ML20080P578

From kanterella
Jump to navigation Jump to search
Change 1 to Procedure CP/O/A/8100/05, Chemistry Procedure for Determination of Chloride (Manual Method)
ML20080P578
Person / Time
Site: Catawba  
Issue date: 02/25/1981
From: Chaust R, Painter R, Tuckman M
DUKE POWER CO.
To:
Shared Package
ML20080P419 List:
References
CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220588
Download: ML20080P578 (2)


Text

-

Fom SPD-1003-2 m

3 DUKE POWER COMPANY (1)~ ID No: CP/0/A/8100/05 PROCEDURE MAJOR CHANGE Change No:

/

PROCESS RECORD Permanent /

(2)

STATION:

Catawba (3) PROCEDURE TIiT.E: Chemistry Procedure for the Determination of Chloride (Manual Method)

(4)

SECTION(S) 0F PROCEDURE AFFECTED:

1.3.1 and 4.1 (5), DESCRIPTION OF CHANGE:

(Attach additional pages, if necessary.)

See attachment (6) REASON FOR CHANGE:

Procedure Improvement (7) PREPARED 3Y:

[ v,.

DATE: Q. f/

(8) SAFETY EVALUATION This change:

Yes No Represents a change to the station or procedures as described y

in the FSAR, or a test or experiment not described in the FSK Yes No Requires a change to the station Technical Specifications?

y Yes No Involves an unreviewed safety question?

y If the answer to any of the above is "Yes", attach a detailed explanation.

As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.

By:

kI Date:

2 U (9) REVIEWED BY.

DATE:

1~ M ~ '

Cross-Disciplinary Review By:

)

(10) TEMPORARY APPROVAL (IF NECESSAP.Y):

By:

(SRO) Date:

By:

Date:

2fd5 l

(11) APPROVED BY:

e DATE:

(12) MISCELLANEOUS:

Reviewed / Approved By:

Date:

Reviewed / Approved By:

Date:

(13) Page 1 of 8402220598 840215 PDR ADOCK 05000413 E

PDR Rev 14 9/20/77

c

~

-s.,

CP/0/A/8100/05 Change Section 1.3.1 to read:

The precision and accuracy of this method will be determined by Q-sum data.

Change Section 4.1 to read:

l NOTE: Generation of a standard curve is not required if method is in current use; however two 100 ppb standards are to be run daily for Q-sum data.

i i

l i

l i

I L

.