{{#Wiki_filter:1IPRenewal | {{#Wiki_filter:1IPRenewal NPEmails From:Wentzel, Michael Sent:Wednesday, April 22, 2015 8:29 PM To:'Gray, Dara F' | ||
==Subject:== | ==Subject:== | ||
RE: Northern Long-Eared Bat | RE: Northern Long-Eared Bat RAIs Attachments: | ||
ML15104A541.pdfDara, The electronic copy of the RAIs is attached. | |||
: Thanks, Mike | : Thanks, Mike | ||
Line 33: | Line 34: | ||
==Subject:== | ==Subject:== | ||
Northern Long-Eared Bat RAIs Dara, I just wanted to let you know that I signed-out the RAIs. As discussed, the letter states a 45-day turnaround time for the response. I will forward on an electronic copy of the letter once it is available. | Northern Long-Eared Bat RAIs | ||
Dara, I just wanted to let you know that I signed-out the RAIs. As discussed, the letter states a 45-day turnaround time for the response. I will forward on an electronic copy of the letter once it is available. | |||
: Thanks, Mike | : Thanks, Mike | ||
Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov<mailto:michael.wentzel@nrc.gov> | Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov<mailto:michael.wentzel@nrc.gov | ||
Hearing Identifier: IndianPointUnits2and3NonPublic_EX | > | ||
Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 5097 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F028816408DF2) | |||
==Subject:== | ==Subject:== | ||
RE: Northern Long-Eared Bat RAIs Sent Date: 4/22/2015 8:29:15 PM Received Date: 4/22/2015 8:29:16 PM | RE: Northern Long-Eared Bat RAIs Sent Date: 4/22/2015 8:29:15 PM Received Date: 4/22/2015 8:29:16 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients: "'Gray, Dara F'" <DGray@entergy.com> | ||
Tracking Status: None Post Office: HQCLSTR02.nrc.gov | Tracking Status: None | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 22, 2015 | |||
Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 822 4/22/2015 8:29:16 PM ML15104A541.pdf 171635 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 22, 2015 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412) | REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412) | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
By letter dated April 23, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted to the U.S. Nuclear Regulatory Commission (NRC) an application and associated environmental report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings related to the environmental review of Entergy's license renewal application in Supplement 38 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)" (SEIS), which was issued in December 2010. In June 2013, NRC issued Volume 4 of Supplement 38 to NUREG-1437 to correct impingement and entrainment data presented in the final SEIS, revise conclusions regarding thermal impacts, and update the status of the NRC's consultation with the National Marine Fisheries Service under section 7 of the Endangered Species Act. By letter dated September 8, 2014, the NRC notified Entergy of its intent to prepare a second supplement to the final SEIS to address new information identified since June 2013. On April 2, 2015, the U.S. Fish and Wildlife Service published a final rule listing the northern long-eared bat (Myotis septentrionalis) as threatened throughout its range, which includes the IP2 and IP3 site. The NRC staff has identified in the attached enclosure areas where additional information is necessary for the NRC staff to complete its assessment of the potential effects of the IP2 and IP3 license renewal on the northern long-eared bat. Items in the enclosure were discussed with Ms. Dara Gray, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov. Sincerely, /RA/ Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | By letter dated April 23, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted to the U.S. Nuclear Regulatory Commission (NRC) an application and associated environmental report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings related to the environmental review of Entergy's license renewal application in Supplement 38 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)" (SEIS), which was issued in December 2010. In June 2013, NRC issued Volume 4 of Supplement 38 to NUREG-1437 to correct impingement and entrainment data presented in the final SEIS, revise conclusions regarding thermal impacts, and update the status of the NRC's consultation with the National Marine Fisheries Service under section 7 of the Endangered Species Act. By letter dated September 8, 2014, the NRC notified Entergy of its intent to prepare a second supplement to the final SEIS to address new information identified since June 2013. | ||
On April 2, 2015, the U.S. Fish and Wildlife Service published a final rule listing the northern long-eared bat (Myotis septentrionalis) as threatened throughout its range, which includes the IP2 and IP3 site. The NRC staff has identified in the attached enclosure areas where additional information is necessary for the NRC staff to complete its assessment of the potential effects of the IP2 and IP3 license renewal on the northern long-eared bat. Items in the enclosure were discussed with Ms. Dara Gray, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov | |||
. Sincerely, | |||
/RA/ Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated cc w/encl: Listserv | ||
ML15104A541 *concurred via email OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SWoods MWentzel BWittick (LJames for) MWentzel DATE 04/15/15 4/20/15 4/20/15 4/22/15 | ML15104A541 *concurred via email OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SWoods MWentzel BWittick (LJames for) MWentzel DATE 04/15/15 4/20/15 4/20/15 4/22/15 | ||
==SUBJECT:== | ==SUBJECT:== | ||
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412) | REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412) | ||
DISTRIBUTION: | |||
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraArcb Resource RidsOgcMailCenter Resource | DISTRIBUTION: | ||
------------- MWentzel JWeil, OCA BGrange MGray, RI DLogan ABurritt, RI BWittick DonaldJackson, RI DWrona MModes, RI DPickett NSheehan, RI OPA STurk, OGC DScrenci, RI OPA BMizuno, OGC DTifft, RI DRoth, OGC NMcNamara, RI BHarris, OGC GNewman, RI SBurnell, OPA JSStewart, RI DMcIntyre, OPA BPinson, RI ENCLOSURE REQUESTS FOR ADDITIONAL INFORMATION RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW | |||
HARD COPY | |||
: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraArcb Resource RidsOgcMailCenter Resource | |||
------------- MWentzel JWeil, OCA BGrange MGray, RI DLogan ABurritt, RI BWittick DonaldJackson, RI DWrona MModes, RI DPickett NSheehan, RI OPA STurk, OGC DScrenci, RI OPA BMizuno, OGC DTifft, RI DRoth, OGC NMcNamara, RI BHarris, OGC GNewman, RI SBurnell, OPA JSStewart, RI DMcIntyre, OPA BPinson, RI | |||
ENCLOSURE REQUESTS FOR ADDITIONAL INFORMATION RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW On April 2, 2015, the U.S. Fish and Wildlife Service (FWS) published a final rule (80 FR 17973) that lists the northern long-eared bat (Myotis septentrionalis) as threatened throughout its range. The northern long-eared bat's range includes Westchester County, New York, in which Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3) are located. Accordingly, the U.S. Nuclear Regulatory Commission (NRC) staff intends to address potential effects to this species as part of its IP2 and IP3 license renewal review. The NRC staff requests the following information to assist in its review: | |||
: 1. Provide any information that Entergy Nuclear, LLC (Entergy) has regarding the northern long-eared bat's use of the IP2 and IP3 site. Such information may include potential habitat (particularly summer roosting habitat) or other uses of the IP2 and IP3 site by the species, observations of the species on the site, and studies or monitoring performed to document potential presence of the species on the site. The FWS's final rule describes northern long-eared bat habitat in detail. | |||
: 2. Because the Indiana bat (Myotis sodalis), a Federally endangered species that was addressed in the NRC's final supplemental environmental impact statement for IP2 and IP3 license renewal, is similar in its habitat requirements to the northern long-eared bat, please provide updated information, if applicable, on the Indiana bat's potential use of the IP2 and IP3 site. | |||
: 3. Provide updated information, if applicable, regarding the effects that activities associated with IP2 and IP3 license renewal and refurbishment could have on the northern long-eared bat and Indiana bat. Such activities may include habitat loss, degradation, disturbance, or fragmentation, as well as temporary or permanent increases in noise, vibration, dust, chemical use, lighting, vehicle use, and general levels of human activity during the license renewal term that may result from refurbishment or other site activities. | |||
: 4. Describe the procedures or protocols that Entergy maintains, if any, to ensure that effects to Federally listed bats are appropriately considered prior to site activities, such as hazardous tree removal, landscape maintenance, or other operations activities that could directly or indirectly affect bats. | |||
: 5. Has Entergy observed any injured or dead bats (of any species) on the site, especially near the base of tall buildings and structures? If so, please describe these occurrences and include the date of observation, species (if known), condition of individual(s), and any follow-up actions that Entergy took as a result of the incident(s). | |||
: 6. The Federal Energy Regulatory Commission's final environmental impact statement (FEIS) on the Algonquin Incremental Market (AIM) Project (available at https://www.ferc.gov/ industries/gas/enviro/eis/2015/01-23-15-eis.asp) indicates that acoustic surveys for the northern long-eared bat and Indiana bat detected both species at locations in Westchester County, New York (see FEIS, p. 4-113 and 4-116). As indicated in Entergy's March 10, 2015, response to a request for additional information (ADAMS Accession No. ML15089A338), the Algonquin gas pipeline associated with this project would cross a portion of the IP2 and IP3 property. Is Entergy aware of whether the affected portions of the IP2 and IP3 site were surveyed for bats as part of the AIM project? Provide any available information obtained from those surveys concerning the presence or use of the IP2 and IP3 site by the northern long-eared bat.}} |
Revision as of 01:41, 1 July 2018
ML15112B192 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 04/22/2015 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
Download: ML15112B192 (8) | |
Text
1IPRenewal NPEmails From:Wentzel, Michael Sent:Wednesday, April 22, 2015 8:29 PM To:'Gray, Dara F'
Subject:
RE: Northern Long-Eared Bat RAIs Attachments:
ML15104A541.pdfDara, The electronic copy of the RAIs is attached.
- Thanks, Mike
Original Message-----
From: Gray, Dara F [1] Sent: Wednesday, April 22, 2015 9:57 AM To: Wentzel, Michael
Subject:
RE: Northern Long-Eared Bat RAIs
Thanks Mike
________________________________________
From: Wentzel, Michael [Michael.Wentzel@nrc.gov]
Sent: Wednesday, April 22, 2015 8:23 AM To: Gray, Dara F
Subject:
Northern Long-Eared Bat RAIs
Dara, I just wanted to let you know that I signed-out the RAIs. As discussed, the letter states a 45-day turnaround time for the response. I will forward on an electronic copy of the letter once it is available.
- Thanks, Mike
Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov<mailto:michael.wentzel@nrc.gov
>
Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 5097 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F028816408DF2)
Subject:
RE: Northern Long-Eared Bat RAIs Sent Date: 4/22/2015 8:29:15 PM Received Date: 4/22/2015 8:29:16 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients: "'Gray, Dara F'" <DGray@entergy.com>
Tracking Status: None
Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 822 4/22/2015 8:29:16 PM ML15104A541.pdf 171635 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 22, 2015 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412)
Dear Sir or Madam:
By letter dated April 23, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted to the U.S. Nuclear Regulatory Commission (NRC) an application and associated environmental report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings related to the environmental review of Entergy's license renewal application in Supplement 38 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)" (SEIS), which was issued in December 2010. In June 2013, NRC issued Volume 4 of Supplement 38 to NUREG-1437 to correct impingement and entrainment data presented in the final SEIS, revise conclusions regarding thermal impacts, and update the status of the NRC's consultation with the National Marine Fisheries Service under section 7 of the Endangered Species Act. By letter dated September 8, 2014, the NRC notified Entergy of its intent to prepare a second supplement to the final SEIS to address new information identified since June 2013.
On April 2, 2015, the U.S. Fish and Wildlife Service published a final rule listing the northern long-eared bat (Myotis septentrionalis) as threatened throughout its range, which includes the IP2 and IP3 site. The NRC staff has identified in the attached enclosure areas where additional information is necessary for the NRC staff to complete its assessment of the potential effects of the IP2 and IP3 license renewal on the northern long-eared bat. Items in the enclosure were discussed with Ms. Dara Gray, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov
. Sincerely,
/RA/ Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: Listserv
ML15104A541 *concurred via email OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SWoods MWentzel BWittick (LJames for) MWentzel DATE 04/15/15 4/20/15 4/20/15 4/22/15
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412)
DISTRIBUTION:
HARD COPY
- DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraArcb Resource RidsOgcMailCenter Resource
MWentzel JWeil, OCA BGrange MGray, RI DLogan ABurritt, RI BWittick DonaldJackson, RI DWrona MModes, RI DPickett NSheehan, RI OPA STurk, OGC DScrenci, RI OPA BMizuno, OGC DTifft, RI DRoth, OGC NMcNamara, RI BHarris, OGC GNewman, RI SBurnell, OPA JSStewart, RI DMcIntyre, OPA BPinson, RI
ENCLOSURE REQUESTS FOR ADDITIONAL INFORMATION RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW On April 2, 2015, the U.S. Fish and Wildlife Service (FWS) published a final rule (80 FR 17973) that lists the northern long-eared bat (Myotis septentrionalis) as threatened throughout its range. The northern long-eared bat's range includes Westchester County, New York, in which Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3) are located. Accordingly, the U.S. Nuclear Regulatory Commission (NRC) staff intends to address potential effects to this species as part of its IP2 and IP3 license renewal review. The NRC staff requests the following information to assist in its review:
- 1. Provide any information that Entergy Nuclear, LLC (Entergy) has regarding the northern long-eared bat's use of the IP2 and IP3 site. Such information may include potential habitat (particularly summer roosting habitat) or other uses of the IP2 and IP3 site by the species, observations of the species on the site, and studies or monitoring performed to document potential presence of the species on the site. The FWS's final rule describes northern long-eared bat habitat in detail.
- 2. Because the Indiana bat (Myotis sodalis), a Federally endangered species that was addressed in the NRC's final supplemental environmental impact statement for IP2 and IP3 license renewal, is similar in its habitat requirements to the northern long-eared bat, please provide updated information, if applicable, on the Indiana bat's potential use of the IP2 and IP3 site.
- 3. Provide updated information, if applicable, regarding the effects that activities associated with IP2 and IP3 license renewal and refurbishment could have on the northern long-eared bat and Indiana bat. Such activities may include habitat loss, degradation, disturbance, or fragmentation, as well as temporary or permanent increases in noise, vibration, dust, chemical use, lighting, vehicle use, and general levels of human activity during the license renewal term that may result from refurbishment or other site activities.
- 4. Describe the procedures or protocols that Entergy maintains, if any, to ensure that effects to Federally listed bats are appropriately considered prior to site activities, such as hazardous tree removal, landscape maintenance, or other operations activities that could directly or indirectly affect bats.
- 5. Has Entergy observed any injured or dead bats (of any species) on the site, especially near the base of tall buildings and structures? If so, please describe these occurrences and include the date of observation, species (if known), condition of individual(s), and any follow-up actions that Entergy took as a result of the incident(s).
- 6. The Federal Energy Regulatory Commission's final environmental impact statement (FEIS) on the Algonquin Incremental Market (AIM) Project (available at https://www.ferc.gov/ industries/gas/enviro/eis/2015/01-23-15-eis.asp) indicates that acoustic surveys for the northern long-eared bat and Indiana bat detected both species at locations in Westchester County, New York (see FEIS, p. 4-113 and 4-116). As indicated in Entergy's March 10, 2015, response to a request for additional information (ADAMS Accession No. ML15089A338), the Algonquin gas pipeline associated with this project would cross a portion of the IP2 and IP3 property. Is Entergy aware of whether the affected portions of the IP2 and IP3 site were surveyed for bats as part of the AIM project? Provide any available information obtained from those surveys concerning the presence or use of the IP2 and IP3 site by the northern long-eared bat.