LIC-02-0136, Drawing - 11405-M-42, Rev.85, Nitrogen, Hydrogen, Methane, Propane & Oxygen Gas Flow Diagram P & Id. Sheet 1: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:LR-NG              LR-NG        LR-NG                        LR-NG LR-NG LR-NG      LR-NG LR-NG  LR-NG LR-NG                  LR-NG LR-NG LR-NG LR-NG
* PORTIONS OF SYSTEM WITHIN LICENSE RENEWAL SCOPE ARE BOUNDED BY LR FLAGS.
* UNLESS OTHERWISE INDICATED, VENTS, DRAINSAND TEST LR-NG                                                                                                        CONNECTIONS THAT ARE WITHIN LICENSE BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
LR-NG                          LR-NG                LR-NG
* ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE LR-NG      LR-NG LR-NG                                                                                                                    PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
LR-NG LR-NG    LR-NG LR-NG
* IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
LR-NG  LR-NG LR-NG LR-NG LR-CH FOR INFORMATION ONLY DF 10/01 NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.
IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.}}

Latest revision as of 06:18, 26 March 2020

Drawing - 11405-M-42, Rev.85, Nitrogen, Hydrogen, Methane, Propane & Oxygen Gas Flow Diagram P & Id. Sheet 1
ML023300649
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/22/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
LIC-02-0136 11405-M-42, Rev 85
Download: ML023300649 (1)


Text

LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG LR-NG

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINSAND TEST LR-NG CONNECTIONS THAT ARE WITHIN LICENSE BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.

LR-NG LR-NG LR-NG

  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE LR-NG LR-NG LR-NG PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.

LR-NG LR-NG LR-NG LR-NG

  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.

LR-NG LR-NG LR-NG LR-NG LR-CH FOR INFORMATION ONLY DF 10/01 NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.