ML20065N737
| ML20065N737 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/15/1982 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20065N702 | List: |
| References | |
| TASK-1.A.1.3, TASK-TM TAC-49071, TAC-49072, NUDOCS 8210220298 | |
| Download: ML20065N737 (1) | |
Text
.V i TABLE 6.2.2-1 MINIMUM SHIFT CREW COMPOSITION Condition of Unit 2 - Unit 1 in Reactor Power Operation, Hot Standby or Hot Shutdown Condition LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1, 2, 3 4&5 50L**
2 2*
l OL**
3 3
Non-Licensed 3
1 Condition of Unit 2 - Unit 1 in Cold Shutdown Condition or Refuel Mode LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1,2,3 4&5 503=
l 2
1*
OL*x 3
2 l
Non-Licensed 3
None Condition of Unit 2 - No Fuel in Unit 1 LICENSE APPLICABLE CATEGORY OPERATIONAL CONDITIONS 1,2,3 4&5 l
SQL**
2 1*
OL**
3 2
Non-Licensed 2
None
- Does not include the Licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling, supervising CORE ALTERATIONS.
- Assumes each individual is licensed on both units.
- Shift crew composition, including an individual qualified in radiation protecticn procedures, may be less than the minimum requirements for a l
period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected l
absence of on duty shift crew members provided immediate action is taken l
to restore the shift crew composition to within the minimum requirements of Table 6.2.2-1.
l PLANT HATCH UNIT 2 6-4 B2.1D220298 821015 l
PDF)ADOCK 05000366 P
gg