ML15217A507: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 11
| page count = 11
}}
}}
=Text=
{{#Wiki_filter:EntergyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Franciaville, LA 70775Tel 225-381-4157N. Todd BrumfieldDirector -Regulatory & PerformanceImprovementRBG-47582July 16, 2015U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555
==SUBJECT:==
ReferencesResponse to Request for Information -Change to Technical Specification3.8.1, "AC Sources -Operating"River Bend Station, Unit 1Docket No. 50-458License No. NPF-471. Entergy letter, Application for Change to Technical Specification 3.8.1,"AC Sources -Operating" dated July 9, 2014 (RBG-47461)2. NRC email, River Bend Station Unit 1 License Amendment Request forChange to Technical Specifications 3.8.1, "AC Sources -Operating"(MF4421) dated January 20, 20153. Entergy letter, Response to Request for Information -Change toTechnical Specification 3.8.1, "AC Sources -Operating" dated May 7,20154. NRC email, River Bend Station Unit I License Amendment Request forChange to Technical Specifications 3.8.1, "AC Sources -Operating"(MF4421) dated May 04, 20155. Entergy letter, Response to Request for Information -Change toTechnical Specification 3.8.1, "AC Sources -- Operating" dated June 3,2015
==Dear Sir or Madam:==
In Reference 1 Entergy submitted a request for an amendment to the TechnicalSpecifications (TS) for River Bend Station (RBS), Unit 1, modifying the existingSurveillance Requirements (SRs) related to Technical Specification 3.8.1, "AC Sources -Operating." References 3 and 5, are responses to NRC Staff requested additionalinformation.During the review an editorial changes to the numbering of the revised TS SRs wasidentified. The changes are for clarity and have no technical effect. The changes areidentified in the attachment.Aw1~ff'~
RBG-47582Page 2 of 3The changes were discussed with the NRC Project Manager. These changes are in theAttachment.There are not new commitments in this letter. Please contact Mr. J. A. Clark at (225) 381-4177, if you have any questions.I declare under penalty of perjury that the foregoing is true and correct. Executed onJuly 16, 2015.NTB/JAC/bmb
==Attachment:==
Revised Surveillance Requirement Numberingcc: Regional AdministratorU. S. Nuclear Regulatory Commission, Region IV1600 East Lamar Blvd.Arlington, TX 76011-4511NRC Senior Resident InspectorP. 0. Box 1050St. Francisville, LA 70775U. S. Nuclear Regulatory CommissionAttn: Mr. Alan WangMS O-8B1One White Flint North11555 Rockville PikeRockville, MD 20852 RBG-47582Page 3 of 3Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312Public Utility Commission of TexasAttn: PUC Filing Clerk1701 N. Congress AvenueP. 0. Box 13326Austin, TX 78711-3326RBF1-15-0101LAR 2014-02 AC Sources-Operating3.8.1SURVEILLANCEREQUIREMENTS_(continued)________SURVEILLANCE FREQUENCYSR 3.8.1.11------------NOTES-------1. All DG starts may be preceded by an engineprelube period.2. This Surveillance shall not be performed inMODE 1, 2, or 3. (Not applicable to DG 1C)However, credit may be taken for unpiannedevents that satisfy this SR.Verify on an actual or simulated loss of offsite power 24 monthssignal:a. De-energization of emergency buses;b. Load shedding from emergency buses forDivisions I and II; andc. DC auto-starts from standby condition and:1. energizes permanently connected loads in_< 10 seconds for DG IA and DG lB and_< 13 seconds for DC IC,2. energizes auto-connected shutdown loads,3. maintains steady state voltagei.forDGl1Aand DG1B_>374OV and<_4368 V,ii. forDGl1C>3740Vand_<4580V4. maintains steady state frequency >_ 58.8 Hzand < 60.2 Hz, and5. supplies permanently connected andauto-connected shutdown loads for_> 5 minutes.(continued)RIVER BEND3.8-9RIVE BED 38-9 Amendment No. 81!21!33 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)________SURVEILLANCE FREQUENCYSR 3.8.1.12--------------NOTES- ------1. All DG starts may be preceded by an engineprelube period.2. This Surveillance shall not be performed inMODEl1 or2. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify on an actual or simulated Emergency CoreCooling System (ECCS) initiation signal each DGauto-starts from standby condition and:a. For DG 1C during the auto-start maintainsvoltage < 5400 V and frequency < 66.75 Hz;b. In < 10 seconds for DG 1A and DG lB and_< 13 seconds for DG IC after auto-start andduring tests, achieves voltage _> 3740 V andfrequency _> 58.8 Hz.c. Achieves steady state voltage1. ForDG 1Aand DG1B>3740Vand<4368 V,2. For DG 1C_374OV and<4580 V,and3. For DG 1A, 1B, and IC, frequency of_> 58.8 and < 60.2 Hz; andd. Operates for _> 5 minutes.24 months(contirnued)I RIVER BENDI IVRBED3.8-10 Amendment No. 165, 168v, 187  RBG-47582Revised Surveillance Requirement NumberingSpecification Page Note/ChangeSR 3.8.1.11 3.8-9 Subsection lettering/numberingSR 3.8.1.12 3.8-10 Subsection lettering/numberingSR 3.8.1.15 3.8-12 Subsection lettering/numberingSR 3.8.1.15 3.8-13 Relocation of SR 3.8.1.16 (nochange to SR)SR 3.8.1.19 3.8-14 Subsection lettering/numberingSR 3.8.1.20 3.8-15 Subsection lettering/numbering AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.13-~~~NOTE--- --This Surveillance shall not be performed inMODE 1, 2, or 3. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify each DG's automatic trips are bypassed onan actual or simulated ECCS initiation signalexcept:a. Engine overspeed; andb. Generator differential current.24 monthsSR 3.8.1.14-~~~~NOTES-------1. Momentary transients outside the load andpower factor ranges do not invalidate thistest.2. Credit may be taken for unplanned eventsthat satisfy this SR.Verify each DG operating at a power factor _< 0.9,operates for _> 24 hours:a. For DG 1A and DG I1B loaded _> 3050 kWand <3130 kW; andb. For DG 1C:1. For_ 2 hours loaded _2750 kW and_<2850 kW, and2. For the remaining hours of the testloaded _2525 kW and  2600 kW.24 months(continued)RIVER BENDRIE ED3.8-11 Amendment No. 81 9"!,1211331!68, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.15-~~~NOTES--------1. This Surveillance shall be performed within5 minutes of shutting down the DG after the DGhas operated > 1 hour loaded > 3050 kW and3100 kW for DG 1A and DG 1B, and>2525 kW and <2600 for DC lC, or operatingtemperatures have stabilized, which ever islonger.Momentary transients outside of the load rangedo not invalidate this test.2. All DG starts may be preceded by an engineprelube period.Verify each DG starts and achieves:1. In <l0 seconds for DG1A and DG1B and< 13 seconds for DC IC voltage >3740 V andfrequency _> 58.8 Hz, and2. Steady state voltagea) ForDGI1Aand DG1B>_374OV and<4368 Vb) For DG1C>3740Vand_<4580Vandc) For DC 1A, 1B, and 1C frequency> 58.8 Hz and _< 60.2 Hz.24 months(continued)RIVER BENDRIVR BND3.8-12 Amendment No. 81!21!33 165 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.16-----------NOTE- -------This Surveillance shall not be performed in MODE 1, 2,or 3. (Not applicable to DG 1C) However, credit maybe taken for unplanned events that satisfy this SR.Verify each DG:a. Synchronizes with offsite power source whileloaded with emergency loads upon a simulatedrestoration of offsite power;b. Transfers loads to offsite power source; andc. Returns to ready-to-load operation.24 monthsSR 3.8.1.17--------NOTE---------------..... 1 ..This Surveillance shall not be performed in MODE 1, 2,or 3. (Not applicable to DG 1C) However, credit maybe taken for unplanned events that satisfy this SR.Verify, with a DG operating in test mode andconnected to its bus, an actual or simulated ECCSinitiation signal overrides the test mode by:a. Returning DG to ready-to-load operation; andb. Automatically energizing the emergency loadsfrom offsite power.24 monthsSR 3.8.1.18-----------NOTE-------This Surveillance shall not be performed in MODE 1,2, or 3. (Not applicable to DG lC) However, creditmay be taken for unplanned events that satisfy thisSR.Verify sequence time is within + 10% of design for each 24 monthsload sequencer timer.(continued)RIVER BENDRIVR BND3.8-13 Amendment No. 81 95 121 133 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)________SURVEILLANCE FREQUENCYSIR 3.8.1.19----------NOTES- ------1. All DG starts may be preceded by anengine prelube period.2. This Surveillance shall not be performed inMODE 1,2, or 3. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify, on an actual or simulated loss of offsite power 24 monthssignal in conjunction with an actual or simulated ECCSinitiation signal:a. De-energization of emergency buses;b. Load shedding from emergency buses forDivisions I and II; andc. DG auto-starts from standby condition and:1. energizes permanently connected loads in_< 10 seconds for DG 1A and DG lB and_<l3 seconds for DG 1C,2. energizes auto-connected emergencyloads,3. achieves steady state voltagei. forDGl1Aand DG1B>_3740 Vand_<4368 V,ii. for DG 1C>_374OV and_<4580V,4. achieves steady state frequency >_ 58.8 Hzand < 60.2 Hz, and5. supplies permanently connected andauto-connected emergency loads for_> 5 minutes.(continued)RIVER BEND3.8-14RIVE BED 3-14 Amendment No. 81!21 133 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQU IREMENTS (continued)SURVEILLANCE FREQUENCYSR 3.8.1.20 _-..............-.NOTE-----------..........All DG starts may be preceded by an engine prelubeperiod.Verify, when started simultaneously from standby 10 yearscondition, each DG achieves:1. In_<l0 seconds for DG 1Aand DG1B and< 13 seconds for DG 1C voltage _3740 V andfrequency > 58.8 Hz, and2. Steady state voltagea) For DG 1A and DG 1B->374OV and<4368 V,b) For DG IC  3740 V and  4580 V, andc) For DG IA, I1B, and IC frequency_ 58.8 Hzand _< 60.2 Hz.RIVER BEND3.8-15RIVER BED 3.8-15Amendment No. &1-12'1--65 187}}

Revision as of 17:33, 6 June 2018

River Bend Station, Unit 1 - Response to Request for Information - Change to Technical Specification 3.8.1, AC Sources - Operating
ML15217A507
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/16/2015
From: Brumfield N T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47582
Download: ML15217A507 (11)


Text

EntergyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Franciaville, LA 70775Tel 225-381-4157N. Todd BrumfieldDirector -Regulatory & PerformanceImprovementRBG-47582July 16, 2015U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555

SUBJECT:

ReferencesResponse to Request for Information -Change to Technical Specification3.8.1, "AC Sources -Operating"River Bend Station, Unit 1Docket No. 50-458License No. NPF-471. Entergy letter, Application for Change to Technical Specification 3.8.1,"AC Sources -Operating" dated July 9, 2014 (RBG-47461)2. NRC email, River Bend Station Unit 1 License Amendment Request forChange to Technical Specifications 3.8.1, "AC Sources -Operating"(MF4421) dated January 20, 20153. Entergy letter, Response to Request for Information -Change toTechnical Specification 3.8.1, "AC Sources -Operating" dated May 7,20154. NRC email, River Bend Station Unit I License Amendment Request forChange to Technical Specifications 3.8.1, "AC Sources -Operating"(MF4421) dated May 04, 20155. Entergy letter, Response to Request for Information -Change toTechnical Specification 3.8.1, "AC Sources -- Operating" dated June 3,2015

Dear Sir or Madam:

In Reference 1 Entergy submitted a request for an amendment to the TechnicalSpecifications (TS) for River Bend Station (RBS), Unit 1, modifying the existingSurveillance Requirements (SRs) related to Technical Specification 3.8.1, "AC Sources -Operating." References 3 and 5, are responses to NRC Staff requested additionalinformation.During the review an editorial changes to the numbering of the revised TS SRs wasidentified. The changes are for clarity and have no technical effect. The changes areidentified in the attachment.Aw1~ff'~

RBG-47582Page 2 of 3The changes were discussed with the NRC Project Manager. These changes are in theAttachment.There are not new commitments in this letter. Please contact Mr. J. A. Clark at (225) 381-4177, if you have any questions.I declare under penalty of perjury that the foregoing is true and correct. Executed onJuly 16, 2015.NTB/JAC/bmb

Attachment:

Revised Surveillance Requirement Numberingcc: Regional AdministratorU. S. Nuclear Regulatory Commission, Region IV1600 East Lamar Blvd.Arlington, TX 76011-4511NRC Senior Resident InspectorP. 0. Box 1050St. Francisville, LA 70775U. S. Nuclear Regulatory CommissionAttn: Mr. Alan WangMS O-8B1One White Flint North11555 Rockville PikeRockville, MD 20852 RBG-47582Page 3 of 3Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312Public Utility Commission of TexasAttn: PUC Filing Clerk1701 N. Congress AvenueP. 0. Box 13326Austin, TX 78711-3326RBF1-15-0101LAR 2014-02 AC Sources-Operating3.8.1SURVEILLANCEREQUIREMENTS_(continued)________SURVEILLANCE FREQUENCYSR 3.8.1.11------------NOTES-------1. All DG starts may be preceded by an engineprelube period.2. This Surveillance shall not be performed inMODE 1, 2, or 3. (Not applicable to DG 1C)However, credit may be taken for unpiannedevents that satisfy this SR.Verify on an actual or simulated loss of offsite power 24 monthssignal:a. De-energization of emergency buses;b. Load shedding from emergency buses forDivisions I and II; andc. DC auto-starts from standby condition and:1. energizes permanently connected loads in_< 10 seconds for DG IA and DG lB and_< 13 seconds for DC IC,2. energizes auto-connected shutdown loads,3. maintains steady state voltagei.forDGl1Aand DG1B_>374OV and<_4368 V,ii. forDGl1C>3740Vand_<4580V4. maintains steady state frequency >_ 58.8 Hzand < 60.2 Hz, and5. supplies permanently connected andauto-connected shutdown loads for_> 5 minutes.(continued)RIVER BEND3.8-9RIVE BED 38-9 Amendment No. 81!21!33 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)________SURVEILLANCE FREQUENCYSR 3.8.1.12--------------NOTES- ------1. All DG starts may be preceded by an engineprelube period.2. This Surveillance shall not be performed inMODEl1 or2. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify on an actual or simulated Emergency CoreCooling System (ECCS) initiation signal each DGauto-starts from standby condition and:a. For DG 1C during the auto-start maintainsvoltage < 5400 V and frequency < 66.75 Hz;b. In < 10 seconds for DG 1A and DG lB and_< 13 seconds for DG IC after auto-start andduring tests, achieves voltage _> 3740 V andfrequency _> 58.8 Hz.c. Achieves steady state voltage1. ForDG 1Aand DG1B>3740Vand<4368 V,2. For DG 1C_374OV and<4580 V,and3. For DG 1A, 1B, and IC, frequency of_> 58.8 and < 60.2 Hz; andd. Operates for _> 5 minutes.24 months(contirnued)I RIVER BENDI IVRBED3.8-10 Amendment No. 165, 168v, 187 RBG-47582Revised Surveillance Requirement NumberingSpecification Page Note/ChangeSR 3.8.1.11 3.8-9 Subsection lettering/numberingSR 3.8.1.12 3.8-10 Subsection lettering/numberingSR 3.8.1.15 3.8-12 Subsection lettering/numberingSR 3.8.1.15 3.8-13 Relocation of SR 3.8.1.16 (nochange to SR)SR 3.8.1.19 3.8-14 Subsection lettering/numberingSR 3.8.1.20 3.8-15 Subsection lettering/numbering AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.13-~~~NOTE--- --This Surveillance shall not be performed inMODE 1, 2, or 3. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify each DG's automatic trips are bypassed onan actual or simulated ECCS initiation signalexcept:a. Engine overspeed; andb. Generator differential current.24 monthsSR 3.8.1.14-~~~~NOTES-------1. Momentary transients outside the load andpower factor ranges do not invalidate thistest.2. Credit may be taken for unplanned eventsthat satisfy this SR.Verify each DG operating at a power factor _< 0.9,operates for _> 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:a. For DG 1A and DG I1B loaded _> 3050 kWand <3130 kW; andb. For DG 1C:1. For_ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded _2750 kW and_<2850 kW, and2. For the remaining hours of the testloaded _2525 kW and 2600 kW.24 months(continued)RIVER BENDRIE ED3.8-11 Amendment No. 81 9"!,1211331!68, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.15-~~~NOTES--------1. This Surveillance shall be performed within5 minutes of shutting down the DG after the DGhas operated > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> loaded > 3050 kW and3100 kW for DG 1A and DG 1B, and>2525 kW and <2600 for DC lC, or operatingtemperatures have stabilized, which ever islonger.Momentary transients outside of the load rangedo not invalidate this test.2. All DG starts may be preceded by an engineprelube period.Verify each DG starts and achieves:1. In <l0 seconds for DG1A and DG1B and< 13 seconds for DC IC voltage >3740 V andfrequency _> 58.8 Hz, and2. Steady state voltagea) ForDGI1Aand DG1B>_374OV and<4368 Vb) For DG1C>3740Vand_<4580Vandc) For DC 1A, 1B, and 1C frequency> 58.8 Hz and _< 60.2 Hz.24 months(continued)RIVER BENDRIVR BND3.8-12 Amendment No. 81!21!33 165 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)SURVEILLANCEFREQUENCYSR 3.8.1.16-----------NOTE- -------This Surveillance shall not be performed in MODE 1, 2,or 3. (Not applicable to DG 1C) However, credit maybe taken for unplanned events that satisfy this SR.Verify each DG:a. Synchronizes with offsite power source whileloaded with emergency loads upon a simulatedrestoration of offsite power;b. Transfers loads to offsite power source; andc. Returns to ready-to-load operation.24 monthsSR 3.8.1.17--------NOTE---------------..... 1 ..This Surveillance shall not be performed in MODE 1, 2,or 3. (Not applicable to DG 1C) However, credit maybe taken for unplanned events that satisfy this SR.Verify, with a DG operating in test mode andconnected to its bus, an actual or simulated ECCSinitiation signal overrides the test mode by:a. Returning DG to ready-to-load operation; andb. Automatically energizing the emergency loadsfrom offsite power.24 monthsSR 3.8.1.18-----------NOTE-------This Surveillance shall not be performed in MODE 1,2, or 3. (Not applicable to DG lC) However, creditmay be taken for unplanned events that satisfy thisSR.Verify sequence time is within + 10% of design for each 24 monthsload sequencer timer.(continued)RIVER BENDRIVR BND3.8-13 Amendment No. 81 95 121 133 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQUIREMENTS (continued)________SURVEILLANCE FREQUENCYSIR 3.8.1.19----------NOTES- ------1. All DG starts may be preceded by anengine prelube period.2. This Surveillance shall not be performed inMODE 1,2, or 3. (Not applicable to DG 1C)However, credit may be taken for unplannedevents that satisfy this SR.Verify, on an actual or simulated loss of offsite power 24 monthssignal in conjunction with an actual or simulated ECCSinitiation signal:a. De-energization of emergency buses;b. Load shedding from emergency buses forDivisions I and II; andc. DG auto-starts from standby condition and:1. energizes permanently connected loads in_< 10 seconds for DG 1A and DG lB and_<l3 seconds for DG 1C,2. energizes auto-connected emergencyloads,3. achieves steady state voltagei. forDGl1Aand DG1B>_3740 Vand_<4368 V,ii. for DG 1C>_374OV and_<4580V,4. achieves steady state frequency >_ 58.8 Hzand < 60.2 Hz, and5. supplies permanently connected andauto-connected emergency loads for_> 5 minutes.(continued)RIVER BEND3.8-14RIVE BED 3-14 Amendment No. 81!21 133 168, 187 AC Sources-Operating3.8.1SURVEILLANCE REQU IREMENTS (continued)SURVEILLANCE FREQUENCYSR 3.8.1.20 _-..............-.NOTE-----------..........All DG starts may be preceded by an engine prelubeperiod.Verify, when started simultaneously from standby 10 yearscondition, each DG achieves:1. In_<l0 seconds for DG 1Aand DG1B and< 13 seconds for DG 1C voltage _3740 V andfrequency > 58.8 Hz, and2. Steady state voltagea) For DG 1A and DG 1B->374OV and<4368 V,b) For DG IC 3740 V and 4580 V, andc) For DG IA, I1B, and IC frequency_ 58.8 Hzand _< 60.2 Hz.RIVER BEND3.8-15RIVER BED 3.8-15Amendment No. &1-12'1--65 187