ML20086D567: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:3  _3        :e  _a,  ,; . g.,
{{#Wiki_filter:b IU '[..i L.1 i l e. c.
b IU '[. .i L.1 i       l e . c. . ,      . wTi Li: a WAs g ,, m... .    *
. wTi Li: a WAs 3
                                                            *;(           w a                                           . uw.&
_3
NORTHERN                     STATES           POWER       COMPANY Ponticello Nuc1 car Generating Plant
:e
                                                .% nticello,FN       55362 9
_a, g.,
Septtsaber 12, 1977 thb &b h Mr. 1. G. Xeppler, Director R2gion III office of Inspection and Enforcement United States Nuclear Regulaton Cosamission 799 Roosevelt Road Glen Ellyn, IL               60137
g,,
m...
*;(
w a
. uw.&
NORTHERN STATES POWER COMPANY Ponticello Nuc1 car Generating Plant
.% nticello,FN 55362 9
Septtsaber 12, 1977 thb &b h Mr. 1. G. Xeppler, Director R2gion III office of Inspection and Enforcement United States Nuclear Regulaton Cosamission 799 Roosevelt Road Glen Ellyn, IL 60137


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
MATICEl.ID NJCIIAR GDiERATING PIMir Docket No. 50-263 License No. DPR-22 Previous correspondence with your office on Septcseher 15, 1975, discussed re-porting of refueling outage valve leakage pmblems.
MATICEl.ID NJCIIAR GDiERATING PIMir Docket No. 50-263 License No. DPR-22 Previous correspondence with your office on SeptcseherFor                        15,the  1975,     discussed re-current refueling porting of refueling outage valve leakage pmblems.
For the current refueling outage we will report penetration and isolation valve leakage rates which ex-cced the acceptance criteria outlined in section 4.7.A.2.f of the Technical Specification in a similar anaer.
outage we will report penetration and isolation valve leakage rates which ex-cced the acceptance criteria outlined in section 4.7.A.2.f of the Technical Specification in a similar anaer. Excessive Icakage rates will be reported within 24 hours or no later than the first working day following the event, Office of Inspection and by telephone and                 telecopy   to   the Director,   Region III,d   within 14 days following Enforcement. A Licensee Event Report will be submitte rep::ii of all Icaking valves.
Excessive Icakage rates will be reported within 24 hours or no later than the first working day following the event, Office of Inspection and by telephone and telecopy to the Director, Region III,d within 14 days following Enforcement.
In acconlance with these reporting nquimments, notification is herchy nede that the fo11cming valves were found to leak in excess of th'c acceptance criteria for local leak tests specified in Section 4.7.A.2.f of the Technical .epecifi-cations:                                 ,
A Licensee Event Report will be submitte rep::ii of all Icaking valves.
Main Steam Drain Isolation Valve, FD 2373                     .
In acconlance with these reporting nquimments, notification is herchy nede that the fo11cming valves were found to leak in excess of th'c acceptance criteria for local leak tests specified in Section 4.7.A.2.f of the Technical.epecifi-cations:
Main Steam Outboart) Isolation Valve, AD 2-86A-Yours yery truly, M                                         %
Main Steam Drain Isolation Valve, FD 2373 Main Steam Outboart) Isolation Valve, AD 2-86A-Yours yery truly, M
    . L. R. Eliason .
. L. R. Eliason.
* Plant Manager                           8y3202                       ~
Plant Manager 8y3202
AD       05 gg                                     s                                                              ,
~
cc:    Dinctor, Office of Management Information 6 Program Contml G. Charnoff                                                                     '
AD s
Minnesota Pollution Control Agency
05 gg Dinctor, Office of Management Information 6 cc:
;                    Attn: J. W. Fennan -                             .
Program Contml G. Charnoff Minnesota Pollution Control Agency Attn:
J. W. Fennan -
1ile Copy sent bv telcennier to Reppler.,
1ile Copy sent bv telcennier to Reppler.,
                -                                              m-thW $:.m
thW $: 9 L LSg 9
                                                                                                ,   z.
p z.
99  L LSgp}}
.m m-
,}}

Latest revision as of 02:27, 14 December 2024

Telecopy Ro:Main Steam Drain Isolation Valve MD 2373 & Main Steam Outboard Isolation Valve AO 2-86A Exceeded Tech Spec Acceptance Criteria for Local Leak Rate Tests
ML20086D567
Person / Time
Site: Monticello, 05000000
Issue date: 09/12/1977
From: Eliason L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
NUDOCS 8312020392
Download: ML20086D567 (1)


Text

b IU '[..i L.1 i l e. c.

. wTi Li: a WAs 3

_3

e

_a, g.,

g,,

m...

  • (

w a

. uw.&

NORTHERN STATES POWER COMPANY Ponticello Nuc1 car Generating Plant

.% nticello,FN 55362 9

Septtsaber 12, 1977 thb &b h Mr. 1. G. Xeppler, Director R2gion III office of Inspection and Enforcement United States Nuclear Regulaton Cosamission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

MATICEl.ID NJCIIAR GDiERATING PIMir Docket No. 50-263 License No. DPR-22 Previous correspondence with your office on Septcseher 15, 1975, discussed re-porting of refueling outage valve leakage pmblems.

For the current refueling outage we will report penetration and isolation valve leakage rates which ex-cced the acceptance criteria outlined in section 4.7.A.2.f of the Technical Specification in a similar anaer.

Excessive Icakage rates will be reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or no later than the first working day following the event, Office of Inspection and by telephone and telecopy to the Director, Region III,d within 14 days following Enforcement.

A Licensee Event Report will be submitte rep::ii of all Icaking valves.

In acconlance with these reporting nquimments, notification is herchy nede that the fo11cming valves were found to leak in excess of th'c acceptance criteria for local leak tests specified in Section 4.7.A.2.f of the Technical.epecifi-cations:

Main Steam Drain Isolation Valve, FD 2373 Main Steam Outboart) Isolation Valve, AD 2-86A-Yours yery truly, M

. L. R. Eliason.

Plant Manager 8y3202

~

AD s

05 gg Dinctor, Office of Management Information 6 cc:

Program Contml G. Charnoff Minnesota Pollution Control Agency Attn:

J. W. Fennan -

1ile Copy sent bv telcennier to Reppler.,

thW $: 9 L LSg 9

p z.

.m m-

,