ML20080P547

From kanterella
Jump to navigation Jump to search
Change 3 to Procedure CP/O/A/8100/05, Chemistry Procedure for Determination of Chloride (Manual Method)
ML20080P547
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/31/1983
From: Evans L, Painter R, Tuckman M
DUKE POWER CO.
To:
Shared Package
ML20080P419 List:
References
CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220579
Download: ML20080P547 (1)


Text

e Fcrm 34811 (7-81)

.s (Formerly SPD.1003-2)

DUKE POWER COMPANY (if ID No: CF/o/A/f7do/Of PROCEDURE MAJOR CEANGE Change,No: J PROCESS RECORD Permanent /";. =i t;d Tc (2) STATION: b 4w A

(3) -PROCEDURE TITLE: C_Je=T M.., [rc<e d re [r Me 3e-$,,,,.o h of CA /or,Mc-Nb,,.aI /he bel (4)

SECTION(S) 0F PROCEDURE AFFECTED: t 9./ J.1 J13.4, J r 1.7, 4 /./ O.A /.v./ 4 r/4,r.

(5) DESCRIPTION OF CHANGE:

(Attach additional pages, if necessary.)

j.4./- Change *go"

},*1e,"

2.s - e t.aey - dtd,//e/% 'ru,,er a **, q.,,y, c.h,,y Ja,..en te.al" 1. " Lp e < 4."

2. I,.y. 3, 3,

,, 7,,,,,1,,,a a, y,4,,, y.,,1

% adJ ^ Retorf at k kw o. J a o era as <.2o prA

(6).

ON FOR CHANGE:

Procedun-I m <o w =~ Y f

(7) PREPARED BY: 8L [

DATE: fM7//7 (8) SAFETY EVALUATION This change:

Yes No g Represents a change to the station or procedures as described

  1. n the FSAR, or a test or experiment not described in the FSAI i

Yes No Requires a change to the station Technical Specifications?

l Yes No

/ Involves an unreviewed safety question?

If the answer to any of the above is "Yes", attach a detailed explanation.

As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.

By:

AI Date: fd >/PT (9) REVIEWED BY:

Yb b.

[bbE:

f-h-[3 a

Cross-Disciplinary Review By:

h

[(d[

(10) TEMPORARY APPROVAL (IF NECESSARY):

(

By:

(SRO) Date:

By:

Date:

(11) APPROVED BY:

d

.s%/h-DATE:

3t (12) MISCELLANEOUS:

Reviewed / Approved By:

Date:

Reviewed / Approved By:

Date:

(13) Page 1 of f

0 Pcv l4 E

9/20/77 i.

.. - -. -. - -.. -. - - - - -.. -. - -. -. -. - - - - - - - -. - -