{{#Wiki_filter:ES-401 Record of Rejected K/As Form ES-401-4  Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 1 / Group 1 APE 022AK1.04 Loss of Reactor Coolant Makeup Reason for changing from manual to automatic control of charging flow valve controller:  PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / Group 1 EPE 038EK1.04 Steam Generator Tube Rupture (SGTR):  Reflux boiling:  Reflux boiling is not used as a  mitigation strategy for SGTR at PBNP:  Reselected 038EK1.01 RO Tier 1 / Group 1 APE 054K2.* Loss of Main Feedwater (MFW):  No K2.* K/A with an RO Importance Rating :  Reselected 054G2.2.36 RO Tier 1 / Group 1 EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout):  No K2.* K/A with an RO :  Reselected 055G2.4.8 RO Tier 1 / Group 1 W/E04EA2.1 LOCA Outside Containment:  Facility conditions and selection of appropriate procedures during abnormal and emergency operations:  Determined to be an SRO level question due to selection of procedures while within the EOP network:  Reselected W/E04EA2.2 RO Tier 1 / Group 2 APE 059AK1.05 Accidental Liquid Radioactive-Waste Release:  The calculation of offsite doses due to a release from the power plant:  This is not an RO responsibility/job at PBNP:  Reselected 059AK1.01 RO Tier 1 / Group 2 W/E13EA2.
1 Steam Generator Overpressure:  Facility conditions and selection of appropriate procedures during abnormal and emergency operations:  This is not an RO responsibility at PBNP due to being a "Yellow" Critical Safety Function Path:  Reselected W/E13EA2.2 RO Tier 2 / Group 1 SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS):  PRT temperature and pressure during PORV testing:  No PORV testing is performed at PBNP which causes a temperature change in the PRT:  Reselected 010A3.02 RO Tier 2 / Group 1 SYS 078K5.* Instrument Air System (IAS):  No K5.* K/A 2.5:  Reselected 078K1.04, see explanation below (061K1.*) RO Tier 2 / Group 1 SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System:  Was not used due to no he randomly exchanged it with an already selected K/A (i.e., 061K1.*):  Reselected 061K5.05 RO Tier 2 / Group 1 SYS103K5.* Containment System:  No K5.* K/A with an RO Importance Rating :  Reselected 103K3.01, see explanation below (073K3.*) RO Tier 2 / Group 1 SYS 073K3.* Process Radiation (PRM) System:  Was not used due to no 103K5.* K/A with 103 (Calready selected K/A (i.e., 073K3.*):  Reselected 073K5.01 RO Tier 2 / Group 1 SYS 076K4.01 Service Water System (SWS):  Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves:  The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure:  Reselected 076K4.06 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 1 SYS 076K4.06 Service Water System (SWS):  Service water train separation:  Train separation is only achieved by Service Water Pump power supplies at PBNP:  Reselected 076K4.02 RO Tier 2 / Group 2 SYS 029A4.04 Containment Purge System (CPS):  Containment evacuation signal:  Unable to construct a question with the required level of difficulty:  Reselected 029A4.01 RO Tier 2 / Group 2 SYS 029A4.01 Containment Purge System (CPS):  Containment purge flow rate:  Purge flow rate of the Containment Purge System is not monitored:  No further A4.* K/A  029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / Group 2 SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control:  S/G level:  Unable to construct a question with the required level of difficulty:  Reselected 041K1.05 SRO Tier 1 / Group 1 APE 026G2.2.4 Loss of Component Cooling Water (CCW):  (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility:  No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 026G2.2.38 SRO Tier 1 / Group 1 APE 040AA2.02 Steam Line Rupture:  Conditions requiring a reactor trip:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 040AA2.04 SRO Tier 1 / Group 2 APE 036G2.1.25 Fuel Handling Incidents:  Ability to interpret reference materials, such as graphs, curves, tables, etc:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 036G2.1.31 SRO Tier 1 / Group 2 APE 036G2.1.31 Fuel Handling Incidents:  Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 036G2.1.23 SRO Tier 2 / Group 1 SYS 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS):  Bubble formation in PZR:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 007A2.07 SRO Tier 2 / Group 1 SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS):  Recirculating quench tank:  There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 007A2.01 SRO Tier 2 / Group 2 SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS):  Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):  Reselected 011G2.1.32 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 2 SYS 022G2.2.4 Containment Spray System (CSS):  (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility:  Unable to write a question to meet this K/A due to no major differences between units for this system:  Reselected 022G2.2.39 RO Tier 2 / Group 1 SYS 078K1.04 Instrument Air System (IAS):  Cooling water to compressor:  Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature):  Reselected 078K1.05 RO Tier 1 / Group 2 APE 033AA2.12 Loss of Intermediate Range Nuclear Instrumentation:  Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Maximum allowable channel disagreement.:  Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw:  Reselected 033AA2.01}}

Revision as of 16:19, 12 June 2018

2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4
ML15083A062
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
References
Download: ML15083A062 (3)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 1 / Group 1 APE 022AK1.04 Loss of Reactor Coolant Makeup Reason for changing from manual to automatic control of charging flow valve controller: PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / Group 1 EPE 038EK1.04 Steam Generator Tube Rupture (SGTR): Reflux boiling: Reflux boiling is not used as a mitigation strategy for SGTR at PBNP: Reselected 038EK1.01 RO Tier 1 / Group 1 APE 054K2.* Loss of Main Feedwater (MFW): No K2.* K/A with an RO Importance Rating : Reselected 054G2.2.36 RO Tier 1 / Group 1 EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout): No K2.* K/A with an RO : Reselected 055G2.4.8 RO Tier 1 / Group 1 W/E04EA2.1 LOCA Outside Containment: Facility conditions and selection of appropriate procedures during abnormal and emergency operations: Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 / Group 2 APE 059AK1.05 Accidental Liquid Radioactive-Waste Release: The calculation of offsite doses due to a release from the power plant: This is not an RO responsibility/job at PBNP: Reselected 059AK1.01 RO Tier 1 / Group 2 W/E13EA2.

1 Steam Generator Overpressure: Facility conditions and selection of appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a "Yellow" Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 / Group 1 SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS): PRT temperature and pressure during PORV testing: No PORV testing is performed at PBNP which causes a temperature change in the PRT: Reselected 010A3.02 RO Tier 2 / Group 1 SYS 078K5.* Instrument Air System (IAS): No K5.* K/A 2.5: Reselected 078K1.04, see explanation below (061K1.*) RO Tier 2 / Group 1 SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System: Was not used due to no he randomly exchanged it with an already selected K/A (i.e., 061K1.*): Reselected 061K5.05 RO Tier 2 / Group 1 SYS103K5.* Containment System: No K5.* K/A with an RO Importance Rating : Reselected 103K3.01, see explanation below (073K3.*) RO Tier 2 / Group 1 SYS 073K3.* Process Radiation (PRM) System: Was not used due to no 103K5.* K/A with 103 (Calready selected K/A (i.e., 073K3.*): Reselected 073K5.01 RO Tier 2 / Group 1 SYS 076K4.01 Service Water System (SWS): Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves: The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure: Reselected 076K4.06 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 1 SYS 076K4.06 Service Water System (SWS): Service water train separation: Train separation is only achieved by Service Water Pump power supplies at PBNP: Reselected 076K4.02 RO Tier 2 / Group 2 SYS 029A4.04 Containment Purge System (CPS): Containment evacuation signal: Unable to construct a question with the required level of difficulty: Reselected 029A4.01 RO Tier 2 / Group 2 SYS 029A4.01 Containment Purge System (CPS): Containment purge flow rate: Purge flow rate of the Containment Purge System is not monitored: No further A4.* K/A 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / Group 2 SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control: S/G level: Unable to construct a question with the required level of difficulty: Reselected 041K1.05 SRO Tier 1 / Group 1 APE 026G2.2.4 Loss of Component Cooling Water (CCW): (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 026G2.2.38 SRO Tier 1 / Group 1 APE 040AA2.02 Steam Line Rupture: Conditions requiring a reactor trip: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 040AA2.04 SRO Tier 1 / Group 2 APE 036G2.1.25 Fuel Handling Incidents: Ability to interpret reference materials, such as graphs, curves, tables, etc: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.31 SRO Tier 1 / Group 2 APE 036G2.1.31 Fuel Handling Incidents: Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.23 SRO Tier 2 / Group 1 SYS 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS): Bubble formation in PZR: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.07 SRO Tier 2 / Group 1 SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS): Recirculating quench tank: There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.01 SRO Tier 2 / Group 2 SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS): Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 011G2.1.32 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 2 SYS 022G2.2.4 Containment Spray System (CSS): (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: Unable to write a question to meet this K/A due to no major differences between units for this system: Reselected 022G2.2.39 RO Tier 2 / Group 1 SYS 078K1.04 Instrument Air System (IAS): Cooling water to compressor: Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature): Reselected 078K1.05 RO Tier 1 / Group 2 APE 033AA2.12 Loss of Intermediate Range Nuclear Instrumentation: Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Maximum allowable channel disagreement.: Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw: Reselected 033AA2.01