This letter provides notification of a change to the Decommissioning Project Manager assigned to the Enrico Fermi Atomic Power Plant Unit 1. Effective October 2, 2017, project management responsibilities for your license No. DPR-9 have been assigned to Kim Conway. Ms. Conway can be contacted by telephone at 301-415-1335 or by e-mail at kimberly.conway@nrc.gov
This letter provides notification of a change to the Decommissioning Project Manager assigned to the Enrico Fermi Atomic Power Plant Unit 1. Effective October 2, 2017, project management responsibilities for your license No. DPR-9 have been assigned to Kim Conway. Ms. Conway can be contacted by telephone at 301-415-1335 or by e-mail at kimberly.conway@nrc.gov. Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:  
. Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:  


Kim Conway, Project Manager U.S Nuclear Regulatory Commission  
Kim Conway, Project Manager U.S Nuclear Regulatory Commission  
Line 35: Line 34:
Mailstop T-8 F5 Washington, D.C. 20555-0001  
Mailstop T-8 F5 Washington, D.C. 20555-0001  


In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commission (NRC) "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commission (NRC) "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,  /RA/  Bruce Watson, CHP, Chief  
. Sincerely,  
  /RA/  Bruce Watson, CHP, Chief  


Reactor Decommissioning Branch  
Reactor Decommissioning Branch  

Revision as of 18:54, 6 July 2018

Change in NRC Staff Project Management for the Enrico Fermi Unit 1
ML17289A040
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/16/2017
From: Bruce Watson
Reactor Decommissioning Branch
To: Polson K
Detroit Edison, Co
KAConway NMSS/DUWP/RDB 415-1335 T-8J07
References
Download: ML17289A040 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

October 16, 2017 Mr. Keith Polson

Site Vice President, Nuclear Generation Detroit Edison Company

6400 North Dixie Highway Newport, MI 48166

SUBJECT:

CHANGE IN NRC STAFF PROJECT MANAGEMENT FOR THE ENRICO FERMI ATOMIC POWER PLANT UNIT 1

Dear Mr. Polson:

This letter provides notification of a change to the Decommissioning Project Manager assigned to the Enrico Fermi Atomic Power Plant Unit 1. Effective October 2, 2017, project management responsibilities for your license No. DPR-9 have been assigned to Kim Conway. Ms. Conway can be contacted by telephone at 301-415-1335 or by e-mail at kimberly.conway@nrc.gov. Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:

Kim Conway, Project Manager U.S Nuclear Regulatory Commission

Mailstop T-8 F5 Washington, D.C. 20555-0001

In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commission (NRC) "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, /RA/ Bruce Watson, CHP, Chief

Reactor Decommissioning Branch

Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards

Docket No.: 50-16 License No.: DPR-9

cc: Fermi Unit 1 Service List

ML17289A040 OFFICE DUWP:PM DUWP:PM DUWP:BC NAME TSmith KConway BWatson DATE 10/16/17 10/16/17 10/16/17 Fermi Unit 1 Service List

cc: Ms. Lynne Goodman

Manager - Fermi 1 Detroit Edison Company

6400 North Dixie Highway Newport, MI 48166 Mr. Richard Whale Michigan Public Service Commission

6545 Mercantile Way P.O. Box 30221 Lansing, MI 48909

John Flynn Esq.

Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, MI 48226

Radiological Protection Section Michigan Department of Environmental Quality P.O. Box 30241 Lansing, MI 48909-1278

U.S. Nuclear Regulatory Commission

Resident Inspector's Office 6450 W. Dixie Highway Newport, MI 48166

Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, MI 48161

Flint Watt, P.E., Chief Bureau of Environmental and Occupational Health Michigan Department of Public Health 3423 N Logan Street P.O. Box 30195 Lansing, MI 48909