ML17110A251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:APR 2 0 2017 Brad Berryman Site Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 brad.berryman@talenenergy.com SUSQUEHANNA STEAM ELECTRIC STATION UPDATED RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2016-09 "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" PLA-7590 ENERGY 10 CFR 55.40 Docket No. 50-387 and 50-388 Reference 1: NRC RJS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations, " dated June 16, 2016. Reference 2: PLA-7519 "Response to NRC Regulat01y Issue Summmy 2016-09 'Preparation and Scheduling of Operator Licensing Examinations', "dated September 7, 2016. The purpose of this letter is to provide an updated response to the Nuclear Regulatory Commission Regulatory Issue Summary 2016-09 "Preparation and Scheduling of Operator Licensing Examinations" (Reference 1 ). Susquehanna Nuclear, LLC previously submitted a response in August (Reference 2). Enclosed is the updated NRC Form 536 (Enclosure 1) representing the current plan for operator licensing needs at the Susquehanna Steam Electric Station. Susquehanna Nuclear, LLC will support Region I to balance examiner workload and provide mutually agreeable exam schedules through 2021. Susquehanna Nuclear, LLC intends to prepare all license operator examinations during this period. Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager-Nuclear Regulatory Affairs at (570) 542-3155. This submittal contains no new regulatory commitments. B. Berryman Enclosure 1: NRC Form 536 Copy: NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. H. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP   to PLA-7590 NRCForm536 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour. This infonmation collection is used to plan budgets and resources for operator examinations. Send (!)-+ OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and lnfonmation Collections Branch (T-5 1!1 0 . 0 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to \i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131), Office of Management and Budget, Washington, DC 20503. If a means ... ***"' used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. FACILITY NRC REGION Susquehanna Nuclear, LLC 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 ---------NUMBER OF REACTOR 6 8 8 OPERATORS NUMBER OF SENIOR REACTOR 8 6 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/26/2018 08/19/2019 08/23/2021 ALTERNATE DATE 03/05/2018 08/26/2019 08/30/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 17 CY 18 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (05-2016)}}
{{#Wiki_filter:APR 2 0 2017 Brad Berryman Site Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna  
: Nuclear, LLC 769 Salem Boulevard  
: Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 brad.berryman@talenenergy.com SUSQUEHANNA STEAM ELECTRIC STATION UPDATED RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2016-09 "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" PLA-7590 ENERGY 10 CFR 55.40 Docket No. 50-387 and 50-388 Reference 1: NRC RJS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations,  
" dated June 16, 2016. Reference 2: PLA-7519 "Response to NRC Regulat01y Issue Summmy 2016-09 'Preparation and Scheduling of Operator Licensing Examinations',  
"dated September 7, 2016. The purpose of this letter is to provide an updated response to the Nuclear Regulatory Commission Regulatory Issue Summary 2016-09 "Preparation and Scheduling of Operator Licensing Examinations" (Reference 1 ). Susquehanna  
: Nuclear, LLC previously submitted a response in August (Reference 2). Enclosed is the updated NRC Form 536 (Enclosure  
: 1) representing the current plan for operator licensing needs at the Susquehanna Steam Electric Station.
Susquehanna  
: Nuclear, LLC will support Region I to balance examiner workload and provide mutually agreeable exam schedules through 2021. Susquehanna  
: Nuclear, LLC intends to prepare all license operator examinations during this period. Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager-Nuclear Regulatory Affairs at (570) 542-3155.
This submittal contains no new regulatory commitments.
B. Berryman Enclosure 1: NRC Form 536 Copy: NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. H. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP Enclosure 1 to PLA-7590 NRCForm536 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES:
10/31/2017 (05-2016)
Estimated burden per response to comply with this voluntary information collection request 1 hour. This infonmation collection is used to plan budgets and resources for operator examinations
. Send (!)-+ OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and lnfonmation Collections Branch (T-5 1!1 0 . 0 F53), U.S. Nuclear Regulatory Commission
, Washington, DC20555-0001
, or by e-mail to \i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131)
, Office of Management and Budget, Washington, DC 20503. If a means ... ***"' used to impose an infonmation collectio n does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Susquehanna Nuclear, LLC 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 ---------NUMBER OF REACTOR 6 8 8 OPERATORS NUMBER OF SENIOR REACTOR 8 6 6 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 0 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/26/2018 08/19/2019 08/23/2021 ALTERNATE DATE 03/05/2018 08/26/2019 08/30/2021  
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 17 CY 18 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (05-2016)}}

Revision as of 21:27, 29 June 2018

Susquehanna, Units 1 and 2 - Updated Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.
ML17110A251
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/20/2017
From: Berryman B
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7590, RIS-2016-09
Download: ML17110A251 (3)


Text

APR 2 0 2017 Brad Berryman Site Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna

Nuclear, LLC 769 Salem Boulevard
Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 brad.berryman@talenenergy.com SUSQUEHANNA STEAM ELECTRIC STATION UPDATED RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2016-09 "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" PLA-7590 ENERGY 10 CFR 55.40 Docket No. 50-387 and 50-388 Reference 1: NRC RJS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations,

" dated June 16, 2016. Reference 2: PLA-7519 "Response to NRC Regulat01y Issue Summmy 2016-09 'Preparation and Scheduling of Operator Licensing Examinations',

"dated September 7, 2016. The purpose of this letter is to provide an updated response to the Nuclear Regulatory Commission Regulatory Issue Summary 2016-09 "Preparation and Scheduling of Operator Licensing Examinations" (Reference 1 ). Susquehanna

Nuclear, LLC previously submitted a response in August (Reference 2). Enclosed is the updated NRC Form 536 (Enclosure
1) representing the current plan for operator licensing needs at the Susquehanna Steam Electric Station.

Susquehanna

Nuclear, LLC will support Region I to balance examiner workload and provide mutually agreeable exam schedules through 2021. Susquehanna
Nuclear, LLC intends to prepare all license operator examinations during this period. Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager-Nuclear Regulatory Affairs at (570) 542-3155.

This submittal contains no new regulatory commitments.

B. Berryman Enclosure 1: NRC Form 536 Copy: NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. H. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP Enclosure 1 to PLA-7590 NRCForm536 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES:

10/31/2017 (05-2016)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonmation collection is used to plan budgets and resources for operator examinations

. Send (!)-+ OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and lnfonmation Collections Branch (T-5 1!1 0 . 0 F53), U.S. Nuclear Regulatory Commission

, Washington, DC20555-0001

, or by e-mail to \i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131)

, Office of Management and Budget, Washington, DC 20503. If a means ... ***"' used to impose an infonmation collectio n does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Susquehanna Nuclear, LLC 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 ---------NUMBER OF REACTOR 6 8 8 OPERATORS NUMBER OF SENIOR REACTOR 8 6 6 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 0 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/26/2018 08/19/2019 08/23/2021 ALTERNATE DATE 03/05/2018 08/26/2019 08/30/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 17 CY 18 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (05-2016)