/4.6.2.1 and3/4.6.2.3 havebeenverifiedtobeconsistent withthePSL1andPSL2safetyanalyses.
Theproposedrestructured TS3/4.6.2.1, considering plantspecificdifferences, isequivalent toNUREG-1432, Revision0,Specification 3.6.6Aanditsassociated bases,andincludesallrelatedrequirements fortheContainment SprayandContainment CoolingSystems.Therefore, FPLconsiders theproposedamendment tobeacceptable asaTSlineitemimprovement forSt.LucieUnit1andUnit2,consistent withtheCommission's FinalPolicyStatement onTechnical Specification Improvements (58FR39132).
St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsATTACHMENT 2DETERMINATION OFNOSIGNIFICANT HAZARDSCONSIDERATION St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 2Page1of2DETERMINATION OFNOSIGNIFICANT HAZARDSCONSIDERATION Pursuantto10CFR50.92, adetermination maybemadethataproposedlicenseamendment involvesnosignificant hazardsconsideration ifoperation ofthefacilityinaccordance withtheproposedamendment wouldnot:(1)involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated; or(2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; or(3)involveasignificant reduction inamarginofsafety.Eachstandardisdiscussed asfollows:(1)Operation ofthefacilityinaccordance withtheproposedamendment wouldnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
Theproposedamendment willupgradetheexistingLimitingConditions forOperation (LCOs)associated withtheContainment CoolingandSpraySystemstobeconsistent withNUREG-1432, StandardTechnical Specifications forCombustion Engineering Plants.TheContainment CoolingandSpraySystemsarenotinitiators ofaccidents previously evaluated, butareincludedaspartofthesuccesspathsassociated withmitigating variousaccidents andtransients.
Theredundancy affordedbyContainment CoolingandSpraySystemsinconjunction withtherequirements oftheproposedLCOassuresthatthesafetyfunctionofthesesystemscanbeaccomplished considering singlefailurecriteria.
NeitherthedesignnorthesafetyfunctionoftheContainment CoolingandSpraySystemshavebeenaltered,andtheproposedamendment doesnotchangetheapplicable plantsafetyanalyses.
Therefore, operation ofthefacilityinaccordance withtheproposedamendment willnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
(2)Operation ofthefacilityinaccordance withtheproposedamendment wouldnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated.
Theproposedamendment willnotchangethephysicalplantorthemodesofoperation definedinthefacilitylicense.Thechanges St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments Containment SraandCoolinSstemsL-94-260Attachment 2Page2of2areadministrative innatureinthattheydonotinvolvetheadditionofnewequipment orthemodification ofexistingequipment, nordotheyotherwise alterthedesignofSt.LucieUnit1&2systems.Therefore, operation ofthefacilityinaccordance withtheproposedamendment wouldnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated.
(3)Operation ofthefacilityinaccordance withtheproposedamendment wouldnotinvolveasignificant reduction inamarginofsafety.ThesafetyfunctionoftheContainment CoolingSystemistoprovidecontainment heatremovalduringnormaloperation andaccidentconditions.
ThesafetyfunctionoftheContainment SpraySystemistoprovidecontainment heatandiodineremovalduringaccidentconditions.
Theproposedamendment, inconjunction withtheredundancy affordedbytheContainment CoolingandSpraysystemdesign,assuresthatthesesafetyfunctions canbeaccomplished considering single-failure criteria.
Thebasesforrec{uired actionsandtheactioncompletion timesspecified for.inoperable Containment CoolingandSpraytrainsareconsistent withthecorresponding specifications inNUREG-1432.
Thesafetyanalysesforapplicable accidents andtransients remainunchanged fromthosepreviously evaluated andreportedintheUpdatedFinalSafetyAnalysisReport.Therefore, operation ofthefacilityinaccordance withtheproposedamendment wouldnotinvolveasignificant reduction inamarginofsafety.Basedontheabovediscussion andthesupporting Evaluation ofTechnical Specification changes,FPLhasdetermined thattheproposedlicenseamendment involvesnosignificant hazardsconsideration.}}

Revision as of 17:04, 7 July 2018

Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants
ML17228A901
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/02/1994
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228A902 List:
References
L-94-260, NUDOCS 9411080181
Download: ML17228A901 (21)


Text

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRXBUTXON SYSTEM (RXDS)ACCESSION NBR: 9411080181 DOC~DATE: 94/11/02 NOTARIZED:

YES FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light, Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFXLIATXON SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000335 05000389

SUBJECT:

Application for amends to licenses DPR-67&NPF-16,upgrading TS 3/4.6.2.1&3/4.6.2.3 by adapting combined spec for containment spray&cooling sys contained in std TS for C-E plants.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR i ENCL 3 SIZE:/TITLE: OR Submittal:

General Distribution NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRXS,J INTERNAL: ACRS NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD2-2 PD ILE CENTE~NRR D CH/HICB NRR/DS SA/S PLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE!CONTACT'I'HE DOCL'i!ENT CONTROL DESK, ROOM Pl-37 (EXT.504-0083)To ELI%)IRATE YOUR iAiI E r RoiI D!s rR!o U'I'IoN LIs'rs I:oR Doc!.'@EN I's Yo!.'oN"!'!

LD!TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 18 0

Florida Power&Light Company, P.O.Box 12S, Fort Pierce, FL34S54-0128 November 2, 1994 L-94-260 10 CFR'0.90 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and.Coolin S stems Pursuant to 10 CFR 50.90, Florida Power&Light Company (FPL)requests to amend Facility Operating Licenses DPR-67 and NPF-16 for St.Lucie Unit, 1 and Unit 2, respectively, by incorporating the attached Technical Specifications (TS)revisions.

The proposed amendments will.upgrade existing TS 3/4.6.2.1 and TS 3/4.6.2.3 by adapting the combined specification for Containment Spray and Cooling Systems, contained in the Standard Technical Specifications for Combustion Engineering Plants, to the St.Lucie units.The changes account for plant specific differences and include all related requirements of NUREG-1432, Rev.0, specification 3.6.6A.Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).It is requested that the proposed amendments, if approved, be ,issued by January 31, 1995.Attachment 1 is an evaluation of the proposed changes.Attachment 2 is the"Determination of No Significant Hazards Consideration." Attachments 3 and 4 contain copies of the appropriate technical specifications pages marked up to show the proposed changes.The proposed amendments have been reviewed by the St.Lucie Facility Review Group and the FPL Company Nuclear Review Board.In accordance with 10 CFR 50.91 (b)(1), copies of the proposed amendments are being forwarded to the State Designee for the State of Florida.Please contact us if there are any questions about this submittal.

Very truly yours, o D.A.ger Vice r sident St.c'e Plant 901 l 080 K B 1 941 102 PDR ADQCK 05000335 PDR an FPL Group companY y0'I 4'I St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Page 2 DAS/RLD Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC.Senior Resident Inspector, USNRC, St.Lucie Plant.Mr.W.A.Passetti, Florida Department of Health and Rehabilitative Services.

y,(14, l I~>l~',i-:~f<t'I St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment, S ra and Coolin S stems L-94-260 Page 3 STATE OF FLORIDA))COUNTY OF ST LUCIE SS~D.A.Sager being first duly sworn, deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power&Light Company, the Licensee hereinr That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.D.A.er STATE OF FLORIDA COUNTY OF SC, I veil The foregoing instrument.

was acknowledged before me this~day of No<fccsfa, 19 l4 by D.A.Sager, who is personally known to me and who did take an oath.Name of Notary Public My Commission expires R~klL l5 l598 Commission No.<<348 989 Ogglllll/lylll ega+e*e Oeg'lllllllmliloo St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems ATTACHMENT 1 EVALUATION OF PROPOSED TS CHANGES St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 1 of 8 EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL)requests that Appendix A of Facility Operating License DPR-67 for St.Lucie Unit 1 (PSL1)and NPF-16 for St.Lucie Unit 2 (PSL2)be changed to upgrade Technical Specifications (TS)3/4.6.2.1 and 3/4.6.2.3.

The specifications apply to the Containment Spray and Containment Cooling Systems, respectively.

This line-item improvement will clarify the actions required for inoperable equipment associated with the depressurization and cooling systems installed in the reactor containment building, and will provide consistency of operations between PSL1 and PSL2.The proposed changes will combine TS 3/4.6.2.1 and 3/4.6.2.3 into a single Limiting Condition for Operation (LCO)similar to specification 3.6.6A of the Standard Technical Specifications (STS)for Combustion Engineering Plants (NUREG-1432, Rev.0).The proposed LCO, accounting for plant specific differences, includes all related NUREG-1432 requirements.

Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).PSL1 and PSL2 Pro osed Technical S ecification Chan es INDEX Pa e VI PSL1 and Pa e VII PSL2: The title"Containment Spray System" will be revised to read,"Containment Spray and Cooling Systems." The title"Containment Cooling System" and its reference page will be deleted.TS 3 4.6.2.1 Containment S ra S stem: The existing LCO requires two independent containment spray systems to be OPERABLE in MODES 1 and 2, and in MODE 3 when pressurizer pressure is>1750 psia.The wording for this LCO and the associated ACTION statement(s) for an inoperable spray train will be replaced in their entirety pursuant.to the bases and guidance provided in NUREG-1432, specification 3.6.6A, CONTAINMENT SPRAY AND COOLING SYSTEMS.The NUREG-1432 tabular arrangement of conditions, required actions, and action completion times will be restructured into the narrative form consistent with the PSL1 and PSL2 TS format.

~~St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 2 of 8 The existing surveillance re uirements for the Containment Spray System will not be altered.However, the proposed specification will incorporate the surveillances required for the Containment Cooling System.The footnote"*", which provides an explanation of MODE 3 APPLICABILITY, will be deleted.The proposed LCO has been structured such that the footnote will not be necessary.

TS 3 4.6.2.3 Containment Coolin S stem: This specification will be deleted in its entirety.Bases a es B 3 4 6-2 and B 3 4 6-3: Bases section 3/4.6.2.1 will be revised to reflect the bases for the proposed specification.

Bases section 3/4.6.2.3 will be deleted.The applicable TS pages have been marked-up to show the proposed changes, and are provided in Attachments 3 and 4 to this submittal.

Back round The function of the Containment Spray (CS)System is to provide containment heat, removal and iodine removal during accident conditions.

It accomplishes its function through the use of two redundant spray trains which are capable of taking suction from the Refueling Water Tank (RWT)on a Containment Spray Actuation Signal (CSAS), automatically transferring suction to the containment sump on a Recirculation Actuation Signal (RAS), and transferring heat to the ultimate heat sink via the component cooling water (CCW)and intake cooling water (ICW)systems.Each train consists of a spray pump, shutdown cooling heat exchanger, piping, valves, and spray header;and is capable of satisfying at least 504 of accident heat removal requirements.

One train of the CS system, in conjunction with its Spray Additive/Iodine Removal System, can satisfy post-accident iodine removal requirements.

In the event offsite power is lost, each train is powered by an emergency diesel generator.

The function of the Containment Cooling System is to provide containment heat removal during both normal operation and accident conditions.

It accomplishes its function through the use of two electrically and mechanically independent containment cooling 1" l II t St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L 94 260 Attachment 1 Page 3 of 8 trains.Four fan coolers, two per train, transfer heat to the ultimate heat sink via the CCW and ICW systems.Each train is capable of satisfying at least 50%of accident heat removal requirements, and each train is powered by an emergency diesel generator in the event offsite power is lost.Each fan is capable of auto-start on a Safety Injection Actuation Signal (SIAS).PSL1 and PSL2 each have a plant specific LCO (TS 3.6.1.5)which provides assurance that the average containment temperature will be maintained

<120'F for the purpose of preserving the validity of accident analyses assumptions, environmental qualification of equipment located inside containment, and assumptions made for stress analyses of reactor vessel supports.Each PSL unit also has a plant specific LCO for the Spray Additive/Iodine Removal System (TS 3.6.2.2)to ensure that sufficient additives are available for injection into the containment spray.Evaluation of the Chan es Pro osed for PSL1 and PSL2 LCO: The containment analyses for PSL1 and PSL2 demonstrate that the removal of design basis accident (DBA)heat loads can be accomplished by at least one train of the containment spray system in conjunction with one train of the containment cooling system;and that requirements for iodine removal from the containment atmosphere can be satisfied by a single CS train.The proposed LCO requires two containment spray trains and two containment cooling trains to be OPERABLE.Therefore, in the event of an accident and considering single failure criteria, the heat and iodine removal requirements will be satisfied.

The wording of the proposed LCO is the same as the STS.APPLICABILITY:

The proposed APPLICABILITY for the CS System is the same as existing LCO 3.6.2.1, e.g., MODES 1 and 2, and MODE 3 with pressurizer pressure~1750 psia.It is noted that the pressure criterion specified for MODE 3 operation is a plant specific difference from the generic STS.FPL desires to retain this previously approved stipulation since, during shutdown and cooldown of the reactor coolant system (RCS), the CS system must be removed from service during the preparations necessary for shutdown cooling operations.

St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 4 of 8 FPL has evaluated the PSL1 and PSL2 containment pressure and temperature response to the limiting loss of coolant (LOCA)and main steam line break (MSLB)accidents during MODE 3 conditions.

The results of this evaluation confirm that, with pressurizer pressure<1750 psia, containment design pressure and temperature will not be exceeded when two containment fan coolers are operable (both CS trains were assumed to be out of service).The proposed LCO requires two trains (two fan coolers per train)of containment cooling to be OPERABLE throughout the entire MODE 3 range of operation.

Therefore, retaining the previously approved, pressure dependent MODE 3 applicability for the CS System will afford a more efficient and timely transition to Shutdown Cooling System operation without loss of an acceptable ability to mitigate the postulated accidents.

In addition, agreement with the applicability of related LCO 3.6.2.2 (Spray Additive/Iodine Removal System)will be preserved.

The proposed APPLICABILITY for the Containment Cooling System is the same as existing LCO 3.6.2.3, e.g., MODES 1, 2, and 3.To verify that lower mode applicability should not be required;FPL has evaluated the PSL1 and PSL2 containment pressure and temperature response to the limiting LOCA and MSLB accidents for operations with the RCS temperature at 360'F.The results of this evaluation confirm that the containment design pressure and temperature will not be exceeded with both CS trains and all four fan coolers out of service.Operational MODES 4, 5 and 6 occur at RCS temperatures below 325 4F, and the impact on containment parameters from potential accidents will be further reduced in these lower modes.Therefore, FPL considers the proposed APPLICABILITY for the Containment Cooling System to be acceptable, and to be consistent with the STS.ACTION-i.a:

With one CS train inoperable, proposed ACTION-1.a requires the inoperable train to be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and within 10 days of initial discovery of failure to meet the LCO.In this condition, the remaining OPERABLE spray and cooling trains are capable of providing the iodine removal function and at least 100%of accident heat load removal.The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time takes into account the redundant heat and iodine removal capability afforded by the Containment Spray System, reasonable time for repairs, and the low probability of a DBA occurring during this period.The 10 days (from initial discovery St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 5 of 8 of failure to meet the LCO)portion of the completion time is based on engineering judgement, and clarifies that failure to completely satisfy the LCO for an excessive interval is not permitted.

It takes into account the low probability of coincident entry into two conditions in this specification (defined in proposed ACTION-1.c) coupled with the low probability of an accident occurring during this time.The proposed condition, required action, completion times, and their bases are equivalent to Action"A" of STS LCO 3.6.6A.If the inoperable spray train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-1.a requires the plant to be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 4 within the following 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br />.The proposed action will bring the plant to a MODE in which the LCO does not apply.The 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> completion time is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner, and without challenging plant systems;and it is consistent with PSL1 and PSL2 TS 3.0.3.The extended interval to reach MODE 4 includes additional time (48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />)for restoration of the CS train, beyond the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> typically allotted by TS 3.0.3 to enter this mode.This is reasonable when considering that the driving force for a release of radioactive material from the RCS is reduced in MODE 3.The proposed condition, required action, completion times, and their bases are equivalent to Action"B" of STS LCO 3.6.6A.ACTION-1.b:

With one containment cooling train inoperable, proposed ACTION-1.b requires the inoperable train to be restored to OPERABLE status within 7 days, and within 10 days from initial discovery of failure to meet the LCO.In this condition, the remaining OPERABLE spray and cooling system components are capable of providing the iodine removal function and at least 1004 of the heat removal needs after an accident.The 7 day completion time takes into account the redundant heat removal capabilities afforded by the combinations of the CS System and the Containment Cooling System, and the low probability of a DBA occurring during this period.The 10 days (from initial discovery of failure to meet the LCO)portion of the completion time is based on engineering judgement, and clarifies that, failure to completely satisfy the LCO for an excessive interval is not permitted.

It takes into account the low probability of coincident entry into two conditions in this specification (defined in proposed ACTION-1.c), coupled with the St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 6 of 8 low probability of an accident occurring during this time.The proposed condition, required action, completion times, and their bases are equivalent to Action"C" of STS LCO 3.6.6A.If the inoperable containment cooling train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-1.b requires the plant to be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.The proposed action will bring the plant to a MODE in which the LCO does not apply.The allowed completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.The proposed condition, required action, completion times, and their bases are equivalent to Action"F" of STS LCO 3.6.6A;and are consistent with PSL1 and PSL2 TS 3.0.3.ACTION-1.c:

With one CS train and one containment cooling train inoperable, proposed ACTION-1.c allows concurrent entry into ACTION-l.a and ACTION-l.b; and allows the action completion intervals to be tracked separately, starting from the time that each train was discovered inoperable.

The remaining OPERABLE spray and containment cooling system components are capable of providing the iodine removal function and 1004 of accident heat load removal.Considering the narrative format and existing structure of the PSL1 and PSL2 technical specifications, this action statement provides clarification that entry into both ACTIONS-1.a and 1.b within this LCO is permissible, and specifies how each action completion interval will be tracked.Proposed ACTION-l.c is consistent with Part 1.3,"Completion Times", of the STS"USE AND APPLICATION" section.ACTION-i.d:

With two containment cooling trains inoperable, proposed ACTION-1.d requires at least one cooling train to be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.In this condition, the OPERABLE spray trains are capable of providing the iodine removal function and the heat removal needs after an accident.FPL has evaluated this ,condition for the limiting LOCA and MSLB accidents postulated for the PSLl and PSL2 containment analyses, and has confirmed that two CS trains are capable of satisfying 1004 of the accident heat removal requirements.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time takes into account the redundant heat removal capabilities afforded by the CS System, and the low probability of a DBA

~F St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 7 of 8 occurring during this period.The proposed condition, required action, completion time, and their bases are equivalent to ACTION"D" of STS LCO 3.6.6A.If at least one inoperable containment cooling train cannot be restored to OPERABLE status within the required completion time, proposed ACTION-l.d requires the plant to be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.The proposed action will bring the plant to a MODE in which the LCO does not apply.The allowed completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.The proposed condition, required action, completion times, and their bases are equivalent to Action"F" of STS LCO 3.6.6A;and are consistent with PSLl and PSL2 TS 3.0.3.ACTION-l.e:

With two CS trains inoperable or any combination of three or more trains inoperable, proposed ACTION-1.e requires LCO 3.0.3 to be entered immediately.

In this condition, the unit is outside the accident analyses for the applicable operational modes.The proposed condition(s), required action, completion time, and basis are equivalent to ACTION"E" of STS LCO 3.6.6A.ACTION<<2.a:

With one containment cooling train inoperable during MODE 3 conditions with pressurizer pressure<1750 psia, ACTION-2.a requires the inoperable train to be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.FPL has verified that, during these conditions, containment design pressure and temperature will not be exceeded when two containment fan coolers are operable (both CS trains out of service).Therefore, the action completion time is reasonable, taking into account the low probability of a DBA occurring during this period and the heat removal capability of the remaining OPERABLE fan coolers.If the inoperable containment cooling train cannot be restored to OPERABLE status within the required action completion time, ACTION-2.a requires the plant to be in MODE 4 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.This proposed action will bring the plant to a mode in which the LCO does not apply, and is consistent with PSL1 and PSL2 TS 3.0.3.

St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 1 Page 8 of 8 ACTION-2.b:

With two containment cooling trains inoperable during MODE 3 conditions with pressurizer pressure<1750 psia, ACTION-2.b requires LCO 3.0.3 to be entered immediately.

Since the proposed LCO does not require the CS system to be OPERABLE with pressurizer pressure<1750 psia, the unit will be outside the containment analysis for this condition.

The proposed action will bring the plant to an operational MODE in which the LCO do'es not apply.SURVEILLANCE REQUIREMENTS:

The proposed surveillance requirements (SR)are equivalent to the surveillances identified in Specification 3.6.6A of the STS.It is noted that neither PSL1 nor PSL2 require a pre-filled spray header to ensure that spray flow will be admitted to the containment atmosphere within the time frame assumed in the safety analyses;therefore, SR 3.6.6A.4 of the STS is not applicable.

Conclusion The changes proposed for existing TS 3/4.6.2.1 and 3/4.6.2.3 have been verified to be consistent with the PSL1 and PSL2 safety analyses.The proposed restructured TS 3/4.6.2.1, considering plant specific differences, is equivalent to NUREG-1432, Revision 0, Specification 3.6.6A and its associated bases, and includes all related requirements for the Containment Spray and Containment Cooling Systems.Therefore, FPL considers the proposed amendment to be acceptable as a TS line item improvement for St.Lucie Unit 1 and Unit 2, consistent with the Commission's Final Policy Statement on Technical Specification Improvements (58 FR 39132).

St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems ATTACHMENT 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-2 60 Attachment 2 Page 1 of 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination may be made that a proposed license amendment involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant increase in the probability or consequences of an accident previously evaluated; or (2)create the possibility of a new or different kind of accident from any accident previously evaluated; or (3)involve a significant reduction in a margin of safety.Each standard is discussed as follows: (1)Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed amendment will upgrade the existing Limiting Conditions for Operation (LCOs)associated with the Containment Cooling and Spray Systems to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.The Containment Cooling and Spray Systems are not initiators of accidents previously evaluated, but are included as part of the success paths associated with mitigating various accidents and transients.

The redundancy afforded by Containment Cooling and Spray Systems in conjunction with the requirements of the proposed LCO assures that the safety function of these systems can be accomplished considering single failure criteria.Neither the design nor the safety function of the Containment Cooling and Spray Systems have been altered, and the proposed amendment does not change the applicable plant safety analyses.Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.

(2)Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed amendment will not change the physical plant or the modes of operation defined in the facility license.The changes St.Lucie Unit 1 and Unit 2 Docket Nos.50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems L-94-260 Attachment 2 Page 2 of 2 are administrative in nature in that they do not involve the addition of new equipment or the modification of existing equipment, nor do they otherwise alter the design of St.Lucie Unit 1&2 systems.Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.

(3)Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.The safety function of the Containment Cooling System is to provide containment heat removal during normal operation and accident conditions.

The safety function of the Containment Spray System is to provide containment heat and iodine removal during accident conditions.

The proposed amendment, in conjunction with the redundancy afforded by the Containment Cooling and Spray system design, assures that these safety functions can be accomplished considering single-failure criteria.The bases for rec{uired actions and the action completion times specified for.inoperable Containment Cooling and Spray trains are consistent with the corresponding specifications in NUREG-1432.

The safety analyses for applicable accidents and transients remain unchanged from those previously evaluated and reported in the Updated Final Safety Analysis Report.Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.Based on the above discussion and the supporting Evaluation of Technical Specification changes, FPL has determined that the proposed license amendment involves no significant hazards consideration.