| number = ML16137A009
| number = ML16137A009
| issue date = 05/16/2016
| issue date = 05/16/2016
| title = Acceptance Review CAC No. MF7574
| title = NRR E-mail Capture - Acceptance Review CAC No. MF7574
| author name = Lyon F
| author name = Lyon F
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1

Latest revision as of 15:43, 4 December 2019

NRR E-mail Capture - Acceptance Review CAC No. MF7574
ML16137A009
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/16/2016
From: Lyon F
Plant Licensing Branch IV
To: Matzke E
Omaha Public Power District
References
MF7574
Download: ML16137A009 (2)


Text

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Monday, May 16, 2016 6:13 AM To: MATZKE, ERICK P Cc: Burkhardt, Janet

Subject:

Acceptance Review CAC No. MF7574 By letter dated April 11, 2016, OPPD submitted a proposed alternative to use Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, to Class 2 and 3 moderate energy piping including elbows, bent pipe, reducers, expanders, and branch tees.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

1

Hearing Identifier: NRR_PMDA Email Number: 2845 Mail Envelope Properties (Fred.Lyon@nrc.gov20160516061200)

Subject:

Acceptance Review CAC No. MF7574 Sent Date: 5/16/2016 6:12:47 AM Received Date: 5/16/2016 6:12:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "MATZKE, ERICK P" <ematzke@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1379 5/16/2016 6:12:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Monday, May 16, 2016 6:13 AM To: MATZKE, ERICK P Cc: Burkhardt, Janet

Subject:

Acceptance Review CAC No. MF7574 By letter dated April 11, 2016, OPPD submitted a proposed alternative to use Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, to Class 2 and 3 moderate energy piping including elbows, bent pipe, reducers, expanders, and branch tees.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

1

Hearing Identifier: NRR_PMDA Email Number: 2845 Mail Envelope Properties (Fred.Lyon@nrc.gov20160516061200)

Subject:

Acceptance Review CAC No. MF7574 Sent Date: 5/16/2016 6:12:47 AM Received Date: 5/16/2016 6:12:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "MATZKE, ERICK P" <ematzke@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1379 5/16/2016 6:12:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: