ML20065N737: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 1
| page count = 1
| project = TAC:49071, TAC:49072
| stage = Other
}}
}}



Latest revision as of 18:51, 31 May 2023

Corrected Page 6-4 to 820611 Tech Spec Change Request Re Designation of Unit Status for Shift Manning Requirements
ML20065N737
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/15/1982
From:
GEORGIA POWER CO.
To:
Shared Package
ML20065N702 List:
References
TASK-1.A.1.3, TASK-TM TAC-49071, TAC-49072, NUDOCS 8210220298
Download: ML20065N737 (1)


Text

.V i TABLE 6.2.2-1 MINIMUM SHIFT CREW COMPOSITION Condition of Unit 2 - Unit 1 in Reactor Power Operation, Hot Standby or Hot Shutdown Condition LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1, 2, 3 4&5 50L** 2 2*

OL** 3 3 l

Non-Licensed 3 3 Shift Technical Advisor 1 1 Condition of Unit 2 - Unit 1 in Cold Shutdown Condition or Refuel Mode LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1,2,3 4&5 503= l 2 1*

OL*x 3 2 l Non-Licensed 3 3 Shift Technical Advisor 1 None Condition of Unit 2 - No Fuel in Unit 1 LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1,2,3 4&5 l SQL** 2 1*

OL** 3 2 Non-Licensed 2 3 Shift Technical Advisor 1 None

  • Does not include the Licensed Senior Reactor Operator or Senior Reactor
Operator Limited to Fuel Handling, supervising CORE ALTERATIONS.

! ** Assumes each individual is licensed on both units.

  1. Shift crew composition, including an individual qualified in radiation protecticn procedures, may be less than the minimum requirements for a l period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected l absence of on duty shift crew members provided immediate action is taken l to restore the shift crew composition to within the minimum requirements of Table 6.2.2-1.

l PLANT HATCH UNIT 2 6-4 l

B2.1D220298 821015 PDF)ADOCK P

05000366 gg