SignaturdDate DWCW -RBCCW JPM.doc                                                        Page 1 of 6
SignaturdDate DWCW -RBCCW JPM.doc                                                        Page 1 of 6


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW                                  REV. NO.: -
.
CODE NO.: PLOR-NEW                                  REV. NO.: -
000 TITLE:    Verify Isolation of Drywell Chilled Water and RBCCW 9.
000 TITLE:    Verify Isolation of Drywell Chilled Water and RBCCW 9.
IO.
IO.
Line 37: Line 35:
4 DWCW-RBCCW JPM.dOC                                                Page 2 of 6
4 DWCW-RBCCW JPM.dOC                                                Page 2 of 6


EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:              Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 213022O401/ PLOR-NEW                          WA:    295024EA1.07 URO: 3.8      SRO: 3.9 TASK DESCRIPTI0N:            Verify Isolation of Drywell Chilled Water and RBCCW A. NOTES TO EVALUATOR:
.
POSITION TITLE:              Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 213022O401/ PLOR-NEW                          WA:    295024EA1.07 URO: 3.8      SRO: 3.9 TASK DESCRIPTI0N:            Verify Isolation of Drywell Chilled Water and RBCCW A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
Line 62: Line 58:
F. TASK CONDITIONS/PREREQUISlTES
F. TASK CONDITIONS/PREREQUISlTES
: 1. The Reactor has just been scrammed.
: 1. The Reactor has just been scrammed.
----
: 3. DWCW Return Header pressure as read on P1-2-0262 is 32 psig.
: 3. DWCW Return Header pressure as read on P1-2-0262 is 32 psig.
: 4. Drywell pressure is approximately 24 psig.
: 4. Drywell pressure is approximately 24 psig.
Line 83: Line 78:
Annunciators 214 C-3 and H-3 are lit.)
Annunciators 214 C-3 and H-3 are lit.)
I-
I-
-
   *6  Close MO-2373, RBCCW Isolation valve.
   *6  Close MO-2373, RBCCW Isolation valve.
(Cue: Acknowledge control switch operation.)
(Cue: Acknowledge control switch operation.)
Line 89: Line 83:
DWCW-RBCCW JPM.dOC                                                              Page 5 of 6
DWCW-RBCCW JPM.dOC                                                              Page 5 of 6


1  STEP
1  STEP NO                      STEP                    ACT                      STANDARD the MO-2373, the RBCCW Isolation    P    MO-2373 green light is verified ON and valve is closed.                                  red light is verified OFF at panel 20C012.
                                                    -
NO                      STEP                    ACT                      STANDARD the MO-2373, the RBCCW Isolation    P    MO-2373 green light is verified ON and valve is closed.                                  red light is verified OFF at panel 20C012.
(Cue: MO-2373 green light is on, red light is off.)
(Cue: MO-2373 green light is on, red light is off.)
     *8    Close MO-2374, the RBCCW Isolation            P    MO-2374 control switch is momentarily valve.                                              placed in the "CLOSE" position at panel 20c012.
     *8    Close MO-2374, the RBCCW Isolation            P    MO-2374 control switch is momentarily valve.                                              placed in the "CLOSE" position at panel 20c012.
Line 101: Line 93:
(Cue: Control Room Supervisor acknow-ledges report.)
(Cue: Control Room Supervisor acknow-ledges report.)
P    Positive control established.
P    Positive control established.
provided to the examinee (Task Conditions/Prerequisites) AND
provided to the examinee (Task Conditions/Prerequisites) AND Under "ACT" P - must perform S must simulate
                                                    -
Under "ACT" P - must perform
                          -
S must simulate
: 1. TERMINATING CUE When step 3.5 of GP-8.B has been completed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When step 3.5 of GP-8.B has been completed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
DWCW-RBCCW JPM.dm                                                                        Page 6 of 6
DWCW-RBCCW JPM.dm                                                                        Page 6 of 6
Line 114: Line 102:
: 2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
: 2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
: 3. Drywell pressure is 24 psig.
: 3. Drywell pressure is 24 psig.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation Groups II and 111.
                      -
8.B, PCIS Isolation Groups II and 111.


EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET U
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET U
Line 175: Line 161:


H. PERFORMANCE CHECKLIST
H. PERFORMANCE CHECKLIST
" STEP
" STEP ACT                  STANDARD NO 1  Obtain a copy of procedure SO 7C.1 .B-2. P  A copy of procedure SO 7C.1 .B-2 is obtained.
                                                  -
ACT                  STANDARD NO 1  Obtain a copy of procedure SO 7C.1 .B-2. P  A copy of procedure SO 7C.1 .B-2 is obtained.
     *2  Open SV4948A Drywell Nitrogen Supply      P  SV-4948A control switch is placed in the valve.                                        OPEN position at panel 20C484A.
     *2  Open SV4948A Drywell Nitrogen Supply      P  SV-4948A control switch is placed in the valve.                                        OPEN position at panel 20C484A.
(Cue: Acknowledge control switch operation.)
(Cue: Acknowledge control switch operation.)
Line 194: Line 178:
8  As an evaluator, ensure that you have      P  Positive control established.
8  As an evaluator, ensure that you have      P  Positive control established.
positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.                              -
positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.                              -
.
PLOR034C Rev011.doc                                                              Page 5 of 6
PLOR034C Rev011.doc                                                              Page 5 of 6


Under "ACT" P - must perform S - must simulate
Under "ACT" P - must perform S - must simulate
._
: 1. TERMINATING CUE When nitrogen is being added to the Drywell at a flow rate of 60 scfm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When nitrogen is being added to the Drywell at a flow rate of 60 scfm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
.-
PLOR034C Rev011 .doc                                                                  Page 6 of 6
PLOR034C Rev011 .doc                                                                  Page 6 of 6


TASK CONDITIONS/PREREQUISITES
TASK CONDITIONS/PREREQUISITES
-
: 1. All SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
: 1. All SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
: 2. Primary Containment venting is NOT required.
: 2. Primary Containment venting is NOT required.
Line 210: Line 190:
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.


I
I EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET S:
,
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET S:
signaturn I Title    Date Signatwe I Title      Date IAPPROVED FOR USE:
signaturn I Title    Date Signatwe I Title      Date IAPPROVED FOR USE:
signature I Title    Date I                        EFFECTIVE DATE:                  I        I NAME:                                                  ISSUE DATE:
signature I Title    Date I                        EFFECTIVE DATE:                  I        I NAME:                                                  ISSUE DATE:
Line 231: Line 209:
8.
8.
1 1                              1
1 1                              1
                                                                  . .
; 9.                            1 IO.
; 9.                            1 IO.
11.
11.
Line 240: Line 217:
RClC JPM Rev000.doc                                                                    Page 2 of 7
RClC JPM Rev000.doc                                                                    Page 2 of 7


EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:                Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR:          2008070501 / PLOR-3??CA              WA:    295031EA1.05 URO: 4.3      SRO: 4.3 TASK DESCRlPTION:            Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)
-
POSITION TITLE:                Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR:          2008070501 / PLOR-3??CA              WA:    295031EA1.05 URO: 4.3      SRO: 4.3 TASK DESCRlPTION:            Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)
A. NOTES TO EVALUATOR:
A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- .
: 3. JPM Performance
: 3. JPM Performance
: a.    "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
: a.    "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
Line 411: Line 385:
PlMS CODE:
PlMS CODE:
PlMS ENTRY:
PlMS ENTRY:
---
4 PLOR023C RevOO6.doc                                          Page 1 of 7
4 PLOR023C RevOO6.doc                                          Page 1 of 7


Line 442: Line 415:
: 1)    For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 1)    For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
-.
given to the examinee.
P~OR023~RevOO6.doc                                                                    Page 3 of 7
P~OR023~RevOO6.doc                                                                    Page 3 of 7


Line 504: Line 475:
PLOR023C RevOO6.doc                                                              Page 6 of 7
PLOR023C RevOO6.doc                                                              Page 6 of 7


                                                  -
-E  15 STEP Erect an Equipment Operator to perform ACT P
-E  15 STEP Erect an Equipment Operator to perform ACT P
STANDARD Equipment Operator directed to perform Steps 4.3.1,4.3.2, and 4.3.3 of                  Steps 4.3.1,4.3.2, and 4.3.3 of SO SO 1G.7.C-2 in the Cable Spread Room.            1G.7.C-2.
STANDARD Equipment Operator directed to perform Steps 4.3.1,4.3.2, and 4.3.3 of                  Steps 4.3.1,4.3.2, and 4.3.3 of SO SO 1G.7.C-2 in the Cable Spread Room.            1G.7.C-2.
Line 520: Line 490:


TASK CONDlTlONSlPREREQUlSlTES
TASK CONDlTlONSlPREREQUlSlTES
-
: 1. RPV water level is greater than -160 and the capability exists to maintain level above -160.
: 1. RPV water level is greater than -160 and the capability exists to maintain level above -160.
: 2. The following annunciators have been reset:
: 2. The following annunciators have been reset:
Line 544: Line 513:
NEW HPCl ALT PATH Rev000.doc                                                    Page 1 of 7
NEW HPCl ALT PATH Rev000.doc                                                    Page 1 of 7


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: NEW HPCl AP                        REV. NO.:
._
CODE NO.: NEW HPCl AP                        REV. NO.:
TITLE:      Raise HPCl Flow (Alternate Path - Suctions Fail to Auto Swap on Low CST Level) 1.
TITLE:      Raise HPCl Flow (Alternate Path - Suctions Fail to Auto Swap on Low CST Level) 1.
2.
2.
Line 593: Line 560:
: 5. ST-0-007-540-2, Torus Water Temperatures is in progress.
: 5. ST-0-007-540-2, Torus Water Temperatures is in progress.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.
-
NEW HPCl ALT PATH Rev000.doc                                                              Page 4 of 7
NEW HPCl ALT PATH Rev000.doc                                                              Page 4 of 7


Line 615: Line 581:
1 NEW HPCl ALT PATH Rev000.doc                                                                Page 5 of 7
1 NEW HPCl ALT PATH Rev000.doc                                                                Page 5 of 7


                                                    -
STEP                      ACT                  STANDARD 8 Obtain a copy of procedure SO 23.7.B-2.          A copy of procedure SO 23.7.8-2 is obtained.
STEP                      ACT                  STANDARD 8 Obtain a copy of procedure SO 23.7.B-2.          A copy of procedure SO 23.7.8-2 is obtained.
   ~
   ~
Line 642: Line 607:
Under ACT P - must perform S - must simulate I
Under ACT P - must perform S - must simulate I
I. TERMINATING CUE When the HPCI suction has been transferred to the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
I. TERMINATING CUE When the HPCI suction has been transferred to the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
-.
NEW HPCl ALT PATH Rev000.doc                                                          Page 7 of 7
NEW HPCl ALT PATH Rev000.doc                                                          Page 7 of 7


Line 661: Line 625:
EDG Synch & Loading Rev. 000.doc                                                  Page 1 of 7
EDG Synch & Loading Rev. 000.doc                                                  Page 1 of 7


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR                          REV. NO.: @
-
CODE NO.: PLOR                          REV. NO.: @
TITLE:        Diesel Generator Svnchronization and Loadinq I -2.
TITLE:        Diesel Generator Svnchronization and Loadinq I -2.
3.
3.
Line 683: Line 645:
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance
: 3. JPM Performance
: a. Control Room JPMs are designed to be performed in the simulator. If a
: a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
.-
Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
: b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
: b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if:
: 4. Satisfactory performance of this JPM is accomplished if:
Line 693: Line 653:
: 2)      For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2)      For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
-._
EDG Sy&h 8 Loading Rev. 000.doc                                                          Page 3 of 7
EDG Sy&h 8 Loading Rev. 000.doc                                                          Page 3 of 7


__                      -
B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle C. REFERENCES Procedure SO 52A.l .B, Rev. 32, "Diesel Generator Operations" (R)
B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle C. REFERENCES Procedure SO 52A.l .B, Rev. 32, "Diesel Generator Operations" (R)
D. TASK STANDARD
D. TASK STANDARD
Line 703: Line 661:
300 KW and 100 KVAR for testing purposes using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
300 KW and 100 KVAR for testing purposes using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
F. TASK CONDITIONS/PREREQUISlTES I.      The E 4 Diesel Generator has been "SLOW" started and is running in accordance with Section 4.1 of SO 52A. 1.B, "Diesel Generator Operations."
F. TASK CONDITIONS/PREREQUISlTES I.      The E 4 Diesel Generator has been "SLOW" started and is running in accordance with Section 4.1 of SO 52A. 1.B, "Diesel Generator Operations."
-..-
: 2.      The E 4 Diesel Generator is running at rated frequency and voltage.
: 2.      The E 4 Diesel Generator is running at rated frequency and voltage.
: 3.      The E 4 3 Bus is being supplied by 2SUE.
: 3.      The E 4 3 Bus is being supplied by 2SUE.
: 4.      The ESW system is supplying Diesel Generator cooling water.
: 4.      The ESW system is supplying Diesel Generator cooling water.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 200 - 300 Kw and 100 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 200 - 300 Kw and 100 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."
---
EDG Synch & Loading Rev. 000.doc                                                        Page 4 of 7
EDG Synch & Loading Rev. 000.doc                                                        Page 4 of 7


H. PERFORMANCE CHECKLIST 7
H. PERFORMANCE CHECKLIST 7
3TEP                        STEP
3TEP                        STEP ACT                  STANDARD NO 1  Obtain a copy of procedure SO 52A.1.B.      P  A copy of procedure SO 52A.1.B is obtained.
                                                    -
ACT                  STANDARD NO 1  Obtain a copy of procedure SO 52A.1.B.      P  A copy of procedure SO 52A.1.B is obtained.
2  Verify E 4 D/G is running at rated          P  E 4 D/G frequency is verified at 58.8 to frequency and voltage.                          61.2 Hz on E 4 D/G Freq. meter. E 4 D/G voltage is verified at 4.16 to 4.4 KV on E 4 D/G Volt meter.
2  Verify E 4 D/G is running at rated          P  E 4 D/G frequency is verified at 58.8 to frequency and voltage.                          61.2 Hz on E 4 D/G Freq. meter. E 4 D/G voltage is verified at 4.16 to 4.4 KV on E 4 D/G Volt meter.
(Cue: E 4 DIG frequency is 60 HZ and voltage is 4280 volts.)
(Cue: E 4 DIG frequency is 60 HZ and voltage is 4280 volts.)
Line 730: Line 684:
EDG Synch 8 Loading Rev. 000.doc                                                      Page 5 of 7
EDG Synch 8 Loading Rev. 000.doc                                                      Page 5 of 7


--                              STEP
--                              STEP ACT                STANDARD
                                                      -
ACT                STANDARD
     *7    Adjust E 4 D/G engine speed using            P  Sync scope is verified rotating slowly in "GOVERNOR" control switch until sync            "FAST" direction at panels 00C026A OR scope is rotating slowly in "FAST"              OOC026C.
     *7    Adjust E 4 D/G engine speed using            P  Sync scope is verified rotating slowly in "GOVERNOR" control switch until sync            "FAST" direction at panels 00C026A OR scope is rotating slowly in "FAST"              OOC026C.
direction.
direction.
Line 754: Line 706:
EDG Synch & Loading Rev. 000.doc                                                    Page 6 of 7
EDG Synch & Loading Rev. 000.doc                                                    Page 6 of 7


STEP
STEP ACT                      STANDARD NO P    E 4 D/G KVAR load is promptly raised by momentarily placing the AUTO VOLT REG control switch (90-DG14) in RAISE at panel 00C026D.
                                                -
ACT                      STANDARD NO P    E 4 D/G KVAR load is promptly raised by momentarily placing the AUTO VOLT REG control switch (90-DG14) in RAISE at panel 00C026D.
P    E 4 D/G load is verified to be 50-150 KVAR on the E 4 D/G KVAR meter at panel OOC026D.
P    E 4 D/G load is verified to be 50-150 KVAR on the E 4 D/G KVAR meter at panel OOC026D.
P    E 4 3 BKR SYNC switch taken to OFF at Panel 00C026D.
P    E 4 3 BKR SYNC switch taken to OFF at Panel 00C026D.
Line 787: Line 737:
7.
7.
8.
8.
- .
9.
9.
10.
10.
Line 821: Line 770:
: 1. Satisfactory task completion is indicated when "B" SJAE placed in service and "A" SJAE placed in standby.
: 1. Satisfactory task completion is indicated when "B" SJAE placed in service and "A" SJAE placed in standby.
: 2. Estimated time to complete: 25 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to place "6"SJAE in service and place "A" SJAE in standby using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
: 2. Estimated time to complete: 25 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to place "6"SJAE in service and place "A" SJAE in standby using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
---
F. TASK CONDITIONS/PREREQUISlTES
F. TASK CONDITIONS/PREREQUISlTES
: 1. Plant is at steady state conditions.
: 1. Plant is at steady state conditions.
Line 852: Line 800:
                                                     ***NOTE***
                                                     ***NOTE***
The following direction to the Equipment Operator requires simulator instructor action:
The following direction to the Equipment Operator requires simulator instructor action:
MRF MSS05B OPEN
MRF MSS05B OPEN Page 5 of 9
.._
Page 5 of 9


STEP                  ACT                STANDARD
STEP                  ACT                STANDARD
Line 871: Line 817:
B in AUTO.
B in AUTO.
(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.
(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.
  -                                              -
1                                                                                Page 6 of 9  1
1                                                                                Page 6 of 9  1


Line 884: Line 829:
   *I6    Adjust setpoint on PIC-2239A to 0 psi.        P    Control knob on PIC-2239A is rotated in the COUNTERCLOCKWISE direction unti (Cue: PI-2472A is quickly decreasing,              the setpoint is at minimum at panel controller setpoint (SP) and Process Valve          20C007A.
   *I6    Adjust setpoint on PIC-2239A to 0 psi.        P    Control knob on PIC-2239A is rotated in the COUNTERCLOCKWISE direction unti (Cue: PI-2472A is quickly decreasing,              the setpoint is at minimum at panel controller setpoint (SP) and Process Valve          20C007A.
(PV) are slowly decreasing. Controller output stabilizes at 100.)
(PV) are slowly decreasing. Controller output stabilizes at 100.)
                                                      -
                                                 ***NOTE***
                                                 ***NOTE***
The following direction to the Equipment Operator requires simulator instructor action:
The following direction to the Equipment Operator requires simulator instructor action:
Line 929: Line 873:
1                                                                                    Page 1 of 9 1
1                                                                                    Page 1 of 9 1


TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-062P                                    REV. NO.:  015 TITLE:          Restore Control Room Ventilation Followina a Hiah Radiation Trip
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-062P                                    REV. NO.:  015 TITLE:          Restore Control Room Ventilation Followina a Hiah Radiation Trip 9.
--
9.
                                                                                                >
10.
10.
11.
11.
Line 961: Line 902:
: b.      Startup of Control Room N C Supply, N C Return, and Fresh Air Supply Fans.
: b.      Startup of Control Room N C Supply, N C Return, and Fresh Air Supply Fans.
: c.      Startup of Toilet Room Fan and Control Room Office cooling unit.
: c.      Startup of Toilet Room Fan and Control Room Office cooling unit.
: 2. Estimated time to complete: 24 minutes Non-Time Critical E.      DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore and startup Control Room
: 2. Estimated time to complete: 24 minutes Non-Time Critical E.      DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore and startup Control Room Ventilation following a high radiation trip using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
  --
Ventilation following a high radiation trip using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
F. TASK CONDIT1ONS/PREREQUISITES
F. TASK CONDIT1ONS/PREREQUISITES
: 1. Initially, the "A" Control Room Ventilation fans were running.
: 1. Initially, the "A" Control Room Ventilation fans were running.
Line 986: Line 925:
4 Page 5 of 9
4 Page 5 of 9


  .
H. PERFORMANCE CHECKLIST 3TEP                      STEP ACT                    STANDARD NO 1  Obtain a copy of procedure SO 40D.1.A. P  A copy of procedure SO 40D.1.A is obtained.
H. PERFORMANCE CHECKLIST 3TEP                      STEP
                                                    -
ACT                    STANDARD NO 1  Obtain a copy of procedure SO 40D.1.A. P  A copy of procedure SO 40D.1.A is obtained.
I    *2  Start OAV-079, "Control Rm Fresh Air      S  OAV-079 fan control switch is placed in Supply Fan A".                                "RUN" at panel OOCl33.
I    *2  Start OAV-079, "Control Rm Fresh Air      S  OAV-079 fan control switch is placed in Supply Fan A".                                "RUN" at panel OOCl33.
(Cue: Acknowledge control switch operation.)
(Cue: Acknowledge control switch operation.)
Line 1,009: Line 945:
(Cue: Acknowledge control switch I bLOR062P NRC Rev015d.m-                            -                                Page 6 of 9
(Cue: Acknowledge control switch I bLOR062P NRC Rev015d.m-                            -                                Page 6 of 9


                                                          -
STEP                    STEP                    ACT                    STANDARD NO
STEP                    STEP                    ACT                    STANDARD NO
       *10 Start OAV-029, "Control Room A/C Returr      S  OAV-029 fancontrol switch is placed%
       *10 Start OAV-029, "Control Room A/C Returr      S  OAV-029 fancontrol switch is placed%
Line 1,029: Line 964:
(Cue: Fan OOV-33 red light is on.)
(Cue: Fan OOV-33 red light is on.)
1                                    1                    -                          Page 7 of 9
1                                    1                    -                          Page 7 of 9
                                                                                                    -


STEP
STEP ACT                    STANDARD Start OOV-326, the "Control Room Ofice          S    OOV-326 control switch is placed in "ON" Area Cooling Unit".                                    at panel OOCl33.OOV-326 Control Room Office Area Cooling Unit red light is (Cue: Acknowledge control switch                      verified ON at panel OOCl33.
                                                        -
ACT                    STANDARD Start OOV-326, the "Control Room Ofice          S    OOV-326 control switch is placed in "ON" Area Cooling Unit".                                    at panel OOCl33.OOV-326 Control Room Office Area Cooling Unit red light is (Cue: Acknowledge control switch                      verified ON at panel OOCl33.
operation on.)
operation on.)
Verify Fan OOV-326 Control Room Office                OOV-326 Control Room Office Area Area-Cooling Unit is running.                        Cooling Unit red light is verified ON at panel OOC133.
Verify Fan OOV-326 Control Room Office                OOV-326 Control Room Office Area Area-Cooling Unit is running.                        Cooling Unit red light is verified ON at panel OOC133.
Line 1,049: Line 981:
I FLOR062P NRC Rev015.doc                                            -                      Page 8 of 9
I FLOR062P NRC Rev015.doc                                            -                      Page 8 of 9


I STEP I                        STEP                  I ACT I                STANDARD
I STEP I                        STEP                  I ACT I                STANDARD I    NO 24      Inform the Control Room Supervisor that      P  Task completion reported using a hand Control Room Ventilation has been                held radio or GAI-TRONICS page system.
                                                                                                        .
I    NO 24      Inform the Control Room Supervisor that      P  Task completion reported using a hand Control Room Ventilation has been                held radio or GAI-TRONICS page system.
I            restored IAW SO 40D.1.A.
I            restored IAW SO 40D.1.A.
(Cue: Control Room Supervisor acknowledges report.)
(Cue: Control Room Supervisor acknowledges report.)
Line 1,075: Line 1,005:
0        Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.
0        Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.
0        "BeeControl Room Ventilation fans aligned for automatic start.
0        "BeeControl Room Ventilation fans aligned for automatic start.
-
.            -
Steps 4.1 4.12 of SO 40D.1 .A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.
Steps 4.1 4.12 of SO 40D.1 .A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.


Line 1,155: Line 1,083:
8    As an evaluator ensure that you have      P      Positive control established.
8    As an evaluator ensure that you have      P      Positive control established.
positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.
positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.
Under ACT P - must perform
Under ACT P - must perform S must simulate
                              -
S must simulate
: 1. TERMINATING CUE When Control Rod 26-15 scram solenoid fuses have been pulled, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When Control Rod 26-15 scram solenoid fuses have been pulled, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
---
PLOR075P RevO12.doc                                                                    Page 6 of 6
PLOR075P RevO12.doc                                                                    Page 6 of 6


Line 1,168: Line 1,093:
: 4. Use of procedure T-213~2,Scram Solenoid De-energization has been directed by the T=lOO procedures.
: 4. Use of procedure T-213~2,Scram Solenoid De-energization has been directed by the T=lOO procedures.
: 5. Prerequisites and procedure steps up to and including step 4.3 of procedure T=213=2have been completed.
: 5. Prerequisites and procedure steps up to and including step 4.3 of procedure T=213=2have been completed.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps 4.4.1 4.4.3 of procedure T=213-2, Scram Solenoid L De-energization.
        -
4.4.1 4.4.3 of procedure T=213-2, Scram Solenoid L De-energization.


EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I
Line 1,198: Line 1,121:
       . 7.
       . 7.
8.
8.
1                                1
1                                1 I
  -.
I
    -
: 9.                            1                              1 10.
: 9.                            1                              1 10.
11.
11.
(12.
(12.
113.
113.
-__..
I    NEW MSlV AP Rev000.doc                                                                Page 2 of 6
I    NEW MSlV AP Rev000.doc                                                                Page 2 of 6


Line 1,221: Line 1,140:
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
.._-
I NEW MSlV AP Rev000.doc                                                                  Page 3 of 6
I NEW MSlV AP Rev000.doc                                                                  Page 3 of 6


Line 1,234: Line 1,152:
: 5. Radiologicalconditions do NOT allow entry into the Outboard MSlV Room.
: 5. Radiologicalconditions do NOT allow entry into the Outboard MSlV Room.
G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 3 Outboard MSIVs using A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV beginning with step 4.1.3.
G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 3 Outboard MSIVs using A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV beginning with step 4.1.3.
..
1                                                                                        Page 4 of 6 1
1                                                                                        Page 4 of 6 1



Latest revision as of 01:23, 15 March 2020

Final - Section B Operating (Folder 3)
ML050830182
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/18/2005
From: Popielarski J
Exelon Generation Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
Download: ML050830182 (86)


Text

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I Signature I Title Date 6

Signature I Title Date I APPROVED FOR USE:

Signature I Title Date I EFFECTIVE DATE:

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness:

SignaturdDate DWCW -RBCCW JPM.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW REV. NO.: -

000 TITLE: Verify Isolation of Drywell Chilled Water and RBCCW 9.

IO.

11.

12.

13.

14.

15.

4 DWCW-RBCCW JPM.dOC Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 213022O401/ PLOR-NEW WA: 295024EA1.07 URO: 3.8 SRO: 3.9 TASK DESCRIPTI0N: Verify Isolation of Drywell Chilled Water and RBCCW A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

- a. . Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be L given to the examinee.

DWCW-RBCCW JPM.dOC Page 3 of 6

B. TOOLS AND EQUIPMENT

- None

. C. REFERENCES GP-8.B, Rev. 17, "PCIS Isolation - Groups II and 111" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the Drywell Chilled Water isolation valves, MO-2200A & B and M0-2201A & B are closed, The Drywell Chillers are tripped, and the DWCW Pump control switches are in "PULL TO LOCK".
2. Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of GP 8.B Section 3.5 "PCIS Isolation -

Groups II and 111". I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The Reactor has just been scrammed.
3. DWCW Return Header pressure as read on P1-2-0262 is 32 psig.
4. Drywell pressure is approximately 24 psig.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, "PCIS Isolation - Groups It and 111".

\

DWCW-RBCCW JPM.dOC Page 4 of 6

H. PERFORMANCE CHECKLIST NO STEP ACT STANDARD I 1 (Obtaina copy of procedure GP-8.B. P ( A copy of procedure GP-8.B is obtained.

2 Verify MO-20245 AND MO-20246 aligned P MO-20245 AND MO-20246 red "CHILLEC in the "CHILLED WATER" position. WATER" lights are lit. MO-20245 AND MO-20246 red "MBLDG CLG WATER (Cue: MO-20245 AND MO-20246 red lights are out at Panel 20C005A.

"CHILLED WATER" lights are lit. MO-20245 AND MO-20246 red "RX BLDG CLG WATER" lights are out.)

'3 Calculate corrected RBCCW pressure P Indicated RBCCW pressure is checked, (CRP) by taking indicated RBCCW then 25 psig is subtracted to determine a pressure on Pl-2350 - 25 psig. CRP of approximately 15 psig.

(Cue: Pl-2350 is indicating 40 psig.)

4 Compare Drywell pressure to DWCW P Recognize that DWCW Return Header Return Header pressure. pressure is greater than Drywelt pressure (Cue: Comparison acknowledged) and DWCW isotation is not required and i_ not performed.

ompare Drywell pressure to Corrected P Corrected RBCCW Pressure (CRP) is BCCW Pressure (CRP) to determine determined to be less than PR-2508 or which pressure is greater. PR-4805 or PR-8102A(B) at panels 20C003/ 20C004C.

(Cue: PR-2508 indicates 24 psig.)

P The control switches for the Drive Motor Breakers on both A and B Recirc "DRIVE (Cue: Both Recirc pumps breaker green MOTOR" breakers are placed in TRJP at lights are on and red lights are off. panel 20C004A.

Annunciators 214 C-3 and H-3 are lit.)

P A and B Recirc "DRIVE MOTOR" breaker green lights are verified to be ON at panel (Cue: Both Recirc pumps breaker green 20C004A.

lights are on and red lights are off.

Annunciators 214 C-3 and H-3 are lit.)

I-

  • 6 Close MO-2373, RBCCW Isolation valve.

(Cue: Acknowledge control switch operation.)

P MO-2373 control switch is momentarily placed in the "CLOSE" position at panel 20c012.

DWCW-RBCCW JPM.dOC Page 5 of 6

1 STEP NO STEP ACT STANDARD the MO-2373, the RBCCW Isolation P MO-2373 green light is verified ON and valve is closed. red light is verified OFF at panel 20C012.

(Cue: MO-2373 green light is on, red light is off.)

  • 8 Close MO-2374, the RBCCW Isolation P MO-2374 control switch is momentarily valve. placed in the "CLOSE" position at panel 20c012.

(Cue: Acknowledge control switch operation.)

9 Verify the MO-2374, the RBCCW Isolation P MO-2374 green light is verified ON and valve is closed. red light is verified OFF at panel 2OCO12.

(Cue: MO-2374 green light is on, red light is off.)

10 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknow-ledges report.)

P Positive control established.

provided to the examinee (Task Conditions/Prerequisites) AND Under "ACT" P - must perform S must simulate

1. TERMINATING CUE When step 3.5 of GP-8.B has been completed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

DWCW-RBCCW JPM.dm Page 6 of 6

TASK CONDITIONS/PREREQUISlTES

\

1. The Reactor has just been scrammed.
2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
3. Drywell pressure is 24 psig.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation Groups II and 111.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET U

s i t w e~ r i Date Signature I Title Date I APPROVED FOR USE:

Signature I Titla Date I EFFECTIVE DATE:

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. I COMPLETION DATE:

COMMENTS:

I ITraining Review for Completeness: I PlMS CODE:

ti t I I

1 Signature/Date I ENTRY:

PLOR034C R e d l 1.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-034C REV. NO.: -

011 TITLE: CAD System Nitrogen Addition To Containment During Normal Operations 2.

3.

4.

1 I 5.

6.

7.

8.

9.

IO.

11.

I I

1

12. 1 I 13.

14.

15.

PLOR034C RevOl 1.doc Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2240130101 / PLOR-OMC WA: 223001A4.10 URO: 3.2 SRO: 3.2 TASK DESCRIPTI0N: CAD System Nitrogen Addition To Containment During Normal Operations A. NOTES TO EVALUATOR:

1. An asterisk (*)before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.

~

5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

PLOR034C Rev011 .doc Page 3 of 6

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 7C.1.B-2, Rev. 18, CAD System Nitrogen Addition to Containment During Normal Operations (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when Nitrogen has been added to containment with an N, flow of 55-65 sdm.
2. Estimated time to complete: 14 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform a normal nitrogen addition to the Drywell from the CAD system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. All SO 7C.1 .B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
2. Primary Containment venting is NOT required.
3. CAD Tank level is 45 inches.

G. INITIATING CUE I The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using Aloop of the CAD system at 60 sdm in accordance with SO 7C.1 .B-2, CAD System Nitrogen Addition to Containment During Normal Operations.

L PLOR034C Rev011 .doc Page 4 of 6

H. PERFORMANCE CHECKLIST

" STEP ACT STANDARD NO 1 Obtain a copy of procedure SO 7C.1 .B-2. P A copy of procedure SO 7C.1 .B-2 is obtained.

  • 2 Open SV4948A Drywell Nitrogen Supply P SV-4948A control switch is placed in the valve. OPEN position at panel 20C484A.

(Cue: Acknowledge control switch operation.)

3 Verify SV4948A Drywell Nitrogen Supply P SV4948A red light is verified ON at panel valve is open. 20C484A.

(Cue: SV4948A red light is on and green light is off.)

  • 4 Open SV4949A Drywell Nitrogen Supply P SV4949A control switch is placed in the Valve. OPEN position at panel 20C484A.

(Cue: Acknowledge control switch operation.)

5 Verify SV4949A Drywell Nitrogen Supply P SV4949A red light is verified ON at panel Valve is open. 20C484A.

(Cue: SV4949A red light is on and green light is off.)

  • 6 Open CV4947A using HCS4947A to P HCS-4947A manual adjustment knob is obtain a flow rate of 60 scfm on FI4947A.

c rotated clockwise until 50 to 70 scfm is obtained on FI4947A at panel 20C484A.

(Cue: [CLOCKWISE HCS-4947A manual adjustment knob is rotated.] HCS4947A indicates 55% controller output; FI4947A indicates 60 sdm; FR-4947A indicates 62 scfm.

7 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknow-ledges report.)

8 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures. -

PLOR034C Rev011.doc Page 5 of 6

Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When nitrogen is being added to the Drywell at a flow rate of 60 scfm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR034C Rev011 .doc Page 6 of 6

TASK CONDITIONS/PREREQUISITES

1. All SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
2. Primary Containment venting is NOT required.
3. CAD Tank level is 45 inches.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.

I EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET S:

signaturn I Title Date Signatwe I Title Date IAPPROVED FOR USE:

signature I Title Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PlMS CODE:

Signature/Date 1 PlMS ENTRY:

RClC JPM Rev000.doc Page 1 of 7

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-3??CA REV. NO.: 000 TITLE: Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align) 1.

2.

3.

4.

5.

6.

7.

8.

1 1 1

9. 1 IO.

11.

12.

13.

14.

15.

RClC JPM Rev000.doc Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2008070501 / PLOR-3??CA WA: 295031EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRlPTION: Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

RClC JPM Rev000.doc Page 3 of 7

B. TOOLS AND EQUIPMENT

1. None

- C. REFERENCES

1. RRC 13.1-2 Rev. 0, RCIC System Operation During A Plant Event D. TASK STANDARD
1. Satisfactory task completion is indicated when RClC is injecting to the RPV with cooling water properly aligned.
2. Estimated time to complete: 6 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the RClC system and inject into the Reactor vessel at a flow rate of approximately 600 gpm using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. Reactor Scram has occurred on low level due to a loss of all Feedwater.
2. Reactor level is -25 and dropping slowly.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to initiate the RClC I System using the RClC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1-2 RCIC System Operation During a Plant Event.

RClC JPM Rev000.doc Page 4 of 7

H. PERFORMANCE CHECKLIST I

1 I

NO STEP STEP ACT STANDARD 1- Obtain a copy of procedure RRC 13.1-2. P A copy of procedure RRC 13.1-2 is obtained.

P 1 RCIC Manual Initiation pushbutton collar i rotated clockwise to the ARMED position at panel 20C004C.

(Cue: Acknowledge pushbutton collar operation; annunciator A-2 on alarm panel 222 is alarming.)

  • 3 Depress the RClC Manual Initiation 'P RClC Manual Initiation pushbutton is pushbutton, 13A-S80. momentarily DEPRESSED at panel 20c004c.

(Cue: Acknowledge Manual Initiation 4 Acknowledge the "RCIC BAROMETRIC P The annunciator "ACKNOWLEDGE" CONDENSER VACUUM PUMP pushbutton is depressed.

RUNNING" annunciator.

(Cue: Annunciator 222 C-5 is lit solid.

5 V e m MO-2-13-131, RCIC Turbine Supply P MO-2-13-131 red light is verified ON at valve, opens. panel 20C004C.

(Cue: MO-131 red light is on, green light is off.)

6 Verify MO-2-13-021, RCIC to Feed Line P MO-2-13-021 red light is verified ON at valve, opens. panel 20C004C.

(Cue: MO-021 red light is on, green light is off.)

  • 7 Verify MO-2-13-132, RCIC Cooling Water P MO-2-13-132 red light discovered to be valve, is open. OFF at panel 20C004C.

(Cue: MO-132 green light is on, red light is off.)

RClC JPM Rev000.doc Page 5 of 7

STEP ACT STANDARD

  • 8 Place the switch for MO-2-13-132, RClC The control switch for MO-2-13-132 is Cooling Water valve, to the OPEN placed in the OPEN position until the valvc position. begins stroking open.

(Cue: Acknowledae switch maniDulation.

9 Verify MO-2-13-132, RClC Cooling Water P MO-2-13-132 red light is verified to be to valve, is open. be ON at panel 20C004C.

(Cue: MO-132 red light is on, green light is off.)

10 Verify AO-2-13-034 and AO-2-13-035, P AO-2-13-034 and AO-2-13-035 green RClC Drain Is01to Mn Cndr valves, dose. lights verified ON at panel 20C004C.

(Cue: AO-034 and AO-035 green lights are on, red lights are off.)

11 Verify 20P046, Vacuum Pump, starts. P 20P046 red light verified ON at panel 20c004c.

[Cue: 20P046 red light is on, green lght is Dut. Alarm 222 C-5 lit.)

derify RClC system flowrate is 600 gpm. P I l2 i

Cue: FI-2-13-091 indicates 600 gpm.

RClC Flow is verified to be 600 gpm on panel 20C004C.

3CIC Flow Controller output meter ndicates 80%.)

Jerify MO-2-13-027, RClC Min Flow valve, P MO-2-13-027 red light verified ON at panel 20C004C when RClC pump flowrate reaches 600 gpm.

(Cue: MO-27 green light is on, red light is off at normal RClC pump flow.)

14 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

15 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND IL procedures.

RClC JPM Rev000.doc

- Page 6 of 7

Under ACT P - must perform S - must simulate TERMINATING CUE When RCIC is injecting into the Reactor vessel with cooling water aligned, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

RClC JPM Rev000.doc Page 7 of 7

TASK CONDITIONS/PREREQUISlTES I. Reactor Scram has occurred on low level due to a loss of all Feedwater.

2. Reactor level is -25 and dropping slowly.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator to initiate the RCIC System using the RCIC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1-2 RCIC System Operation During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL;COVERSHEET Signature / T i Date I

SigMture I Title Date PROVED FOR USE:

Signature I T i i Date I EFFECTIVE DATE: f f NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PIMS CODE:

t I Signature/Date I I

ENTRY: I SBLC JPM.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW REV. NO.:

TITLE: lniect SBLC (Alternate Path - Low SBLC Discharge Pressure) 1.

2.

3.

4.

5.

6.

7.

8.

9.

IO.

11.

12.

13.

114. I I 115.

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2130220401/ PLOR-NEW WA: 295024EA1.07 URO: 3.8 SRO: 3.9 TASK DESCRIPTION: lniect SBLC (Alternate Path - Low SBLC Discharqe Pressure)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control RoommJPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph 0.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

SBLC JPM.doc Page 3 of 6

B. TOOLS AND EQUIPMENT None C. REFERENCES RRC 11-1-2, Rev. 0, Standby Liquid System Initiation During a Plant Event D. TASK STANDARD

1. Satisfactory task completion is indicated when Standby Liquid Control is injecting into the RPV at adequate discharge pressure using the 6 SBLC Pump.
2. Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, inject SBLC into the RPV using the A SBLC Pump using RRC 11.l-2, Standby Liquid System Initiation during a Plant Event. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUlSlTES

1. An attempt has been made to scram the reactor.
2. An Electric ATWS has resulted and SBLC injection is required.
3. Reactor Pressure is 1000 psig with the Turbine EHC system in control.
4. Reactor Level is in the normal band with feedwater in automatic control.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC 11.1-2, Standby Liquid System Injection During a Plant Event.

1 SBLC JPM.doc Page 4 of 6

H. PERFORMANCE CHECKLIST STEP NO STEP STANDARD 1 Obtain a copy of procedure RRC 11.l-2. A copy of procedure RRC 11.l-2 is obtained.

2 Verify CLOSED the AO-39 AND AO-40, P AO-39 AND AO-40 green lights are ON Recirc Sample Inboard and Outboard and red lights are OFF on Panel Isolation valves. 20C005A.

(Cue: AO-39 AND A 0 4 0 green lights are ON and red lights are OFF.)

  • 3 Start the A SBLC Pump. P The SBLC switch is placed in the START SYS A position on Panel 20C005A.

{Cue: Acknowledge switch movement.)

4 Verify that the RWCU system isolates. P Veriw green lights ON and red lights OFF (Cue: Valves checked have the green for the following valves on Panel lights ON and the red lights off.) 20C004A:

MO-2-12-15, RWCU Inboard Isolation MO-2-12-18, RWCU Outboard Isolation MO-2-12-68, RWCU Outlet valve

  • 5 Verify that SBLC is injecting. P Recognize that SBLC Pump discharge pressure on PI-2-11-065 is lower than (Cue: Pump Red Light is on, Discharge reactor pressure and therefore SBLC is pressure 400 psig, tank level steady.) NOT injecting.

NOTE:

Candidate may immediately move to inject with the B SBLC Pump OR may notify the CRS of the failure to inject. If the candidate noties the CRS, then direct him to inject with the B SBLC Pump.

6 Start the B SBLC Pump. P The SBLC switch is placed in the START SYS B position on Panel 20C005A.

(Cue: Acknowledge switch operation.)

Verify that SBLC is injecting.

(Cue when checked: Pump Red Light is Ip Venfy that SBLC Discharge pressure is now greater than reactor pressure.

on, Discharge pressure 1050 psig, tank level is lowering.)

SBLC JPM.doc Page 5 of 6

STEP

- NO STEP ACT STANDARD

~

8 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknow-ledges report.)

P Positive control established.

Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When SBLC is injecting at greater than reactor pressure, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

SBLC JPM.doc Page 6 of 6

TASK CONDITIONS/PREREQUlSlTES I.An attempt has been made to scram the reactor.

2. An Electric A l W S has resulted and SBLC injection is required.
3. Reactor Pressure is I000 psig with the Turbine EHC system in control.
4. Reactor Level is in the normal band with feedwater in automatic control.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC I 1.I=2,Standby Liquid System Injection During a Plant Event.

PECO NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

,PPROVED FOR USE:

1 EFFECTIVE DATE: f t NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: COMPLETION DATE:

PlMS CODE:

PlMS ENTRY:

4 PLOR023C RevOO6.doc Page 1 of 7

TEMPORARY CHANGE FORM LOG

- CODE NO.: PLOR-023C REV. NO.: -

006 TITLE: ADS RESET FOLLOWING BLOWDOWN 1.

2.

3.

4.

I 5. 1 1 I

8.

9.

IO.

11.

12.

13.

14.

15.

1 PLOR023C RevOO6.d~ Page 2 of 7

PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C WA: 218000A4.03 RO: 4.2 SRO: 4.2 TASK DESCRI PTI0N: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

P~OR023~RevOO6.doc Page 3 of 7

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 1G.7.C-2, Rev. 8, Automatic DepressurizationSystem Reset Following Blowdown (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
2. Estimated time to complete: 7 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. RPV water level is greater than -160 and the capability exists to maintain level above

-160.

2. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 0-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.
3. Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
4. Relief Valve Tailpipe Temperatures indicated on TR-2-02-103 on Panel 2OCOO3-01 are all 200°F and lowering.
5. Reactor pressure is 20 psig.
6. Drywell pressure is 0.25 psig.

G. INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1G.7.C-2, Automatic DepressurizationSystem Reset Following Blowdown.

PLORO23C RevOO6.doc Page 4 of 7

H. PERFORMANCE CHECKLIST TEP STEP ACT STANDARD NO

  • I Depress the A ADS LOGIC RESET- P The A ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2A. pushbutton, 2E-S2A, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.)

  • 2 Depress the B ADS LOGIC RESET- P The B ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S26. pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton meration.)

3 Reset the following annunciators: P The alarm RESET Pushbutton is momentarily depressed on panel 20C003.

a. BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS (227 E-4)
b. BLOWDOWN RELIEF VALVES HIGH TEMP (227 8-4)

(Cue: Acknowledge pushbutton operation.)

4 Verify BLOWDOWN AUX RELAYS P BLOWDOWN AUX RELAYS ENERGIZED ENERGIZED RHR OR CS and RHR OR CS and BLOWDOWN RELIEF BLOWDOWN RELIEF VALVES HIGH VALVES HIGH TEMP annunciators are TEMP annunciators are clear. verified clear on alarm panels 227 E-4 and 227 6-4.

(Cue: Annunciators 227 E-4 and 227 8-4 are not lit.)

Verify BLOWDOWN TIMERS INITIATED P BLOWDOWN TIMERS INITIATED annunciator reset. annunciator is verified clear on alarm panel 227 D-4.

(Cue: Annunciator 227 D-4 is not lit.)

Verify SAFETY RELIEF VALVE OPEN P SAFETY RELIEF VALVE OPEN annunciator reset. annunciator is verified clear on alarm panel 210 D-2.

(Cue: Annunciator 210 D-2 is not lit.)

Verify the ADS valves indicate closed. P RV-2-02-71A, B, C, G, & K green lights verified ON at panel 2OCOO3-01.

(Cue: RV-2-02-71A, B, C,G, & K green lights are on, red lights are off.) I

      • NO E***

If candidate begins to look at TR-2-02-103 to check SRV Tailpipe Temperatures, 1-then refer them to the initial task conditions information provided.

PLOR023C RevOO6.doc Page 5 of 7

STEP ACT STANDARD Monitor temperature recorder TR-2-02-103 P TR-2-02-103 monitored to ensure each to ensure each valve has reseated. ADS valve has reseated at panel 20C003-01.

(Cue: TR-2-02-103 points TE-2-2-113A, B, C, G, & K read 200°F and decreasing slowly.)

  • 9 Depress the "A" ADS LOGIC RESET - P The " A ADS DRYWELL HIGH DRYWELL HIGH PRESS pushbutton, 2E- PRESSURE LOGIC RESET pushbutton, S3A. 2A-S3A, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.) ~~

  • 10 Depress the "B" ADS LOGIC RESET P The "B" ADS DRYWELL HIGH PRESS DRYWELL HIGH PRESS pushbutton 2E- LOGIC RESET pushbutton, 2E-S3B, is S3B. momentarily depressed at panel 20C003-01.

(Cue: Acknowledae Dushbutton oDeration.

~~ ~

11 Reset the following annunciators: P The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

a. "DRYWELL HI PRESS SIGNAL SEALED IN" (227 A-4).
b. "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" (227 A-3).

(Cue: Acknowledge pushbutton operation.)

Verify "DRYWELL HI PRESS SIGNAL P "DRYWELL HI PRESS SIGNAL SEALED SEALED IN" and "HIGH DRYWELL IN" and "HIGH DRYWELL PRESSURE PRESSURE BYPASS TIMERS BYPASS TIMERS INITIATED" INITIATED" annunciators are clear. annunciators are verified clear on alarrn panels 227 A-4 and 227 A-3.

(Cue: Annunciators 227 A 4 and 227 A-3 are not lit.)

Verify "MSRV DISCH LIN VAC RELIEF P "MSRV DISCH LINE VAC RELIEF VALVE VALVE OPEN" annunciator is clear. OPEN" annunciator is verified clear on alarm panel 219 C-5.

Cue: Annunciator 219 C-5 is not lit.)

Verify vacuum breaker amber lights out. P All of the ADS valve vacuum breaker amber lights verified OUT at panel (Cue: All ADS valve vacuum breaker 2OCOO3-01.

amber lights are not lit.)

PLOR023C RevOO6.doc Page 6 of 7

-E 15 STEP Erect an Equipment Operator to perform ACT P

STANDARD Equipment Operator directed to perform Steps 4.3.1,4.3.2, and 4.3.3 of Steps 4.3.1,4.3.2, and 4.3.3 of SO SO 1G.7.C-2 in the Cable Spread Room. 1G.7.C-2.

(Cue: Equipment Operator acknowledges direction.)

16 Depress the SRV MEMORY RESET P The SRV MEMORY RESET pushbutton, pushbutton, 2E-S9. 2E-S9 is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.)

17 Verify the ADS Valve "MEMORY" lights go P RV-2-02-71A, C, C, G, & K white memory out. lights verified OUT at panel 2OCOO3-01.

(Cue: RV-2-02-71A, 6, C, G, & K white memory lights are not lit.)

18 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknowledges report.) -

Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

1 PLOR023C RevOO6.doc Page 7 of 7

TASK CONDlTlONSlPREREQUlSlTES

1. RPV water level is greater than -160 and the capability exists to maintain level above -160.
2. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C=2.
3. Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
4. Relief Valve Tailpipe Temperatures indicated on TR-2-02-103 on Panel 2OCOO3-01 are all 2OOOF and lowering
4. Reactor pressure is 20 psig.
5. Drywell pressure is 0.25 psig.

INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1G.7.C-2, Automatic Depressurization System Reset Following

_. Blowdown.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET IIAPPROVALS:

Signature I Title Date n Signature / Title Date Signature I Title Date I APPROVED FOR USE:

EFFECTIVE DATE:

Signature I Title I I Date NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PIMS CODE:

PIMS ENTRY:

Signature/Date I

NEW HPCl ALT PATH Rev000.doc Page 1 of 7

TEMPORARY CHANGE FORM LOG CODE NO.: NEW HPCl AP REV. NO.:

TITLE: Raise HPCl Flow (Alternate Path - Suctions Fail to Auto Swap on Low CST Level) 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

NEW HPCl ALT PATH Rev000.doc Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2060250101 / PLOR-323CA WA: 206000A2.09 URO: 3.5 SRO: 3.7 TASK DESCRIPTION: Raise HPCI Flow (Alternate Path - Suction Valves Fail to Auto Swap on Low CST Level)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

~

a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performanceof this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

L-NEW HPCl ALT PATH Rev000.doc Page 3 of 7

B. TOOLS AND EQUIPMENT None C. REFERENCES

1. Alarm Response Card 221 C-3, Condensate Stor Tank Level Low-Low
2. Procedure SO 23.7.B-2, Rev. 5, Transfer of HPCl Pump Suction from CST to Torus (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when HPCl flow has been raised to 5000 gpm and pump suction is manually transferred from the CST to the Torus (Torus suction valves open and CST suction valve closed) without adverse effects on RPV injection.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps raise HPCl flowrate to 5000 gpm and maintain injection to the RPV. I will describe initial plant conditions and provide you access to the materials required to complete this task.
c. TASK CONDITIONS/PREREQUISlTES
1. HPCl is injecting into the RPV at 4000 gpm in response to a plant transient.
2. RClC is isolated.
3. Torus Cooling is in service per SO 10.1.D-2, Residual Heat Removal System Torus Cooling.
4. SBGT is in service per SO 9A.1 .B, Standby Gas Treatment System Manual Startup.
5. ST-0-007-540-2, Torus Water Temperatures is in progress.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.

NEW HPCl ALT PATH Rev000.doc Page 4 of 7

H. PERFORMANCE CHECKLIST I

3TEP

- NO STEP ACT STANDARD

  • 1 Raise HPCl Flow Rate to 5000 gpm. P The HPCl Flow Controller knob is adjustec in the clockwise direction to raise the flow rate setting to 5000.

(Cue: The HPCl Flow Controller is now indicating 5000.)

2 HPCl Flow is verified to rise to 5000 gpm. P Fl-2-23-108 is monitored to verify that the actual flow rate rises to 5000 gpm.

(Cue: The Flow Indicator is reading 5000 gpm.)

I will be received initiatina the next part of the JPM.

  • 3 Recognize the Condensate Storage Tank Recognize by reporting annunciator 221 Low Level Condition alarm. C-3 is alarming indicating a Low CST Level condition.

(Cue: Report Annunciator 221 C-3 is alarming.)

I' Obtain a copy of Alarm Response Card 221 c-3.

Candidate references ARC 221 C-3, CONDENSATE STOR TANK LEVEL LOW - LOW.

5 Verify the Low CST Level Condition. P Candidate verifies that CST Level is low by referencing LR-2217 on 20C007A or LI-2217 OR Ll-8453 on 20C004. (The (Cue: When the candidate checks any candidate may also send an EO to verify of the CST Level indications, report to level on LI-2210.)

the candidate that level is indicating 5 feet.)

  • 6 Recognize that HPCl failed to P Candidate will recognize by reporting that automatically swap suction paths on low the HPCl suction path failed to CST level. automatically swap. (A RClC suction swap is not required due to RClC being isolated.)

(Cue: Acknowledge report.)

I 7 Check Level Switches responsible for the P Direct that LS-2-23-74 and LS-2-23-75 be automatic swap. checked for proper operation due to the (Cue: Acknowledge direction failed auto transfer.

1 NEW HPCl ALT PATH Rev000.doc Page 5 of 7

STEP ACT STANDARD 8 Obtain a copy of procedure SO 23.7.B-2. A copy of procedure SO 23.7.8-2 is obtained.

~

  • 9 Open MO-2-23-057HPCl Torus Suction P M0-2-23-057 control switch is valve. momentarily placed in the OPEN position then released at panel 20C004B.

(Cue: Acknowledge control switch operation.)

~ ~~~ ~

  • 10 Open MO-2-23-058, HPCl Torus Suction P MO-2-23-058 control switch is valve. momentarily placed in the OPEN position then released at panel 20C004B.

(Cue: Acknowledge control switch operation.)

11 Verify MO-2-23-057 and MO-2-23-058, P M0-2-23-057 and M0-2-23-058 red lights HPCl Torus Suction valves are open. are verified ON, and green lights OFF at panel 20C004B.

(Cue: MO-57 and MO-58 red lights are on, green lights are off.)

-_ 12 Verify MO-2-23-017 Cond Tank Suction P Recognize that MO-2-23-017 failed to valve automaticallycloses when close as indicated by the green light M0-2-23-057 and MO-2-23-058 are full verified OFF and red light verified ON at open. panel 20C004B.

(Cue: MO-17 green light is off, red light is on .)

  • 13 Close MO-2-23-017, Cond Tank Suction P MO-2-23-017 control switch is valve. momentarily placed in the CLOSE position then released at panel 20C004B.

(Cue: Acknowledge control switch 9perat ion.)

14 Verify M0-2-23-017, Cond Tank Suction P \no-2-23-017 green light is verified ON, valve is closed. 3nd red light OFF at panel 20C004B.

[Cue: MO-17 green light is on, red light is D f f.)

15 derify HPCl has been declared S 2ontrol Room Supervisor is informed that noperable. iPCI is inoperable.

Cue: Acknowledge report.)

NEW HPCl ALT PATH Rev000.doc Page 6 of 7

I STEP NO STEP ACT STANDARD Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Acknowledge report.)

As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate I

I. TERMINATING CUE When the HPCI suction has been transferred to the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

NEW HPCl ALT PATH Rev000.doc Page 7 of 7

TASK CONDITIONS/PREREQUISlTES I. HPCl is injecting into the RPV at 4000 gpm in response to a plant transient.

2. RClC is isolated.
3. Torus Cooling is in service per SO 10.1 .D-2, Residual Heat Removal System Torus Cooling.
4. SBGT is in service per SO 9A.l.B, Standby Gas Treatment System Manual Startup.
5. ST-0-007-540=2, Torus Water Temperatures is in progress.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET Signature I Title Date Signature I Title Date Signature I Title Date I APPROVED FOR USE:

Signature I Title Date EFFECTIVE DATE: / /

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. I COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PlMS CODE: I Signature/Date I ENTRY:

EDG Synch & Loading Rev. 000.doc Page 1 of 7

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR REV. NO.: @

TITLE: Diesel Generator Svnchronization and Loadinq I -2.

3.

4.

5.

6.

7.

8.

10.

11.

12.

13.

14.

15.

EDG Synch & Loading Rev. 000.doc Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640020101 / PLOR-322CA WA: 264000A4.04 URO: 3.7 SRO: 3.7 TASK DESCRIPTION: Diesel Generator Svnchronization and Loading A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

EDG Sy&h 8 Loading Rev. 000.doc Page 3 of 7

B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle C. REFERENCES Procedure SO 52A.l .B, Rev. 32, "Diesel Generator Operations" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the EDG has been synchronized and appropriate load has been picked up.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, synchronize the E 4 Diesel to the E 4 3 bus and pick up 200 -

300 KW and 100 KVAR for testing purposes using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES I. The E 4 Diesel Generator has been "SLOW" started and is running in accordance with Section 4.1 of SO 52A. 1.B, "Diesel Generator Operations."

2. The E 4 Diesel Generator is running at rated frequency and voltage.
3. The E 4 3 Bus is being supplied by 2SUE.
4. The ESW system is supplying Diesel Generator cooling water.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 200 - 300 Kw and 100 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."

EDG Synch & Loading Rev. 000.doc Page 4 of 7

H. PERFORMANCE CHECKLIST 7

3TEP STEP ACT STANDARD NO 1 Obtain a copy of procedure SO 52A.1.B. P A copy of procedure SO 52A.1.B is obtained.

2 Verify E 4 D/G is running at rated P E 4 D/G frequency is verified at 58.8 to frequency and voltage. 61.2 Hz on E 4 D/G Freq. meter. E 4 D/G voltage is verified at 4.16 to 4.4 KV on E 4 D/G Volt meter.

(Cue: E 4 DIG frequency is 60 HZ and voltage is 4280 volts.)

  • 3 Insert Sync scope key in E 4 3 Breaker P E 4 3 Breaker Sync Switch (3-125-1807) is Sync Switch and turn ON. placed in the "ON" position at panel 00C026A.

(Cue: Both Sync Scopes rotating, incoming and running lights "ON" at Bottom Dead Center and "OFF" at Top Dead Center.)

Verify E 4 D/G speed control. P E 4 D/G frequency is raised to 60.5 Hz then lowered to 55.5 Hz on E 4 D/G FREC (Cue: "GOVERNOR control switch meter using the "GOVERNOR control raises, lowers frequency 0.5 Hz switch (165-OG12) then returned to the above/below the initial value, then returns initial value at panel 00C026D.

to initial value.)

Verify E 4 D/G voltage control. P E 4 D/G voltage is raised and lowered 50 volts above/below initial value on E 4 D/G (Cue: "AUTO VOLT REG" raises then volts meter using the "AUTO VOLT REG" lowers voltage 50 volts above/below initial control switch (90-DG14) then returned to value, then returns to initial value.) the initial value at panel 00C026D.

6 Check both synchronizing lights for proper P Both sync lights are verified "ON" at

,pera tion. Bottom Dead Center and "OFF" at Top Dead Center at panels 00C026A or

[Cue: Both lights "ON" when sync scope OOC026C.

at "Bottom Dead Center" and both lights

'OFF" when sync scope at "Top Dead

- Center".)

EDG Synch 8 Loading Rev. 000.doc Page 5 of 7

-- STEP ACT STANDARD

  • 7 Adjust E 4 D/G engine speed using P Sync scope is verified rotating slowly in "GOVERNOR" control switch until sync "FAST" direction at panels 00C026A OR scope is rotating slowly in "FAST" OOC026C.

direction.

(Cue: Acknowledge control switch operation. Synchroscope is rotating slowly in the fast direction.)

a Adjust E 4 diesel generator voltage until P Incoming voltmeter about 50 volts but less "INCOMING" voltmeter is slightly higher than 100 volts above bus voltage at panel than "RUNNING" voltmeter. OOC026C.

(Cue: Acknowledge control switch operation. Incoming is slightly higher than running.)

9 Verify sync scope rotating slowly in P Sync scope is verified rotating slowly in "FAST" direction. "FAST" direction at Panels 00C026A OR OOC026C.

(Cue: Sync scope rotating slowly in "FAST".)

  • 10 Close the E 4 3 breaker when the sync P When the sync scope is within 13 degrees scope is within 13 degrees of "Top Dead Df "Top Dead Center, the E 4 3 breaker Center. mntrol switch is taken to the "CLOSED" position and released at panel 00C026D.

(Cue: Acknowledge [CLOCKWISE]

breaker control switch operation.)

~ ~~

11 Verify the E 4 3 breaker is closed. P E43 breaker red light lit, sync scope stopped at 12 o'clock, and sync lights (Cue: E 4 3 breaker red light on, both sync 'OFF" verified at panel OOC026C and scopes stopped at 12 o'clock and sync 30C026D.

lights "OFF".)

"12 Immediately load the E 4 diesel to P 5 4 D/G KW load is promptly raised by 200-300 KW. momentarily placing the "GOVERNOR" mntrol switch (165-DG12) to "RAISE" at

Cue: [CLOCKWISE, "GOVERNOR" lane1 00C026D. No reverse power trip of zontrol switch is taken to "RAISE'1. :he E 4 3 breaker occurs.

~~

13 derify E 4 D/G load is 200-300 KW. P 3 D/G load is verified to be 150 - 350 (W on the E 4 DIG KW meter at panel

Cue: E 4 DIG load is 250 KW.)

- lOC026D.

EDG Synch & Loading Rev. 000.doc Page 6 of 7

STEP ACT STANDARD NO P E 4 D/G KVAR load is promptly raised by momentarily placing the AUTO VOLT REG control switch (90-DG14) in RAISE at panel 00C026D.

P E 4 D/G load is verified to be 50-150 KVAR on the E 4 D/G KVAR meter at panel OOC026D.

P E 4 3 BKR SYNC switch taken to OFF at Panel 00C026D.

(Cue: Acknowledge P BKR SYNC verified in OFF via INCOMING and RUNNING voltmeters dropping to zero.

P Positive control established.

positive control of all exam material Under ACT P - must perform S - must simulate I. TERMINATING CUE When the Diesel is Loaded and the Synch Switch is in OFF, the evaluator will terminate the exercise.

EDG Synch & Loading Rev. 000.doc Page 7 of 7

TASK CONDITIONS/PREREQUISlTES I. The E 4 Diesel Generator has been SLOW started and is running in accordance with Section 4.1 of SO 52A.I.B, Diesel Generator Operations.

2. The E 4 Diesel Generator is running at rated frequency and voltage.
3. The E 4 3 Bus is being supplied by 2SUE.
4. The ESW system is supplying Diesel Generator cooling water.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E43 Bus and pick up 200 = 300 KW and I 0 0 KVAR in accordance with Section 4.2 of SO 52A.l.B, Diesel Generator Operations.

PECO NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET AND PLACING THE IN-SERVICE SJAE IN I APPROVALS:

1 APPROVED FOR USE:

EFFECTIVE DATE: I I NAME: SOC. SEC. NO.

Last First M.I.

I ISSUE DATE: 1 COMPLETION DATE:

COMMENTS:

PlMS CODE:

PlMS ENTRY:

1 Page 1 of 9 1

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-067C REV. NO.: - 008 TITLE: Placing the Standby SJAE In-Service and Placing the ln-Service SJAE in Standby 2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

1 Page 2 of 9 1

PECO NUCLEAR PEACH BOlTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2550030101 / PLOR-067C WA: 271000A4.09 URO: 3.3 SRO: 3.2 TASK DESCRIPTION: Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standbv A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.

\

5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

1 Page 3 of 9 1

B. TOOLS AND EQUIPMENT None

-~

C. REFERENCES

1. Procedure SO 8A.6.A-2 Rev. 13, "Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby" (R)
2. P&ID M-310, "Air Ejector and Off-Gas" (A)
3. P&ID M-307, "Condensate System" (A)

D. TASK STANDARD

1. Satisfactory task completion is indicated when "B" SJAE placed in service and "A" SJAE placed in standby.
2. Estimated time to complete: 25 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to place "6"SJAE in service and place "A" SJAE in standby using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. Plant is at steady state conditions.
2. "A" SJAE in service.
3. Air ejector intedafter condenser loop seals have been established IAW GP-2 Attachment 4.

I G. INITIATING CUE The Control Room Supervisor directs you to place the "6"SJAE in service and place "A" SJAE in standby in accordance with SO 8A.6.A-2 "Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby".

I PLOR067C Rev008.doc Page 4 of 9

H. PERFORMANCE CHECKLIST

'TEP 1 ii NO I STEP ACT STANDARD I ~~

1 2

~

Obtain a copy of procedure SO 8A.6.A-2.

Verify MO-2104B, SPE B Isolation valve P

P A copy of procedure SO 8A.6.A-2 is obtained.

MO-2104B and MO-21058, red lights are and MO-21058, SJAE B Isolation valve verified ON at panel 20C007A.

are open.

(Cue: MO-2104B and MO-2105B red lights are on, green lights are off.)

3 Verify PIC-2239B, B SJAE Main Steam PIC-2239B is verified to be in "MANUAL",

Supply Hdr Controller is in "MANUAL" and point at panel 20C007A by ensuring lower the control valve is closed by adjusting the portion of auto/manual selector switch is setpoint to minimum. lit.

(Cue: PIC-22398 (SP) is in "MANUAL".)

I 4 Adjust PIC-2239B setpoint to the minimum position and depress the "CLOSE" button.

P PIC-22398 auto setpoint knob is verified at 0 psig. Controller manual close pushbutton is depressed as required to ensure setpoint at minimum, controller A (Cue: PIC-2239B controller indicates 0 psig with a controller output of loo%.)

output of 100%.

I

  • 5 Open AO-2244/45/47B, Air Ejector Inlet B P A0-2244/45/478 control switch is placed 2nd Stage valves. in the "OPEN" position at panel 20C007A.

(Cue: Acknowledge control switch operation.)

6 Verify A0-2244/45/478, Air Ejector Inlet B P AO-2244/45/47B red light is verified ON 2nd Stage valves are open. and green light is verified OFF at panel 20C007A.

(Cue: AO-2244/45/478 red light is on, green light is off.)

      • NOTE***

The following direction to the Equipment Operator requires simulator instructor action:

MRF MSS05B OPEN Page 5 of 9

STEP ACT STANDARD

  • 7 Direct Equipment Operator to adjust HCS- P Equipment Operator directed to adjust 2-8A-24666, Main Steam Isolation Valve HCS-2-8A-2466B for 35 to 40 psi.

to SJAE 2B, for 35 to 40 psi.

(Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-24666 adjusted to 35 psi.)

  • 8 Place PIC-2239B in AUTO. P PIC-2239B auto portion of Auto/Manual selector switch is depressed and verified lit.

(Cue: PIC-2239B is in AUTO.)

  • 9 Raise setpoint on PIC-2239B in 20 psig P PIC-2239B control knob is rotated in the increments to between 115 and 125 psig. CLOCKWISE direction in increments (20 psig increments over several minutes) at (Cue: Pl-24728 is slowly increasing, panel 20C007A to increase SJAE B steam controller setpoint (SP) and Process Valve pressure to 115 to 125 psig on PI-24726 (PV) slowly increase. Controller output is at panel 20C006B.

slowly decreasing until PI-2472B reaches 120 psig.

  • IO Open AO-2238D, E, F Air Ejector Inlet B P AO-2238D, E & F/AO-2540B control 1st Stage/AO-25406 Air Ejector Inner switch is placed in the OPEN position at Cdsr Drain valves when SJAE B 2nd panel 20C007A when SJAE B 2nd stage stage pressure is greater than 13 inches pressure is greater than 13 inches of mercury on Pl-22468 at panel 20C006B.

(Cue: Acknowledge control switch operation.)

11 Verify AO-2238D,EIF, Air Eject Inlet B 1st P AO-2238D,E,F/AO-2540B red light is Stage valves are open. verified ON and green light is verified OFF at panel 20C007A.

(Cue: AO-2238D,E,F red light is on, green light is off.)

  • 12 When steam pressure reaches 115 to 125 P Steam pressure on Pl-24728 is verified to psig, place the control switch for be 115 to 125 psig and the control switch AO-2236D/E/F Air Ejector M-Gas Inlet for AO-2236D/E/F is placed in AUTO.

B in AUTO.

(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.

1 Page 6 of 9 1

STEP ACT STANDARD I

13 Verify AO-2236D,E and F Off Gas Inlet B P AO-2236D,E and F red light is verified ON in AUTO. and green light is verified OFF at panel 20C007A.

(Cue: AO-2236D,E and F red light on, green light off.)

  • 14 Place control switch for AO-2236A,B,C, P AO-2236A,BlC control switch is placed in Air Ejector Off Gas Inlet A valves in the "CLOSE" position at panel 20C007A.

CLOSE.

(Cue: Acknowledge control switch operation.)

15 Verify AO-2236AlBlC Air Ejector Off Gas P AO-2236A,B,C green light is verified ON Inlet A valves closed. and red light verified OFF at panel 20C007A.

(Cue: AO-2236A,B,C green light is on, red light is off.)

  • I6 Adjust setpoint on PIC-2239A to 0 psi. P Control knob on PIC-2239A is rotated in the COUNTERCLOCKWISE direction unti (Cue: PI-2472A is quickly decreasing, the setpoint is at minimum at panel controller setpoint (SP) and Process Valve 20C007A.

(PV) are slowly decreasing. Controller output stabilizes at 100.)

      • NOTE***

The following direction to the Equipment Operator requires simulator instructor action:

MRF MSS05A CLOSE 17 Direct Equipment Operator to adjust HCS- P Equipment Operator directed to adjust 2-8A-2466A, Main Steam Isolation valve HCS-2-8A-2466A to 0 psi, at panel to SJAE 2A, to 0 psi. 20C156.

(Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-2466A adjusted to 0 psi.)

18 Verify pressure on PI-2472A decreases to P Pressure on PI-2472A is verified to be at 0 0 psig. psig at panel 20C006B.

I(Cue: PI-2472A indicates 0 psig.) I I I PLOR067C Rev008.doc Page 7 of 9

STEP ACT STANDARD

  • 19 Close AO-2238A,B,C, "Air Ejector Inlet A P AO-2238A,B,C/AO-254OA, control switch 1st Stagen/AO-2540A"Air Ejector Inter is placed in the "CLOSE" position at panel Cdsr Drain" valves when steam pressure 20C007A when steam pressure decreases decreases to 30 psig. to 30 psig.

(Cue: Acknowledge control switch operation.)

20 Verify AO-2238A,B,C, "Air Ejector Inlet A P AO-2238A,B,C, AO-2540A, green light is 1st Stage" AO-2540A "Air Ejector Inter verified ON and red light is verified OFF at Cdsr Drain", valves are closed. panel 20C007A.

(Cue: AO-2238A,B,C green light is on, red light is off.)

  • 2 1 Close AO-2244/45/47A, Air Ejector Inlet A P AO-2244/45/47A control switch is placed 2nd Stage valves. in the "CLOSE" position at panel 20C007A.

(Cue: Acknowledge control switch operation.)

22 Verify AO-2244/45/47A, Air Ejector Inlet A P 40-2244/45/47A green light is verified ON 2nd Stage valves are closed. and red light is verified OFF at panel 20C007A.

[Cue: AO-2244/45/47A green light is on, red light is off.)

23 Verify " B SJAE parameters are within P 'B" SJAE 1st stage pressure on PI-24728 desired limits. s verified to be within 115-125 psig and

'B"SJAE 2nd stage pressure is verified to

[Cue: PR-2154 is 28" Hg; PI-24728 3 8 greater than 13 inches Hg at panel ndicates 120 psig, PI-22466 indicates 15" ZOC006B.

-b)

~~

24 nform Control Room Supervisor of task P rask completion reported.

zompletion.

Cue: Control Room Supervisor acknowledges report.)

1 Page 8 of 9 1

Under ACT P - must perform S - must simulate I. TERMINATING CUE When SJAE B is in service and SJAE A is in standby, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

I PLOR067C Rev008.doc Page 9 of 9

TASK CONDITIONS/PREREQUISlTES I. Plant is at steady state conditions.

2. A SJAE in service.
3. Air ejector intedafter condenser loop seals have been established IAW GP-2 Attachment 4.

INITIATING CUE The Control Room Supervisor directs you to place the BySJAE in service and place A SJAE in standby in accordance with SO 8Am6mA12 Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I Signature I Title Signature I Title 2 1 pAG5 Date Date Signature I Title Date Signature I Title Date

'1 I APPROVED FOR USE:

Signature I Title Date I EFFECTIVE DATE: I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

Signature/Date I PlMS ENTRY:

1 Page 1 of 9 1

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-062P REV. NO.: 015 TITLE: Restore Control Room Ventilation Followina a Hiah Radiation Trip 9.

10.

11.

12.

13.

14.

15.

I z O R 0 6 2 P NRC RevO15.doc

- Page 2 of 9 1

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2880010101/ PLOR-062P KIA: 29003A4.01 URO: 3.2 SRO: 3.2 TASK DESCRIPTION: Restore Control Room Ventilation Followina a Hiqh Radiation Trip A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

I G 6 6 2 P NRC Rev015.doc Page 3 of 9

. B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 400.1 .A Rev. 11, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operation Alignment" D. TASK STANDARD

1. Restoration and startup of Control Room Ventilation completed following a trip due to high radiation. This will include:
a. Placing all Control Room ventilation fans to "OFF".
b. Startup of Control Room N C Supply, N C Return, and Fresh Air Supply Fans.
c. Startup of Toilet Room Fan and Control Room Office cooling unit.
2. Estimated time to complete: 24 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore and startup Control Room Ventilation following a high radiation trip using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDIT1ONS/PREREQUISITES

1. Initially, the "A" Control Room Ventilation fans were running.
2. Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its "A" Fan.
3. Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 44B.
4. 480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1.A, 'Startup of Auxiliary Steam System".
6. Instrument Air is available to Control Room Ventilation System in accordance with SO 368.

-- 7. 120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.

I x R 0 6 2 P NRC Rev015.doc

-cII Page 4 of 9

8. The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
9. Airborne activity levels in the ventilation intake have been verified acceptable by Health Physics.

IO. Communication is established between OOCl33 and Control Room (simulated).

11. Shift management has determined that COL 40D.l .A is not required to be performed.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 40D.1 .A, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following line-up:

e "A" Control Room Ventilation fans running.

e Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.

e "B" Control Room Ventilation fans aligned for automatic start.

r- Steps 4.1 - 4.12 of SO 400.1 .A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.

IF F - -

4 Page 5 of 9

H. PERFORMANCE CHECKLIST 3TEP STEP ACT STANDARD NO 1 Obtain a copy of procedure SO 40D.1.A. P A copy of procedure SO 40D.1.A is obtained.

I *2 Start OAV-079, "Control Rm Fresh Air S OAV-079 fan control switch is placed in Supply Fan A". "RUN" at panel OOCl33.

(Cue: Acknowledge control switch operation.)

I 3 Verify Fan OAV-079, Control Room Fresh S OAV-079 Control Room Fresh Air Supply Fan red light is verified ON at panel Air Supply is running.

OOC133.

(Cue: Fan OAV-079 red light is on.)

I 4 Verify that "CONTROL ROOM SUPPLY S "CONTROL ROOM SUPPLY FAN FAN OA-BV79 STANDBY FAN" OA-BV79 STANDBY FAN" annunciator is annunciator is clear. verified clear at panel OOCl33.

(Cue: Annunciator OOC133 P-4 is not lit.)

.I I I *5 Place standby fan, OBV-079, control switch in "AUTO".

S OBV-079 fan control switch is placed in "AUTO" at panel OOCl33.

(Cue: Acknowledge control switch o eration.

I *6 Start OAV-028, "Control Room N C Supply S OAV-028 control switch is placed in "RUN' Fan A." at panel OOCl33.

(Cue: Acknowledge control switch operation.)

I 7 Verify OAV-028, Control Room N C S OAV-028 Control Room A/C Supply Fan Supply is running. red light is verified ON at panel OOC133."

(Cue: Fan OAV-028 red light is on.)

I 8 Verify that "CONTROL ROOM SUPPLY S "CONTROL ROOM SUPPLY FAN FAN OA-BV28 STANDBY FAN" OA-BV28 STANDBY FAN" annunciator is annunciator is clear. verified clear at panel OOCl33.

(Cue: Annunciator OOC133 R-1 is not lit.)

I 9 Place the standby fan, OW-028, control S OBV-028 fan control switch is placed in switch in "AUTO". 'AUTO" at panel OOCl33.

(Cue: Acknowledge control switch I bLOR062P NRC Rev015d.m- - Page 6 of 9

STEP STEP ACT STANDARD NO

  • 10 Start OAV-029, "Control Room A/C Returr S OAV-029 fancontrol switch is placed%

Fan A". "RUN" at panel OOCl33.

(Cue: Acknowledge control switch oDeration.)

11 Verify OAV-029, "Control Room A/C S OAV-029 Control Room A/C Return Fan Return Fan A" is running. red light is verified ON at panel OOCl33.

(Cue: Fan OAV-029 red light is on.)

12 Verify that "CONTROL ROOM RETURN S "CONTROL ROOM RETURN FAN OA-FAN OA-BV29 STANDBY FAN" BV29 STANDBY FAN" annunciator is annunciator is clear. verified clear at panel OOCl33.

(Cue: Annunciator OOCl33-0-1 is not lit 13 Place the standby fan, OBV-029, control S OBV-029 fan control switch is placed in switch to "AUTO". "AUTO" at panel OOCl33 (Cue: Acknowledge control switch operation.)

14 Place HS-2-63L-J180 and J181 to the S HS-2-63L-J180 and J181 momentarily "RESET" position at panel OOCl33 and placed in "RESET" and released.

release.

(Cue: Acknowledge control switch operation.)

15 Request the Control Room personnel S The Control Room is requested to place the Control Room Vent Purge place the Control Room Vent Purge Control switch to "OFF" on panel C012 Control switch to "OFF" on panel 20C012 and verify FR-0765 on panel COlO and v e r i i FR-0765 on panel 20C010 indicates 2500-3000 cfm (or that they indicates 2500 -3000 cfm (or to complete perform steps 4.17 and 4.18). steps 4.17 and 4.18).

(Cue: The Control Room reports that the Control Room Vent Purge control switch is in "OFF" and FR-0765 indicates 2800 cfm or that steps 4.17 and 4.1 8 are complete.)

  • 16 Start OOV-33, the "Toilet Room Exhaust S OOV-33 control switch is placed in "ON" at Fan". panel OOC133..

(Cue: Acknowledge control switch operation.)

17 Verify OOV-33, Toilet Room Exhaust is S OOV-33 Toilet Room Exhaust Fan red running. light is verified ON at panel OOCl33.

\-

(Cue: Fan OOV-33 red light is on.)

1 1 - Page 7 of 9

STEP ACT STANDARD Start OOV-326, the "Control Room Ofice S OOV-326 control switch is placed in "ON" Area Cooling Unit". at panel OOCl33.OOV-326 Control Room Office Area Cooling Unit red light is (Cue: Acknowledge control switch verified ON at panel OOCl33.

operation on.)

Verify Fan OOV-326 Control Room Office OOV-326 Control Room Office Area Area-Cooling Unit is running. Cooling Unit red light is verified ON at panel OOC133.

(Cue: Unit OOV-326 red light is on.)

switch is in the Filter 'A' position.)

Request that Control Room personnel The Control Room is requested to place place the "Outside Air Filter Select SV- the "Outside Air Filter Select SV-00154" 00154" control switch to FILTER 'A'('B') control switch to FILTER 'A'('B*) or to (or complete step 4.21.1). complete step 4.21 .l.

(Cue: The Control Room reports that the "Outside Air Filter Select SV-00154" control switch is in the Filter 'A' position or that step 4.21.1 is complete.) ~~ ~

Request that Control Room personnel The Control Room is requested to place place the "Outside Air Filter Bypass SV- the "Outside Air Filter Bypass SV-00153" 00153" to "BYPASS" (or perform step to "BYPASS" or complete step 4.21.2.

4.21 2).

(Cue: The Control Room reports that the "Outside Air Filter Bypass SV-00153" is in the "BYPASS" position or that step 4.21.2 is complete Verify OBV030, "Control Room S OBV030, "Control Room Emergency Emergency Ventilation Supply Fan B" to Ventilation Supply Fan 6" is verified in the the "AUTO-STBY" position on Panel "AUTO-STBY" position on Panel OOCl33.

OOC133.

(Cue: OBV030, "Control Room Emergency Ventilation Supply Fan B is in the "AUTO-STBY" position on Panel OOCl33.)

Place OAV030, "Control Room S OAV030, "Control Room Emergency Emergency Ventilation Supply Fan A" to Ventilation Supply Fan A" is placed to the the "AUTO" position on Panel OOCl33. "AUTO" position on Panel OOC133.

(Cue: OAV030, "Control Room Emergency Ventilation Supply Fan A is in the "AUTO" position on Panel OOCl33.)

I FLOR062P NRC Rev015.doc - Page 8 of 9

I STEP I STEP I ACT I STANDARD I NO 24 Inform the Control Room Supervisor that P Task completion reported using a hand Control Room Ventilation has been held radio or GAI-TRONICS page system.

I restored IAW SO 40D.1.A.

(Cue: Control Room Supervisor acknowledges report.)

25 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Under ACT P - must perform S - must simulate

1. TERMINATING CUE When the Control Room Ventilation system is in operation, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

I E O R 0 6 2 P NRC Rev015.doc Page 9 of 9

TASK CONDITIONS/PREREQUlSlTES

1. Initially, the "A" Control Room Ventilation fans were running.
2. Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its "A" Fan.
3. Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 448.
4. 480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1.4 "Startup of Auxiliary Steam System".
6. Instrument Air is available to Control Room Ventilation System in accordance with SO 36B.
7. 120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.
8. The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
9. Airborne activity levels in the ventilation intake have been verified acceptable by L-Health Physics.

1o. Communication is established between OOCl33 and Control Room (simulated).

11. Shift management has determined that COL 40D.1 .A is not required to be performed.

INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 400.1 .A, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following line-up:

0 "A" Control Room Ventilation fans running.

0 Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.

0 "BeeControl Room Ventilation fans aligned for automatic start.

Steps 4.1 4.12 of SO 40D.1 .A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date I APPROVED FOR USE:

Signature I Title Date Signature I Title Date EFFECTIVE DATE: I I SOC. SEC. NO.

M.I.

ISSUE DATE: COMPLETION DATE:

COMMENTS:

PlMS CODE:

1 PIMS ENTRY:

PLOR075P RevO12.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-075P REV. NO.: 012 TITLE: -

SCRAM SOLENOID DE-ENERGIZATION UNIT 2 (T-213-2) 2.

3.

4.

5.

~ ~ ~

6.

7.

112.

13.

14.

15.

PLOR075P RevO12.doc Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2003730599 / PLOR-075P WA: 295037EA1.01 URO: 4.6 SRO: 4.6 TASK DESCRIPTI0N: Scram Solenoid De-energization- Unit 2 (T-213-2)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performancechecklist are to be provided to the examinee when no system response is available.
3. JPM Performance

..-- a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be

. given to the examinee.

PLORO75P RevO12.d~ Page 3 of 6

B. TOOLS AND EQUIPMENT

1. T-213-2 Tool Package from the Main Control Room Emergency Operating Procedure Tool Box
2. EOP Tool Box Key C. REFERENCES Procedure T-213-2, Rev. 9, "Scram Solenoid De-energization" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when Unit 2 Control Rod 26-15 scram solenoid fuses are removed.
2. Estimated time to complete: 5 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to de-energize Unit 2 ConLiolRod 26-15 scram solenoids using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

c TASK CONDITIONS/PREREQUISlTES

1. Unit 2 was initially at 100% power.
2. RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
3. Several Control Rods are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
4. Use of procedure T-213-2, "Scram Solenoid De-energization" has been directed by the T-100 procedures.
5. Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 26-15 scram solenoids in accordance with Steps 4.4.1 - 4.4.3 of procedure T-213-2, "Scram Solenoid De-energization".

PLOR075P Rev012.doc Page 4 of 6

H. PERFORMANCE CHECKLIST

~

STEP NO STEP ACT STANDARD

  • 1 Obtain the key for the Emergency S Emergency Operating Procedure Tool Operating Procedure Tool Locker. Locker Key requested from WECS OR examinee identifies the location of the WECS key box and its associated key.

(Cue: When examinee requests EOP Tool Locker key from WECS examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.)

  • 2 Open Emergency Operation Procedure P Tool Locker located on Radwaste Building Tool Locker and obtain T-213 Tool Kit E. 165' is unlocked, opened and T-213 equipment. Tool Kit is located.

(Cue: Equipment obtained.)

t"*

""NOTE When examinee locates tool kit, inform him that he now has the tools to perform the procedure. Provide the examinee with a copy of the T-200 procedure which corresponds to the tool kit that has been chosen. DO NOT allow equipment to be 1 removed from the locker. Relock the locker before leaving the area.

Open panel 2CC068 door. P Panel fasteners unfastened, door pulled outward to gain access to Control Rod 26-(Cue: Panel 2CC068 door is open.) 15 fuses.

Pull the Channel A fuse for Control Rod S Control Rod 26-15 Channel A fuse is 26-15. removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.

(Cue: Fuse is removed.)

Pull the Channel B fuse for Control Rod S Control Rod 26-15 Channel B fuse is 26-15. removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.

(Cue: Fuse is removed. Control Room reports Control Rod 26-15 is inserting.)

Initial on Table 1 by Control Rod 26-15. P T-213-2, Table 1 is initialed under "FUSES REMOVED" column by Control Rod 26-(Cue: Acknowledge initialing Table 1.) 15.

PLOR075P RevOl2.doc Page 5 of 6

STEP ACT STANDARD 7 1 Inform Control Room of task comdetion. S Task completion reported using telephone, hand held radio or GAI-TRONICS page (Cue: Control Room acknowledges system.

report. Control Rod 26-15 blue scram lights are lit.)

8 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.

Under ACT P - must perform S must simulate

1. TERMINATING CUE When Control Rod 26-15 scram solenoid fuses have been pulled, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR075P RevO12.doc Page 6 of 6

TASK CONDITIONS/PREREQUISITES

1. Unit 2 was initially at 100% power.
2. RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
3. Several Control Rods are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
4. Use of procedure T-213~2,Scram Solenoid De-energization has been directed by the T=lOO procedures.
5. Prerequisites and procedure steps up to and including step 4.3 of procedure T=213=2have been completed.

INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps 4.4.1 4.4.3 of procedure T=213-2, Scram Solenoid L De-energization.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I

CLOSING A STUCK OPEN MSlV - UNIT 3 (ALTERNATE PATH - AC FUSES DO APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date IAPPROVED FOR USE:

EFFECTIVE DATE:

Signature I T i e I I Date NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PIMS CODE:

Signature/Date 1 PlMS ENTRY:

1 Page 1 of 6 1

TEMPORARY CHANGE FORM LOG

CODE NO.
PLOR REV. NO.:

I TITLE: Closing a Stuck Open MSlV - Unit 3 (Alternate Path - AC Fuses do not isolate MSlVs)

I 1.

~~~~ ~~ ~

i

~

i 2.

3.

4.

5.

6.

. 7.

8.

1 1 I

9. 1 1 10.

11.

(12.

113.

I NEW MSlV AP Rev000.doc Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor OperatodSenior Reactor Operator TASK-JPM DESIGNATOR: 2390110401 / PLOR-118P WA: 2390016.2.4.35 URO: 3.3 SRO: 3.5 1 TASK DESCRIPTION: Closing a Stuck Open MSlV - Unit 3 A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completionwithin double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

I NEW MSlV AP Rev000.doc Page 3 of 6

B. TOOLS AND EQUIPMENT Insulated Fuse Pullers

-L C. REFERENCES A 0 1A.2-3, Rev. 9, Closing a Stuck Open Inboard or Outboard Main Steam Isolation Valve D. TASK STANDARD

1. Satisfactory task completion is indicated when the Unit 3 Outboard MSlV AC AND DC solenoid valve control power fuses are removed.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to close the stuck open outboard MSlVs using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES I 1. Unit 3 has just been manually scrammed (Unit 3 Mode Switch in Shutdown).

2. RPV level is -175 inches (Group I isolation signal is present).
3. All Outboard MSlVs failed to isolate.
4. The MSlVs did not close using the Test Pushbuttons in accordance with Steps 4.1.I and 4.1.2 of A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV.
5. Radiologicalconditions do NOT allow entry into the Outboard MSlV Room.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 3 Outboard MSIVs using A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV beginning with step 4.1.3.

1 Page 4 of 6 1

H. PERFORMANCE CHECKLIST YTEP 1 STEP I ACT I STANDARD NO 1 Obtain a copy of procedure A 0 1A.2-3. P A copy of procedure A 0 1A.2-3 is obtained.

Examinee should utilize Seci In 4.1 of A 0 1A.2-3.

  • 2 Open panel 306042 front panel doors. P 1 Door handle turned, doors pulled outward

'to gain access to the outboard MSlV AC (Cue: Panel 30C042 doors are open.) 'and DC solenoid valve fuses at the front oi panel 306042 in the Cable Spreading Room.

  • 3 Pull the outboard MSlV AC solenoid valve S Fuse 16A-F12B is identified as the fourth fuse 16A-F12B.

(Cue: Fuse is removed.)

4 Direct the Unit Reactor Operator to S Unit Reactor Operator is contacted to monitor outboard MSlV position indication. monitor outboard MSlV position indication.

(Cue: Outboard MSIVs are open.)

  • 5 Pull the outboard MSlV DC solenoid valve S Fuse 16A-F11B is identified as the eighth fuse for 16A-F11B. fuse from the top of terminal strip BB located inside the lefthear of Panel (Cue: Fuse is removed.) 20C042. Fuse puller is attached to outboard MSlV DC solenoid valve fuse 16A-F11B. Fuse is pulled outward until fuse is free of fuse holder.

Direct the Unit Reactor Operator to S Unit Reactor Operator is contacted to monitor Main Steam line flow using FI monitor Main Steam line flow on FI-3 06-088A,B,C,D on panel 30C008A. 088A,B,C,D at panel 30C008A.

(Cue: Main steam line FI-2 088A,B,C,D read 0 Mlbm/hr.

Close panel 30C042 front panel doors. P Door closed and relatched using handle.

(Cue: Panel 306042 doors are closed.)

Inform Control Room of task completion. S Task completion reported using telephone or GAI-TRONICS page system.

[Cue: Control Room acknowledges report.

Outboard MSlV are closed.)

I NEW MSlV AP Rev000.doc Page 5 of 6

STEP STEP ACT STANDARD NO Positive control established

-- 9 As an evaluator ensure you have positive control of all exam material provided to the P

examinee (Task Conditionslprerequisites)

AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE I When the Unit 3 Outboard MSlVs are closed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

I NEW MSlV AP Rev000.doc Page 6 of 6