ML20080P547
| ML20080P547 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/31/1983 |
| From: | Evans L, Painter R, Tuckman M DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20080P419 | List:
|
| References | |
| CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220579 | |
| Download: ML20080P547 (1) | |
Text
e Fcrm 34811 (7-81)
.s (Formerly SPD.1003-2)
DUKE POWER COMPANY (if ID No: CF/o/A/f7do/Of PROCEDURE MAJOR CEANGE Change,No: J PROCESS RECORD Permanent /";. =i t;d Tc (2) STATION: b 4w A
(3) -PROCEDURE TITLE: C_Je=T M.., [rc<e d re [r Me 3e-$,,,,.o h of CA /or,Mc-Nb,,.aI /he bel (4)
SECTION(S) 0F PROCEDURE AFFECTED: t 9./ J.1 J13.4, J r 1.7, 4 /./ O.A /.v./ 4 r/4,r.
(5) DESCRIPTION OF CHANGE:
(Attach additional pages, if necessary.)
j.4./- Change *go"
},*1e,"
2.s - e t.aey - dtd,//e/% 'ru,,er a **, q.,,y, c.h,,y Ja,..en te.al" 1. " Lp e < 4."
- 2. I,.y. 3, 3,
,, 7,,,,,1,,,a a, y,4,,, y.,,1
% adJ ^ Retorf at k kw o. J a o era as <.2o prA
(6).
ON FOR CHANGE:
Procedun-I m <o w =~ Y f
(7) PREPARED BY: 8L [
DATE: fM7//7 (8) SAFETY EVALUATION This change:
Yes No g Represents a change to the station or procedures as described
- n the FSAR, or a test or experiment not described in the FSAI i
Yes No Requires a change to the station Technical Specifications?
l Yes No
/ Involves an unreviewed safety question?
If the answer to any of the above is "Yes", attach a detailed explanation.
As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.
By:
AI Date: fd >/PT (9) REVIEWED BY:
Yb b.
[bbE:
f-h-[3 a
Cross-Disciplinary Review By:
h
[(d[
(10) TEMPORARY APPROVAL (IF NECESSARY):
(
By:
(SRO) Date:
By:
Date:
(11) APPROVED BY:
d
.s%/h-DATE:
3t (12) MISCELLANEOUS:
Reviewed / Approved By:
Date:
Reviewed / Approved By:
Date:
(13) Page 1 of f
0 Pcv l4 E
9/20/77 i.
.. - -. -. - -.. -. - - - - -.. -. - -. -. -. - - - - - - - -. - -