Umd Responses to RAIs on SAR
ML101970211
Person / Time
Site: University of Maryland
Issue date: 06/07/2004
From: Al-Sheikhly M
Univ of Maryland
To: Alexander Adams
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101970211 (13)


Text

UNIVERSITY OF MARYNLAN GLENN L. MARTIN INSTITULE OF TECHNOLOGY A.JAMES CLARK SCHIOOL OF ENGINEERING Dcr.?arrmair !I',AarrriatL. Sc'irtr and Iiyincctinq Bluilding 0901 College Pak Maryliald 24174-21-' I5 301.405.5207 TEL 301.314.20129 FAX wwwv~rwc.umd.cdu United States Nuclear Regulatory Commission One White Flint North MS 12G13 11555 Rockville Pike Rockville, Maryland 20852-2738 ATTN: ALEXANDER ADAMS, JR June 7, 2004 Enclosed please find the University of Maryland's response to the request for additional information as it pertains to sections six through ten of the Safety Analysis Report (SAR).

I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 7, 2004 ISignature] Mohamad AI-Sheikhly, Director University of Maryland Training Reactor License Number R-70, Docket number 50-166

.1-7

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 6.0 ENGINEERED SAFETY FEATURES

23. Chapter 6.0, Engineered Safety Features. The SAR states there are Uexternal entrances into the confinement. Technical Specification 4.4, Confinement, states that prior to reactor startup, isolation of these doors is visually verified. Once verified and the reactor is made critical,

-are these entrances alarmed in some way to alert the operator that confinement is unsecured if someone opens one inadvertently, or are they locked during the visual? Disposition of these doors is not specified in the SAR.

Response

The doors that enter into the confinementi are equipped with status indiators aa ow eoperaor o rmie e

ac anges during operation. These indicators change from green to yellow if the door is opened and are displayed on the auxiliary console.

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 7.0 I&C SYSTEMS

24. Section 7.2. Design of Instrumentation and Control Systems. This section describes a system performance/reliability analysis for the bistable trips, console scram, and rod control circuits. Have there been any notable problems in the operating experience for these systems that would call into question the analytical results?

Response

These systems have proven to be extremely reliable since their installation. At no time has the reactor scram systems or trips failed to perform their intended functions during routine inspections and trip challenges performed during the start up check list.

25. Section 7.4, Reactor Protection System. As detailed in this section, the reactor protection system provides a number of redundant and diverse Inputs into the scram logic. Please provide a description as to the separation/isolation these various inputs are afforded throughout the reactor facility.,

Response

The scram and control circuits receive their AC power All I & C cabling are routed separatenlyfron s

as veufl ot cabling. This includes separate high voltage cabling for safety I and II as well as the two CIC monitors. Conductivi flo and temperature monitors from the water handling room feed into the console

26. Sections 7.3, Reactor Control System. In the manual mode, rod up movement is interlocked such that only one rod can be raised at a time. Is it possible to raise one rod and inadvertently lower another simultaneously, and if so, could this present a problem?

Response

It is possible to raise one rod and lower another rod simultaneously. In fact it is standard practice when doing a flux balance to do this exact process. Whereas it is placing the reactor in a safer, more conservative mode when adding negative reactivity, this presents no adverse situation to reactor control or safety.

27. Section 7.3.3, RCS Interlocks. Please clarify the first sentence in paragraph 5, where it states that "the regulating rod motor leads are removed from manual operation and connected to the output of the servo-amplifier." Is this just the turning of a switch or a more involved procedure?

Response

It is simply a matter of moving a switch from the "STEADY STATE" position to the "AUTOMATIC" position.

28. Section 7.7, Radiation Monitoring Systems. This section has a discussion regarding the multiple roles of the area radiation monitors (i.e., reactor protection, engineered safety features actuation, and health physics protection for the facility inhabitants). Upon the loss of the normal electrical power supply, RPS and ESF actuation is automatically initiated. However, it appears that the protection function for the facility inhabitants is lost. Please provide comments as to the acceptability of this situation.

Response

Technical Specification 3.6 section 2 provides that in the event that both channels are inoperable, a portable alarming meter or a meter that is observable shall be utilized to monitor the facility. Furthermore, if the facility is in a black out condition, it will not be inhabited.

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 8.0 ELECTRICAL POWER SYSTEMS

29. Section 8.0, Electrical Power Systems. Describe how the separation of electrical power cables and those cables associated with the experiments is accomplished in order to prevent any electromagnetic interference with the reactor protection instrumentation.

Response

Experiments that require electrical power are fed from the outlets located around the perimeter of the facility. These outlets do not share a common breaker with control and instrumentation.

30. Section 8.0, Electrical Power Systems. Describe any needs for electrical power that may be required for placinglmaintaining experimental equipment in a safe condition.

Response

Experiments that require electrical power to be considered safe would be considered a "Special Experiment" as described in the Tech Specs. This type of experiment requires approval by the Reactor Safety Committee. The Committee will not approve any experiment that jeopardizes the safety of the facility in the event of a power failure.

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 9.0 AUXILIARY SYSTEMS

31. Chapter 9, Auxiliary Systems and Chapter 11, Radiation Protection Program and Waste Management. There is no mention of the reactor building floor drain system in either of these SAR chapters. Decontamination activities and minor valve and fitting leakages of reactor coolant would be potentially contaminated. Are the floor drains all routed to the sump located in the water handling room or are they routed to the sanitary system?

Please discuss.

Response

All floor drains empty into the sump. See SAR Fig 5.1

32. Section 9.2.3 Fuel-Rod Transfer Cask. The SAR states that the fuel rod transfer cask weighs Provide a discussion on the procedures, equipment, and lifting 9hth this load handling at MUTR.

Response

See Fig 3.2 of the SAR regarding the crane position.

The procedures would be consideredca "Special ExpernmenPt"andwile PHenm in conjunction with the Radiation Safety Officer and the Reactor Safety Committee.

33. Section 9.3. Fire Protection. This section states that a water sprinkler system provides the fire suppression in the reactor building. Is the drain system sized to handle the water volume created
  • by actuation of the sprinkler system to prevent both migration of radiological contamination outside the building and potential flooding of the water handling room?

Response

Th ae omsm sdsge ohnl h is 200 gallons of drainage.

=

Intheevent is equipped to collect water from the sump area into a tanker truck equipped with onboard pumps which are capable of removing water at a rate that is faster than the fire suppression can deliver.

34. Section 9.3, Fire Protection. If the sprinkler system actuates when the building is unoccupied, how will the fire department or security be made aware of it?

Res o e:

35. Section 9.4. Communication System. Is the audible evacuation alarm separate from the intercom system? If it is, please provide a brief description of the system design.

Response

The evacuation ala independent of all other systezif"g yannau ible alarm that is triggered by the or frompthe control consotey.

36. Figure 9.5, page 9-8. The locations of the fire alarm pull boxes and speaker intercom locations are not clear. Figure 9.5 should be revised, with the locations of the fire alarm pull boxes and intercom speakers clearly identified.

Response

The figure listed does indeed list both pull station and intercom locations.

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166

37. Section 9.5, Possession and Use of Byproduct, Source, and Special Nuclear Material.

Please confirm that you want to maintain the current license special nuclear material and byproduct material limits in your renewed license.

Response

It is the desire of the licensee to maintain the current level of SNM.

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 10.0 EXPERIMENTAL FACILITIES AND UTILIZATION

38. Section 10.2, Experimental Facilities. Provide a more detailed description of the functional design of the Thermal Column, Beam Ports and Through Tube experimental facilities. For example, from the description provided it is not clear if these facilities require an air exhaust system or if beam tubes must be filled with demineralized water to provide shielding. Additionally, Figures 10.3, "Beam Tube," 10.4, "Beam Tube Plugs," and 10.5, "Through Tube" are not legible (apparently due to their reduced size).

Please provide clearer illustrations that are of a larger size. Enlarging each figure to 8Y by 11 inches should be sufficient.

Response

See Attached

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 THE PMIIL COLUMN LINER TANK WtALL ACCESS PLUC6 THERMAL COLUMAN GRAP.IlT*e

- seoc' our 4CAPI,4/TE

,2ý-/0 Al C -2 X 2 4 4 CAD7 PZtA7.e 6OL7 Z6Ja I

6-ff

/ot-OORE F

,9,5Ae ro~' &//lll/A/4 4L1-00R 6

ýý PAD AE r

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 N

CORE END

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 telir resr vY PreysmiArmitj To 12, PSI WITIJ AIR 'A CEwee 944 LEtA"' 0510J4 SOAP 4OVS84e 7J17r Deffdr. POOJR,4 cwc~dRTe Ai FeLO SEAl.

-.Io'Mrf"Wirh rAPkf CRMAlrdC.

Lweg,' i AJ ev AW1i De;-A 'f

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166

-sa;a 7~O~I7 P(AM1PB.~

ArAJ~ 0*l ~IAMe Fe-

- SIEl 7,o ei PfA.4 T.aas ip.

f7r.*g~ Cý)

V~4THji ro4 CLeACA&Ce VAM VIAMffreR OUITER PLU6 INNER PL V6 40 reLGUm#E a iree vleS Wf1e'Mr -

IM LZ A4PPIMO We,4Tr-Jo LaA ~PPO)C NO7 re:.

1. FILL FarMl PUAIS WirN, OPPIMA)A' 9amic.eeFF

/o uto

/-a/pr

'lzz A4 ACMMlj$ Arlfi-

pgg,

,.',rui comAck-frtc.

J.AcTIAP mtrcaDr AFTeL-Am.-~JAwwoJ

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166

39. Section 10.2.4, Pneumatic Transfer System. Provide a more detailed description of the pneumatic transfer system design and operation and the administrative controls governing its use. Specific topics to be addressed include the source(s) of CO 2, potential consequences of a stuck/immovable rabbit assembly and design features and/or administrative controls provided to preclude or mitigate this occurrence, manual and automatic timing modes of operation, system venting, and design features which preclude the potential for a failure within this system to result in a loss of pool water inventory.

Response

The Pneumatic Transfer System is supplied with CO2 by means of a standard cylinder that is secured to the wall in the hot room. The resulting circumstances that would occur from a "stuck" rabbit capsule are of an extremely low risk of causing either core damage or loss of pool water due to the fact that the rabbit experiments are limited to a maximum of S 1.00 reactivity and the CO2 piping is routed to exit the source tank vertically on a path that routes to the top of the security cage. Flooding of the rabbit receiver could reach a level equal to the height of the tank water and not above. Timing of the insertion is controlled from the auxiliary console with the operator controlling the insertion. Capsule ejection may be set to automatically occur at the end of a preset time with the operator having a manual return switch mounted in the same location as the insertion. The capsule is then returned to a receiver in a sealed glove box in the hot room which is the same location as the sample started its path into the core. The glove box is equipped with a fan which vents the box into the bay area. The glove box is also equipped with a radiation monitor which provides a display at the operators console and the door which allows entry into the hot room. Procedures governing the operation of the system are contained in 0P105RI2 Installation of Experiments.

40. Section 10.2.5, Other Locations. This section states that the reactor grid plate and reactor pool tank may be utilized to conduct experiments. Provide a more detailed description of the functional design of these facilities, the type of experiments that are typically conducted at these locations, and if any special precautions or limitations are needed to ensure their safe use.

Response

The standard review format must be followed before conducting any experiment. In addition to the standard review, all experiments must be evaluated against the experimental maximum for reactivity worth.

42. Section 10.3, Experiment Review. Regulatory Position C.3.a(1) of Regulatory Guide 2.2 states that no experiment should be performed without review and approval by a technically competent Safety Review Group or Committee. From the discussion presented in Section 10.3 of the SAR and Technical Specification 6.5, it is not clear if all experiments categorized as "routine" have been previously reviewed and approved by RSC. Please clarify.

Response

The standard review format must be followed before conducting any experiment. The review program states that any experiment conducted for the first time is considered a "Special Experiment" and as such is required to undergo approval by the Reactor Safety Committee.

43. Section 10.3, Experiment Review. Please clarify in the SAR that all new (modified routine and special) experiments will go through a 50.59 review.

Response

The standard description clearly states that no new experiment may be classified as routine or modified routine. The sentence in section 10.3 that currently states "Any experiment that requires

REQUEST FOR ADDOITIONAL INFORMATION UNIVERSITY OF MARYLAND RESEARCH REACTOR DOCKET NO. 50-166 modification of the reactor facility or interfaces with control and/or safety systems will be reviewed for 10 CFR Part 50.59 compliance." Shall be replaced with "Any new or special.

experiment will be reviewed for 10 CFR Part 50.59 compliance."

44. Section 10.3, Experiment Review. This section notes that quantities of TNT less than 25 mg can be irradiated but calculations must show that the pressure produced (if detonation occurs) is less than the failure pressure of the container. The overpressure from detonation of 25 mg of TNT (from Regulatory Guide 1.91, R 0"

I containers can be significant For larger containers the overp

  • IyIIIiI.UdIIL.

rledduiI III 11W adm IIs rative controls you have to ensure that the necessary calculations are performed and performed correctly, if TNT were to be irradiated.

Response

Irradiation of any quantity of explosives would be considered a "special" experiment. And as such must be approved by the Reactor Safety Committee. As part of the review process, the committee members must be satisfied that the container would have passed a 50.59 review and will meet all requirements associated with the irradiation, including being satisfied that the container is of sufficient to withstand any potential over pressure.