ML14239A035: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NJ **ECTIVES FPLo,BL :t- 22AN 11, 28August 21, 2014L-2014-267 Ms. Cindy BladeyChief, Rules, Announcements and Directives Branch (RADB)Office of Administration Mail Stop: 3WFN 06-44MU.S. Nuclear Regulatory Commission Washington, DC 20555-0001 3/~ J6~ $
 
==Subject:==
Request for Comments on Proposed Revision to 10 CFR 50.46(c),
Emergency Core Cooling System (ECCS) Cladding Acceptance Criteriafor Liqht-Water Nuclear Reactors (Docket ID: NRC-2008-0332)
Florida Power and Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and its affiliates, NextEraEnergy Seabrook, LLC, the licensee for the Seabrook
: Station, NextEra Energy DuaneArnold, LLC, the licensee for the Duane Arnold Energy Center, and NextEra EnergyPoint Beach, LLC, the licensee for the Point Beach Nuclear Plant, Units 1 and 2(hereafter referred to collectively as "NextEra"),
hereby submit comments on theproposed rule, revising the acceptance criteria for the emergency core cooling system(ECCS) for light-water nuclear power reactors, and three draft regulatory guides, (1)DG-1261, "Conducting Periodic Testing for Breakaway Oxidation Behavior;"
(2) DG-1262, "Testing for Post Quench Ductility;"
and (3) DG-1263, "Establishing Analytical Limits for Zirconium Based Alloy Cladding,"
published in the Federal Register on March24, 2014 (79 FR 16106).NextEra endorses the comments of the Nuclear Energy Institute (NEI), dated August21, 2014.NextEra appreciates the NRC's consideration of NEI's comments.
Sincerely Yours,James M. Petro, Jr.Nuclear Licensing and egulatory Compliance DirectorSUNSI Review CompleteTemplate
= ADM -013E-RIDS= ADM-03Ad=_Florida Power & Ught Company700 Universe Boulevard, Juno Beach, FL 33408}}

Revision as of 10:35, 1 July 2018

Comment (9) of James M. Petro on Behalf of FPL on Proposed Revision to 10 CFR 50.46(c), Emergency Core Cooling System (ECCS) Cladding Acceptance Criteria for Light-Water Nuclear Reactors (Docket Id: NRC-2008-0332
ML14239A035
Person / Time
Site: Saint Lucie, Point Beach, Turkey Point  NextEra Energy icon.png
Issue date: 08/21/2014
From: Petro J M
Florida Power & Light Co
To: Bladey C K
Division of Administrative Services
SECY RAS
References
79FR16106 00009, L-2014-267, NRC-2008-0332
Download: ML14239A035 (1)


Text

{{#Wiki_filter:NJ **ECTIVES FPLo,BL :t- 22AN 11, 28August 21, 2014L-2014-267 Ms. Cindy BladeyChief, Rules, Announcements and Directives Branch (RADB)Office of Administration Mail Stop: 3WFN 06-44MU.S. Nuclear Regulatory Commission Washington, DC 20555-0001 3/~ J6~ $

Subject:

Request for Comments on Proposed Revision to 10 CFR 50.46(c), Emergency Core Cooling System (ECCS) Cladding Acceptance Criteriafor Liqht-Water Nuclear Reactors (Docket ID: NRC-2008-0332) Florida Power and Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and its affiliates, NextEraEnergy Seabrook, LLC, the licensee for the Seabrook

Station, NextEra Energy DuaneArnold, LLC, the licensee for the Duane Arnold Energy Center, and NextEra EnergyPoint Beach, LLC, the licensee for the Point Beach Nuclear Plant, Units 1 and 2(hereafter referred to collectively as "NextEra"),

hereby submit comments on theproposed rule, revising the acceptance criteria for the emergency core cooling system(ECCS) for light-water nuclear power reactors, and three draft regulatory guides, (1)DG-1261, "Conducting Periodic Testing for Breakaway Oxidation Behavior;" (2) DG-1262, "Testing for Post Quench Ductility;" and (3) DG-1263, "Establishing Analytical Limits for Zirconium Based Alloy Cladding," published in the Federal Register on March24, 2014 (79 FR 16106).NextEra endorses the comments of the Nuclear Energy Institute (NEI), dated August21, 2014.NextEra appreciates the NRC's consideration of NEI's comments. Sincerely Yours,James M. Petro, Jr.Nuclear Licensing and egulatory Compliance DirectorSUNSI Review CompleteTemplate = ADM -013E-RIDS= ADM-03Ad=_Florida Power & Ught Company700 Universe Boulevard, Juno Beach, FL 33408}}