MONTHYEARML20107B3321985-02-13013 February 1985 Proposed Tech Specs,Changing Min RCS Flow Requirement to Take Credit for Use of Lump Burnable Poison Rods & Corresponding Decrease in Core Bypass Flow in Cycle 5 Reload Core Design Project stage: Other ML20107B3291985-02-13013 February 1985 Application for Amend to License NPF-3,changing Tech Specs to Revise Min RCS Flow Requirement to Take Credit for Decrease in Core Bypass Flow Project stage: Request ML20113C7701985-04-0404 April 1985 Revised Application for Amend to License NPF-3,correcting Typo in Tech Specs Re RCS Flow Requirements to Take Credit for Use of Lumped Burnable Position Rods & Corresponding Decrease in Core by-pass Flow in Cycle 5 Project stage: Request ML20129H2971985-05-29029 May 1985 Forwards B&W Proprietary Rept, Summary of Core By-Pass Flow Calculational Methodology, Per Aw Deagazio Request Concerning 850213 Amend Request for Reactor Coolant Min Flow Requirement.Rept Withheld (Ref 10CFR2.790) Project stage: Request 1985-04-04
[Table View] |
Proposed Tech Specs,Changing Min RCS Flow Requirement to Take Credit for Use of Lump Burnable Poison Rods & Corresponding Decrease in Core Bypass Flow in Cycle 5 Reload Core DesignML20107B332 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
02/13/1985 |
---|
From: |
TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20107B324 |
List: |
---|
References |
---|
TAC-57219, NUDOCS 8502200349 |
Download: ML20107B332 (5) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
. - - . . - ._
i , .
- Figure 2.2-1 Trio Setpoint for Flux -- AFlux/ Flow 8
Curve shows/ trip setpointGHfor-ep GEs sM4) flow reduction for three putmp operation (200,100 ppm). The actual setpoint will be directly i proportional to the actual flow with three pumps.
1 RATED THERMAL POWER i
UNACCEPTABLE 120 UNACCEPTABLE OPERATION OPERATION
(-18.2.106.8) (18.2.106.8)
"1=1.000 4 P MP - - 00 "2 -1.000 I
LIMIT
(-34.0,91.0)
' I 34.0,91.0) l l l l 80 i
(-18.2J79.7) l iPUMP l
LyIT l*
(-34.0,6r3.9) - 34.0,63.9) l
- - 60 g i l ACCE ABLE OP! RATION R5t l SPEC IED RC P JMP COMByATION. l, I i _
_4o ,
1 I I l l l l 1 I I - - 20 l l 1 l 1 I .
l l l l e i t n l Ie It i 1 0 20 40 60 i ~60 -40 - 20 Axial Power Imbalance, 1 f
I 8502200349 850213
! PDR ADOCK 05000346 PDR
- , P -
) .
paendment No. 11, 15. JJ. #1 DAVIS-5 ESSE, Ull!T 1 2-7 M , 80
- ~
' - ~- ......
r
,w- v - + , - - - , , + ,,,y,w-nr.,-e,- m y ,,_.,.,,,,-e,,
,_m , - , - ---,,n_-, , , _ - ,,.+,--pmy4.,,,,g. -,.m. - - - -- - --mw,a-v-, - - - - , - ,,- w------
(
k Figure 2.1-2 Reactor Core Safety Limit,
- % RATED THERMAL POWER
- 120 (44,112)
(-48,112.0)g
-100 49,100)
(-49.100.0)h
(-48,'89.1) F (44,89.1)
F 3 PUMP LIMIT
-80 .g49,77,g)
(-49,77.1)t A?CEPTABLE
- 60
- OPERATION UNACCEPTABLE UNACCEPTABLE FOR SPECIFIED OPERATION OPERATION RC PUMP COMBINATION - - 40
~ ,
- 20 ,
I I f I a f .f I 60
-20 0 20 40
-50 40 Axial Power Imbalance, 1 REACTOR COOLANT FLOW, GPM PUMPS OPERATING 4 M+6 3 g h-y o y ,_--,,.--
)
DAVIS-CESSE, UNIT 1 2-3 Amendm:nt No. JJ JJ, JJ J5, 80
TABLE 3.2-1
,' ! 018 MARGIN ,
G '
a LIMITS O
N Four Reactor Tieree Reactor Coolant Pumps Coolant Pumps
- l, E Parameter Operating Operatine l 1 5
- - Beactor Coolant ilot Les < 610
< 610(II
- famperature Ty*F Reactor Coolant Pressure, psig.(2) .
III f 1 2062.7 1 2058.7 Acactor Coolant flow Rate, gpm I3I 3 088 1 96 1 8A,346 2 l l
l m '3% M4 7_91,oss o' 2
I m IIIApplicable to tiee loop with 2 iteactor Coo'laat Pimps operatlag.
I I2I Limit not applicable during either a Til[IlMAL POWER ramp increase la excess of 65 of 2i RATED lilfimAL POWER per minute or a lil[IlMAL POWER step lacrease of greater than 101
$ of RATED lit [RMAL POWER.
f 3
- f. I3hese flows include a flow rate uncertainty of 2.51.
J I
E
. 3
! U i
2.1 SAFETY t,!MITS BASIS l
2.1.1 and 2.1.2 REACTCR CCRE The restrictions of this safety limit prevent overheating of the fuel cladding and possible cladding perforation wnich would result in the release of fission products to the reactor coolant. Overnuting of the
- fuel cladding is prevented by restricting fuel operation to within the nucleate boiling regime where the heat transfer coefficient is large and the cladding surface tamperature is slightly above the coolant sa::uration temperature.
Doeration above the upoer boundary of the nucleate boiling regime would result in excessive cladding temperatures because of the onset of departure from nucleate boiling (DNS) and the resultant sharp reduction in heat transfer coefficient. DN8 is not a directly ressurable parameter during operation and therefore THERMAL POWER and Reactor Coolant Tauer-ature and Pressure have been related to DN8 througn the S&W-2 DNS correlation.. .The DN8 correlation has been developed to predict the DN8 flux and the location of DNS for axially unifom and non-unifom neat flux distrinutions. The local DNS heat flux ratio. DNSR defined as the ratio of tne heat flux that would cause DNS at a particular core locat ion to tne local heat flux, is indicative of the margin to DNS.
The mintaman value of tne DNBR during steady state operation, nemal operational transients, and anticipated transients is limited to 1.30.
This value corresponds to a 95 percent probability at a 95 percent -
confidence level that DNS will not occur and is enosen as an appropriate margin to DNS for all operating conditio ter/y The curve presented in Figure 2.1-1 seh@
resents the condi .ioW at which a minimum DN8R of 1.30 is predicted for t maximum possible thermal power GPM which is M 9t of l 1125 wnen the reactor coolant flow is '
design flow rate for four operating reactor coolant ouros. This curve is t
based on the following hot chanr.e1 factors with pctantial fuel densifi-cation and fuel rod bowing effects:
l Fh a 1.71; FN g = 1.50 Fq = 2.56; The design limit power peaking factors are the most restrictive calculated at full power for tne range from all control rods fully l- withdrawn to minimm allowable control rod withorawal, and fom the l
$ core DN8R design basis.
Y.
821 Amendment No. .d 3 3 DAV15-8E55E. tp IT 1
Pressure / Temperature Limits at Maximus Allowable Bases .Fiaura 2.1 Power for Minimum DNBR .
IL 2400 -
3 PUur CURVE 2300 -
x 4 PUNP CURVE 3
.\ x
= 2200 -
p, W
2l00 - !
. f-
)::
R -
~~ *
. 2000 .
u 3
1900 - .
s 1800 -
1700 -
e , ,
i _ .
_, i ,
510 620' 630 540 580 550 500 '
' Reactor Outtst Temperature. (*F) ,
FLOW (Gru) POWER _
-PUWPs
... .. 1125 4 n ....
380,1 b o 89.6'o 5 2-a Arnendment rio..)f,)f,45 DAVIS-BESSE, UNIT 1 .}}