ML20065N700

From kanterella
Jump to navigation Jump to search

Forwards Corrected Page 6-4 for 820611 Tech Spec Change Request Re Designation of Unit Status for Shift Manning Requirements.Original Submittal Inadvertently Reversed
ML20065N700
Person / Time
Site: Hatch 
Issue date: 10/15/1982
From: Gucwa L
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20065N702 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-TM NED-82-303, TAC-49071, TAC-49072, NUDOCS 8210220290
Download: ML20065N700 (1)


Text

3

.c Georg a Power Company 333 Pw:dmont Avenue AUanta Ge%rgia 33308 Teiephone 404 526-f;526 Yasi:ng Address Pest Othce Box 4545 Apan!a Georg<a 30302 GeorgiaPower NIE5NSN[

Power Generation Department October 15, 1982 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D. C.

20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 ERROR IN PREVIOUS SUBMITTAL Gentlemen:

Our letter of June 11, 1982 requested Technical Specification changes which increased shift manning requirements per NUREG-0737.

The affected page 6-4 for Unit 2 is in error as submitted.

The designation of unit status for shift manning requirements was inadvertently reversed. Please replace it with the enclosed page.

Very truly yours,

[E 4"

t l

L. T. Gucwa Chief Nuclear Engineer REB /mb Enclosure xc:

R. F. Rogers, III H. C. Nix, Jr.

J. P. O'Reilly (NRC-Region II) e' h?%

T B210220290 821015 PDR ADOCK 05000366 P

PDR

-