ML20080P526

From kanterella
Jump to navigation Jump to search
Change 4 to Procedure CP/O/A/8100/05, Chemistry Procedure for Determination of Chloride (Manual Method)
ML20080P526
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/30/1983
From: Cox J, Evans L, Mcneill B
DUKE POWER CO.
To:
Shared Package
ML20080P419 List:
References
CP-O-A-8100-05, CP-O-A-8100-5, NUDOCS 8402220572
Download: ML20080P526 (3)


Text

._

Ferm 34811 (7 81)

^

(Fcrmerly SPD 1003-2)

DUF2 POWER COMPANY (1)

ID No: 0?/O/A/Pic(/ 6 PROCEDURE MAJOR CHANGE Change No: ' 34-PROCESS RECORD grmanent/ Restricted To (2) STATION:

CQIACN (3) PROCEDUPI TIni:

C HGOTifiRY ):7COGDiiRG FOR TJF Dt:TE?nuupTic4 h C' H LCe2 C G ( m h n,a t McTekt. )

(4)

SECTION(S) 0F PROCEDURE AFFECTED:

32.

(5) DESCRIPTION OF CFMGE:

(Attach additional pages, if necessary.)

Adc[itih TlX [ it P2i n g

  • s h c cicl b c c{c y w.ih c)lrMS Eirce sc4 acchi bdced 4.;c.h c.Nc ac!c ckTz zm.s.3tiLi, (6) PIASON FOR CPE GE:

(7) PREPARED BY:

u.)ce ~ M Nt.L([ DATE:

12-l 3 - 6 3 (8)

SAFETY EVALUATIONJ This change:

Yes No X Represents a change to the sta:1cn or procedures as described in the FSAR, or a test or experiment not described in the FSAT Yes No X Requires a change to the station Technical Specifications?

Yes No 1 Invofves an unreviewed safety question?

If the answer to any of the above is "Yes", attach a detailed explanation.

As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.

By:

bA M Date:

/ 2. - d ~ b (9) REVIEWED BY 87h DATE:

/)-So-/2 Cross-Disciplinary Review By:

hM_

(10) TEMPORARY APPROVAL (IF NECESSARY):

By:

(SRO) Date:

By-Date:

(11) APPROVED BY:

v.

DATE:

/0 h (12) MISCELLANEOUS:

Reviewed / Approved By:

Date:

Reviewed / Approved By:

Date:

(13) Page 1 of

}

8402220572 840215 PDR ADOCK 05000413 E

PDR Rev 14 9/20/77

l' Ferm 34811 (7 81)

S (Formerly SPD 1003-2)

DUKE POWER COMPANY (1)

ID No: C/ /p///e0/0,r PROCEDURE MAJOR CPANGE Change No:

4 PROCESS RECORD

@nenJ/h (2)

STAI!ON:

"J

^

(3) PROCEDURE TITLE:

e% /r ey toeedec=

b c fe'r~ b a e

CJ ke:s'e /ho/ meEA (4)

SECTION(S) 0F PROCEDURE AFFECTED:

l' 7' 2 4/. [

(5) DESCRIPTION OF CHANGE:

(Attach additional pa se~Mce

" Ta rLd:+y a s.ges, if necessary. )

11 1 Add a u Her ye, d'ed sehh e a ~ atre vue 1.,ie 4<e ce.r.

%L Adel see hw 4 L -see MaltNn /

2

/ =S es a (6) REASON FOR CHANGE:

poi analysis a f L ilic/ s e g hs ; h re.rfr ae h CS E G~ 82-W I (7) PREPARED BY:

N DATE:

/

2 d!PJ (S)

SAFETT EVALUATION This change:

Yes No Represents a change to the station or procedures as described j in the FSAR, or a test or experiraent not described in the FSAF Yes No

, Requires a change to the station Technical Specifications?

Yes No

' Involves an unreviewed safety question?

If the answer to any of the above is "Yes", attach a detailed explanation.

As appropriate a::ach a conpleted " Nuclear Safety Evaluation Check List" fem.

By:

d Date:

/ M2e/#3 kh n a b DATE:

l'2.-Z 8 "73 (9) REVIEWED BY:

Cross-Disciplinary Review By:

[h u

(10) TEMPORARY APPROVAL (IF NECESSART):

By:

(SRO) Date:

By:

Date:

I1!L.!iG (11) APPROVED BY:

tN-DATE:

(12) MISCELLANEOUS:

Reviewed / Approved By:

Date:

Reviewed / Approved By:

Date:

(13) Page 1 of 1

Rev 11.

9/20/77

r Page 2 of 2 Add Section 4.6 4.6 Blank, Standard, and Sample Preparation - If turbidity or suspended matter is present.

4.6.1 Prepare a blank by filtering 100 1m1 of Super-0 water using a nitric acid washed, thoroughly rinsed filtering appartus and 0.45 micron filter paper.

4.6.2 Prepare standards by filtering 100 : 1m1 of standard using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper.

4.6.3 Prepare the sample by filtering 100 1ml of sample using a nitric acid washed, thoroughly rinsed filtering apparatus and 0.45 micron filter paper.

Note:

The labware need not be acid washed between blank, standard, and sample, but it must be thoroughly rinsed with Super-Q water.

4.6.4 Go to step 4.2.3 l

i i

_