e                        TENNESSEE VALLEY AUTHORITY Watts Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 f
TENNESSEE VALLEY AUTHORITY e
Watts Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 f
December 24, 1986 Mr. Harold Denton Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814
December 24, 1986 Mr. Harold Denton Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
In the Matter of the Application of
In the Matter of the Application of                         )       Docket Nos. 50-327 Tennessee Valley Authority                                   )                   50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)
)
Enclosure I provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG
Docket Nos.
    ~~
50-327 Tennessee Valley Authority
      ,  Writer's Guide recommended report format and the transmitted reports. As has been previously discussed with your staff, the welding reports addressing employee concerns have been left in the format used by the Weld Task Group.
)
Enclosure 3 to this letter transmits, for NRC's review, two initial element reports addressing Sequoyah Nuclear Plant employee concerns in the engineering category.   (These reports have been reviewed and approved by the Senior Review Panel).
50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)
Enclosure 4 transmits the final element reports for 20 elements addressing Sequoyah Nuclear Plant employee concerns in the following categories:
Enclosure I provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports. As has
Construction               - 4 reports Engineering                 - 12 reports Operations                 - 3 reports Welding                     - 1 report As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for Construction Subcategory 10700, Instrument Tubing and Engineering Subcategory 23500. Electrical Safety Design.
~~
8701090475 861224 PDR   ADOCK 05000327 b
been previously discussed with your staff, the welding reports addressing employee concerns have been left in the format used by the Weld Task Group. to this letter transmits, for NRC's review, two initial element reports addressing Sequoyah Nuclear Plant employee concerns in the engineering category.
P                  PCR                           hd An Equal Opportunity Employer k
(These reports have been reviewed and approved by the Senior Review Panel). transmits the final element reports for 20 elements addressing Sequoyah Nuclear Plant employee concerns in the following categories:
Construction
- 4 reports Engineering
- 12 reports Operations
- 3 reports Welding
- 1 report As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for Construction Subcategory 10700, Instrument Tubing and Engineering Subcategory 23500. Electrical Safety Design.
8701090475 861224 b
PDR ADOCK 05000327 hd P
PCR An Equal Opportunity Employer k


r I2 1
r I2 1
Nr. Denton Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.
Nr. Denton Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.
Very truly yours, TENNESSEE VALLEY AUTHORITY y .J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager l
Very truly yours, TENNESSEE VALLEY AUTHORITY y.J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager l
cc (Enclosures):
cc (Enclosures):
Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 U.S. Nuclear Regulatory Commission Region II Attn: Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. J. Youngblood, Project Director l
Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.
PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 j            Nr. B. D. Liaw, Branch Chief
20555 U.S. Nuclear Regulatory Commission Region II Attn:
!            U.S. Nuclear Regulatory Commission l .          7920 Norfolk Avenue Room T-1132 Bethesda, Maryland 20814 i
Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. J. Youngblood, Project Director l
PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 Nr. B. D. Liaw, Branch Chief j
U.S. Nuclear Regulatory Commission l
7920 Norfolk Avenue Room T-1132 Bethesda, Maryland 20814 i
l l
l l
I                                                                                   __J
I J


e-Enclosure 1 i
e-i l
l l
l


ENCLOSURE 1 Page 1 of 5 SEQUOYAH                                             EMPLOYEE ELEMENT REPORT                                           CONCERN NUMBER               ISSUE Engineering 23801                                           IN-85-432-001 Conduit Overfills and Cable Damage (Initial)                                                   IN-86-036-001 IN-86-310-001 IN-85-313-001 IN-85-506-001 IN-85-622-001 IN-85-685-001 IN-85-743-008 IN-86-034-001 IN-86-266-003 IN-85-642-001 IN-85-856-003 IN-86-028-002 IN-86-262-001 IN-85-832-001 IN-85-312-001
ENCLOSURE 1 Page 1 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 23801 IN-85-432-001 Conduit Overfills and Cable Damage (Initial)
,                                                                    IN-85-734-001 IN-85-367-001 IN-86-262-004 IN-86-254-009 IN-86-206-001 OW-85-007-003 Engineering 23803                                           OW-85-007-002 Cable Tray Overfills (Initial)                                                   IN-85-186-003 and Wall and Floor WI-85-100-011 Penetrations IN-85-798-004 IN-86-238-003 IN-86-232-002 IN-85-688-N05 IN-85-919-001 IN-85-432-002 IN-85-688-001
IN-86-036-001 IN-86-310-001 IN-85-313-001 IN-85-506-001 IN-85-622-001 IN-85-685-001 IN-85-743-008 IN-86-034-001 IN-86-266-003 IN-85-642-001 IN-85-856-003 IN-86-028-002 IN-86-262-001 IN-85-832-001 IN-85-312-001 IN-85-734-001 IN-85-367-001 IN-86-262-004 IN-86-254-009 IN-86-206-001 OW-85-007-003 Engineering 23803 OW-85-007-002 Cable Tray Overfills (Initial)
                                                                  -IN-85-856-003 i                                                                   PH-85-003-023 IN-86-028-002 IN-85-312-001 IN-85-734-001 i                                                                   IN-86-262-001 IN-85-832-001 IN-85-207-001 IN-85-519-001 WI-85-100-015 i
IN-85-186-003 and Wall and Floor WI-85-100-011 Penetrations IN-85-798-004 IN-86-238-003 IN-86-232-002 IN-85-688-N05 IN-85-919-001 IN-85-432-002 IN-85-688-001
-IN-85-856-003 i
PH-85-003-023 IN-86-028-002 IN-85-312-001 IN-85-734-001 i
IN-86-262-001 IN-85-832-001 IN-85-207-001 IN-85-519-001 WI-85-100-015 i


ENCLOSURE 1 Page 2 of 5 SEQUOYAH                 EMPLOYEE ELEMENT REPORT                 CONCERN NUMBER                     ISSUE Construction 10603               IN-86-183-001     Bolting Material (Final)                         IN-85-021-X04     Compatibility IN-85-824-001 NOTE: Report 10603 and listed concerns were added after 9/26/86.         Initial report transmitted 11/17/86.
ENCLOSURE 1 Page 2 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Construction 10603 IN-86-183-001 Bolting Material (Final)
Construction 10703               IN-85-707-002     Bending Equipment / Material (Final)                         IN-85-740-002 IN-85-740-003 IN-85-773-002 IN-85-831-001 NOTE: Initial report transmitted 11/17/86.
IN-85-021-X04 Compatibility IN-85-824-001 NOTE: Report 10603 and listed concerns were added after 9/26/86.
Construction 11103               IN-85-228-001     Methods Used During Installation (Final)                         IN-86-116-001 XX-85-070-007 NOTE: Initial report transmitted 9/25/86.
Initial report transmitted 11/17/86.
Construction 11305           *HI-85-020-N02       Anchors Cut Off as (Final)                       *HI-85-073-N04       Related to Construction
Construction 10703 IN-85-707-002 Bending Equipment / Material (Final)
                                *HI-85-113-N02 IN-85-020-001 IN-85-037-001
IN-85-740-002 IN-85-740-003 IN-85-773-002 IN-85-831-001 NOTE: Initial report transmitted 11/17/86.
                                *IN-85-246-003 IN-85-285-001
Construction 11103 IN-85-228-001 Methods Used During Installation (Final)
                                *IN-85-625-002
IN-86-116-001 XX-85-070-007 NOTE: Initial report transmitted 9/25/86.
                                *IN-85-664-001
Construction 11305
                                *IN-85-982-001 IN-86-140-002
*HI-85-020-N02 Anchors Cut Off as (Final)
                                *IN-86-177-001
*HI-85-073-N04 Related to Construction
                                *IN-86-221-001 IN-86-294-002 PH-85-002-026 PH-85-035-007
*HI-85-113-N02 IN-85-020-001 IN-85-037-001
                                *PH-85-054-NO3
*IN-85-246-003 IN-85-285-001
                                *QCP-10,35-8-23 SQP-5-005-002 SQP-5-005-003 SQP-5-005-004 SQP-5-005-005 SQP-5-005-006 SQP-85-005-001 SQP-85-005-007 WI-85-011-001 XX-85-010-001 XX-85-010-N02 NOTE: Initial report transmitted 9/11/86
*IN-85-625-002
*IN-85-664-001
*IN-85-982-001 IN-86-140-002
*IN-86-177-001
*IN-86-221-001 IN-86-294-002 PH-85-002-026 PH-85-035-007
*PH-85-054-NO3
*QCP-10,35-8-23 SQP-5-005-002 SQP-5-005-003 SQP-5-005-004 SQP-5-005-005 SQP-5-005-006 SQP-85-005-001 SQP-85-005-007 WI-85-011-001 XX-85-010-001 XX-85-010-N02 NOTE: Initial report transmitted 9/11/86


ENCLOSURE 1 Page 3 of 5 SEQUOYAH             EMPLOYEE ELEMENT REPORT         CONCERN NUMBER                       ISSUE Engineering 20302       WI-85-100-034     Feedback to Design (Final)                                     Organization not Properly Utilized NOTE: An initial report was not necessary. This will be the only submittal for 20302.
ENCLOSURE 1 Page 3 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 20302 WI-85-100-034 Feedback to Design (Final)
Engineering 20503       WI-85-100-043     Calculation Records Retention.
Organization not Properly Utilized NOTE: An initial report was not necessary. This will be the only submittal for 20302.
(Final)                 IN-85-110-004 NOTE: An initial report was not necessary. This will be the only submittal for 20503.
Engineering 20503 WI-85-100-043 Calculation Records Retention.
Engineering 20703         IN-86-077-001     Deviations to Pre-op (Final)                                     Test Acceptance Criteria.
(Final)
IN-85-110-004 NOTE: An initial report was not necessary. This will be the only submittal for 20503.
Engineering 20703 IN-86-077-001 Deviations to Pre-op (Final)
Test Acceptance Criteria.
NOTE: An initial report was not necessary. This will be the only submittal for 20703.
NOTE: An initial report was not necessary. This will be the only submittal for 20703.
Engineering 20704         I-85-761-NPS       CAQ Documentation (Final)
Engineering 20704 I-85-761-NPS CAQ Documentation (Final)
NOTE: An initial report was not necessary. This will be the only submittal for 20704.
NOTE: An initial report was not necessary. This will be the only submittal for 20704.
Engineering 21202         IN-85-027-001     NRC Bulletin (Final)                   SQN-86-002-02     79-14 ABR Program NOTE: An initial report was not necessary. This will be the only submittal for 21202.
Engineering 21202 IN-85-027-001 NRC Bulletin (Final)
Engineering 21801       SQN-86-002-03       Thermal Analysis (Final)                 SQN-86-001-03       of Piping Subjected
SQN-86-002-02 79-14 ABR Program NOTE: An initial report was not necessary. This will be the only submittal for 21202.
                          *IN-85-038-001       to Temperature Less IN-85-039-001       Than 120* F.
Engineering 21801 SQN-86-002-03 Thermal Analysis (Final)
                          *IN-85-039-002
SQN-86-001-03 of Piping Subjected
*IN-85-038-001 to Temperature Less IN-85-039-001 Than 120* F.
*IN-85-039-002
* Concerns added after 9/26/86.
* Concerns added after 9/26/86.
NOTE: An initial report was not necessary. This will be the only submittal for for 21801.
NOTE: An initial report was not necessary. This will be the only submittal for for 21801.
l
l


ENCLOSURE 1 4                                                                  Page 4 of 5 SEQUOYAH             EMPLOYEE ELEMENT REPORT           CONCERN NUMBER                       ISSUE Engineering 22902           XX-85-127-001     Radioactive Panels (Final)                   IN-85-143-003     Drains Into Floor IN-85-197-002     Drains
ENCLOSURE 1 Page 4 of 5 4
                            *IN-85-514-002 IN-85-748-001 IN-85-952-001 IN-85-983-001
SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 22902 XX-85-127-001 Radioactive Panels (Final)
IN-85-143-003 Drains Into Floor IN-85-197-002 Drains
*IN-85-514-002 IN-85-748-001 IN-85-952-001 IN-85-983-001
* Concern added after 9/26/86 NOTE: An initial report was not necessary. This will be the only submittal for 22902.
* Concern added after 9/26/86 NOTE: An initial report was not necessary. This will be the only submittal for 22902.
Engineering 22905         IN-85-348-002     Control Air System (Final)                                       Adequancy.
Engineering 22905 IN-85-348-002 Control Air System (Final)
Adequancy.
NOTE: An initial report not necessary. This will be the only submittal for 22905.
NOTE: An initial report not necessary. This will be the only submittal for 22905.
Engineering 23209         IN-85-772-005     Freezing of (Final)                                       Condensate Lines.
Engineering 23209 IN-85-772-005 Freezing of (Final)
Condensate Lines.
NOTE: An initial report was not necessary. This will be the only submittal for 23209.
NOTE: An initial report was not necessary. This will be the only submittal for 23209.
l Engineering 23501         WBM-5-002-003     480 Volt Power (Final)                   EX-85-154-007     Receptacles Unsafe.
l Engineering 23501 WBM-5-002-003 480 Volt Power (Final)
EX-85-154-007 Receptacles Unsafe.
NOTE: An initial report was not necessary. This will be the only submittal for 23501.
NOTE: An initial report was not necessary. This will be the only submittal for 23501.
Engineering 23508         IN-85-973-003     PVC Liguidtight (Final)                                       Flex Conduit l NOTE: An initial report was not necessary. This will be the only submittal for 1
Engineering 23508 IN-85-973-003 PVC Liguidtight (Final)
Flex Conduit l
NOTE: An initial report was not necessary. This will be the only submittal for 1
23508.
23508.
r l
r l


ENCLOSURE 1 Page 5 of 5 SEQUOYAH             EMPLOYEE ELEMENT REPORT         CONCERN NUMBER                           ISSUE Engineering 24103         XX-85-094-006         No Megger Test on (Final)                                         Low Voltage Cables.
ENCLOSURE 1 Page 5 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 24103 XX-85-094-006 No Megger Test on (Final)
Low Voltage Cables.
NOTE: An initial report was not necessary. This will be the only submittal for 24103.
NOTE: An initial report was not necessary. This will be the only submittal for 24103.
Operation 30701         *IN-85-847-001         Plant Operations Review (Final)                                         Committee (PORC) Process
Operation 30701
*IN-85-847-001 Plant Operations Review (Final)
Committee (PORC) Process
* Concern transferred from 70500.
* Concern transferred from 70500.
NOTE: An initial report was not necessary. This will be the only submittal for 30701.
NOTE: An initial report was not necessary. This will be the only submittal for 30701.
Operation 30704           XX-85-070-005         Workplan Process (Final)                   XX-85-070-003
Operation 30704 XX-85-070-005 Workplan Process (Final)
                          *XX-85-070-002
XX-85-070-003
                          *XX-85-070-006 SQP-86-003-003 SQP-86-003-N06 IN-85-305-NO3
*XX-85-070-002
*XX-85-070-006 SQP-86-003-003 SQP-86-003-N06 IN-85-305-NO3
* Concerns added after 9/26/86.
* Concerns added after 9/26/86.
NOTE: An initial report was not necessary. This will be the only submittal for 30704.
NOTE: An initial report was not necessary. This will be the only submittal for 30704.
Operation 30804           IN-86-073-002         Program / Procedure (Final)                   IN-86-315-002         Violations IN-86-110-001 SQP-85-004-006 JAN-86-001 I-86-233-SQN                                               ,
Operation 30804 IN-86-073-002 Program / Procedure (Final)
JLH-86-001 NOTE: An initial report was not necessary. This will be the only submittal for 30804 Welding WP-23-SQN         XX-85-124-001 (71100)*   Control of Unused (Final)                                             Weld Material.
IN-86-315-002 Violations IN-86-110-001 SQP-85-004-006 JAN-86-001 I-86-233-SQN JLH-86-001 NOTE: An initial report was not necessary. This will be the only submittal for 30804 Welding WP-23-SQN XX-85-124-001 (71100)*
Control of Unused (Final)
Weld Material.
* Data base subcategory as shown in 9/26/86 printout.
* Data base subcategory as shown in 9/26/86 printout.
NOTE: An initial report was not necessary. This will be the only submittal for WP-23.
NOTE: An initial report was not necessary. This will be the only submittal for WP-23.
[                                                                                   ___
[
 
b
__.e-i a
,c-.,
.-- +
_,.--,.p.---
,,w.
.,"-.-.y


b -.-- , . __.e-                              _
CONSTRUCTION CATEGORY Enclosure 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.
i a
Introduction Characterization II.
Enclosure 2
Summary of Perceived Problem 2.0 Summary IV.
  -- ---- - ,c-., .-- +  -,--_- ,_---..-._ . - _,.--,.p.--- - _ , _ . , , , , -                  - _ - - . _ _ , , . _ . - - ,- _ _ .- - _ . ,,w. ,_,- _ . , ,._ .. - - - , , . .,"-.-.y
Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation III. Evaluation Process Nethodology


CONSTRUCTION CATEGORY Enclosure 2 ECTG WRITER'S GUIDE                                                          ELEMENT REPORT FORMAT 1.0                    Issue                                                    I. Introduction Characterization II. Summary of Perceived Problem 2.0                    Summary                                                  IV. Summary of Findings Conclusions (Portion) 3.0                    Evaluators                                            Cover Sheet Information 4.0                    Evaluation                                              III. Evaluation Process                                                        Nethodology 5.0                   Findings                                                 IV. Summary of Findings 6.0                   Root Cause                                                 7. Root Cause (Collective Significance)**                               ** Overall Root Cause will not be considered at this report level.
===5.0 Findings===
7.0                 Attachments /                                           VIII. Attachments List of Concerns Other items included                                                           VI. Corrective Actions in Construction Element                                                               (To be provided by Reports                                                                               line orgainzations)
IV.
Summary of Findings 6.0 Root Cause 7.
Root Cause (Collective Significance)**
** Overall Root Cause will not be considered at this report level.
7.0 Attachments /
VIII. Attachments List of Concerns Other items included VI.
Corrective Actions in Construction Element (To be provided by Reports line orgainzations)
VII. Generic Applicability
VII. Generic Applicability
:i i
:i i
190ST f
190ST f


ENGINEERING CATEGORY Enclosure 2 Page 1 of 2 ECTG WRITER'S GUIDE                       ELEMENT REPORT FORMAT 1.0       Issue                             1. Characterization of Issue (s)
ENGINEERING CATEGORY Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue 1.
Characterization 2.0       Summary                           9. Discussion, Findings and Conclusions 3.0     Evaluators                               Cover Sheet Information
Characterization of Issue (s)
  ,  4.0       Evaluation                         8. Evaluation Process Process 5.0       Findings                           9. Discussion, Findings, and Conclusions 6.0       Root Cause (Collective Significance)M*       ** Overall Root Cause will
Characterization 2.0 Summary 9.
                                        ,              not be considered at this report level.
Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 Evaluation 8.
7.0       Attachments /                           Attachments as required List of Concerns Other items included                         2. Have issue (s) been identified in Engineering Element                             in another systematic Reports                                           analysis?
Evaluation Process Process
: 3. Document nos., tag nos.,
 
locations or other specific descriptive identifications
===5.0 Findings===
;                                                        stated in element.
9.
I
Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)M*
: 4. Interview files reviewed l
** Overall Root Cause will not be considered at this report level.
: 5. Documents reviewed related to the element 1992T
7.0 Attachments /
Attachments as required List of Concerns Other items included 2.
Have issue (s) been identified in Engineering Element in another systematic Reports analysis?
3.
Document nos., tag nos.,
locations or other specific descriptive identifications stated in element.
I 4.
Interview files reviewed l
5.
Documents reviewed related to the element 1992T


4 ENGINEERING CATEGORY Enclosure 2 Page 2 of 2 ECTG WRITER'S GUIDE                     ELEMENT REPORT FORMAT Other items included in Engineering Element                     6. What regulations, licensing Reports                                         commitments, design require-(cont'd)                                         ments, or other apply or control in this area?
4 ENGINEERING CATEGORY Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in Engineering Element 6.
: 7. List requests for information, meetings, telephone calls, and other discussions related to element.
What regulations, licensing Reports commitments, design require-(cont'd) ments, or other apply or control in this area?
7.
List requests for information, meetings, telephone calls, and other discussions related to element.
t t
t t
f I
f I
I
I


OPERATIONS CATEGORY Enclcsura 2
OPERATIONS CATEGORY Enclcsura 2 ECTG WRITER'S GUIDE OPERATIONS (0P) ELEMENT REPORTS NOTES / COMMENTS 1.0 Issue I.
.                                                                  ECTG WRITER'S GUIDE           OPERATIONS (0P) ELEMENT REPORTS NOTES / COMMENTS 1.0                     Issue                           I. Title                     The brief introduction Characterization                   Very brief introduction   touches on the source of the concerns, i
Title The brief introduction Characterization Very brief introduction touches on the source of the concerns, i
i 2.0                       Summary                           Title I.                           1. The Conclusions are Very brief introduction       towards the end of the findings.
i 2.0 Summary I.
III. Finding (Conclusions)   2. The conclusions
Title
'                                                                                                                                    services as a summary
: 1. The Conclusions are Very brief introduction towards the end of the findings.
;                                                                                                                                    of the findings.
III. Finding (Conclusions)
: 2. The conclusions services as a summary of the findings.
J
J
]                                         3.0                       Evaluators                     Cover Sheet                   1. The printed name of the original evaluator (s) appears on the cover sheet.
]
3.0 Evaluators Cover Sheet
: 1. The printed name of the original evaluator (s) appears on the cover sheet.
: 2. The peer reviewer and i
)
CEG-H approval signa-tures are also on the cover sheet.
4.0 Evaluation II. Specific Evaluation Process Nethodology i
i
i
: 2. The peer reviewer and CEG-H approval signa-
)                                                                                                                                    tures are also on the cover sheet.
4.0                        Evaluation                      II. Specific Evaluation Process                            Nethodology i
i 5.0                        Findings                        III. Findings 3                                      1880T
,                                                                                                                                      P3 I


EIclesura 2 ECTG WRITER'S GUIDE         OPERATIONS (OP) ELMENT REPORTS NOTES / COMMENTS 6.0   Root Cause                   IV. Root Cause             1. At the element level (Collective Significance)                                   the Root Cause is often not identifible.
===5.0 Findings===
: 2. Collective significance j                                                                                                                                         is not addressed at the element report level.     ,
III. Findings 3
;                                                                      7.0   Attachments /               II. Specific Evaluation     1. A list of the concerns List of Concerns                 Methodology               with text are included within this section.    .
1880T P3 I
: 2. Other reports are j                                                                                                                                         sometimes attached.
 
EIclesura 2 ECTG WRITER'S GUIDE OPERATIONS (OP) ELMENT REPORTS NOTES / COMMENTS 6.0 Root Cause IV. Root Cause
: 1. At the element level (Collective Significance) the Root Cause is often not identifible.
: 2. Collective significance j
is not addressed at the element report level.
7.0 Attachments /
II. Specific Evaluation
: 1. A list of the concerns List of Concerns Methodology with text are included within this section.
: 2. Other reports are j
sometimes attached.
l 1
l 1
i i
i i
1
1


Ercicarro 2 ECTG WRITER'S GUIDE                   NSRS/ERT* WELD PROJECT (WP) REPORTS       NOTES /COMPENTS 1.0   Issue                         Background Info   Issues Addressed Characterization             (Section I)       By Concerns (Section II) 2.0   List Of Concerns             Background Info   Scope of Evaluation (Section I)       (Section I and Att-1) 3.0   Evaluators                   Coversheet       Coversheet i
Ercicarro 2 ECTG WRITER'S GUIDE NSRS/ERT*
WELD PROJECT (WP) REPORTS NOTES /COMPENTS 1.0 Issue Background Info Issues Addressed Characterization (Section I)
By Concerns (Section II) 2.0 List Of Concerns Background Info Scope of Evaluation (Section I)
(Section I and Att-1) 3.0 Evaluators Coversheet Coversheet i
i I
i I
i                                       4.0   Evaluation                   Scope             Not Delineated As Part Process                       (Section II)     Of The WP Reports however it
i 4.0 Evaluation Scope Not Delineated As Part Process (Section II)
;                                                                                            is addressed as part of the J                                                                                             Weld Projects Program Manual i
Of The WP Reports however it is addressed as part of the J
5.0   Findings                     Findings         Validity or (Section III)     Substantiation i
Weld Projects Program Manual i
(Section III)
 
I i
===5.0 Findings===
1 l                                     6.0   Root Cause**                 Conclusion and   Validity or                 *** Note that recommendations l                                                                                                                               are not included in element reports under the current ECTG program, and Conclusion               Recommendations   Substantiation               **    Overall Root Cause will (Section IV)***   (Section III)                     not be considered at this I
Findings Validity or (Section III)
Substantiation (Section III) i I
i 1
l 6.0 Root Cause**
Conclusion and Validity or
*** Note that recommendations l
are not included in element reports under the current ECTG program, and Conclusion Recommendations Substantiation Overall Root Cause will (Section IV)***
(Section III) not be considered at this I
report level.
report level.
l
l
                                            *The Weld Project has endorsed a number of ERT Reports and general issue level reports as adequately addressing the concerns at this level for SQN.
*The Weld Project has endorsed a number of ERT Reports and general issue level reports as adequately addressing the concerns at this level for SQN.
I
I


_. - . w Enclosure 3
w  
_ _ . . _ _ _}}
..}}

Latest revision as of 20:49, 6 December 2024

Forwards 2 Initial Element Repts Re Concerns in Engineering Category & 20 Final Element Repts in Const,Engineering, Operations & Welding Categories.All Employee Concerns Have Been Addressed for Const Subcategory 10700
ML20207K650
Person / Time
Site: Sequoyah  
Issue date: 12/24/1986
From: Mcdonald J
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20207K654 List:
References
NUDOCS 8701090475
Download: ML20207K650 (16)


Text

..

TENNESSEE VALLEY AUTHORITY e

Watts Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 f

December 24, 1986 Mr. Harold Denton Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814

Dear Mr. Denton:

In the Matter of the Application of

)

Docket Nos.

50-327 Tennessee Valley Authority

)

50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)

Enclosure I provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports. As has

~~

been previously discussed with your staff, the welding reports addressing employee concerns have been left in the format used by the Weld Task Group. to this letter transmits, for NRC's review, two initial element reports addressing Sequoyah Nuclear Plant employee concerns in the engineering category.

(These reports have been reviewed and approved by the Senior Review Panel). transmits the final element reports for 20 elements addressing Sequoyah Nuclear Plant employee concerns in the following categories:

Construction

- 4 reports Engineering

- 12 reports Operations

- 3 reports Welding

- 1 report As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for Construction Subcategory 10700, Instrument Tubing and Engineering Subcategory 23500. Electrical Safety Design.

8701090475 861224 b

PDR ADOCK 05000327 hd P

PCR An Equal Opportunity Employer k

r I2 1

Nr. Denton Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.

Very truly yours, TENNESSEE VALLEY AUTHORITY y.J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager l

cc (Enclosures):

Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.

20555 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. J. Youngblood, Project Director l

PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 Nr. B. D. Liaw, Branch Chief j

U.S. Nuclear Regulatory Commission l

7920 Norfolk Avenue Room T-1132 Bethesda, Maryland 20814 i

l l

I J

e-i l

l

ENCLOSURE 1 Page 1 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 23801 IN-85-432-001 Conduit Overfills and Cable Damage (Initial)

IN-86-036-001 IN-86-310-001 IN-85-313-001 IN-85-506-001 IN-85-622-001 IN-85-685-001 IN-85-743-008 IN-86-034-001 IN-86-266-003 IN-85-642-001 IN-85-856-003 IN-86-028-002 IN-86-262-001 IN-85-832-001 IN-85-312-001 IN-85-734-001 IN-85-367-001 IN-86-262-004 IN-86-254-009 IN-86-206-001 OW-85-007-003 Engineering 23803 OW-85-007-002 Cable Tray Overfills (Initial)

IN-85-186-003 and Wall and Floor WI-85-100-011 Penetrations IN-85-798-004 IN-86-238-003 IN-86-232-002 IN-85-688-N05 IN-85-919-001 IN-85-432-002 IN-85-688-001

-IN-85-856-003 i

PH-85-003-023 IN-86-028-002 IN-85-312-001 IN-85-734-001 i

IN-86-262-001 IN-85-832-001 IN-85-207-001 IN-85-519-001 WI-85-100-015 i

ENCLOSURE 1 Page 2 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Construction 10603 IN-86-183-001 Bolting Material (Final)

IN-85-021-X04 Compatibility IN-85-824-001 NOTE: Report 10603 and listed concerns were added after 9/26/86.

Initial report transmitted 11/17/86.

Construction 10703 IN-85-707-002 Bending Equipment / Material (Final)

IN-85-740-002 IN-85-740-003 IN-85-773-002 IN-85-831-001 NOTE: Initial report transmitted 11/17/86.

Construction 11103 IN-85-228-001 Methods Used During Installation (Final)

IN-86-116-001 XX-85-070-007 NOTE: Initial report transmitted 9/25/86.

Construction 11305

  • HI-85-020-N02 Anchors Cut Off as (Final)
  • HI-85-073-N04 Related to Construction
  • HI-85-113-N02 IN-85-020-001 IN-85-037-001
  • IN-85-246-003 IN-85-285-001
  • IN-85-625-002
  • IN-85-664-001
  • IN-85-982-001 IN-86-140-002
  • IN-86-177-001
  • IN-86-221-001 IN-86-294-002 PH-85-002-026 PH-85-035-007
  • PH-85-054-NO3
  • QCP-10,35-8-23 SQP-5-005-002 SQP-5-005-003 SQP-5-005-004 SQP-5-005-005 SQP-5-005-006 SQP-85-005-001 SQP-85-005-007 WI-85-011-001 XX-85-010-001 XX-85-010-N02 NOTE: Initial report transmitted 9/11/86

ENCLOSURE 1 Page 3 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 20302 WI-85-100-034 Feedback to Design (Final)

Organization not Properly Utilized NOTE: An initial report was not necessary. This will be the only submittal for 20302.

Engineering 20503 WI-85-100-043 Calculation Records Retention.

(Final)

IN-85-110-004 NOTE: An initial report was not necessary. This will be the only submittal for 20503.

Engineering 20703 IN-86-077-001 Deviations to Pre-op (Final)

Test Acceptance Criteria.

NOTE: An initial report was not necessary. This will be the only submittal for 20703.

Engineering 20704 I-85-761-NPS CAQ Documentation (Final)

NOTE: An initial report was not necessary. This will be the only submittal for 20704.

Engineering 21202 IN-85-027-001 NRC Bulletin (Final)

SQN-86-002-02 79-14 ABR Program NOTE: An initial report was not necessary. This will be the only submittal for 21202.

Engineering 21801 SQN-86-002-03 Thermal Analysis (Final)

SQN-86-001-03 of Piping Subjected

  • IN-85-038-001 to Temperature Less IN-85-039-001 Than 120* F.
  • IN-85-039-002
  • Concerns added after 9/26/86.

NOTE: An initial report was not necessary. This will be the only submittal for for 21801.

l

ENCLOSURE 1 Page 4 of 5 4

SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 22902 XX-85-127-001 Radioactive Panels (Final)

IN-85-143-003 Drains Into Floor IN-85-197-002 Drains

  • IN-85-514-002 IN-85-748-001 IN-85-952-001 IN-85-983-001
  • Concern added after 9/26/86 NOTE: An initial report was not necessary. This will be the only submittal for 22902.

Engineering 22905 IN-85-348-002 Control Air System (Final)

Adequancy.

NOTE: An initial report not necessary. This will be the only submittal for 22905.

Engineering 23209 IN-85-772-005 Freezing of (Final)

Condensate Lines.

NOTE: An initial report was not necessary. This will be the only submittal for 23209.

l Engineering 23501 WBM-5-002-003 480 Volt Power (Final)

EX-85-154-007 Receptacles Unsafe.

NOTE: An initial report was not necessary. This will be the only submittal for 23501.

Engineering 23508 IN-85-973-003 PVC Liguidtight (Final)

Flex Conduit l

NOTE: An initial report was not necessary. This will be the only submittal for 1

23508.

r l

ENCLOSURE 1 Page 5 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 24103 XX-85-094-006 No Megger Test on (Final)

Low Voltage Cables.

NOTE: An initial report was not necessary. This will be the only submittal for 24103.

Operation 30701

  • IN-85-847-001 Plant Operations Review (Final)

Committee (PORC) Process

  • Concern transferred from 70500.

NOTE: An initial report was not necessary. This will be the only submittal for 30701.

Operation 30704 XX-85-070-005 Workplan Process (Final)

XX-85-070-003

  • XX-85-070-002
  • XX-85-070-006 SQP-86-003-003 SQP-86-003-N06 IN-85-305-NO3
  • Concerns added after 9/26/86.

NOTE: An initial report was not necessary. This will be the only submittal for 30704.

Operation 30804 IN-86-073-002 Program / Procedure (Final)

IN-86-315-002 Violations IN-86-110-001 SQP-85-004-006 JAN-86-001 I-86-233-SQN JLH-86-001 NOTE: An initial report was not necessary. This will be the only submittal for 30804 Welding WP-23-SQN XX-85-124-001 (71100)*

Control of Unused (Final)

Weld Material.

  • Data base subcategory as shown in 9/26/86 printout.

NOTE: An initial report was not necessary. This will be the only submittal for WP-23.

[

b

__.e-i a

,c-.,

.-- +

_,.--,.p.---

,,w.

.,"-.-.y

CONSTRUCTION CATEGORY Enclosure 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.

Introduction Characterization II.

Summary of Perceived Problem 2.0 Summary IV.

Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation III. Evaluation Process Nethodology

5.0 Findings

IV.

Summary of Findings 6.0 Root Cause 7.

Root Cause (Collective Significance)**

    • Overall Root Cause will not be considered at this report level.

7.0 Attachments /

VIII. Attachments List of Concerns Other items included VI.

Corrective Actions in Construction Element (To be provided by Reports line orgainzations)

VII. Generic Applicability

i i

190ST f

ENGINEERING CATEGORY Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue 1.

Characterization of Issue (s)

Characterization 2.0 Summary 9.

Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 Evaluation 8.

Evaluation Process Process

5.0 Findings

9.

Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)M*

    • Overall Root Cause will not be considered at this report level.

7.0 Attachments /

Attachments as required List of Concerns Other items included 2.

Have issue (s) been identified in Engineering Element in another systematic Reports analysis?

3.

Document nos., tag nos.,

locations or other specific descriptive identifications stated in element.

I 4.

Interview files reviewed l

5.

Documents reviewed related to the element 1992T

4 ENGINEERING CATEGORY Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in Engineering Element 6.

What regulations, licensing Reports commitments, design require-(cont'd) ments, or other apply or control in this area?

7.

List requests for information, meetings, telephone calls, and other discussions related to element.

t t

f I

I

OPERATIONS CATEGORY Enclcsura 2 ECTG WRITER'S GUIDE OPERATIONS (0P) ELEMENT REPORTS NOTES / COMMENTS 1.0 Issue I.

Title The brief introduction Characterization Very brief introduction touches on the source of the concerns, i

i 2.0 Summary I.

Title

1. The Conclusions are Very brief introduction towards the end of the findings.

III. Finding (Conclusions)

2. The conclusions services as a summary of the findings.

J

]

3.0 Evaluators Cover Sheet

1. The printed name of the original evaluator (s) appears on the cover sheet.
2. The peer reviewer and i

)

CEG-H approval signa-tures are also on the cover sheet.

4.0 Evaluation II. Specific Evaluation Process Nethodology i

i

5.0 Findings

III. Findings 3

1880T P3 I

EIclesura 2 ECTG WRITER'S GUIDE OPERATIONS (OP) ELMENT REPORTS NOTES / COMMENTS 6.0 Root Cause IV. Root Cause

1. At the element level (Collective Significance) the Root Cause is often not identifible.
2. Collective significance j

is not addressed at the element report level.

7.0 Attachments /

II. Specific Evaluation

1. A list of the concerns List of Concerns Methodology with text are included within this section.
2. Other reports are j

sometimes attached.

l 1

i i

1

Ercicarro 2 ECTG WRITER'S GUIDE NSRS/ERT*

WELD PROJECT (WP) REPORTS NOTES /COMPENTS 1.0 Issue Background Info Issues Addressed Characterization (Section I)

By Concerns (Section II) 2.0 List Of Concerns Background Info Scope of Evaluation (Section I)

(Section I and Att-1) 3.0 Evaluators Coversheet Coversheet i

i I

i 4.0 Evaluation Scope Not Delineated As Part Process (Section II)

Of The WP Reports however it is addressed as part of the J

Weld Projects Program Manual i

5.0 Findings

Findings Validity or (Section III)

Substantiation (Section III) i I

i 1

l 6.0 Root Cause**

Conclusion and Validity or

      • Note that recommendations l

are not included in element reports under the current ECTG program, and Conclusion Recommendations Substantiation Overall Root Cause will (Section IV)***

(Section III) not be considered at this I

report level.

l

  • The Weld Project has endorsed a number of ERT Reports and general issue level reports as adequately addressing the concerns at this level for SQN.

I

w

..