|
|
Line 14: |
Line 14: |
| | page count = 6 | | | page count = 6 |
| | project = TAC:ME1592 | | | project = TAC:ME1592 |
| | stage = Other | | | stage = RAI |
| }} | | }} |
|
| |
|
Revision as of 19:27, 2 April 2018
Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML102080241, ML110940236, ML11171A566, ML11363A176, ML13095A006, ML13303B562, ML14364A086, ML16022A184, ML16070A009, ML16279A078, ML16337A343
|
MONTHYEARML1020802412010-07-26026 July 2010 University of Maryland - Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application for Renewal of Facility Operating License No. R-70 for Maryland University Reactor Project stage: Other ML1021100492010-07-28028 July 2010 University of Maryland Responses Request for Additional Information Regarding the License Renewal for Maryland University Training Reactor Project stage: Request ML1024401162010-08-27027 August 2010 University of Maryland, Request for Extension to Submit Reply to Request #2 in Nrc'S April 6, 2010 Additional Information Request Project stage: Request ML1027105562010-09-22022 September 2010 University of Maryland, Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Request ML1035001312010-12-14014 December 2010 University of Maryland, Maryland University Training Reactor (Mutr), Request for an Extension of Time to Submit the Final Calculation File to RAIs 2a and 2b and to Respond to Questions to Be Raised Regarding the Remaining 16 Technical Speci Project stage: Request ML1101903472011-01-20020 January 2011 University of Maryland - Approval of Request for an Extension, University of Maryland Request for Additional Information Dated August 20, 2010 (TAC No. Me1592) Project stage: RAI ML1109402122011-02-17017 February 2011 University of Maryland, Note to File from Project Manager, Spyros Traiforos Regarding Review of Request for Additional Information Responses Dated January 31, 2011 from University of Maryland and Documenting Upcoming Site Visit on February Project stage: RAI ML1109402362011-03-0404 March 2011 University of Maryland, Milestones Provided to University of Maryland Via E-mail Dated March 4, 2011 and Included as an Attachment to the Summary of the Site Visit Project stage: Other ML11124A1242011-05-0202 May 2011 University of Maryland, Maryland University Training Reactor (Mutr), Technical Specifications, Response to February 18, 2011, Request for Additional Information (RAI) Regarding Remaining Technical Specifications Project stage: Request ML11171A5662011-06-22022 June 2011 University of Maryland, NRC Response to Letter Dated May 2, 2011 Project stage: Other ML11277A0262011-09-28028 September 2011 University of Maryland, Request for Additional Information Regarding License Renewal for Maryland University Training Reactor Project stage: Request ML11286A3372011-10-12012 October 2011 University of Maryland - Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Request ML1133300302011-11-23023 November 2011 University of Maryland, E-mail from M. Al-Sheikhly, Umd to J. Lising, NRC Request for Additional Information Extension Request (Tac No. ME1592) Project stage: Request ML1133300392011-12-0101 December 2011 University of Maryland - Approval for Request for Additional Time to Respond to NRC Request for Additional Information Project stage: RAI ML11363A1762011-12-19019 December 2011 Annual Report: July 1, 2010 - June 30, 2011 for the Maryland University Training Reactor (Mutr) Project stage: Other ML1201702562012-01-0606 January 2012 University of Maryland, E-mail Requesting Extension to NRC Request for Additional Information AR-41 Measurements and Analyses (Tac No. ME1592) Project stage: Request ML12060A3442012-02-0909 February 2012 University of Maryland - Response to NRC Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Response to RAI ML12172A1392012-05-22022 May 2012 University of Maryland, Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor (Mutr) Project stage: Request ML12255A4002012-08-29029 August 2012 University of Maryland, Response to Request for Additional Information Regarding the License Renewal for the Training Reactor (Mutr) Project stage: Response to RAI ML13095A0062013-03-21021 March 2013 University of Maryland - License Renewal for the Maryland University Training Reactor (Mutr), TAC ME1592 Project stage: Other ML13303B5622013-10-22022 October 2013 Annual Report: July 1, 2013 for the Maryland University Training Reactor, Docket No. 05000166, License No. R-70 (TAC ME1592), University of Maryland Project stage: Other ML14064A3692014-03-11011 March 2014 University of Maryland, College Park Request for Additional Information Review of the Emergency Plan for License Renewal for the University of Maryland Training Reactor Project stage: RAI ML14141A6302014-06-0202 June 2014 University of Maryland, College Park Request for Additional Information Financial Update for License Renewal for the University of Maryland, College Park Training Reactor Project stage: RAI ML14176A0782014-06-18018 June 2014 University of Maryland Training Reactor - Report on AR-41 Mitigation Project stage: Request ML14266A6582014-09-25025 September 2014 University of Maryland - Request for Additional Information Review of the Argon-41 Radiological Dose Assessment for License Renewal Project stage: RAI ML14332A3002014-11-25025 November 2014 University of Maryland - Request for Additional Information Review of the ARGON-41 Radiological Dose Assessment for License Renewal of the Maryland University Training Reactor Project stage: Request ML14342A5632014-11-25025 November 2014 University of Maryland, Response to Request for Additional Information Regarding Financial Update for License Renewal Project stage: Response to RAI ML14364A0862014-12-19019 December 2014 University of Maryland - Revised Physical Security Plan for License Renewal of the Maryland University Training Reactor (TAC ME1592) License No. 70; Docket No. 50-166 Project stage: Other ML15058A2762015-03-12012 March 2015 Letter Request for Additional Information Physical Security Plan Review for License Renewal Project stage: RAI ML15084A6122015-04-0101 April 2015 University of Maryland - Request for Additional Information Financial Qualification for License Renewal for the Maryland University Training Reactor Project stage: RAI ML15190A3432015-07-0101 July 2015 University of Maryland - Request for Additional Information Review of the Physical Security Plan for the License Renewal for University for Maryland Training Reactor Project stage: Request ML15205A0912015-08-0707 August 2015 University of Maryland Dismissal of Request for Additional Information Dated April 1, 2015 to the Maryland University Training Reactor Project stage: RAI ML15219A4712015-09-10010 September 2015 University of Maryland - Request for Additional Information for License Renewal of the Maryland University Training Reactor Pertaining to Thermal Hydraulics Project stage: RAI ML16022A1842015-11-23023 November 2015 Univ. of Maryland - Updated Physical Security Plan for License Renewal Project stage: Other ML15349A8942015-12-0202 December 2015 University of Maryland - Request for Additional Information for License Renewal Pertaining to Thermal Hydraulics Project stage: Request ML16070A0092016-02-10010 February 2016 University of Maryland - Revised Physical Security Plan for License Renewal of the Training Reactor Project stage: Other ML16279A0782016-09-29029 September 2016 Univ. of Maryland - Submittal of Annual Operating Report for 07/01/2015 - 06/30/2016 Project stage: Other ML16312A0662016-11-0101 November 2016 University of Maryland, Research Reactor, License Amendment Request Project stage: Request ML16323A4462016-11-17017 November 2016 University of Maryland - Request for Additional Information Regarding the Review of License Renewal for the Maryland University Training Reactor Project stage: Request ML16337A3432016-12-0202 December 2016 Conversation Record - Changes to the Technical Specifications in Support of License Renewal Project stage: Other 2013-10-22
[Table View] |
|
---|
Category:Response to Request for Additional Information (RAI)
MONTHYEARML20016A3142020-01-13013 January 2020 University of Maryland Response to Requests for Additional Information Issued on November 22, 2019 ML19165A0212019-06-0606 June 2019 Univ. of Maryland - College Park - Transmittal of Responses to Request for Additional Information Dated April 16, 2019 ML16323A4462016-11-17017 November 2016 University of Maryland - Request for Additional Information Regarding the Review of License Renewal for the Maryland University Training Reactor ML16323A4472016-11-17017 November 2016 University of Maryland - Request for Additional Information ML16320A0072016-11-10010 November 2016 University of Maryland - Response to Request for Additional Information for the Renewal of Facility Operating License No. R-70 the Maryland University Training Reactor ML16319A3692016-11-0202 November 2016 Mutr Triga Response to Us NRC Generic Letter 2016-01 ML16309A1842016-11-0202 November 2016 University of Maryland - Response to Request for Additional Information for Renewal of Facility Operating License No. R-070 ML16061A0032016-02-29029 February 2016 University of Maryland - Request for Additional Information for the Renewal of Facility Operating License No. R-70 the Maryland University Training Reactor Docket No. 50-166 ML16008A0722016-01-0505 January 2016 Univ. of Maryland - Response to Request for Additional Information for License Renewal ML15349A8942015-12-0202 December 2015 University of Maryland - Request for Additional Information for License Renewal Pertaining to Thermal Hydraulics ML15190A3432015-07-0101 July 2015 University of Maryland - Request for Additional Information Review of the Physical Security Plan for the License Renewal for University for Maryland Training Reactor 2020-01-13
[Table view] |
Text
<l"l>RSI1-y. 0,..p INSTITUTE FOR RESEARCH IN 18 . 56 ELECTRONICS ,., & APPLIED PHYSICS Nov. 17,2016 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Dr. Timothy W. Keeth Associate Research Professor Director, Nuclear Reactor & Radiation Facilities Energy Research Facility, Building 223, Paint Branch Drive, College Park, MD 20742-3511 TEL: 301.405.4952 -FAX 301.314.9437 -koeth@umd.edu SUBJECT: UNIVERSITY OF MARYLAND -REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF LICENSE RENEWAL FOR THE MARYLAND UNIVERSITY TRAINING REACTOR (TAC NO. ME1592) Enclosed please find the responses to RAls dated November 9, 2016 for the University of Maryland Training Reactor (MUTR). I declare under penalty of perjury that the foregoing response is true and correct. u 1,,,., Timotny W. Koeth
- 1. The amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), requested an amendment to increase the SNM possession limit. By letter dated October 10, 2002 (ADAMS Accession No. ML022690533), NRG staff requested additional information in support of the facility operating license renewal: 37. Section 9.5, Possession and Use of Byproduct, Source, and Special Nuclear Material. Please confirm that you want to maintain the current license special nuclear material and byproduct material limits in your renewed license. In response to RAI No. 37 in letter dated June 7, 2004 (ADAMS Accession No. ML 101970211 ), the MUTR staff response states, "It is the desire of the licensee to maintain the current level of SNM." It is not clear if this new amendment is intended to be a separate amendment to Facility Operating License R-70, or if this is to be reviewed and evaluated in the license renewal. Clarify the intended review and evaluation of this amendment. We would like this to be evaluated as part of the license renewal. 2. The amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), states in part, that, "Pursuant to the Act and 10 CFR Part 70, "Domestic Licensing of Special Nuclear Material," to receive and possess, but not use, up to 1,060 grams of contained uranium-235 enriched to less than 20 percent in the form of TRIGA reactor fuel." It is not clear how these additional elements may be distinguished from the other TRIGA fuel elements currently allowed for use. Provide an identifier to be used in the license condition for these 19 elements that will distinguish them as possession only fuel. We will refer to this shipment as Alternate Reactor Fuel. 3. The amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), states in part, that:
Due to our need for new fuel, and with only slightly irradiated fuel available, we will be receiving a shipment of 19 used stainless steel clad TRIGA fuel elements from Idaho National Laboratory (INL) which will arrive before we have completed the analysis to load the fuel in the reactor. a. License condition 2.B.(3) to the amended R-70 license states, "Pursuant to the Act and 10 CFR Part 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material," to possess, but not to separate, such byproduct materials as may be produced by operation of the facility." It appears the license amendment does not address possession of byproduct material produced in reactors other than the MUTR. Provide a license condition that would enable Facility Operating License R-70 to receive, possess, but not use, in the form of TRIGA fuel elements, such byproduct materials that may have been produced in other facilities. Pursuant to the Act and Title 10, Chapter 1, CFR, Part 30, to receive, possess, use, but not separate, in connection with operation of the facility, byproduct material contained in fuel produced in the MUTR and other facilities. b. It appears the license amendment does not propose a license condition forthe possession of SNM produced in other facilities Provide a license condition that would enable Facility Operating License R-70 to receive, possess, but not use, in the form of TRIGA fuel elements, SNM that may have been produced in other facilities. Pursuant to the Act and 10 CFR Part 70, to receive, possess, but not use and not separate, in connection with operation of the facility: such special nuclear material as may be received in TR/GA fuel elements that are transferred to License No. R-70 after utilization in other research reactor facilities. 4. The regulations in 10 CFR 50.34{b){3) require the kinds and quantities of radioactive materials expected to be produced in the operation and the for controlling and limiting radioactive effluents and radiation exposures within the limits set forth in 10 CFR Part 20. In the amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), you reviewed the security plan, but not any other plans that may be in place at the facility. What plans or procedures does the facility have in place to ensure the radiation exposures from fuel receipt and storage are within 10 CFR Part 20 or the facility as low as reasonably achievable program? We are preparing procedures that will be in place that ensure the radiation exposures from fuel receipt and storage will be within 1 O CFR Part 20. 5. The regulations in 10 CFR 50.34(b)(6)(v) require that plans for coping with emergencies be included in the safety analysis report (SAR). In the amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), you reviewed the security plan, but not any other plans that may be in place at the facility. a. Are there new any new accident.s involving fuel receipt and storage that have not been previously evaluated? There are no new accidents involving fuel receipt and storage that have not been previously evaluated. b. What plans or procedures does the facility have in place to mitigate the consequences of accidents involving fuel receipt and storage? We have an emergency plan in place to mitigate the consequences of accidents involving fuel receipt and storage. We are preparing procedures to deal with the receipt and storage of fuel. 6. The regulations in 10 CFR 50.34(b){2) require that a description and analysis of the structures, systems, and components of the facility required in 10 CFR 34{b){2)(i) be sufficient to permit understanding of the system designs and their relationship to safety evaluations. The amendment request dated November 1, 2016 (ADAMS Accession No. ML 16312A066), states, in part, that, "Fuel storage at the MUTR is described in the MUTR Safety Analysis Report (February 1, 2000) section 9.2. In summary, the MUTR has a safe and secure storage capacity for 19 TRIGA fuel elements." SAR Section 9.2, describes an in pool fuel storage rack, and a fuel storage pit. Guidance in NUREG-1537, Part 1, Section 9.2 states, in part, that: The applicant should provide analyses and discuss how subcriticality is ensured (keff not to exceed 0.90) under all conditions, except during transportation off site ... Descriptions of procedures and systems for the
- I .. storage and handling of irradiated fuel should include radiation shielding, protection from physical damage, physical control, and sufficient cooling to prevent overheating and surface corrosion ... It appears there are two separate fuel storage locations at the MUTR, and it is not clear if; the prevention of inadvertent criticality, radiation shielding, and cooling of the fuel is . acceptable. Clarify the following fuel storage items: a. The geometry the fuel will have in storage, We will fabricate holders that maintain the same geometry as a four-element fuel bundle, as defined in proposed technical specifications 5.4. 1. b. Radiation shielding the fuel will have in storage, and The fuel will be stored in the pool, see SAR 9.2.1, using the water as radiation shielding. The radiation levels of the fuel stored in the water are well within the limits of 10 CFR Part 20. The maximum dose at 3 feet in air is approximately 2 Rlhr. c. Methods of cooling the fuel while in storage; or The fuel will be stored in the pool, see SAR 9.2.1, which will provide the cooling. d. Confirm additional fuel will be stored in in accordance with proposed technical specification 5.4, and provide a basis for that conclusion, or We have. evaluated the fuel with TS 3.3 specification 1 and TS 5.4 specifications 1,2 and 3. We have also added an additional SCRAM channel in Table 3.1. e. Justify why additional information is not necessary.