ML17305A153: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 32: Line 32:


The NRC approved the subject operating test in accordance with NUREG
The NRC approved the subject operating test in accordance with NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC staff will administer the operating tests during the week s of November 6 and November 13, 2017
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC staff will administer the operating tests during the week s of November 6 and November 13, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG
. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG
-1021 for content, operational, and discrimination validity.   
-1021 for content, operational, and discrimination validity.   


Line 41: Line 40:
R. Bologna 2  Please contact your Chief Examiner, Joseph M. D'Antonio at (610) 337
R. Bologna 2  Please contact your Chief Examiner, Joseph M. D'Antonio at (610) 337
-5085, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
-5085, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
Sincerely,
Sincerely, /RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
  /RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety


Docket Nos.
Docket Nos.
Line 52: Line 50:
==SUBJECT:==
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNIT 2  
BEAVER VALLEY POWER STATION, UNIT 2  
- INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL DATED OCTOBER 31
- INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL DATED OCTOBER 31 , 2017  Distribution
, 2017  Distribution
:  D. Jackson, DRS J. Dantonio, DRS DRS Master Exam File w/concurrence s DDorman, RA DLew, DRA RLorson, DRP DPelton, DRP JYerokun, DRS BWelling, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP CSafouri, DRP JKrafty, DRP, SRI JD'Antonio, DRS DJackson, DRS AGould, AA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource
:  D. Jackson, DRS J. Dantonio, DRS DRS Master Exam File w/concurrence s DDorman, RA DLew, DRA RLorson, DRP DPelton, DRP JYerokun, DRS BWelling, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP CSafouri, DRP JKrafty, DRP, SRI JD'Antonio, DRS DJackson, DRS AGould, AA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource


Line 59: Line 56:
G:\DRS\Operations Branch
G:\DRS\Operations Branch
\DANTONIO\Exam 18 - BV2 Nov 2017 (NRC dev) (U01938)\ExamApproval
\DANTONIO\Exam 18 - BV2 Nov 2017 (NRC dev) (U01938)\ExamApproval
-O-Ltr-Rev11.docx ADAMS PKG:  ML 17068A096   ADAMS ACCESSION NO.:  ML17305A153 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME JDantonioJ/D DEJackson/DJ    DATE 10/19/17 10/31/17      OFFICIAL RECORD COPY}}
-O-Ltr-Rev11.docx ADAMS PKG:  ML 17068 A 096   ADAMS ACCESSION NO.:  ML17305A153 SUNSI Review Non-Sensitive   Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME JDantonioJ/D DEJackson/DJ    DATE 10/19/17 10/31/17      OFFICIAL RECORD COPY}}

Revision as of 11:34, 6 July 2018

Beaver Valley, Unit 2 - Initial Operator Licensing Operating Test Approval
ML17305A153
Person / Time
Site: Beaver Valley
Issue date: 10/31/2017
From: Jackson D E
Operations Branch I
To: Bologna R D
FirstEnergy Nuclear Operating Co
Jackson D E
Shared Package
ML17068A096 List:
References
Download: ML17305A153 (3)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PA 19406

-2713 October 31, 2017 Mr. Richard Bologna Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077

-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT 2

- INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL

Dear Mr. Bologna:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Beaver Valley Power Station Unit 2.

Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William C. Cothen, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC staff will administer the operating tests during the week s of November 6 and November 13, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG

-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG

-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610

) 337-5306.

R. Bologna 2 Please contact your Chief Examiner, Joseph M. D'Antonio at (610) 337

-5085, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely, /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

Docket Nos.

50-412 License Nos.

NPF-73 cc: Distribution via ListServ

R. Bologna 3

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT 2

- INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL DATED OCTOBER 31 , 2017 Distribution

D. Jackson, DRS J. Dantonio, DRS DRS Master Exam File w/concurrence s DDorman, RA DLew, DRA RLorson, DRP DPelton, DRP JYerokun, DRS BWelling, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP CSafouri, DRP JKrafty, DRP, SRI JD'Antonio, DRS DJackson, DRS AGould, AA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource

DOCUMENT NAME:

G:\DRS\Operations Branch

\DANTONIO\Exam 18 - BV2 Nov 2017 (NRC dev) (U01938)\ExamApproval

-O-Ltr-Rev11.docx ADAMS PKG: ML 17068 A 096 ADAMS ACCESSION NO.: ML17305A153 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME JDantonioJ/D DEJackson/DJ DATE 10/19/17 10/31/17 OFFICIAL RECORD COPY