{{#Wiki_filter: | {{#Wiki_filter:March 5, 2012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 32: | Line 32: | ||
The NRC determined that overall, Byron Station Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Byron Station Unit 1 during the most recent quarter, as well as the first three quarters of the assessment period, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). | The NRC determined that overall, Byron Station Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Byron Station Unit 1 during the most recent quarter, as well as the first three quarters of the assessment period, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). | ||
The NRC determined the performance at Byron Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix, based on one inspection finding being classified as having low-to-moderate safety significance (White) and all PIs indicated that your performance was within the nominal, expected range (Green). The White finding involved the failure to ensure that a flange connection on the upper lube oil cooler of the 2A diesel generator was correctly torqued following maintenance. This White finding was closed on August 26, 2011, as documented in our letter to you dated October 4, 2011 | The NRC determined the performance at Byron Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix, based on one inspection finding being classified as having low-to-moderate safety significance (White) and all PIs indicated that your performance was within the nominal, expected range (Green). The White finding involved the failure to ensure that a flange connection on the upper lube oil cooler of the 2A diesel generator was correctly torqued following maintenance. This White finding was closed on August 26, 2011, as documented in our letter to you dated October 4, 2011 | ||
[ML112770516]. Unit 2 returned to the Licensee Response Column of the ROP Action Matrix in the first quarter of 2012. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. We also plan to conduct several special and infrequently performed inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation (ISFSI). These inspections include IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants; IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b) | [ML112770516]. Unit 2 returned to the Licensee Response Column of the ROP Action Matrix in the first quarter of 2012. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. We also plan to conduct several special and infrequently performed inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation (ISFSI). These inspections include IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants; IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b) | ||
Evaluations at Operating Plants. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at your Byron Station. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit | Evaluations at Operating Plants. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at your Byron Station. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit | ||
[ML110190808] that was issued. | [ML110190808] that was issued. | ||
| Line 44: | Line 44: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Steven West, Director Division of Reactor Projects Docket Nos. 50-454 and 50-455 License Nos. NPF-37 and NPF-66 | |||
Page 2 of | Enclosure: Byron Station Inspection/Activity Plan | ||
BI RP - RADIATION PROTECTION BASELINE INSPECTION | |||
cc w/encl: Distribution via ListServ | |||
Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW | |||
IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 01/02/2012 02/29/2012 OL PREP | |||
- BYRON INIT PREP - 01/2012 | |||
OL - INITIAL EXAM - 2012 JAN - BYRO W90227 01/02/2012 01/06/2012 OL EXAM | |||
- BYRON INITIAL EXAM - 01/2012 | |||
OL - INITIAL EXAM - 2012 JAN - BYRO W90227 01/23/2012 01/27/2012 TI-182 | |||
- TI-2515/182 PHASE I - BURIED PIPING | |||
IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 01/30/2012 02/01/2012 ER SIT | |||
- EVENT RESPONSE - SIT | |||
IP Special Inspection 93812 01/31/2012 02/03/2012 ISFSI | |||
- ISFSI INSPECTION - SCHEDULE DEPENDENT | |||
IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 02/01/2012 02/29/2012 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 02/01/2012 03/31/2012 FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW | |||
IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 11/01/2012 12/20/2012 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 BI CDBI | |||
- COMPONENT DESIGN BASIS INSPECTION | |||
IP Component Design Bases Inspection 7111121 05/14/2012 06/15/2012 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 IP Reactor Coolant System Activity 71151-BI01 06/11/2012 06/15/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2012 06/15/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 06/11/2012 06/15/2012 BI EPR | |||
- EP ROUTINE INSPECTION / PI VERIFICATION | |||
IP Alert and Notification System Testing 7111402 06/25/2012 06/29/2012 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/25/2012 06/29/2012 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/25/2012 06/29/2012 IP Performance Indicator Verification 71151 06/25/2012 06/29/2012 BI ISI | |||
- INSERVICE INSPECTION UNIT 1 | |||
IP Inservice Inspection Activities - PWR 7111108P 09/10/2012 10/05/2012 | |||
Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/17/2012 09/21/2012 IP Occupational ALARA Planning and Controls 71124.02 09/17/2012 09/21/2012 BI OLRQ | |||
- BIENNIAL REQUAL PROGRAM INSPECTION | |||
IP Licensed Operator Requalification Program 7111111B 11/05/2012 11/09/2012 BI FIRE | |||
- FIRE PROTECTION INSPECTION & BAG TRIP | |||
IP Fire Protection [Triennial] | |||
7111105T 01/14/2013 02/15/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/10/2012 12/14/2012 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/25/2013 03/01/2013 OL PREP | |||
- BYRON INIT PREP 04/2013 | |||
OL - INITIAL EXAM - 2013 APR-MAY - BYRON W90282 04/01/2013 04/05/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2013 04/12/2013 IP Occupational ALARA Planning and Controls 71124.02 04/08/2013 04/12/2013 OL EXAM | |||
- BYRON INIT EXAM - 04/2013 | |||
OL - INITIAL EXAM - 2013 APR-MAY - BYRON W90282 04/29/2013 05/10/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/13/2013 05/17/2013 IP Occupational Dose Assessment 71124.04 05/13/2013 05/17/2013 | |||
}} | }} | ||
Latest revision as of 03:38, 12 January 2025
| ML12065A108 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 03/05/2012 |
| From: | Stephanie West Division Reactor Projects III |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-11-007 | |
| Download: ML12065A108 (6) | |
Text
March 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BYRON STATION, UNITS 1 AND 2 (REPORT 05000454/2011007 AND 05000455/2011007)
Dear Mr. Pacilio:
On February 14, 2012, the Nuclear Regulatory Commission (NRC) staff completed its end-of-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Byron Station Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Byron Station Unit 1 during the most recent quarter, as well as the first three quarters of the assessment period, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
The NRC determined the performance at Byron Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix, based on one inspection finding being classified as having low-to-moderate safety significance (White) and all PIs indicated that your performance was within the nominal, expected range (Green). The White finding involved the failure to ensure that a flange connection on the upper lube oil cooler of the 2A diesel generator was correctly torqued following maintenance. This White finding was closed on August 26, 2011, as documented in our letter to you dated October 4, 2011
[ML112770516]. Unit 2 returned to the Licensee Response Column of the ROP Action Matrix in the first quarter of 2012. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. We also plan to conduct several special and infrequently performed inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation (ISFSI). These inspections include IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants; IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b)
Evaluations at Operating Plants. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at your Byron Station. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit
[ML110190808] that was issued.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Eric Duncan at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket Nos. 50-454 and 50-455 License Nos. NPF-37 and NPF-66
Enclosure: Byron Station Inspection/Activity Plan
cc w/encl: Distribution via ListServ
Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW
IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 01/02/2012 02/29/2012 OL PREP
- BYRON INIT PREP - 01/2012
OL - INITIAL EXAM - 2012 JAN - BYRO W90227 01/02/2012 01/06/2012 OL EXAM
- BYRON INITIAL EXAM - 01/2012
OL - INITIAL EXAM - 2012 JAN - BYRO W90227 01/23/2012 01/27/2012 TI-182
- TI-2515/182 PHASE I - BURIED PIPING
IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 01/30/2012 02/01/2012 ER SIT
- EVENT RESPONSE - SIT
IP Special Inspection 93812 01/31/2012 02/03/2012 ISFSI
- ISFSI INSPECTION - SCHEDULE DEPENDENT
IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 02/01/2012 02/29/2012 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 02/01/2012 03/31/2012 FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW
IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 11/01/2012 12/20/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 BI CDBI
- COMPONENT DESIGN BASIS INSPECTION
IP Component Design Bases Inspection 7111121 05/14/2012 06/15/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 IP Reactor Coolant System Activity 71151-BI01 06/11/2012 06/15/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2012 06/15/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 06/11/2012 06/15/2012 BI EPR
- EP ROUTINE INSPECTION / PI VERIFICATION
IP Alert and Notification System Testing 7111402 06/25/2012 06/29/2012 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/25/2012 06/29/2012 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/25/2012 06/29/2012 IP Performance Indicator Verification 71151 06/25/2012 06/29/2012 BI ISI
- INSERVICE INSPECTION UNIT 1
IP Inservice Inspection Activities - PWR 7111108P 09/10/2012 10/05/2012
Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/17/2012 09/21/2012 IP Occupational ALARA Planning and Controls 71124.02 09/17/2012 09/21/2012 BI OLRQ
- BIENNIAL REQUAL PROGRAM INSPECTION
IP Licensed Operator Requalification Program 7111111B 11/05/2012 11/09/2012 BI FIRE
- FIRE PROTECTION INSPECTION & BAG TRIP
IP Fire Protection [Triennial]
7111105T 01/14/2013 02/15/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/10/2012 12/14/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/25/2013 03/01/2013 OL PREP
- BYRON INIT PREP 04/2013
OL - INITIAL EXAM - 2013 APR-MAY - BYRON W90282 04/01/2013 04/05/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2013 04/12/2013 IP Occupational ALARA Planning and Controls 71124.02 04/08/2013 04/12/2013 OL EXAM
- BYRON INIT EXAM - 04/2013
OL - INITIAL EXAM - 2013 APR-MAY - BYRON W90282 04/29/2013 05/10/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/13/2013 05/17/2013 IP Occupational Dose Assessment 71124.04 05/13/2013 05/17/2013