MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11
[Table view] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Randomly Tier /
Selected Reason for Rejection Group K/A RO Tier 1 / APE Loss of Reactor Coolant Makeup Group 1 022AK1.04 Reason for changing from manual to automatic control of charging flow valve controller: PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / EPE Steam Generator Tube Rupture (SGTR): Reflux boiling: Reflux boiling is not Group 1 038EK1.04 used as a mitigation strategy for SGTR at PBNP: Reselected 038EK1.01 RO Tier 1 / APE Loss of Main Feedwater (MFW): No K2.* K/A with an RO Importance Rating Group 1 054K2.* 2.5: Reselected 054G2.2.36 RO Tier 1 / EPE Loss of Offsite and Onsite Power (Station Blackout): No K2.* K/A with an RO Group 1 055EK2.* Importance Rating 2.5: Reselected 055G2.4.8 RO Tier 1 / W/E04EA2. LOCA Outside Containment: Facility conditions and selection of appropriate Group 1 1 procedures during abnormal and emergency operations: Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 / APE Accidental Liquid Radioactive-Waste Release: The calculation of offsite Group 2 059AK1.05 doses due to a release from the power plant: This is not an RO responsibility/job at PBNP: Reselected 059AK1.01 RO Tier 1 / W/E13EA2. Steam Generator Overpressure: Facility conditions and selection of Group 2 1 appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 / SYS Pressurizer Pressure Control System (PZR PCS): PRT temperature and Group 1 010A3.01 pressure during PORV testing: No PORV testing is performed at PBNP which causes a temperature change in the PRT: Reselected 010A3.02 RO Tier 2 / SYS Instrument Air System (IAS): No K5.* K/A with an RO Importance Rating Group 1 078K5.* 2.5: Reselected 078K1.04, see explanation below (061K1.*)
RO Tier 2 / SYS Auxiliary / Emergency Feedwater (AFW) System: Was not used due to no Group 1 061K1.* 078K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A 2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*):
Reselected 061K5.05 RO Tier 2 / SYS103K5.* Containment System: No K5.* K/A with an RO Importance Rating 2.5:
Group 1 Reselected 103K3.01, see explanation below (073K3.*)
RO Tier 2 / SYS Process Radiation (PRM) System: Was not used due to no 103K5.* K/A with Group 1 073K3.* an RO Importance Rating 2.5, randomly selected the available K/As within 103 (Containment) which had a K/A 2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*): Reselected 073K5.01 RO Tier 2 / SYS Service Water System (SWS): Conditions initiating automatic closure of Group 1 076K4.01 closed cooling water auxiliary building header supply and return valves: The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure: Reselected 076K4.06
Randomly Tier /
Selected Reason for Rejection Group K/A RO Tier 2 / SYS Service Water System (SWS): Service water train separation: Train Group 1 076K4.06 separation is only achieved by Service Water Pump power supplies at PBNP:
Reselected 076K4.02 RO Tier 2 / SYS Containment Purge System (CPS): Containment evacuation signal: Unable Group 2 029A4.04 to construct a question with the required level of difficulty: Reselected 029A4.01 RO Tier 2 / SYS Containment Purge System (CPS): Containment purge flow rate: Purge flow Group 2 029A4.01 rate of the Containment Purge System is not monitored: No further A4.* K/A exist with an RO Importance Rating 2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / SYS Steam Dump System (SDS) and Turbine Bypass Control: S/G level: Unable Group 2 041K1.02 to construct a question with the required level of difficulty: Reselected 041K1.05 SRO Tier APE Loss of Component Cooling Water (CCW): (multi-unit license) Ability to 1/ 026G2.2.4 explain the variations in control board/control room layouts, systems, Group 1 instrumentation, and procedural actions between units at a facility: No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 026G2.2.38 SRO Tier APE Steam Line Rupture: Conditions requiring a reactor trip: Unable to write a 1/ 040AA2.02 question to the requirements of an SRO level question (meeting the Group 1 requirements of 10CFR55.43(b)): Reselected 040AA2.04 SRO Tier APE Fuel Handling Incidents: Ability to interpret reference materials, such as 1/ 036G2.1.25 graphs, curves, tables, etc: Unable to write a question to the requirements of Group 2 an SRO level question (meeting the requirements of 10CFR55.43(b)):
Reselected 036G2.1.31 SRO Tier APE Fuel Handling Incidents: Ability to locate control room switches, controls, and 1/ 036G2.1.31 indications, and to determine that they correctly reflect the desired plant Group 2 lineup.: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.23 SRO Tier SYS Pressurizer Relief Tank/Quench Tank System (PRTS): Bubble formation in 2/ 007A2.06 PZR: Unable to write a question to the requirements of an SRO level Group 1 question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.07 SRO Tier SYS Pressurizer Relief Tank/Quench Tank System (PRTS): Recirculating quench 2/ 007A2.07 tank: There are no procedures at PBNP which accomplish this task. Unable Group 1 to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.01 SRO Tier SYS Pressurizer Level Control System (PZR LCS): Ability to locate control room 2/ 011G2.1.31 switches, controls, and indications, and to determine that they correctly reflect Group 2 the desired plant lineup: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):
Reselected 011G2.1.32
Randomly Tier /
Selected Reason for Rejection Group K/A RO Tier 2 / SYS Containment Spray System (CSS): (multi-unit license) Ability to explain the Group 2 022G2.2.4 variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: Unable to write a question to meet this K/A due to no major differences between units for this system:
Reselected 022G2.2.39 RO Tier 2 / SYS Instrument Air System (IAS): Cooling water to compressor: Unable to write a Group 1 078K1.04 question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature): Reselected 078K1.05 Loss of Intermediate Range Nuclear Instrumentation: Ability to determine RO Tier 1 / APE and interpret the following as they apply to the Loss of Intermediate Range Group 2 033AA2.12 Nuclear Instrumentation: Maximum allowable channel disagreement.:
Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw:
Reselected 033AA2.01