ML20080P526: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:._ | ||
Ferm 34811 (7 81) | Ferm 34811 (7 81) | ||
^ | |||
(Fcrmerly SPD 1003-2) | (Fcrmerly SPD 1003-2) | ||
DUF2 POWER COMPANY | DUF2 POWER COMPANY (1) | ||
ID No: 0?/O/A/Pic(/ 6 PROCEDURE MAJOR CHANGE Change No: '' ' 34-PROCESS RECORD grmanent/ Restricted To (2) STATION: | |||
(4) | CQIACN (3) PROCEDUPI TIni: | ||
(5) DESCRIPTION OF CFMGE: | C HGOTifiRY ):7COGDiiRG FOR TJF Dt:TE?nuupTic4 h C' H LCe2 C G ( m h n,a t McTekt. ) | ||
Adc[itih | (4) | ||
(7) PREPARED BY: | SECTION(S) 0F PROCEDURE AFFECTED: | ||
Yes | 32. | ||
Yes | (5) DESCRIPTION OF CFMGE: | ||
(Attach additional pages, if necessary.) | |||
Adc[itih TlX [ it P2i n g | |||
*s h c cicl b c c{c y w.ih c)lrMS Eirce sc4 acchi bdced 4.;c.h c.Nc ac!c ckTz zm.s.3tiLi, (6) PIASON FOR CPE GE: | |||
(7) PREPARED BY: | |||
u.)ce ~ M Nt.L([ DATE: | |||
12-l 3 - 6 3 (8) | |||
SAFETY EVALUATIONJ This change: | |||
Yes No X Represents a change to the sta:1cn or procedures as described in the FSAR, or a test or experiment not described in the FSAT Yes No X Requires a change to the station Technical Specifications? | |||
Yes No 1 Invofves an unreviewed safety question? | |||
If the answer to any of the above is "Yes", attach a detailed explanation. | If the answer to any of the above is "Yes", attach a detailed explanation. | ||
As appropriate attach a completed " Nuclear Safety Evaluation Check List" form. | As appropriate attach a completed " Nuclear Safety Evaluation Check List" form. | ||
By: | By: | ||
87h DATE: | bA M Date: | ||
/ 2. - d ~ b (9) REVIEWED BY 87h DATE: | |||
/)-So-/2 Cross-Disciplinary Review By: | |||
hM_ | |||
(10) TEMPORARY APPROVAL (IF NECESSARY): | (10) TEMPORARY APPROVAL (IF NECESSARY): | ||
By: | By: | ||
By- | (SRO) Date: | ||
By-Date: | |||
(11) APPROVED BY: | |||
v. | |||
DATE: | |||
/0 h (12) MISCELLANEOUS: | |||
Reviewed / Approved By: | |||
Date: | Date: | ||
Reviewed / Approved By: | |||
Reviewed / Approved By | Date: | ||
(13) Page 1 of | |||
(13) Page 1 of | } | ||
8402220572 840215 PDR ADOCK 05000413 E | 8402220572 840215 PDR ADOCK 05000413 E | ||
PDR Rev 14 9/20/77 | |||
l' | l' Ferm 34811 (7 81) | ||
S (Formerly SPD 1003-2) | |||
DUKE POWER COMPANY (1) | |||
DUKE POWER COMPANY | ID No: C/ /p///e0/0,r PROCEDURE MAJOR CPANGE Change No: | ||
(3) PROCEDURE TITLE: | 4 PROCESS RECORD | ||
CJ ke:s'e /ho/ meEA (4) | @nenJ/h (2) | ||
(5) DESCRIPTION OF CHANGE: | STAI!ON: | ||
ye, d'ed | "J | ||
^ | |||
(3) PROCEDURE TITLE: | |||
poi analysis a f L ilic/ s e g hs ; h re.rfr ae h CS E G~ 82- W I (7) PREPARED BY: | e% /r ey toeedec= | ||
Yes | b c fe'r~ b a e | ||
Yes | CJ ke:s'e /ho/ meEA (4) | ||
SECTION(S) 0F PROCEDURE AFFECTED: | |||
l' 7' 2 4/. [ | |||
(5) DESCRIPTION OF CHANGE: | |||
(Attach additional pa se~Mce | |||
" Ta rLd:+y a s.ges, if necessary. ) | |||
11 1 Add a u Her ye, d'ed sehh e a ~ atre vue 1.,ie 4<e ce.r. '' | |||
%L Adel see hw 4 L -see MaltNn / | |||
2 | |||
/ =S es a (6) REASON FOR CHANGE: | |||
poi analysis a f L ilic/ s e g hs ; h re.rfr ae h CS E G~ 82-W I (7) PREPARED BY: | |||
N DATE: | |||
/ | |||
2 d!PJ (S) | |||
SAFETT EVALUATION This change: | |||
Yes No Represents a change to the station or procedures as described j in the FSAR, or a test or experiraent not described in the FSAF Yes No | |||
, Requires a change to the station Technical Specifications? | |||
Yes No | |||
' Involves an unreviewed safety question? | |||
If the answer to any of the above is "Yes", attach a detailed explanation. | If the answer to any of the above is "Yes", attach a detailed explanation. | ||
As appropriate a::ach a conpleted " Nuclear Safety Evaluation Check List" fem. | |||
By: | By: | ||
d Date: | |||
/ M2e/#3 kh n a b DATE: | |||
l'2.-Z 8 "73 (9) REVIEWED BY: | |||
Cross-Disciplinary Review By: | |||
[h u | |||
(10) TEMPORARY APPROVAL (IF NECESSART): | (10) TEMPORARY APPROVAL (IF NECESSART): | ||
By: | By: | ||
By: | (SRO) Date: | ||
(11) APPROVED BY: | By: | ||
Reviewed / Approved By: | Date: | ||
Reviewed / Approved By: | I1!L.!iG (11) APPROVED BY: | ||
(13) Page 1 of | tN-DATE: | ||
(12) MISCELLANEOUS: | |||
Reviewed / Approved By: | |||
Date: | |||
Reviewed / Approved By: | |||
Date: | |||
(13) Page 1 of 1 | |||
Rev 11. | Rev 11. | ||
9/20/77 | 9/20/77 | ||
r Page 2 of 2 Add Section 4.6 4.6 Blank, Standard, and Sample Preparation - If turbidity or suspended matter is present. | r Page 2 of 2 Add Section 4.6 4.6 Blank, Standard, and Sample Preparation - If turbidity or suspended matter is present. | ||
4.6.1 | 4.6.1 Prepare a blank by filtering 100 1m1 of Super-0 water using a nitric acid washed, thoroughly rinsed filtering appartus and 0.45 micron filter paper. | ||
4.6.2 | 4.6.2 Prepare standards by filtering 100 : 1m1 of standard using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper. | ||
4.6.3 | 4.6.3 Prepare the sample by filtering 100 1ml of sample using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper. | ||
Note: | |||
Note: | The labware need not be acid washed between blank, standard, and sample, but it must be thoroughly rinsed with Super-Q water. | ||
4.6.4 | 4.6.4 Go to step 4.2.3 l | ||
i i | i i | ||
_ | _}} | ||
Latest revision as of 08:51, 14 December 2024
| ML20080P526 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/30/1983 |
| From: | Cox J, Evans L, Mcneill B DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20080P419 | List:
|
| References | |
| CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220572 | |
| Download: ML20080P526 (3) | |
Text
._
Ferm 34811 (7 81)
^
(Fcrmerly SPD 1003-2)
DUF2 POWER COMPANY (1)
ID No: 0?/O/A/Pic(/ 6 PROCEDURE MAJOR CHANGE Change No: ' 34-PROCESS RECORD grmanent/ Restricted To (2) STATION:
CQIACN (3) PROCEDUPI TIni:
C HGOTifiRY ):7COGDiiRG FOR TJF Dt:TE?nuupTic4 h C' H LCe2 C G ( m h n,a t McTekt. )
(4)
SECTION(S) 0F PROCEDURE AFFECTED:
32.
(5) DESCRIPTION OF CFMGE:
(Attach additional pages, if necessary.)
Adc[itih TlX [ it P2i n g
- s h c cicl b c c{c y w.ih c)lrMS Eirce sc4 acchi bdced 4.;c.h c.Nc ac!c ckTz zm.s.3tiLi, (6) PIASON FOR CPE GE:
(7) PREPARED BY:
u.)ce ~ M Nt.L([ DATE:
12-l 3 - 6 3 (8)
SAFETY EVALUATIONJ This change:
Yes No X Represents a change to the sta:1cn or procedures as described in the FSAR, or a test or experiment not described in the FSAT Yes No X Requires a change to the station Technical Specifications?
Yes No 1 Invofves an unreviewed safety question?
If the answer to any of the above is "Yes", attach a detailed explanation.
As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.
By:
bA M Date:
/ 2. - d ~ b (9) REVIEWED BY 87h DATE:
/)-So-/2 Cross-Disciplinary Review By:
hM_
(10) TEMPORARY APPROVAL (IF NECESSARY):
By:
(SRO) Date:
By-Date:
(11) APPROVED BY:
v.
DATE:
/0 h (12) MISCELLANEOUS:
Reviewed / Approved By:
Date:
Reviewed / Approved By:
Date:
(13) Page 1 of
}
8402220572 840215 PDR ADOCK 05000413 E
PDR Rev 14 9/20/77
l' Ferm 34811 (7 81)
S (Formerly SPD 1003-2)
DUKE POWER COMPANY (1)
ID No: C/ /p///e0/0,r PROCEDURE MAJOR CPANGE Change No:
4 PROCESS RECORD
@nenJ/h (2)
STAI!ON:
"J
^
(3) PROCEDURE TITLE:
e% /r ey toeedec=
b c fe'r~ b a e
CJ ke:s'e /ho/ meEA (4)
SECTION(S) 0F PROCEDURE AFFECTED:
l' 7' 2 4/. [
(5) DESCRIPTION OF CHANGE:
(Attach additional pa se~Mce
" Ta rLd:+y a s.ges, if necessary. )
11 1 Add a u Her ye, d'ed sehh e a ~ atre vue 1.,ie 4<e ce.r.
%L Adel see hw 4 L -see MaltNn /
2
/ =S es a (6) REASON FOR CHANGE:
poi analysis a f L ilic/ s e g hs ; h re.rfr ae h CS E G~ 82-W I (7) PREPARED BY:
N DATE:
/
2 d!PJ (S)
SAFETT EVALUATION This change:
Yes No Represents a change to the station or procedures as described j in the FSAR, or a test or experiraent not described in the FSAF Yes No
, Requires a change to the station Technical Specifications?
Yes No
' Involves an unreviewed safety question?
If the answer to any of the above is "Yes", attach a detailed explanation.
As appropriate a::ach a conpleted " Nuclear Safety Evaluation Check List" fem.
By:
d Date:
/ M2e/#3 kh n a b DATE:
l'2.-Z 8 "73 (9) REVIEWED BY:
Cross-Disciplinary Review By:
[h u
(10) TEMPORARY APPROVAL (IF NECESSART):
By:
(SRO) Date:
By:
Date:
I1!L.!iG (11) APPROVED BY:
tN-DATE:
(12) MISCELLANEOUS:
Reviewed / Approved By:
Date:
Reviewed / Approved By:
Date:
(13) Page 1 of 1
Rev 11.
9/20/77
r Page 2 of 2 Add Section 4.6 4.6 Blank, Standard, and Sample Preparation - If turbidity or suspended matter is present.
4.6.1 Prepare a blank by filtering 100 1m1 of Super-0 water using a nitric acid washed, thoroughly rinsed filtering appartus and 0.45 micron filter paper.
4.6.2 Prepare standards by filtering 100 : 1m1 of standard using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper.
4.6.3 Prepare the sample by filtering 100 1ml of sample using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper.
Note:
The labware need not be acid washed between blank, standard, and sample, but it must be thoroughly rinsed with Super-Q water.
4.6.4 Go to step 4.2.3 l
i i
_