NRR E-mail Capture - Brunswick 1 & 2: Diesel Generators Completion Time Extension for TS 3.8.1 (ME8893 and ME8894)
ML12193A440
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/10/2012
From: Farideh Saba
Division of Operating Reactor Licensing
To: Murray W
Progress Energy Co
References
TAC ME8893, TAC ME8894
Download: ML12193A440 (2)


Text

NRR-PMDAPEm Resource From: Saba, Farideh Sent: Tuesday, July 10, 2012 4:58 PM To: Murray, William R. (Bill)

Cc: Lingam, Siva

Subject:

Brunswick 1 & 2: Diesel Generators completion Time Extension for TS 3.8.1 (ME8893 and ME8894)

Importance: High By letter dated June 19, 2012, Carolina Power & Light (the licensee) submitted a license amendment request for Brunswick Steam Electric Plant Unit Nos. 1 and 2 . The proposed amendment would extend the completion Time of TS 3.8.1 required action D.4 for an inoperable diesel generator. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Please let me know, if you have any questions, Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1

Hearing Identifier: NRR_PMDA Email Number: 406 Mail Envelope Properties (Farideh.Saba@nrc.gov20120710165700)

Subject:

Brunswick 1 & 2: Diesel Generators completion Time Extension for TS 3.8.1 (ME8893 and ME8894)

Sent Date: 7/10/2012 4:57:43 PM Received Date: 7/10/2012 4:57:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

"Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Murray, William R. (Bill)" <william.murray@pgnmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2424 7/10/2012 4:57:00 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: