ML20080P578
| ML20080P578 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 02/25/1981 |
| From: | Chaust R, Painter R, Tuckman M DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20080P419 | List:
|
| References | |
| CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220588 | |
| Download: ML20080P578 (2) | |
Text
-
Fom SPD-1003-2 m
3 DUKE POWER COMPANY (1)~ ID No: CP/0/A/8100/05 PROCEDURE MAJOR CHANGE Change No:
/
PROCESS RECORD Permanent /
(2)
STATION:
Catawba (3) PROCEDURE TIiT.E: Chemistry Procedure for the Determination of Chloride (Manual Method)
(4)
SECTION(S) 0F PROCEDURE AFFECTED:
1.3.1 and 4.1 (5), DESCRIPTION OF CHANGE:
(Attach additional pages, if necessary.)
See attachment (6) REASON FOR CHANGE:
Procedure Improvement (7) PREPARED 3Y:
[ v,.
DATE: Q. f/
(8) SAFETY EVALUATION This change:
Yes No Represents a change to the station or procedures as described y
in the FSAR, or a test or experiment not described in the FSK Yes No Requires a change to the station Technical Specifications?
y Yes No Involves an unreviewed safety question?
y If the answer to any of the above is "Yes", attach a detailed explanation.
As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.
By:
kI Date:
2 U (9) REVIEWED BY.
DATE:
1~ M ~ '
Cross-Disciplinary Review By:
)
(10) TEMPORARY APPROVAL (IF NECESSAP.Y):
By:
(SRO) Date:
By:
Date:
2fd5 l
(11) APPROVED BY:
e DATE:
(12) MISCELLANEOUS:
Reviewed / Approved By:
Date:
Reviewed / Approved By:
Date:
(13) Page 1 of 8402220598 840215 PDR ADOCK 05000413 E
PDR Rev 14 9/20/77
c
~
-s.,
CP/0/A/8100/05 Change Section 1.3.1 to read:
The precision and accuracy of this method will be determined by Q-sum data.
Change Section 4.1 to read:
l NOTE: Generation of a standard curve is not required if method is in current use; however two 100 ppb standards are to be run daily for Q-sum data.
i i
l i
l i
I L
.