ML19332G138: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:-- _ _ | {{#Wiki_filter:-- _ _ | ||
3 | 3 g __ | ||
g __ | |||
% .. .~,_ . @ ; | % .. .~,_ . @ ; | ||
% mi, vias. num.nc,os ,is nacim c4w.=, | % mi, vias. num.nc,os ,is nacim c4w.=, | ||
Line 28: | Line 23: | ||
um w, nema tw n - | um w, nema tw n - | ||
OfCFT.G.E' iffkF4, ,d9N4 (04P.8# | OfCFT.G.E' iffkF4, ,d9N4 (04P.8# | ||
' J un im,wou o | ' J un im,wou o 12, 1989 I | ||
Re: 10CFR50.71(a) 1 U.S. Nuclear Regulatory Commission Document Control Desk | |||
12, 1989 | |||
U.S. Nuclear Regulatory Commission Document Control Desk | |||
,- Washington, D. C. 20555 | ,- Washington, D. C. 20555 | ||
+ | + | ||
==Reference:== | ==Reference:== | ||
Line 47: | Line 36: | ||
This letter is forwarded to provide the report of operating and shutdown , | This letter is forwarded to provide the report of operating and shutdown , | ||
experience relating to Millstone Unit 2 for the month of November, 1989, in accordance with Appendix A Technical Specifications, Section 6.9.1.6. One additional copy of the report is enclosed. | experience relating to Millstone Unit 2 for the month of November, 1989, in accordance with Appendix A Technical Specifications, Section 6.9.1.6. One additional copy of the report is enclosed. | ||
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY , | Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY , | ||
Steph E. cNe tation Superintendent Millstone Nuclear Power Station - | Steph E. cNe tation Superintendent Millstone Nuclear Power Station - | ||
SES/CN cc: W. T. Russell, Region 1 Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 6 3 | SES/CN cc: W. T. Russell, Region 1 Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 6 3 | ||
- _ .8912200204 891130 ,- | - _ .8912200204 891130 ,- | ||
PDR R | PDR R | ||
Line 63: | Line 49: | ||
: e. ; , | : e. ; , | ||
~ | ~ | ||
OPERATING DATA REPORT DOCKET NO. 50 336 DATE 12/07/89 COMPLETED BY 0. Neron TELEPHONE (203) 447-1791 EXT. 4417 OPERATING STATUS Notes: Items 21 and 22 | |||
OPERATING DATA REPORT DOCKET NO. 50 336 DATE 12/07/89 COMPLETED BY 0. Neron TELEPHONE (203) 447-1791 EXT. 4417 OPERATING STATUS | |||
Notes: Items 21 and 22 | |||
: 1. Unit Name: _ Millstone Unit 2 cumulative are weighted | : 1. Unit Name: _ Millstone Unit 2 cumulative are weighted | ||
: 2. Reporting Period: November 1989 averages. Unit operated | : 2. Reporting Period: November 1989 averages. Unit operated | ||
Line 96: | Line 79: | ||
: 26. Units In Test Status (Prior to Commercial Operation): | : 26. Units In Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A | Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A | ||
e | e 4 | ||
4 | |||
l l | l l | ||
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _30 336 UNIT: Millstone Unit 2 : | l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _30 336 UNIT: Millstone Unit 2 : | ||
DATE: 12/07/89 l I | DATE: 12/07/89 l I | ||
COMPLETED BY: G. Neron TELEPHONE: (203)447 1791 EKT: 4417 MONTH: NOVEMBER 1989 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL | COMPLETED BY: G. Neron TELEPHONE: (203)447 1791 EKT: 4417 MONTH: NOVEMBER 1989 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL | ||
! (MWe Net) (MWe. Net) 1 1 0 17 0 2 0 18 0 | ! (MWe Net) (MWe. Net) 1 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 98 8 0 24 670 9 0 25 797 [ | ||
3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 98 8 0 24 670 9 0 25 797 [ | |||
10 0 26 848 11 0 27 847 12 0 28 856 ; | 10 0 26 848 11 0 27 847 12 0 28 856 ; | ||
13 0 29 857 | 13 0 29 857 j 14 0 30 858 15 0 31 - | ||
j 14 0 30 858 15 0 31 - | |||
l 16 0 INSTRUCTIONS 1 | l 16 0 INSTRUCTIONS 1 | ||
On this format, list the average daily unit power 1cvel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power 1cvel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
l | l | ||
DOCKET is0. 50-336 | DOCKET is0. 50-336 | ||
* UNIT NAME Millstone 2 _. , | * UNIT NAME Millstone 2 _. , | ||
Line 133: | Line 102: | ||
H- Other (Explain) 6-Other (Explain) | H- Other (Explain) 6-Other (Explain) | ||
. *-. " ( l . | . *-. " ( l . | ||
l | l BEFUELING INFORMATION REOUEST | ||
BEFUELING INFORMATION REOUEST | |||
: 1. Name of facility: Millstone 2 2.- Scheduled date for next refueling shutdown: October 1990 | : 1. Name of facility: Millstone 2 2.- Scheduled date for next refueling shutdown: October 1990 | ||
: 3. Scheduled date for restart following refueling: N/A l | : 3. Scheduled date for restart following refueling: N/A l |
Revision as of 15:20, 31 January 2020
ML19332G138 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 11/30/1989 |
From: | Neron G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
MP-13849, NUDOCS 8912200204 | |
Download: ML19332G138 (5) | |
Text
-- _ _
3 g __
% .. .~,_ . @ ;
% mi, vias. num.nc,os ,is nacim c4w.=,
um w, nema tw n -
OfCFT.G.E' iffkF4, ,d9N4 (04P.8#
' J un im,wou o 12, 1989 I
Re: 10CFR50.71(a) 1 U.S. Nuclear Regulatory Commission Document Control Desk
,- Washington, D. C. 20555
+
Reference:
Facility Operating License No. DPR 65 .
Docket No. 50-336
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown ,
experience relating to Millstone Unit 2 for the month of November, 1989, in accordance with Appendix A Technical Specifications, Section 6.9.1.6. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY ,
Steph E. cNe tation Superintendent Millstone Nuclear Power Station -
SES/CN cc: W. T. Russell, Region 1 Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 6 3
- _ .8912200204 891130 ,-
PDR R
ADOCK 05000336 PDC
\\ '
0170 REV 7-85
- BP93
0
- e. ; ,
~
OPERATING DATA REPORT DOCKET NO. 50 336 DATE 12/07/89 COMPLETED BY 0. Neron TELEPHONE (203) 447-1791 EXT. 4417 OPERATING STATUS Notes: Items 21 and 22
- 1. Unit Name: _ Millstone Unit 2 cumulative are weighted
- 2. Reporting Period: November 1989 averages. Unit operated
- 3. Licensed Thermal Power (MWt): 2700 at 2560 MWTH prior to its
- 4. Nameplate Rating-(Gross MWe): 909 uprating to the current
- 5. Design Electrical Rating (Net MWe): 870 2700 MWTH power level.
- 6. Maximum Dependable Capacity (Gross MWe): 893.88
- 7. Maximum Dependable capacity (Net MWe): 862.88
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power level To Which Restricted, If any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr..To Date Cumulative
- 11. Hours In Reporting Period 720.0 8016.0 122136.0
- 12. Number Of Hours Reactor Was Critical 204.0 5283.7 89617.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 14. Hours Generator On Line 179.1 5142.0 85207.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 16. Gross Thermal Energy Generated (MWH) 454022.0 13476184.4 ~ 236127464.4
- 17. Gross Electrical Energy Generated (MWH) 145666.5 4426551.0 71257071.5
- 18. Not Electrical Energy Generated (MWH) 136280.5 4248346.0 68357492.5
- 19. Unit Service Factor 24.9 64.1 69.8
- 20. Unit Availability Factor 24.9 64.1 70.1
- 21. Unit Capacity Factor (Using MDC Net) 21.9 61.4 65.9
- 22. Unit Capacity Factor (Using DER Net) 21.8 60.9 64.9
- 23. Unit Forced Outage Rate 0.0 0.0 14.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
N/A ,
- 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
e 4
l l
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _30 336 UNIT: Millstone Unit 2 :
DATE: 12/07/89 l I
COMPLETED BY: G. Neron TELEPHONE: (203)447 1791 EKT: 4417 MONTH: NOVEMBER 1989 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL
! (MWe Net) (MWe. Net) 1 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 98 8 0 24 670 9 0 25 797 [
10 0 26 848 11 0 27 847 12 0 28 856 ;
13 0 29 857 j 14 0 30 858 15 0 31 -
l 16 0 INSTRUCTIONS 1
On this format, list the average daily unit power 1cvel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l
DOCKET is0. 50-336
- UNIT NAME Millstone 2 _. ,
UNIT SHUTDOWNS AND POWER REDUCTIONS 12/07/89 DATE COMPLETED BY C. Neron .,
TELEPHONE (203) 447-1791.
November 1989 EXT. 4417 REPORT MONTH Component Cause & Corrective No. Date Type l Duration Reason2 Method of License Systgm Shutting Event Code Code) Action to (Hours) 3 Prevent Recurrence Down Reactor Report #
1 N/A N/A N/A Continuation of the 02 891021 S 540.4 D Steam Generator in-spection and repair outage: Unit started up on 11/22/89 and achieved 100% power on 11/25/89.
2 Reason: 3 Method ' Exhibit G - Instructions 1: F Forced 1-Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain) Entry Sheets for License B-Maintenance or Test 2-Manual Scram 3-Automatic Scram Event Report (LER) File C-Refueling D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination Previous month 5 Exhibit 5-Power Reduction 1 -Same Source F-Administrative G-Operational Error (Explain) (Duration -0)
H- Other (Explain) 6-Other (Explain)
. *-. " ( l .
l BEFUELING INFORMATION REOUEST
- 1. Name of facility: Millstone 2 2.- Scheduled date for next refueling shutdown: October 1990
- 3. Scheduled date for restart following refueling: N/A l
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Not at this time
- 5. Scheduled date(s) for submitting licensing action and supporting information:
None i
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: i Not at this time j I
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core: (a) 212 In Spent Fuel Pool: (b) 112 l I
- 8. The present licensed spent fuel pool storage capacity and the size !
of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics:
Currently 1277
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1994. Soent Fue: Pool Full, core off load caDacity is reached (with
-out consolioat:.on).
1998. Core Full. Soent Fuel Prol Full
~
1909. Soent Fuel Pool Full, core off load capacity is reached-contincent uDon full scale storace of consolidated fuel .n the Soent Fuel Pool.