ML12200A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:July 18, 2012
[[Issue date::July 18, 2012]]
 
James R. Douet
James Site Vice President Operations Entergy Operations, Inc.
Site Vice President Operations  
 
Entergy Operations, Inc.  
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
Grand Gulf Nuclear Station  
 
P.O. Box 756  
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2012301
Port Gibson, MS 39150
 
==Dear Mr. Douet:==
In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2012301  
 
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Dear Mr. Douet:  
 
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 7, 2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 22, 2012.
In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing  
 
examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.  
M In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
 
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Reactors," Revision 9, Supplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are  
 
administered.  
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
 
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 7, 2012. The written examinations, operating tests, and supporting  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR  
 
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
materials shall be complete and ready-to-use. We request that any personal, proprietary,  
 
sensitive unclassified, or safeguards information in your response be contained in a separate  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
enclosure and appropriately marked. Any delay in receiving the required examinations and  
 
reference materials, or the submittal of inadequate or incomplete materials, may cause the  
M Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159.
examinations to be rescheduled. In addition, your support for on-site validation of the  
 
examinations is required during the week of October 22, 2012.  
Sincerely,/RA/  
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
 
Mr. Douet - 2 -  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
Mark S. Haire, Chief Operations Branch Division of Reactor Safety  
to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  
 
temperatures, and levels) generated during the dynamic operating tests until the examination  
Docket: 50-416 License: NPF-29  
results are final.  
 
M Electronic distribution by RIV:
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
To permit timely NRC review and evaluation, your staff should submit preliminary operator and  
DRP Acting Deputy Director (Allen.Howe@nrc.gov)
senior operator license applications (Office of Management and Budget (OMB) approval number  
DRS Acting Director (Tom.Blount@nrc.gov)
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if  
DRS Acting Deputy Director (Patrick.Louden@nrc.gov)
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If  
Senior Resident Inspector (Rich.Smith@nrc.gov)
the applications are not received at least 30 days before the examination date, a postponement  
Resident Inspector (Blake.Rice@nrc.gov)
may be necessary. Signed applications certifying that all training has been completed should be  
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
submitted at least 14 days before the first examination date.  
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden  
GG Administrative Assistant (Alley.Farrell@nrc.gov)
for this collection of information is estimated to average 50 hours per response, including the  
Public Affairs Officer (Victor.Dricks@nrc.gov)
time for reviewing instructions, gathering and maintaining the data needed, and completing and  
Public Affairs Officer (Lara.Uselding@nrc.gov)
reviewing the collection of information. Send comments regarding this burden estimate or any  
Project Manager (Alan.Wang@nrc.gov)
other aspect of these information collections, including suggestions for reducing the burden, to  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Commission, Washington, DC 20555-0001, or by Internet electronic mail to  
Regional Counsel (Karla.Fuller@nrc.gov)
INFOCOLLECTS@NRC.GOV.  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide  
Documents Access and Management System (ADAMS). ADAMS is accessible from the  
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  
Mr. Douet - 3 -  Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's  
examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at  
817-200-1159.  
      Sincerely,
      /RA/
      Mark S. Haire, Chief Operations Branch       Division of Reactor Safety  
Docket: 50-416  
License: NPF-29  
 
Mr. Douet - 4 -  Electronic distribution by RIV:  
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)  
DRP Director (Kriss.Kennedy@nrc.gov)  
DRP Acting Deputy Director (Allen.Howe@nrc.gov)  
DRS Acting Director (Tom.Blount@nrc.gov)  
DRS Acting Deputy Director (Patrick.Louden@nrc.gov)  
Senior Resident Inspector (Rich.Smith@nrc.gov)  
Resident Inspector (Blake.Rice@nrc.gov)  
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)  
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)  
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)  
GG Administrative Assistant (Alley.Farrell@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Alan.Wang@nrc.gov)  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
OEMail Resource  
OEMail Resource  
R:\_REACTORS\_GG\2012\GG2012301LT-cds.doc ADAMS Accession No.:  ML12200A367 ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials: CDS    Publicly Available  Non-Sensitive    Non-publicly Available  Sensitive OE: OB C: OB  CSteely MHaire  /RA/ /RA/  7/18/12 7/18/12  OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax 


R:\_REACTORS\_GG\2012\GG2012301LT-cds.doc ADAMS Accession No.: ML12200A367 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE: OB C: OB CSteely MHaire /RA/ /RA/ 7/18/12 7/18/12 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
}}
}}

Revision as of 13:45, 28 March 2018

Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416-12-301
ML12200A367
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/18/2012
From: Haire M S
Operations Branch IV
To: Douet J R
Entergy Operations
vlm/Steely C D
References
IR-12-301
Download: ML12200A367 (4)


See also: IR 05000416/2012301

Text

July 18, 2012

James R. Douet

Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2012301

Dear Mr. Douet:

In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing

examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power

Reactors," Revision 9, Supplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 7, 2012. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR

55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of October 22, 2012.

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

Mr. Douet - 2 - In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Mr. Douet - 3 - Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at

817-200-1159.

Sincerely,

/RA/

Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Docket: 50-416

License: NPF-29

Mr. Douet - 4 - Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Acting Deputy Director (Allen.Howe@nrc.gov)

DRS Acting Director (Tom.Blount@nrc.gov)

DRS Acting Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Rich.Smith@nrc.gov)

Resident Inspector (Blake.Rice@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

GG Administrative Assistant (Alley.Farrell@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

R:\_REACTORS\_GG\2012\GG2012301LT-cds.doc ADAMS Accession No.: ML12200A367 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE: OB C: OB CSteely MHaire /RA/ /RA/ 7/18/12 7/18/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax