Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating (TAC No. ME8893 and ME889
ML13141A405
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/14/2013
From: Pope A H
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 13-0054, TAC ME8893, TAC ME8894
Download: ML13141A405 (2)


Text

DUKE Brunswick Nuclear PlantP.O. Box 10429ENERGY. Southport, NC 28461-0429MAY 14 2013Serial: BSEP 13-0054U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2Docket Nos. 50-325 and 50-324Supplement to Request for License Amendments -Diesel Generator (DG)Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, "ACSources -Operating" (TAC No. ME8893 and ME8894)Reference: Letter from M. Annacone to the U.S. Nuclear Regulatory Commission, Request forLicense Amendments -Diesel Generator (DG) Completion Time (CT) Extension forTechnical Specification (TS) 3.8.1, "AC Sources -Operating,"dated June 19, 2012, ADAMS Accession Number ML12173A1 12Ladies and Gentlemen:On June 19, 2012, Duke Energy Progress, Inc., formerly known as Carolina Power & LightCompany (CP&L), requested a revision to the Technical Specifications (TS) for the BrunswickSteam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed revision extends the CompletionTime (CT) of TS 3.8.1, Required Action D.4 for an inoperable diesel generator (DG) from 7 daysto 14 days. A commensurate change was also proposed to extend the maximum CompletionTime of TS 3.8.1, Required Actions C.3 and D.4.In support of the proposed amendments, Duke Energy is installing a supplemental dieselgenerator (SUPP-DG). Currently, the SUPP-DG is scheduled to be available (i.e., installed andready for use by Operations) in January 2014. As such, Duke Energy requests that the approvaldate for the proposed amendments be revised from June 28, 2013, to October 28, 2013.Duke Energy originally requested that implementation of the amendments be completed within90 days of approval. Rather than implementation being based on issuance of the amendments,Duke Energy requests that implementation of the amendments be contingent upon availability ofthe supplemental diesel generator.Based on the above, Duke Energy requests approval of the proposed amendments byOctober 28, 2013, with implementation within 90 days of the supplemental diesel generatorbeing available.

U.S. Nuclear Regulatory CommissionPage 2 of 2No regulatory commitments are contained in this submittal. Please refer any questionsregarding this submittal to Mr. Lee Grzeck, Manager -Regulatory Affairs, at (910) 457-2487.Sincerely,Ann tte H. PopeManager -Organizational EffectivenessBrunswick Steam Electric PlantMAT/matcc:U. S. Nuclear Regulatory Commission, Region IIATTN: Mr. Victor M. McCree, Regional Administrator245 Peachtree Center Ave, NE, Suite 1200Atlanta, GA 30303-1257U. S. Nuclear Regulatory CommissionATTN: Mr. Christopher Gratton (Mail Stop OWFN 8G9A)11555 Rockville PikeRockville, MD 20852-2738U. S. Nuclear Regulatory CommissionATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector8470 River RoadSouthport, NC 28461-8869Chair -North Carolina Utilities CommissionP.O. Box 29510Raleigh, NC 27626-0510Mr. W. Lee Cox, Ill, Section Chief (Electronic Copy Only)Radiation Protection SectionNorth Carolina Department of Health and Human Services1645 Mail Service CenterRaleigh, NC 27699-1645lee.cox@dhhs.nc.gov