ML20080P518
| ML20080P518 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/06/1984 |
| From: | Chaust R, Cox J, Mcneill B DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20080P419 | List:
|
| References | |
| CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220569 | |
| Download: ML20080P518 (1) | |
Text
..
N' Form 34811 (7 81) m (Fcrmerly SPD 1003-2)
DUKE POWER COMPANY (1)
ID No: C.
o 6/00/0 5
~
PROCEDURE MAJOR CHANGE Change No:
D PROCESS RECORD Permanent / Restricted To
\\
(2)
STATION:
O AIAwbA (3) PROCEDUFI TITLE: Chemigrw Trtocoi>cr2e for 7hc c
DAT&q rns jeg oi C loqido [ mAmer+l mc1hed )
hoEndono' chANeg cictod
?.-G-93 (4) SECTION(S) 0F PROCEDURE AFFECTED:
c e w cei, a c so c-t m
- r, _ 2.
a (5) DESCRIPTION OF CHANGE:
(Atrach additional pages, if necessary.)
[d To c.hnsy 1h2 chesy siombeq of ihc sebjecT paccadura 0 % eo
' nom LI do
(
_- 3 h 0 hah
[f) ocMono change tag 3 g ra s p rtep u(i'O.13 Nu m boq,ac{
(b) NDCWUff CllAUG1E' UA6
/NA flof/M2 (7) PREPARED BY:
b%C M_f DATE:
I - T-BL/
(8)
SAFETY EVALUATION This change:
Tes No M Represents a change to the station or procedures as described in the PSAR, or a test or experiment not described in the PSA Yes No V Requires a change to the station Technical Specifications?
Yes No V
Involves an unreviewed safety question?
If the answer to any of the above is "Yes", attach a detailed explanation.
As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.
By:
A @C N Date:
I - $~ 39 M
DATE:
/- f-8 Y (9) REVIEWED.:
Cross-Disciplinary Rev ew By:
h M
(10) TEMPORARY APPROVAL (IF NECESSARY):
By:
(SRO) Date:
By:
Date:
I) 5 (l1) APPROVED BY:
L/-
DATE:
'(12) MISCELLANEOUS:
Reviewed / Approved By:
Date:
Reviewed / Approved By:
Date:
(13) Page 1 of k
8402220569 840215 PDR ADOCK 05000413 E
PDR Rev 14 9/20/77