ML020070071: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CLINTON POWER STATION NUCLEAR STA T3ON-ENGINEERING DEPT. Controlled Dodument Transmittal
{{#Wiki_filter:CLINTON POWER STATION NUCLEAR STA T3ON-ENGINEERING DEPT.
-" Transmittal No. 01 P0214 Transmittal Date 10/23/01 Sheet 1 of Document EMERGENCY PLAN IMPLEMENTING PROCEDURE The attached documents are being transmitted for your use.-2 27. 56. 64. 64A. 64B. 90. 110. 179. 202. 202C(673).
Controlled Dodument Transmittal
255B(698).
-" Transmittal No. 01 P0214     Transmittal Date     10/23/01               Sheet   1 of Letter No.          Document       EMERGENCY PLAN IMPLEMENTING PROCEDURE The attached documents are being transmitted for your use.       -2
262A(69A) 262C(69C).
: 27.       CPS/RL                      V-455        183.         CPS/JPIC                V-922
262D(69D).
: 56.       SDC/NRC OFFICE               V-1 30A                    C/o A. Oleson
273. 273A(708).
: 64.        CPS/TSC                     T-31B      493.          CPS/EOF                V-922 64A.      CPS/TSC                     T-31 B      493A(740). CPS/EOF                V-922 64B.       CPS/TSC                      T-31 B      493B(741). CPS/EOF                V-922
467. 505. 542. 544. 3. 3A.CPS/RL SDC/NRC OFFICE CPS/TSC CPS/TSC CPS/TSC OPS SUPPORT MANAGER SUPV -CHEMISTRY CPS/OPS NTD/SIMULATOR SIMULATOR DOSIMETRY OFFICE. MCR/HORSESHOE SHIFT SUPERVISOR REMOTE SHUTDOWN TRAINING REQUAL TRAINING REQUAL MEDICAL EMERGENCY PLANNING CAS SAS CPS/BEOF CPS/BEOF V-455 V-1 30A T-31B T-31 B T-31 B V-1 30G T-31 C T-31 B V-922 V-922 T-31H T-31 B T-31 B T-31 B V-922 V-922 V-374B V-922 T-31 M T-31 M V-150 V-150 183. 493. 493A(740).
: 90.        OPS SUPPORT MANAGER          V-1 30G    493C(742). CPS/EOF                V-922 110.        SUPV - CHEMISTRY            T-31 C      493D(743). CPS/EOF                V-922 179.        CPS/OPS                      T-31 B     493F(744). CPS/EOF                V-922 202.        NTD/SIMULATOR                V-922      493G(745). CPS/EOF                V-922 202C(673). SIMULATOR                    V-922       493H(746). CPS/EOF                V-922 255B(698). DOSIMETRY OFFICE.            T-31H 262A(69A)  MCR/HORSESHOE                T-31 B       76.          D. V. PICKETT          OS 262C(69C). SHIFT SUPERVISOR            T-31 B     222/(679)    C. SANGSTER              OS 262D(69D). REMOTE SHUTDOWN              T-31 B     223.          U.S. NRC                OS 273.        TRAINING REQUAL            V-922                     DOC. CONTROL DESK 273A(708). TRAINING REQUAL            V-922       225/(680). IDNS (M. SINCLAIR)      OS 467.        MEDICAL                    V-374B       234.          STATE EOC                OS 505.        EMERGENCY PLANNING          V-922       235.          D. Shull                OS 542.        CAS                        T-31 M                     (DEWITT CO. ESDA) 544.        SAS                        T-31 M       238.         M. Sinclair (IDNS)       OS
493B(741).
: 3.       CPS/BEOF                    V-150        567.         J. FAIROW                OS 3A.       CPS/BEOF                    V-150                      (RADIOLOGICAL EP MANAGER)
493C(742).
SEE PAGE 2 FOR UPDATING INSTRUCTIONS Please acknowledge receipt of the attached documents and return this signed transmittal to DOCUMENT CONTROL, V-150. NOTE: RETAIN A COPY OF THIS TRANSMITTAL FOR UPDATING INSTRUCTIONS, AS NEEDED.
493D(743).
Any questions regarding this transmittal should be forwarded to L. Hegger, extension 4087.
493F(744).
                                                                                                ý'W5 Signature/Date
493G(745).
493H(746).
: 76. 222/(679) 223. 225/(680).
234. 235. 238. 567.SEE PAGE 2 FOR UPDATING INSTRUCTIONS Please acknowledge receipt of the attached documents and return this signed transmittal to DOCUMENT CONTROL, V-150. NOTE: RETAIN A COPY OF THIS TRANSMITTAL FOR UPDATING INSTRUCTIONS, AS NEEDED. Any questions regarding this transmittal should be forwarded to L. Hegger, extension 4087.Signature/Date Letter No.CPS/JPIC C/o A. Oleson CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF D. V. PICKETT C. SANGSTER U.S. NRC DOC. CONTROL DESK IDNS (M. SINCLAIR)
STATE EOC D. Shull (DEWITT CO. ESDA) M. Sinclair (IDNS) J. FAIROW (RADIOLOGICAL EP MANAGER)V-922 V-922 V-922 V-922 V-922 V-922 V-922 V-922 V-922 OS OS OS OS OS OS OS OSý'W5 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NT TMRF R EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE ADMINISTRATIVE PROCEDURE (AP)AP-01 AP-02 AP-03 AP-04 AP-05 AP-06 AP-07 AP-09 AP-10 7 05/16/01 n/a 16 07/03/01 n/a 4 5 01/12/96 5/1 08/03/99 n/a 02/03/99 ORGANIZATION
& PREPARATION OF CONTROLLED DOCUMENTS REVISIONS AND ADVANCE CHANGE NOTICES EMERGENCY RECORDS RETENTION PREPARATION
& CONDUCT OF EMERGENCY DRILLS & EXERCISES EMERGENCY PREPAREDNESS TRAINING PROGRAM REVIEW OF EMERGENCY PREPAREDNESS PROGRAM ALERT AND NOTIFICATION SYSTEM EMERGENCY FACILITY AND EQUIPMENT CHECKS EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 6 8 8 9 08/23/01 n/a 06/15/01 n/a 10/16/01 n/a 10/16/01 n/a DOCUMENT CONTROL OCT 2 3 2001 CON4WL ED COPY CLINTON POWER STATION DATE: PAGE: 18-Oct-01 1 oflO 11 08/03/01 n/a CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 2 of 10 NUMBER EPIP TITLE EMERGENCY CONTROL (EC)STATUS REPORT REVISION DATE ACN'S ACN DATE EC-01 8 CPS EMERGENCY RESPONSE ORGANIZATION
& STAFFING F-01 Interim Station Emergency Director F-02 Station Emergency Director (SED) F-03 SED Administrative Support F-04 TSC Administrative Supervisor F-05 Technical Assessment Supervisor F-06 Emergency Operations Supervisor F-07 TSC Radiological Supervisor F-08 OSC Supervisor F-09 Station Security Coordinator F- 10 TSC Communicator F-11 TSC Records Management Coordinator F- 12 TSC Electrical Engineer F- 13 TSC Reactor Engineer F- 14 TSC Chemist-Nuclear F- 15 Operations Coordinator F- 16 TSC Computer Operator 08/23/01 n/a 08/02/01 n/a 06/15/01 n/a 06/15/01 09/25/01 n/a n/a 5 5 2 4 1 1 0 4 0 2 1 2 5 04/21/99 n/a 04/21/99 n/a 09/25/01 n/a 08/26/99 n/a 07/28/92 n/a 08/23/01 n/a 07/28/92 n/a 04/21/99 n/a 04/21/99 n/a 04/21/99 n/a 04/21/99 n/a 02/28/00 n/a CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 3 of 10 STATUS REPORT DATE 11/23/93 07/28/92 07/28/92 07/28/92 07/28/92 04/11/01 ACNWS ACN DATE n/a NUMBER EPIP TITLE F- 17 Radiological Engineering Specialist F- 19 RP (TSC) Communicator F-20 Status Board Keepers F-21 Radiological Controls Supervisor F-22 In-station Emergency Teams F-23 OSC Radiological Controls Coordinator F-24 Assistant OSC Radiological Controls Coordinator F-25 RP (OSC) Communicator F-26 Emergency Team Coordinator F-28 Emergency Manager F-30 EOF Director F-31 Executive Administrative Support F-32 Licensing Advisor F-33 EOF Emergency Advisor F-34 EOF Technical Advisor F-36 Technical Information Liaison F-37 Emergency Action Level/Protective Action Evaluator F-38 Security Supervisor F-39 Radiation Protection Supervisor 06/29/00 REVISION 1 0 0 0 0 1 0 0 1 3 3 2 0 3 0 1 0 0 2 07/28/92 10/18/93 06/15/01 03/05/97 06/15/01 07/28/92 04/11/01 07/28/92 01/22/97 07/28/92 07/28/92 09/25/01 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1/1 n/a n/a 07/28/92 n/a CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 4 of 10 STATUS REPORT NUMBER EPIP TITLE F-40 EOF Administrative Supervisor F-41 EOF Engineering Supervisor F-42 RP (EOF) Communicator F-43 Dose Assessment Supervisor F-44 Dose Assessor F-45 Field Team Coordinator F-46 Field Teams F-47 Radiological Controls Coordinator F-48 Environmental Lab Coordinator F-49 EOF Monitor F-50 EOF Records Management Coordinator F-51 EOF Communicator F-53 Copy Clerk F-54 TSC Emergency Advisor F-55 Procurement Coordinator F-56 Word Processor F-57 EOF Computer Operator F-58 Mechanical/Nuclear Engineer F-59 EOF Electrical Engineer F-60 Core Damage Assessor DATE 07/25/00 07/28/92 07/28/92 12/01/93 07/28/92 01/10/00 07/28/92 11/23/93 ACN'S n/a 1/1 n/a n/a n/a n/a n/a n/a ACN DATE 07/28/99 REVISION 2 0 0 1 0 2 0 1 1 0 0 3 0 0 1 1 4 0 0 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 11/23/93 2/1 03/25/99 07/28/92 07/28/92 02/24/00 07/28/92 07/28/92 05/16/01 05/16/01 09/02/99 07/28/92 07/28/92 07/28/92 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 5 of 10 STATUS REPORT EC-02 EC-03 EC-04 EC-05 EC-06 EC-07 EMERGENCY CLASSIFICATIONS NOTIFICATION OF UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY EMERGENCY PLAN NOTIFICATION 6 6 6 6 13 NUMBER EPIP TITLE F-61 Technical Advisor to State/Local Organizations F-62 EOF Administrative Support F-63 Fire Brigade Coordinator F-64 RAFT Liaison F-65 Warehouseman F-66 EOF Access Control Coordinator F-67 PASS Team Leader F-68 Fitness for Duty (FFD) Coordinator F-69 HAZMAT Team Leader F-70 Assistant Emergency Team Coordinator F-71 OSC Communicator F-72 OSC Support F-73 Mechanical Engineer 06/15/01 n/a 06/15/01 06/15/01 06/15/01 09/25/01 n/a n/a n/a n/a REVISION 0 0 0 0 1 3 1 0 0 0 0 0 0 6 DATE 07/28/92 07/28/92 07/28/92 07/28/92 05/17/01 08/23/01 05/24/93 07/28/92 07/28/92 07/28/92 07/28/92 10/05/93 07/27/99 04/24/98 7/1, 01/27/99, 7/2, 7/3 12/13/99, 12/20/99 ACN'S ACN DATE n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN 1 S ACN DATE F-01 State and NRC Notifications Checklist NON-ESSENTIAL PERSONNEL EVACUATION SECURITY DURING EMERGENCIES PERSONNEL ACCOUNTABILITY REENTRY EMERGENCY TEAMS REACTOR CORE DAMAGE ESTIMATION EC-08 EC-09 EC-10 EC-11 EC-12 EC-13 EC-14 2 8 6 7 4 8 4 3 10/16/01 n/a 07/23/00 n/a 08/23/01 n/a 06/15/01 n/a 08/03/99 n/a 10/03/00 n/a 09/19/97 5/1, 5/2 12/01/97, 09/28/99 10/21/94 4/1, 02/08/96, 4/2, 4/3 02/03/99, 12/13/99 F-01 Recovery Checklist DATE: PAGE: 18-Oct-01 6 of 10 RECOVERY 10/21/94 n/a 0 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 7 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE FACILITIES AND EQUIPMENT (FE) FE-01 TSC OPERATIONS 8 08/23/01 n/a FE-02 OSC OPERATIONS 6 06/09/97 7/1, 7/2 07/23/99, 08/02/01 FE-03 EOF OPERATIONS 7 08/23/01 n/a FE-04 BEOF OPERATIONS 7 08/23/01 n/a FE-05 EMERGENCY EQUIPMENT
& 11 05/26/97 n/a SUPPLIES F-02 OSC Emergency Equipment 4 05/16/01 n/a F-03 EOF Emergency Equipment 5 10/16/01 n/a F-04 BEOF Emergency Equipment 1 05/16/01 n/a F-05 EOF Environmental Lab 0 04/28/92 n/a Equipment F-06 Emergency Vehicle Kit 0 04/28/92 n/a F-07 Field Monitoring Kit 3 10/16/01 n/a F-08 Hospital Kit 2 05/16/01 n/a F-09 Decontamination Kit 2 10/16/94 n/a F-10 TSC Administrative Supplies 4 05/16/01 n/a F-11 OSC Administrative Supplies 1 05/16/01 n/a F-12 OSC Maintenance Tool Box 3 05/16/01 n/a F-13 First Aid Kit (Trauma Kit) 2 05/16/01 n/a F-14 EOF Administrative Supplies 2 05/16/01 n/a F-15 BEOF Administrative 1 05/16/01 n/a Supplies CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: PAGE: NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE F- 16 JPIC Administrative Supplies F- 17 EOP Supply Kit F- 18 EOP MCR Tool Bag EMERGENCY COMMUNICATIONS EQUIPMENT 2 4 1 5 04/11/01 n/a 09/30/99 n/a 05/16/01 n/a 11/07/00 n/a MISCELLANEOUS (MS)TRANSPORTATION ACCIDENTS NOTIFICATION OF NEXT OF KIN PROCESSING NRC & IDNS PERSONNEL DURING AN EMERGENCY 4 4 4 10/13/97 511 02/01/00 01/12/96 5/1, 5/2 02/03/99, 12/13/99 06/06/00 n/a 18-Oct-01 8 of 10 FE-06 MS-01 MS-03 MS-04 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE PUBLIC RELATIONS (PR)PR-01 JOINT PUBLIC INFORMATION CENTER OPERATION AND STAFFING F-01 JPIC Administration Coordinator Checklist F-02 JPIC Audiovisual Support Checklist F-03 JPIC Director Checklist F-06 JPIC Graphic Support Checklist F-07 JPIC Public Information Officer Checklist F-08 JPIC Media Coordinator Checklist F-09 JPIC Media Monitoring Team Checklist F- 12 JPIC Technical Advisor Checklist F-13 JPIC Technical Information Coordinator Checklist F-14 Writer Checklist F- 18 JPIC Administrative Support Staff PREPARATION AND DISSEMINATION OF EMERGENCY INFORMATION PUBLIC INFORMATION
& EDUCATION DATE: PAGE: 18-Oct-01 9 of 10 08/23/01 n/a 08/23/01 n/a 02/06/97 n/a 08/23/01 n/a 07/28/92 n/a 04/11/01 n/a 08/24/01 n/a 07/28/92 n/a 07/28/92 n/a 07/28/92 n/a 07/28/92 n/a 08/23/01 n/a 05/16/01 n/a 06/15/01 n/a PR-03 PR-05 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 10 of 10 NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE RADIOLOGICAL ASSESSMENT (RA)RA-01 RA-02 RA-03 RA-04 RA-05 RA-06 RA-07 RA-09 RA-11 RA-14 RA-15 RA-16 RA-17 RA-18 MANUAL RADIOLOGICAL DOSE ASSESSMENT PROTECTIVE ACTION RECOMMENDATIONS RADIOLOGICAL EXPOSURE GUIDELINES PERSONNEL MONITORING
& DECONTAMINATION PERSONNEL PROTECTION STATION RADIOLOGICAL SURVEYS FIELD RADIOLOGICAL MONITORING POST ACCIDENT SAMPLING STACK EFFLUENT ANALYSIS & SAMPLING DOSE RATE DETERMINATION BASED ON ENVIRONMENTAL AIR SAMPLES PREDICTIVE RELEASE RATES COMPUTERIZED RADIOLOGICAL DOSE ASSESSMENT RADIOLOGICAL CONTROL OF THE EOF EOF ENVIRONMENTAL LAB OPERATIONS 5/16/01 n/a 08/03/99 n/a 08/20/99 7/1 11/29/99 08/08/01 n/a 10/13/97 n/a 08/03/99 n/a 02/24/00 n/a 06/03/96 n/a 08/03/99 n/a 10/12/94 7/1 06/19/97 08/27/00 n/a 12/14/99 n/a 02/18/98 n/a 08/03/99 n/a CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
REVISION:
PAGE: EMERGENCY FACILITY AND EQUIPMENT CHECKS SCOPE OF REVISION: Authority Prepared by Made title changes as appropriate.
Added verbage to Attachment 1 to ensure proper charging of battery powered equipment.
Changed FTS-2000 phones to FTS-2001.Function Signature GreR Birk Date I 10/9/01 Security Manager Concurrence Concurrence Concurrence Independent Reviewer Manager-Clinton Power Station (.0  yy q- ....... .h- -, ., ]- I gu? I J/4 sO/A I  DOCUMENT CONTROL 001 CONTROLLED COPY CLINTON POWER STATION AP-09 8 1 of 6@
CLINTON POWER STATION PROCEDURE:
AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
8 PAGE: 2of6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS


==1.0 INTRODUCTION==
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                        DATE:  18-Oct-01 PAGE:    1 oflO STATUS REPORT NT TMRF R  EPIP TITLE                REVISION  DATE        ACN'S  ACN DATE ADMINISTRATIVE PROCEDURE (AP)
AP-01      ORGANIZATION &                7      05/16/01    n/a PREPARATION OF CONTROLLED DOCUMENTS AP-02      REVISIONS AND ADVANCE          16    07/03/01    n/a CHANGE NOTICES AP-03      EMERGENCY RECORDS            4      01/12/96    5/1      02/03/99 RETENTION AP-04      PREPARATION & CONDUCT OF      5      08/03/99    n/a EMERGENCY DRILLS &
EXERCISES AP-05      EMERGENCY PREPAREDNESS        11    08/03/01    n/a TRAINING PROGRAM AP-06    REVIEW OF EMERGENCY            6      08/23/01    n/a PREPAREDNESS PROGRAM AP-07    ALERT AND NOTIFICATION        8      06/15/01    n/a SYSTEM AP-09    EMERGENCY FACILITY AND        8      10/16/01    n/a EQUIPMENT CHECKS AP-10      EMERGENCY RESPONSE            9      10/16/01    n/a ORGANIZATION ASSIGNMENTS DOCUMENT CONTROL OCT 2 3 2001 CON4WL ED COPY CLINTON POWER STATION


1.1 Purpose The purpose of this procedure is to ensure proper operation and availability of CPS emergency communications equipment on a periodic basis. This procedure also establishes a program to evaluate and document the readiness of emergency response facilities.
CLINTON POWER STATION DATE: 18-Oct-01 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                  PAGE:    2 of 10 STATUS REPORT REVISION  DATE      ACN'S  ACN DATE NUMBER    EPIP TITLE EMERGENCY CONTROL (EC)
2.0 RESPONSIBILITY 2.1 Supervisor-Emergency Planning -is responsible for reviewing completed Facility Logs. 2.2 Security Manager -is responsible for the review and implementation of this procedure.
CPS EMERGENCY RESPONSE                    8      08/23/01  n/a EC-01 ORGANIZATION & STAFFING F-01    Interim Station Emergency        5      08/02/01  n/a Director 5      06/15/01    n/a F-02    Station Emergency Director (SED) 2      06/15/01  n/a F-03    SED Administrative Support 4      09/25/01  n/a F-04    TSC Administrative Supervisor F-05    Technical Assessment                      04/21/99  n/a Supervisor 04/21/99  n/a F-06    Emergency Operations Supervisor                        1 09/25/01  n/a F-07    TSC Radiological Supervisor 1
2.3 Manager-Clinton Power Station -is responsible for final approval of this procedure.
08/26/99  n/a F-08    OSC Supervisor 0      07/28/92  n/a F-09    Station Security Coordinator 4      08/23/01    n/a F- 10  TSC Communicator 0      07/28/92    n/a F-11    TSC Records Management Coordinator 2      04/21/99  n/a F- 12    TSC Electrical Engineer 1      04/21/99  n/a F- 13    TSC Reactor Engineer 2      04/21/99  n/a F- 14  TSC Chemist-Nuclear 04/21/99  n/a F- 15  Operations Coordinator 5      02/28/00  n/a F- 16  TSC Computer Operator
3.0 DEFINITIONS 3.1 Operable -the communication device transmits and/or receives clearly.
 
3.2 Communication Device -a communication device may include the following:
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                                DATE: 18-Oct-01 PAGE:    3 of 10 STATUS REPORT NUMBER    EPIP TITLE                          REVISION  DATE    ACNWS ACN DATE F- 17  Radiological Engineering          1      11/23/93  n/a Specialist F- 19  RP (TSC) Communicator            0      07/28/92  n/a F-20    Status Board Keepers            0      07/28/92  n/a F-21    Radiological Controls            0      07/28/92  1/1    06/29/00 Supervisor F-22    In-station Emergency Teams      0      07/28/92  n/a F-23  OSC Radiological Controls        1      04/11/01  n/a Coordinator F-24  Assistant OSC Radiological      0      07/28/92  n/a Controls Coordinator F-25  RP (OSC) Communicator            0      07/28/92  n/a F-26  Emergency Team Coordinator        1      10/18/93  n/a F-28  Emergency Manager                3      06/15/01  n/a F-30  EOF Director                      3      03/05/97  n/a F-31  Executive Administrative          2      06/15/01  n/a Support F-32  Licensing Advisor                0      07/28/92  n/a F-33  EOF Emergency Advisor            3      04/11/01  n/a F-34  EOF Technical Advisor            0      07/28/92  n/a F-36  Technical Information Liaison    1      01/22/97  n/a F-37    Emergency Action                0      07/28/92  n/a Level/Protective Action Evaluator F-38    Security Supervisor              0      07/28/92  n/a F-39    Radiation Protection            2      09/25/01  n/a Supervisor
* any telephone instrument, regardless of type, 0 any radio transmitter or receiver (i.e.; hand held radio, mobile vehicle radio or equivalent, remote control console, etc.),
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                              DATE: 18-Oct-01 PAGE:    4 of 10 STATUS REPORT NUMBER    EPIP TITLE                          REVISION  DATE    ACN'S  ACN DATE F-40  EOF Administrative              2      07/25/00  n/a Supervisor F-41  EOF Engineering Supervisor      0      07/28/92  1/1    07/28/99 F-42  RP (EOF) Communicator            0      07/28/92  n/a F-43  Dose Assessment Supervisor      1      12/01/93  n/a F-44  Dose Assessor                    0      07/28/92  n/a F-45  Field Team Coordinator          2      01/10/00  n/a F-46  Field Teams                      0      07/28/92  n/a F-47  Radiological Controls            1      11/23/93  n/a Coordinator F-48  Environmental Lab                1      11/23/93  2/1    03/25/99 Coordinator F-49  EOF Monitor                      0      07/28/92  n/a 0      07/28/92  n/a F-50  EOF Records Management Coordinator F-51  EOF Communicator                  3      02/24/00  n/a F-53  Copy Clerk                        0      07/28/92  n/a F-54  TSC Emergency Advisor            0      07/28/92  n/a F-55  Procurement Coordinator          1      05/16/01 n/a 1      05/16/01 n/a F-56  Word Processor F-57  EOF Computer Operator            4      09/02/99 n/a F-58  Mechanical/Nuclear Engineer      0      07/28/92 n/a F-59  EOF Electrical Engineer          0      07/28/92  n/a F-60  Core Damage Assessor            0      07/28/92  n/a
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                            DATE:    18-Oct-01 PAGE:      5 of 10 STATUS REPORT NUMBER    EPIP TITLE                        REVISION  DATE    ACN'S    ACN DATE F-61  Technical Advisor to          0      07/28/92 n/a State/Local Organizations F-62  EOF Administrative Support    0      07/28/92 n/a F-63  Fire Brigade Coordinator      0      07/28/92 n/a F-64  RAFT Liaison                  0      07/28/92 n/a F-65  Warehouseman                  1      05/17/01 n/a F-66  EOF Access Control            3      08/23/01 n/a Coordinator F-67  PASS Team Leader                1      05/24/93 n/a F-68  Fitness for Duty (FFD)        0      07/28/92 n/a Coordinator F-69  HAZMAT Team Leader            0      07/28/92 n/a F-70  Assistant Emergency Team      0      07/28/92 n/a Coordinator F-71  OSC Communicator              0      07/28/92 n/a F-72  OSC Support                    0      10/05/93 n/a F-73  Mechanical Engineer            0      07/27/99 n/a EC-02    EMERGENCY CLASSIFICATIONS            6      04/24/98 7/1,      01/27/99, 7/2, 7/3  12/13/99, 12/20/99 EC-03    NOTIFICATION OF UNUSUAL              6      06/15/01 n/a EVENT EC-04    ALERT                                6      06/15/01  n/a EC-05    SITE AREA EMERGENCY                  6      06/15/01  n/a EC-06    GENERAL EMERGENCY                    6      06/15/01  n/a EC-07    EMERGENCY PLAN                        13    09/25/01  n/a NOTIFICATION
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                            DATE:    18-Oct-01 PAGE:      6 of 10 STATUS REPORT NUMBER    EPIP TITLE                        REVISION  DATE    ACN1 S    ACN DATE F-01  State and NRC Notifications    2      10/16/01  n/a Checklist EC-08    NON-ESSENTIAL PERSONNEL              8      07/23/00  n/a EVACUATION EC-09    SECURITY DURING                      6      08/23/01  n/a EMERGENCIES EC-10    PERSONNEL ACCOUNTABILITY              7      06/15/01  n/a EC-11    REENTRY                              4      08/03/99  n/a EC-12    EMERGENCY TEAMS                        8      10/03/00  n/a EC-13    REACTOR CORE DAMAGE                  4      09/19/97  5/1, 5/2  12/01/97, ESTIMATION                                                        09/28/99 EC-14    RECOVERY                              3      10/21/94 4/1,      02/08/96, 4/2, 4/3  02/03/99, 12/13/99 F-01  Recovery Checklist              0      10/21/94 n/a
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                              DATE:    18-Oct-01 PAGE:      7 of 10 STATUS REPORT NUMBER      EPIP TITLE                          REVISION  DATE    ACN'S    ACN DATE FACILITIES AND EQUIPMENT (FE)
FE-01      TSC OPERATIONS                        8      08/23/01 n/a FE-02      OSC OPERATIONS                        6      06/09/97 7/1, 7/2  07/23/99, 08/02/01 FE-03      EOF OPERATIONS                        7      08/23/01 n/a FE-04      BEOF OPERATIONS                        7      08/23/01 n/a FE-05      EMERGENCY EQUIPMENT &                  11      05/26/97 n/a SUPPLIES F-02  OSC Emergency Equipment        4      05/16/01 n/a F-03  EOF Emergency Equipment        5      10/16/01 n/a F-04  BEOF Emergency Equipment        1      05/16/01 n/a F-05  EOF Environmental Lab          0      04/28/92 n/a Equipment F-06  Emergency Vehicle Kit          0      04/28/92 n/a F-07  Field Monitoring Kit            3      10/16/01 n/a F-08  Hospital Kit                    2      05/16/01 n/a F-09  Decontamination Kit              2      10/16/94 n/a F-10  TSC Administrative Supplies    4      05/16/01 n/a F-11  OSC Administrative Supplies      1      05/16/01 n/a F-12 OSC Maintenance Tool Box          3      05/16/01 n/a F-13  First Aid Kit (Trauma Kit)      2      05/16/01 n/a F-14  EOF Administrative Supplies      2      05/16/01 n/a F-15  BEOF Administrative              1    05/16/01 n/a Supplies
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                            DATE:    18-Oct-01 PAGE:      8 of 10 STATUS REPORT NUMBER    EPIP TITLE                          REVISION  DATE    ACN'S    ACN DATE F- 16 JPIC Administrative Supplies    2      04/11/01 n/a F- 17 EOP Supply Kit                  4      09/30/99 n/a F- 18  EOP MCR Tool Bag                1      05/16/01 n/a FE-06    EMERGENCY                              5      11/07/00 n/a COMMUNICATIONS EQUIPMENT MISCELLANEOUS (MS)
MS-01    TRANSPORTATION ACCIDENTS              4      10/13/97 511        02/01/00 MS-03    NOTIFICATION OF NEXT OF KIN            4      01/12/96 5/1, 5/2  02/03/99, 12/13/99 MS-04    PROCESSING NRC & IDNS                  4      06/06/00 n/a PERSONNEL DURING AN EMERGENCY
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                                DATE: 18-Oct-01 PAGE:    9 of 10 STATUS REPORT NUMBER    EPIP TITLE                          REVISION  DATE    ACN'S  ACN DATE PUBLIC RELATIONS (PR)
PR-01      JOINT PUBLIC INFORMATION                        08/23/01  n/a CENTER OPERATION AND STAFFING F-01  JPIC Administration                      08/23/01  n/a Coordinator Checklist F-02  JPIC Audiovisual Support                02/06/97  n/a Checklist F-03  JPIC Director Checklist                  08/23/01  n/a F-06  JPIC Graphic Support                    07/28/92  n/a Checklist F-07  JPIC Public Information                  04/11/01  n/a Officer Checklist F-08  JPIC Media Coordinator                  08/24/01  n/a Checklist F-09    JPIC Media Monitoring                  07/28/92  n/a Team Checklist F- 12  JPIC Technical Advisor                  07/28/92  n/a Checklist F-13  JPIC Technical Information              07/28/92  n/a Coordinator Checklist F-14  Writer Checklist                        07/28/92  n/a F- 18  JPIC Administrative Support            08/23/01  n/a Staff PR-03      PREPARATION AND                                05/16/01  n/a DISSEMINATION OF EMERGENCY INFORMATION PR-05      PUBLIC INFORMATION &                            06/15/01  n/a EDUCATION
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                      DATE: 18-Oct-01 PAGE:  10 of 10 STATUS REPORT NUMBER    EPIP TITLE                  REVISION  DATE    ACN'S ACN DATE RADIOLOGICAL ASSESSMENT (RA)
RA-01    MANUAL RADIOLOGICAL                    08/20/99  7/1    11/29/99 DOSE ASSESSMENT RA-02    PROTECTIVE ACTION                      08/08/01  n/a RECOMMENDATIONS RA-03    RADIOLOGICAL EXPOSURE                  10/13/97  n/a GUIDELINES RA-04    PERSONNEL MONITORING &                08/03/99  n/a DECONTAMINATION RA-05    PERSONNEL PROTECTION                  02/24/00  n/a RA-06    STATION RADIOLOGICAL                  06/03/96  n/a SURVEYS RA-07    FIELD RADIOLOGICAL                    08/03/99  n/a MONITORING RA-09    POST ACCIDENT SAMPLING                  10/12/94 7/1    06/19/97 RA-11      STACK EFFLUENT ANALYSIS &            08/27/00  n/a SAMPLING RA-14      DOSE RATE DETERMINATION                12/14/99 n/a BASED ON ENVIRONMENTAL AIR SAMPLES RA-15    PREDICTIVE RELEASE RATES              02/18/98  n/a RA-16    COMPUTERIZED                          08/03/99 n/a RADIOLOGICAL DOSE ASSESSMENT RA-17    RADIOLOGICAL CONTROL OF                5/16/01  n/a THE EOF RA-18    EOF ENVIRONMENTAL LAB                  08/03/99  n/a OPERATIONS
 
CLINTON POWER STATION                                                        PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                            REVISION: 8 PAGE: 1 of 6 TITLE:      EMERGENCY FACILITY AND EQUIPMENT CHECKS SCOPE OF REVISION:        Made title changes as appropriate. Added verbage to Attachment 1 to ensure proper charging of battery powered equipment. Changed FTS-2000 phones to FTS-2001.
Authority Function                                      Signature                  Date Prepared by                                                        GreR Birk            I    10/9/01 Security Manager                                    @
(.0 lo*10o yy q-.......  . h- -, .      ,      ]-  I Concurrence Concurrence                                                            gu?
sO/A II  J/4
                                                                                              *j/4 Concurrence Independent Reviewer Manager-Clinton Power Station DOCUMENT CONTROL 0*2    001 CONTROLLED COPY CLINTON POWER STATION
 
CLINTON POWER STATION                                                          PROCEDURE:        AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                            REVISION:      8 PAGE:    2of6 TITLE:        EMERGENCY FACILITY AND EQUIPMENT CHECKS
 
==1.0    INTRODUCTION==
 
1.1  Purpose The purpose of this procedure is to ensure proper operation and availability of CPS emergency communications equipment on a periodic basis. This procedure also establishes a program to evaluate and document the readiness of emergency response facilities.
2.0   RESPONSIBILITY 2.1   Supervisor-Emergency Planning - is responsible for reviewing completed Facility Logs.
2.2   Security Manager - is responsible for the review and implementation of this procedure.
2.3   Manager-Clinton Power Station - is responsible for final approval of this procedure.
3.0   DEFINITIONS 3.1   Operable - the communication device transmits and/or receives clearly.
3.2   Communication Device - a communication device may include the following:
* any telephone instrument, regardless of type, 0       any radio transmitter or receiver (i.e.; hand held radio, mobile vehicle radio or equivalent, remote control console, etc.),
* pagers,
* pagers,
* any facsimile transceiver, or
* any facsimile transceiver, or
Line 59: Line 78:
* satellite phones may be temporarily placed in emergency facilities, these phones should be checked if available,
* satellite phones may be temporarily placed in emergency facilities, these phones should be checked if available,
* computers.
* computers.
3.3 Emergency Response Facility Readiness  
3.3   Emergency Response Facility Readiness - the capability of an emergency response facility to support emergency response organization functions and duties. The applicable emergency response facility operations procedure, listed as references to this procedure, may be referenced to establish required capabilities of each emergency response facility
-the capability of an emergency response facility to support emergency response organization functions and duties. The applicable emergency response facility operations procedure, listed as references to this procedure, may be referenced to establish required capabilities of each emergency response facility CLINTON POWER STATION PROCEDURE:
 
AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
CLINTON POWER STATION                                                     PROCEDURE:       AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                       REVISION:       8 PAGE:     3 of 6 TITLE:     EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.0   INSTRUCTIONS 4.1 Communications Equipment Operability Checks 4.1.1 Operability checks of communication devices located in the Emergency Response Facilities shall be demonstrated at least monthly 4.1.2 Equipment in all of the emergency response facilities is to be tested 4.1.3 For telephone communication devices, operability should be demonstrated by calling another telephone, or the opposite end of the same circuit in the case of a ringdown phone, and verbally communicate. When performing any communications test, clearly state that you are conducting a test. If any telephone equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.
8 PAGE: 3 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.0 INSTRUCTIONS 4.1 Communications Equipment Operability Checks 4.1.1 Operability checks of communication devices located in the Emergency Response Facilities shall be demonstrated at least monthly 4.1.2 Equipment in all of the emergency response facilities is to be tested 4.1.3 For telephone communication devices, operability should be demonstrated by calling another telephone, or the opposite end of the same circuit in the case of a ringdown phone, and verbally communicate.
4.1.4 For two-way radio communication devices, actual two-way communication should be conducted to demonstrate operability. If any radio equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.
When performing any communications test, clearly state that you are conducting a test. If any telephone equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.
4.1.5 For facsimile transceivers, operability should be demonstrated by transmitting and receiving a test copy. If a facsimile machine fails to operate then the applicable vendor or Document Control should be contacted to initiate corrective maintenance.
4.1.4 For two-way radio communication devices, actual two-way communication should be conducted to demonstrate operability.
4.1.6 The OCA Notification System is tested by making a test announcement on the second Tuesday of each month and verifying operability on as many speakers as feasible. If the system fails to operate then notify security of the affected areas and contact the appropriate repair department to initiate corrective maintenance.
If any radio equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.
4.1.7 ERO Pagers are tested at least monthly. If a pager fails to activate troubleshoot the pager, and repair or replace as appropriate.
4.1.5 For facsimile transceivers, operability should be demonstrated by transmitting and receiving a test copy. If a facsimile machine fails to operate then the applicable vendor or Document Control should be contacted to initiate corrective maintenance.
4.1.8 Check FTS 2001 circuits as described below. If an FTS telephone fails to operate then the NRC Operations Center in Rockville, Maryland should be contacted over the commercial telephone system to have the system returned to service.
4.1.6 The OCA Notification System is tested by making a test announcement on the second Tuesday of each month and verifying operability on as many speakers as feasible.
: a.     Emergency Notification System (ENS) - Call NRC Operations Center.
If the system fails to operate then notify security of the affected areas and contact the appropriate repair department to initiate corrective maintenance.
: b.     All other circuits - perform an internal check by dialing 700 followed by its 7 digit phone number.
4.1.7 ERO Pagers are tested at least monthly. If a pager fails to activate troubleshoot the pager, and repair or replace as appropriate.
 
4.1.8 Check FTS 2001 circuits as described below. If an FTS telephone fails to operate then the NRC Operations Center in Rockville, Maryland should be contacted over the commercial telephone system to have the system returned to service.
CLINTON POWER STATION                                                   PROCEDURE:       AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                       REVISION:     8 PAGE:   4 of 6 TITLE:   EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.9 During the checks of the Nuclear Accident Report System (NARS), conduct a roll call with the State and local authorities from at least one of the Clinton NARS stations located in the:
: a. Emergency Notification System (ENS) -Call NRC Operations Center. b. All other circuits -perform an internal check by dialing 700 followed by its 7 digit phone number.
CLINTON POWER STATION PROCEDURE:
AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
8 PAGE: 4 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.9 During the checks of the Nuclear Accident Report System (NARS), conduct a roll call with the State and local authorities from at least one of the Clinton NARS stations located in the:
* Main Control Room (MCR)
* Main Control Room (MCR)
* Technical Support Center (TSC)
* Technical Support Center (TSC)
* Emergency Operations Facility (EOF)
* Emergency Operations Facility (EOF)
* Backup Emergency Operations Facility (BEOF) The roll call should be conducted as follows: a. Attempt to pre-position personnel at the TSC, EOF, Backup EOF, and simulator to participate in the roll call. b. From your location, dial 36 on the NARS station and announce: "This is the Clinton (location)  
* Backup Emergency Operations Facility (BEOF)
.Please standby for a roll call." c. Request acknowledgment from each of the parties on the Clinton NARS circuit other than your location.
The roll call should be conducted as follows:
The parties on the Clinton circuit are:
: a.       Attempt to pre-position personnel at the TSC, EOF, Backup EOF, and simulator to participate in the roll call.
: b.       From your location, dial 36 on the NARS station and announce:
                          "This is the Clinton (location) . Please standby for a roll call."
: c.       Request acknowledgment from each of the parties on the Clinton NARS circuit other than your location. The parties on the Clinton circuit are:
* Illinois Emergency Management Agency (IEMA)
* Illinois Emergency Management Agency (IEMA)
* Illinois Department of Nuclear Safety (IDNS)
* Illinois Department of Nuclear Safety (IDNS)
Line 88: Line 106:
* Technical Support Center (TSC)
* Technical Support Center (TSC)
* Emergency Operations Facility (EOF)
* Emergency Operations Facility (EOF)
* Backup Emergency Operations Facility (BEOF) Thank each party for their participation after they answer the roll call. 4.1.10 Operability of the NARS telephones may also be verified by having the State conduct a roll call with personnel stationed at the NARS telephones.
* Backup Emergency Operations Facility (BEOF)
Thank each party for their participation after they answer the roll call.
4.1.10 Operability of the NARS telephones may also be verified by having the State conduct a roll call with personnel stationed at the NARS telephones.
4.1.11 If any of the NARS telephones fail to operate then IEMA should be contacted to initiate corrective maintenance.
4.1.11 If any of the NARS telephones fail to operate then IEMA should be contacted to initiate corrective maintenance.
4.1.12 For the ERO Notification System, operability shall be demonstrated by activating the system (usually for the monthly pager test). If the system fails to operate then notify Security that the system is inoperable and initiate appropriate actions to reestablish operability.
4.1.12 For the ERO Notification System, operability shall be demonstrated by activating the system (usually for the monthly pager test). If the system fails to operate then notify Security that the system is inoperable and initiate appropriate actions to reestablish operability.
CLINTON POWER STATION PROCEDURE:
AP-09 "EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
8 PAGE: 5 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.13 Computers should be checked by powering each system up and verifying operability.
4.2 Emergency Response Facility Inspections Inspections of the Emergency Response Facilities (ERFs) should be conducted monthly. The inspections should be conducted as follows: 4.2.1 Perform a walk-through of each emergency response facility noting the arrangement and condition of materials, equipment, and supplies. (NOTE: When facilities are eliminated through a change to the Emergency Plan, that facility may be marked "NA".) 4.2.2 Typical equipment associated with emergency response facilities which should be observed may include, but not be limited to, the following:
-MESOREM Computer -Walkdown EOF HVAC -Performance Monitoring System/Display Control System (PMS/DCS)
-Inspect external doors to EOF -Area Radiation/Process Radiation Monitoring System (AR/PR) -Meteorological Monitoring Systems -Battery powered equipment
-EOF Particulate Iodine Noble Gas and Area Radiation Monitors (PING/ARM)
-EOF Environmental Lab Equipment
-Personnel Protective Equipment and Emergency Kits -Un-interruptable power supplies 4.2.3 Ensure that the appropriate maintenance work request has been written for any equipment deficiencies noted. 4.3 Documentation 4.3.1 Attachment 1, FACILITY CHECK LOG, should be used to document communications and facility checks. 4.3.2 The completed FACILITY CHECK LOG shall be provided to the Supervisor Emergency Planning for review and approval.
CLINTON POWER STATION PROCEDURE:
AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
8 PAGE: 6 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.3.4 If some portion of the check cannot be performed, the circumstances and recommendations for deferral or rescheduling should be documented on the FACILITY CHECK LOG. Similarly, it may be noted in the FACILITY CHECK LOG that a portion of the checks have been satisfied by actual use, e.g., during a drill or exercise or by recent or daily use. 4.3.5 Corrective actions to any deficiencies/discrepancies noted during readiness inspections which cannot be completed immediately should be added to the emergency planning tracking system. 4.3.6 If conditions warrant, a condition report shall be written by the individual performing the inspection in accordance with LS-AA-125, CORRECTIVE ACTION PROGRAM (CAP) PROCEDURES.
The deficiencies/discrepancies shall also be reviewed for potential reportability in accordance with 10CFR50.72.
4.3.7 The Manager-Clinton Power Station and the Vice President should be informed of any emergency response facility found degraded to a point which would prohibit it from being activated.
4.3.8 Approved FACILITY CHECK LOGS shall be retained in accordance with Records Management Standards 2.04. 


==5.0 REFERENCES==
CLINTON POWER STATION                                                      PROCEDURE:      AP-09 "EMERGENCYPLAN IMPLEMENTING PROCEDURE                                        REVISION:    8 PAGE:    5 of 6 TITLE:      EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.13    Computers should be checked by powering each system up and verifying operability.
: 1. CPS Emergency Plan, Sections 3.2.7, 5.3 and 5.4.5.1 2. 10CFR50, Appendix E, Section IV.E 3. NUREG-0654, Revision 1 4. Records Management Standards 2.04 5. NRC Information Notice 89-19 6. LS-AA-125, Corrective Action Program (CAP) Procedures 6.0 ATTACHMENTS
4.2  Emergency Response Facility Inspections Inspections of the Emergency Response Facilities (ERFs) should be conducted monthly. The inspections should be conducted as follows:
: 1. FACILITY CHECK LOG CLINTON POWER STATION PROCEDURE:
4.2.1    Perform a walk-through of each emergency response facility noting the arrangement and condition of materials, equipment, and supplies. (NOTE: When facilities are eliminated through a change to the Emergency Plan, that facility may be marked "NA".)
AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION:
4.2.2    Typical equipment associated with emergency response facilities which should be observed may include, but not be limited to, the following:
8 ATTACHMENT:
                      - MESOREM Computer
1 PAGE: 1 of 2 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS Date(s) Check Performed:
                      - Walkdown EOF HVAC
Facility/Location Checked: MCR EOF TSC OSC JPIC BEOF INITIALS 1. Regular Telephones (MERIDIAN, CENTREX, OTHER) demonstrated operable.
                      - Performance Monitoring System/Display Control System (PMS/DCS)
: 2. Nuclear Accident Reporting System demonstrated operable.
                      - Inspect external doors to EOF
: 3. Emergency Automatic Ringdown (EAR) telephones demonstrated operable. (internal circuit checks) 4. FTS-2001 (one circuit only demonstrated operable by calling the NRC Headquarters).
                      - Area Radiation/Process Radiation Monitoring System (AR/PR)
: 5. Radios demonstrated operable (hand held, mobile vehicle radio or equivalent, remote control consoles).
                      - Meteorological Monitoring Systems
: 6. Facsimile machines demonstrated operable.
                      - Battery powered equipment
: 7. OCA Notification System demonstrated operable.
                      - EOF Particulate Iodine Noble Gas and Area Radiation Monitors (PING/ARM)
: 8. ERO Notification System demonstrated operable.
                      - EOF Environmental Lab Equipment
: 9. ERO Pagers demonstrated operable. (OGH) (NSB) 10. EOF HVAC equipment walked down. 11. UPS walkdown.
                      - Personnel Protective Equipment and Emergency Kits
: 12. Inspect EOF external door seals for damage. 13. Inspect battery powered equipment for damage and to ensure proper charging.
                      - Un-interruptable power supplies 4.2.3    Ensure that the appropriate maintenance work request has been written for any equipment deficiencies noted.
4.3  Documentation 4.3.1    Attachment 1, FACILITY CHECK LOG, should be used to document communications and facility checks.
4.3.2    The completed FACILITY CHECK LOG shall be provided to the Supervisor Emergency Planning for review and approval.
 
CLINTON POWER STATION                                                      PROCEDURE:        AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                        REVISION:      8 PAGE:      6 of 6 TITLE:      EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.3.4  If some portion of the check cannot be performed, the circumstances and recommendations for deferral or rescheduling should be documented on the FACILITY CHECK LOG.
Similarly, it may be noted in the FACILITY CHECK LOG that a portion of the checks have been satisfied by actual use, e.g., during a drill or exercise or by recent or daily use.
4.3.5  Corrective actions to any deficiencies/discrepancies noted during readiness inspections which cannot be completed immediately should be added to the emergency planning tracking system.
4.3.6  If conditions warrant, a condition report shall be written by the individual performing the inspection in accordance with LS-AA-125, CORRECTIVE ACTION PROGRAM (CAP) PROCEDURES. The deficiencies/discrepancies shall also be reviewed for potential reportability in accordance with 10CFR50.72.
4.3.7  The Manager-Clinton Power Station and the Vice President should be informed of any emergency response facility found degraded to a point which would prohibit it from being activated.
4.3.8  Approved FACILITY CHECK LOGS shall be retained in accordance with Records Management Standards 2.04.
 
==5.0   REFERENCES==
: 1. CPS Emergency Plan, Sections 3.2.7, 5.3 and 5.4.5.1
: 2. 10CFR50, Appendix E, Section IV.E
: 3. NUREG-0654, Revision 1
: 4. Records Management Standards 2.04
: 5. NRC Information Notice 89-19
: 6. LS-AA-125, Corrective Action Program (CAP) Procedures 6.0   ATTACHMENTS
: 1. FACILITY CHECK LOG
 
CLINTON POWER STATION                                                   PROCEDURE:   AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                       REVISION: 8 ATTACHMENT:   1 PAGE: 1 of 2 TITLE:         EMERGENCY FACILITY AND EQUIPMENT CHECKS Date(s) Check Performed:
Facility/Location Checked:
MCR             EOF           TSC             OSC           JPIC         BEOF INITIALS
: 1.     Regular Telephones (MERIDIAN, CENTREX, OTHER) demonstrated operable.
: 2.     Nuclear Accident Reporting System demonstrated operable.
: 3.     Emergency Automatic Ringdown (EAR) telephones demonstrated operable. (internal circuit checks)
: 4.     FTS-2001 (one circuit only demonstrated operable by calling the NRC Headquarters).
: 5.     Radios demonstrated operable (hand held, mobile vehicle radio or equivalent, remote control consoles).
: 6.     Facsimile machines demonstrated operable.
: 7.       OCA Notification System demonstrated operable.
: 8.       ERO Notification System demonstrated operable.
: 9.       ERO Pagers demonstrated operable.                 (OGH)
(NSB)
: 10. EOF HVAC equipment walked down.
: 11. UPS walkdown.
: 12. Inspect EOF external door seals for damage.
: 13. Inspect battery powered equipment for damage and to ensure proper charging.
: 14. Computer systems verified operable.
: 14. Computer systems verified operable.
Deficiencies Noted, if any:
Deficiencies Noted, if any:
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
AP-09 REVISION:
8 ATTACHMENT:
1 PAGE: 2 of 2 EMERGENCY FACILITY AND EQUIPMENT CHECKS Corrective Actions Implemented:
Comments: Corrective Action(s) added to Action Tracking if not completed?
Yes No Tracking Number Not Applicable Performed By: Signature Reviewed and Approved By: Supervisor-Emergency Planning Date Date CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
AP-10 REVISION:
9 PAGE: 1 of 9 EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS SCOPE OF REVISION: Revised to incorporate organizational title changes and remove reference to ERO badges. Changed the title of Security Screening to Security Badging.
Designated department managers as having the responsibility to notify Emergency Planning of employee terminations.
Made other minor editorial changes. This also serves as the biennial review.Authority Function Prepared by Security Manager Concurrence Concurrence Concurrence Independent Reviewer Manager-Clinton Power Station Signature Greg Birk Date I 9/21/01 I / &/ I 0//I.  ' AA DOCUMENT CONTROL OCT 4 3 2001 CONTROLLED COPY CLINTON POWER STATION PROCEDURE:
AP-10 CLINTON POWER STATION REVISION:
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 2 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS CONTENTS


==1.0 INTRODUCTION==
CLINTON POWER STATION                                            PROCEDURE:  AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                REVISION: 8 ATTACHMENT:  1 PAGE:  2 of 2 TITLE:        EMERGENCY FACILITY AND EQUIPMENT CHECKS Corrective Actions Implemented:
Comments:
Corrective Action(s) added to Action Tracking if not completed?
Yes          Tracking Number No                  Not Applicable Performed By:
Signature                          Date Reviewed and Approved By:
Supervisor-Emergency Planning        Date


2.0 RESPONSIBILITY 3.0 DEFINITIONS 4.0 INSTRUCTIONS 4.1 Establishment of the Emergency Response Organization Roster 4.2 Changing the ERO Roster 4.3 Maintenance of the CPS Emergency Response Organization 4.4 Permanent Removal from the ERO 4.5 Changes in Employee Data
PROCEDURE:      AP-10 CLINTON POWER STATION                                                        REVISION:    9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                              PAGE:    1 of 9 TITLE:      EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS SCOPE OF REVISION:        Revised to incorporate organizational title changes and remove reference to ERO badges. Changed the title of Security Screening to Security Badging.
Designated department managers as having the responsibility to notify Emergency Planning of employee terminations. Made other minor editorial changes. This also serves as the biennial review.
Authority Function                                    Signature                    Date Prepared by                                                      Greg Birk            I    9/21/01 Security Manager Concurrence I    /
Concurrence
                                                                  &/                  I      0//I.
Concurrence Independent Reviewer                                            '  AA Manager-Clinton Power Station DOCUMENT CONTROL OCT 4 3 2001 CONTROLLED COPY CLINTON POWER STATION


==5.0 REFERENCES==
PROCEDURE:  AP-10 CLINTON POWER STATION                                                    REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                      PAGE:  2 of 9 TITLE:      EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS CONTENTS


6.0 ATTACHMENTS 7.0 FORMS PROCEDURE:
==1.0   INTRODUCTION==
AP-10 CLINTON POWER STATION REVISION:
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 3 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS


==1.0 INTRODUCTION==
2.0    RESPONSIBILITY 3.0    DEFINITIONS 4.0    INSTRUCTIONS 4.1   Establishment of the Emergency Response Organization Roster 4.2  Changing the ERO Roster 4.3  Maintenance of the CPS Emergency Response Organization 4.4  Permanent Removal from the ERO 4.5  Changes in Employee Data


The purpose of this procedure is to provide instructions for maintaining and updating assignments of personnel to the Emergency Response Organization (ERO). 2.0 RESPONSIBILITY 2.1 Manager-Clinton Power Station is responsible for the approval of this procedure, for providing training to candidates assigned to the ERO and for resolving differences between Department Managers and the Security Manager over ERO assignments.
==5.0    REFERENCES==
2.2 Security Manager is responsible for maintaining the Emergency Response Organization, by ensuring training is provided and positions are filled with qualified candidates.
 
2.3 Department Managers and Directors (designees) are responsible for recommending candidates to fill particular ERO positions, and for providing Emergency Planning information on employee terminations.
6.0    ATTACHMENTS 7.0    FORMS
2.4 Security Badging is responsible for providing verification of fitness for duty requirements and security screening requirements for assigned ERO members are satisfied.
 
3.0 DEFINITIONS 3.1 Emergency Response Organization Roster -a list of individuals by position that are assigned to the CPS Emergency Response Organization, or are candidates in training to fill such a position.
PROCEDURE:      AP-10 CLINTON POWER STATION                                                              REVISION:  9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                                    PAGE:  3 of 9 TITLE:        EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS
4.0 INSTRUCTIONS 4.1 Establishment of the Emergency Response Organization Roster 4.1.1 Emergency Planning shall maintain the official roster of personnel assigned to the Emergency Response Organization (ERO). The data base should be maintained on a computer.
 
4.1.2 The roster should contain the names of individuals assigned to the various ERO positions, as well as other data such as the individual's department, telephone/extension numbers, and mail codes.4.1.3 Individuals should only be assigned to one ERO position at a time.
==1.0    INTRODUCTION==
PROCEDURE:
 
AP-10 CLINTON POWER STATION REVISION:
The purpose of this procedure is to provide instructions for maintaining and updating assignments of personnel to the Emergency Response Organization (ERO).
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 4 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.1.4 The ERO roster may status individuals with regard to the completion of their initial training for their assigned ERO position.
2.0   RESPONSIBILITY 2.1   Manager-Clinton Power Station is responsible for the approval of this procedure, for providing training to candidates assigned to the ERO and for resolving differences between Department Managers and the Security Manager over ERO assignments.
Status Code 0 is used to designate persons that have not completed their initial training and demonstration, as in the case of a newly assigned individual.
2.2   Security Manager is responsible for maintaining the Emergency Response Organization, by ensuring training is provided and positions are filled with qualified candidates.
Status Code 1 is used to designate persons who have successfully completed initial training for their ERO position and have also demonstrated this knowledge.
2.3   Department Managers and Directors (designees) are responsible for recommending candidates to fill particular ERO positions, and for providing Emergency Planning information on employee terminations.
These persons are considered actively participating in the ERO. Status Code 2 is used to designate persons who have been removed from active duty due to a temporary change or due to expiration of ERO Training.
2.4   Security Badging is responsible for providing verification of fitness for duty requirements and security screening requirements for assigned ERO members are satisfied.
4.1.5 The ERO roster maintained by Emergency Planning shall be the sole official source listing of ERO assignments.
3.0   DEFINITIONS 3.1   Emergency Response Organization Roster - a list of individuals by position that are assigned to the CPS Emergency Response Organization, or are candidates in training to fill such a position.
Training requirements should be in accordance with the most current ERO roster available.
4.0     INSTRUCTIONS 4.1   Establishment of the Emergency Response Organization Roster 4.1.1       Emergency Planning shall maintain the official roster of personnel assigned to the Emergency Response Organization (ERO). The data base should be maintained on a computer.
4.1.6 The Security Manager may make changes to the roster as necessary in accordance with section 4.2 of this procedure.
4.1.2       The roster should contain the names of individuals assigned to the various ERO positions, as well as other data such as the individual's department, telephone/extension numbers, and mail codes.
4.1.7 The accuracy of the ERO roster should be verified quarterly.
4.1.3       Individuals should only be assigned to one ERO position at a time.
4.1.8 Following the quarterly verification, copies of the updated ERO roster shall be provided to the Security Department.
 
Copies may also be provided at other times, specifically if changes have been made. 4.2 Changing the ERO Roster 4.2.1 Additions 4.2.1.1 Additions may be made to the ERO roster at any time to fill vacancies.
PROCEDURE:       AP-10 CLINTON POWER STATION                                                           REVISION:     9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                               PAGE:     4 of 9 TITLE:     EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.1.4   The ERO roster may status individuals with regard to the completion of their initial training for their assigned ERO position. Status Code 0 is used to designate persons that have not completed their initial training and demonstration, as in the case of a newly assigned individual. Status Code 1 is used to designate persons who have successfully completed initial training for their ERO position and have also demonstrated this knowledge. These persons are considered actively participating in the ERO. Status Code 2 is used to designate persons who have been removed from active duty due to a temporary change or due to expiration of ERO Training.
4.2.1.2 Emergency Planning shall notify Security Badging if the individual has not been granted access to the protected area. 4.2.1.3 Emergency Planning should then enter the employee information into the computer data base and enter that individual as a status "0" until initial training is completed, fitness for duty and security screening requirements are verified, and a practical demonstration has been performed.
4.1.5   The ERO roster maintained by Emergency Planning shall be the sole official source listing of ERO assignments. Training requirements should be in accordance with the most current ERO roster available.
4.2.2 Deletions 4.2.2.1 Deletions (except for employee terminations) should be made only on the recommendation of the department responsible for the position and with the approval of the Security Manager.
4.1.6   The Security Manager may make changes to the roster as necessary in accordance with section 4.2 of this procedure.
4.2.2.2 Deletions (except for employee terminations) should not be made unless a replacement has been identified and added per this procedure.
4.1.7   The accuracy of the ERO roster should be verified quarterly.
PROCEDURE:
4.1.8   Following the quarterly verification, copies of the updated ERO roster shall be provided to the Security Department. Copies may also be provided at other times, specifically if changes have been made.
AP-10 CLINTON POWER STATION REVISION:
4.2 Changing the ERO Roster 4.2.1   Additions 4.2.1.1       Additions may be made to the ERO roster at any time to fill vacancies.
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 5 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.3 Changes 4.2.3.1 Changes should only be made to the ERO roster during the quarterly update. Changes shall be made only on the recommendation of the responsible department and only with the approval of the Security Manager.
4.2.1.2       Emergency Planning shall notify Security Badging if the individual has not been granted access to the protected area.
4.2.3.2 If a change creates a vacancy it shall be filled per section 4.2.1 of this procedure at the same time that the change is recommended.
4.2.1.3       Emergency Planning should then enter the employee information into the computer data base and enter that individual as a status "0" until initial training is completed, fitness for duty and security screening requirements are verified, and a practical demonstration has been performed.
4.2.3.3 A determination shall be made on a case-by-case basis as to the status of the individual after reviewing previous ERO training completed.
4.2.2   Deletions 4.2.2.1       Deletions (except for employee terminations) should be made only on the recommendation of the department responsible for the position and with the approval of the Security Manager.
4.2.4 Temporary Changes 4.2.4.1 Temporary changes may be made to the ERO roster on the recommendation from the responsible department, with concurrence from the Security Manager.
4.2.2.2       Deletions (except for employee terminations) should not be made unless a replacement has been identified and added per this procedure.
4.2.4.2 Temporary changes may be made for:
 
PROCEDURE:         AP-10 CLINTON POWER STATION                                                   REVISION:       9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                         PAGE:     5 of 9 TITLE:   EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.3 Changes 4.2.3.1     Changes should only be made to the ERO roster during the quarterly update. Changes shall be made only on the recommendation of the responsible department and only with the approval of the Security Manager.
4.2.3.2     If a change creates a vacancy it shall be filled per section 4.2.1 of this procedure at the same time that the change is recommended.
4.2.3.3   A determination shall be made on a case-by-case basis as to the status of the individual after reviewing previous ERO training completed.
4.2.4 Temporary Changes 4.2.4.1   Temporary changes may be made to the ERO roster on the recommendation from the responsible department, with concurrence from the Security Manager.
4.2.4.2     Temporary changes may be made for:
* Extended sick leave
* Extended sick leave
* Maternity leave
* Maternity leave
* Extended travel outside of the area
* Extended travel outside of the area
* Extended training, such as SRO training 4.2.4.3 Vacancies created by temporary changes will be filled on a case-by case basis as determined by the Security Manager with considerations given for:
* Extended training, such as SRO training 4.2.4.3     Vacancies created by temporary changes will be filled on a case-by case basis as determined by the Security Manager with considerations given for:
* Length of time for temporary change
* Length of time for temporary change
* Positions affected
* Positions affected
* Training requirements 4.2.4.4 "Qualified individuals" are to be used in ERO positions.
* Training requirements 4.2.4.4   "Qualified individuals" are to be used in ERO positions. Temporary exceptions are approved on a case by case basis by the Security Manager for personnel shortfall purposes.
Temporary exceptions are approved on a case by case basis by the Security Manager for personnel shortfall purposes.
In an actual emergency, "Unqualified Individuals" may be used on a temporary basis, to alleviate the emergency and protect the health and safety of employees or the public. Their use must be approved by the Emergency Planning Coordinator, Station Emergency Director, or Emergency Manager. These exceptions are approved per the ERO Assignment Change Form prior to their use, or during an emergency, as time permits.
In an actual emergency, "Unqualified Individuals" may be used on a temporary basis, to alleviate the emergency and protect the health and safety of employees or the public. Their use must be approved by the Emergency Planning Coordinator, Station Emergency Director, or Emergency Manager. These exceptions are approved per the ERO Assignment Change Form prior to their use, or during an emergency, as time permits.
PROCEDURE:
 
AP-10 CLINTON POWER STATION REVISION:
PROCEDURE:         AP-10 CLINTON POWER STATION                                                     REVISION:     9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                           PAGE:     6 of 9 TITLE:   EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.5 Updating from Status 0 to Status 1 4.2.5.1     Emergency Planning should document when fitness for duty and security screening requirements are satisfied, and when course work is completed.
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 6 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.5 Updating from Status 0 to Status 1 4.2.5.1 Emergency Planning should document when fitness for duty and security screening requirements are satisfied, and when course work is completed.
4.2.5.2     When all required classroom training has been successfully completed and documented, Emergency Planning will contact the individual(s) and arrange for a practical demonstration as required by the CPS Emergency Plan. The demonstration will be conducted by Emergency Planning or other appropriate individuals designated by Emergency Planning and will be appropriate for the individual's ERO assignment, and level of previous experience and training. Successful participation in a scheduled drill will satisfy this requirement, but if this is not feasible, a one-on-one walkthrough or demonstration may be conducted.
4.2.5.2 When all required classroom training has been successfully completed and documented, Emergency Planning will contact the individual(s) and arrange for a practical demonstration as required by the CPS Emergency Plan. The demonstration will be conducted by Emergency Planning or other appropriate individuals designated by Emergency Planning and will be appropriate for the individual's ERO assignment, and level of previous experience and training.
4.2.5.3     The successful practical demonstration shall be documented on the ERO Assignment Change Form by signing the appropriate blocks. The ERO roster shall be updated to show the individual as Status Code 1.
Successful participation in a scheduled drill will satisfy this requirement, but if this is not feasible, a one-on-one walkthrough or demonstration may be conducted.
NOTE:       A separate ERO Assignment Change Form should be used for the Primary and the Alternate (if applicable) position.
4.2.5.3 The successful practical demonstration shall be documented on the ERO Assignment Change Form by signing the appropriate blocks. The ERO roster shall be updated to show the individual as Status Code 1. NOTE: A separate ERO Assignment Change Form should be used for the Primary and the Alternate (if applicable) position.
4.2.6 Updating From Status 2 to Status 1 4.2.6.1     When an individual is ready to be returned to duty, the ERO Roster should be updated to change the status from 2 to 1.
4.2.6 Updating From Status 2 to Status 1 4.2.6.1 When an individual is ready to be returned to duty, the ERO Roster should be updated to change the status from 2 to 1. 4.2.6.2 If the change to Status 2 was the result of a temporary change then Emergency Planning will determine if any additional training is needed prior to returning the individual to Status 1. This may include an interview with the individual to verify they are still familiar with their duties. 4.2.6.3 If the change to Status 2 resulted from expired ERO Training, the completed training date should be documented.
4.2.6.2     If the change to Status 2 was the result of a temporary change then Emergency Planning will determine if any additional training is needed prior to returning the individual to Status 1. This may include an interview with the individual to verify they are still familiar with their duties.
4.2.7 Overdue or Expired Annual ERO Training 4.2.7.1 Notices should be sent to Departmental Training Coordinators and ERO members to inform them of upcoming classroom training.
4.2.6.3     If the change to Status 2 resulted from expired ERO Training, the completed training date should be documented.
4.2.7.2 ERO members whose training becomes overdue shall be scheduled for makeup training before their ERO training expires.
4.2.7 Overdue or Expired Annual ERO Training 4.2.7.1     Notices should be sent to Departmental Training Coordinators and ERO members to inform them of upcoming classroom training.
4.2.7.3 Department Managers may be informed of ERO members whose training is overdue due to their failure to attend scheduled training.
4.2.7.2     ERO members whose training becomes overdue shall be scheduled for makeup training before their ERO training expires.
PROCEDURE:
4.2.7.3     Department Managers may be informed of ERO members whose training is overdue due to their failure to attend scheduled training.
AP-10 CLINTON POWER STATION REVISION:
 
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 7 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.7.4 Department Managers shall be informed of ERO members whose ERO training is expired.
PROCEDURE:       AP-10 CLINTON POWER STATION                                                         REVISION:     9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                             PAGE:     7 of 9 TITLE:     EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.7.4     Department Managers shall be informed of ERO members whose ERO training is expired.
4.2.7.5 The Vice President shall be informed of any expired training that has an immediate impact on the ERO. 4.2.7.6 A Condition Report shall be written documenting the expiration of ERO refresher training excluding access training, with the responsibility for resolving the Condition Report assigned to the individual's department.
4.2.7.5     The Vice President shall be informed of any expired training that has an immediate impact on the ERO.
NOTE Access training for ERO members such as Radworker or Respiratory Protection is covered in AP-05. 4.2.7.7 A Status "2" shall be entered in the ERO roster for expired ERO refresher training.
4.2.7.6     A Condition Report shall be written documenting the expiration of ERO refresher training excluding access training, with the responsibility for resolving the Condition Report assigned to the individual's department.
The Status shall be returned to a 1 upon completion of the appropriate refresher training.
NOTE Access training for ERO members such as Radworker or Respiratory Protection is covered in AP-05.
When refresher training is completed the ERO roster is updated by changing the status to 1. 4.3 Maintenance of the Emergency Response Organization 4.3.1 Department Managers should provide Emergency Planning notification of employee terminations.
4.2.7.7       A Status "2" shall be entered in the ERO roster for expired ERO refresher training. The Status shall be returned to a 1 upon completion of the appropriate refresher training. When refresher training is completed the ERO roster is updated by changing the status to 1.
4.3.2 If ERO vacancies are identified, the Emergency Planning Department should evaluate the impact of the vacancy upon the ERO capability to respond to an emergency.
4.3 Maintenance of the Emergency Response Organization 4.3.1 Department Managers should provide Emergency Planning notification of employee terminations.
If the impact is great, notify the responsible Department Manager immediately to recommend a replacement.
4.3.2 If ERO vacancies are identified, the Emergency Planning Department should evaluate the impact of the vacancy upon the ERO capability to respond to an emergency. If the impact is great, notify the responsible Department Manager immediately to recommend a replacement. If the impact is minor, replacement candidates may be identified during the next quarterly ERO roster update.
If the impact is minor, replacement candidates may be identified during the next quarterly ERO roster update. 4.3.3 If necessary, Emergency Planning may rely on the Manager-Clinton Power Station to obtain a suitable replacement.
4.3.3   If necessary, Emergency Planning may rely on the Manager-Clinton Power Station to obtain a suitable replacement.
4.3.4 Vacancies created by employee terminations should be treated as changes to the ERO roster and should be handled in accordance with section 4.2 of this procedure.
4.3.4   Vacancies created by employee terminations should be treated as changes to the ERO roster and should be handled in accordance with section 4.2 of this procedure.
4.3.5 CPS ERO members may be assigned to another work location other than CPS. When this happens the Department Manager is responsible for sending a copy of the Outprocessing Checklist to Emergency Planning for review.
4.3.5   CPS ERO members may be assigned to another work location other than CPS. When this happens the Department Manager is responsible for sending a copy of the Outprocessing Checklist to Emergency Planning for review.
PROCEDURE:
 
AP-10 " CLINTON POWER STATION REVISION:
PROCEDURE:       AP-10
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 8 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.3.6 Emergency Planning will review the ERO position and determine whether the individual will remain on the ERO, and will notify Security Badging as to the disposition of that individual in regards to remaining on the ERO. 4.3.7 ERO members who work at locations other than CPS but are assigned to the TSC, OSC or EOF shall remain in the CPS Fitness For Duty program.
" CLINTON POWER STATION                                                         REVISION:     9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                             PAGE:     8 of 9 TITLE:     EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.3.6 Emergency Planning will review the ERO position and determine whether the individual will remain on the ERO, and will notify Security Badging as to the disposition of that individual in regards to remaining on the ERO.
4.4 Permanent Removal from the ERO 4.4.1 Permanent removal from the ERO should be requested in writing and submitted with justification and concurrence from the appropriate Department Manager. A replacement candidate should be identified.
4.3.7 ERO members who work at locations other than CPS but are assigned to the TSC, OSC or EOF shall remain in the CPS Fitness For Duty program.
Each request will be reviewed on a case by case basis, with final approval coming from the Security Manager.
4.4 Permanent Removal from the ERO 4.4.1   Permanent removal from the ERO should be requested in writing and submitted with justification and concurrence from the appropriate Department Manager. A replacement candidate should be identified. Each request will be reviewed on a case by case basis, with final approval coming from the Security Manager.
4.4.2 A replacement candidate should be qualified per this procedure prior to permanent ERO removal, if possible.
4.4.2   A replacement candidate should be qualified per this procedure prior to permanent ERO removal, if possible.
4.5 Changes in Employee Data 4.5.1 The ERO roster contains personal information on each member assigned to the ERO. This information is needed for various reasons and will be held in strictest confidence.
4.5 Changes in Employee Data 4.5.1   The ERO roster contains personal information on each member assigned to the ERO.
Uses for the data include: .home telephone numbers are used to program the emergency response organization notification system
This information is needed for various reasons and will be held in strictest confidence. Uses for the data include:
                      . home telephone numbers are used to program the emergency response organization notification system
* home telephone numbers are also used to call additional personnel when needed, or to call personnel who do not respond to their pager activation.
* home telephone numbers are also used to call additional personnel when needed, or to call personnel who do not respond to their pager activation.
* Social Security Numbers are used for tracking training progress and for implementing dosimetry logs.
* Social Security Numbers are used for tracking training progress and for implementing dosimetry logs.
* CPS departments and mail codes are used to sort the roster for quarterly reviews and to ensure that mailing lists are accurate.
* CPS departments and mail codes are used to sort the roster for quarterly reviews and to ensure that mailing lists are accurate.
4.5.2 As noted above, it is important that the employee data be correct. Individuals assigned to an ERO position are encouraged to provide updated information to Emergency Planning whenever their personal data changes. Updated information may be provided by memo or telephone call to Emergency Planning.
4.5.2   As noted above, it is important that the employee data be correct. Individuals assigned to an ERO position are encouraged to provide updated information to Emergency Planning whenever their personal data changes. Updated information may be provided by memo or telephone call to Emergency Planning.
PROCEDURE:
AP-10 CLINTON POWER STATION REVISION:
9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 9 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS


==5.0 REFERENCES==
PROCEDURE:  AP-10 CLINTON POWER STATION                                                  REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                      PAGE:  9 of 9 TITLE:      EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS
: 1. CNP 4.03, Emergency Preparedness Program 2. CPS Emergency Plan, Sections 1.5.1 and 2.3, and Table 2-1 3. EC-01, CPS EMERGENCY RESPONSE ORGANIZATION AND STAFFING 5. PR-01, JOINT PUBLIC INFORMATION CENTER ORGANIZATION AND STAFFING 6. AP-05, EMERGENCY PREPAREDNESS TRAINING PROGRAM 6.0 ATTACHMENTS NONE 7.0 FORMS NONE
 
* rCLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
==5.0   REFERENCES==
REVISION:
: 1. CNP 4.03, Emergency Preparedness Program
FORM: PAGE: STATE AND NRC NOTIFICATIONS CHECKLIST SCOPE OF REVISION: Revised to add NARS Form approval note in section A, NARS Form Instructions.
: 2. CPS Emergency Plan, Sections 1.5.1 and 2.3, and Table 2-1
This revision also incorporates ACN 2/1.DOCUMENT CONTROL 0c' 3 2001 CONTROLLED Copy CLINTON POWER STATION Authority Function Signature Date Prepared by Security Manager Concurrence Concurrence Concurrence Independent Reviewer Approval/Effective Date Greg Birk-, I 9/25/01 1 jilo4 ,4I /EC-07 2 1 1 of 8 CIINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
: 3. EC-01, CPS EMERGENCY RESPONSE ORGANIZATION AND STAFFING
EC-07 REVISION:
: 5. PR-01, JOINT PUBLIC INFORMATION CENTER ORGANIZATION AND STAFFING
2 FORM: 1 PAGE: 2 of 8 STATE AND NRC NOTIFICATIONS CHECKLIST Section A: STATE NOTIFICATION Requirements:
: 6. AP-05, EMERGENCY PREPAREDNESS TRAINING PROGRAM 6.0   ATTACHMENTS NONE 7.0   FORMS NONE
State notification is required within 15 minutes when one of the following occur: 1) Initial emergency declaration (block 3). 2) Change in emergency classification (block 3). 3) Change in Protective Action Recommendations.
 
This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9). NARS Form Instructions:
PROCEDURE:  EC-07
Utility Message No. State Message No. 1. Status:2. Station: 3. On-site Accident Classification:
* rCLINTON POWER STATION                                                             REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                             FORM: 1 PAGE: 1 of 8 TITLE:      STATE AND NRC NOTIFICATIONS CHECKLIST SCOPE OF REVISION:         Revised to add NARS Form approval note in section A, NARS Form Instructions. This revision also incorporates ACN 2/1.
: 4. Accident Classified:
DOCUMENT CONTROL 0c'   3 2001 CONTROLLED Copy CLINTON POWER STATION Authority Function                                     Signature               Date Prepared by                                                         Greg Birk-,         I 9/25/01 Security Manager                                                    1 jilo4 Concurrence Concurrence
: 5. Release to Environment:
                                                                            ,4I                   /
: 6. Type of Release: 7. Wind Direction:
Concurrence Independent Reviewer Approval/Effective Date
Sequential number (ie. 1,2,3,4).
 
Enter N/A if this is a State NARS. Sequential number (ie. 1,2,3,4).
PROCEDURE:        EC-07 CIINTON POWER STATION                                                             REVISION:    2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                                   FORM:     1 PAGE:   2 of 8 TITLE:        STATE AND NRC NOTIFICATIONS CHECKLIST Section A:     STATE NOTIFICATION Requirements:       State notification is required within 15 minutes when one of the following occur:
Enter N/A if the NARS is being sent by CPS. Circle the letter by the appropriate status.Circle the letter G. (Clinton)Circle the letter by the appropriate accident classification.
: 1)     Initial emergency declaration (block 3).
This information is obtained from the person with command authority.
: 2)     Change in emergency classification (block 3).
Record the time and date the accident was classified and record the Emergency Action Level(EAL) number used for the classification.
: 3)     Change in Protective Action Recommendations. This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9).
This information is obtained from the individual with command authority.
NARS Form Instructions:
For accident termination, record the date and time and N/A for the EAL. Circle the letter by the appropriate release status. Circle the letter by the appropriate type of release.
Utility Message No.                   Sequential number (ie. 1,2,3,4). Enter N/A if this is a State NARS.
Record the direction(in degrees) from which the wind is blowing. (This is the 10 meter wind direction).
State Message No.                      Sequential number (ie. 1,2,3,4). Enter N/A if the NARS is being sent by CPS.
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
: 1. Status:                          Circle the letter by the appropriate status.
REVISION:
"*J' 2. Station:                          Circle the letter G. (Clinton)
FORM: PAGE: STATE AND NRC NOTIFICATIONS CHECKLIST NOTE Wind Direction is obtained from one of the following sources: 1) On Panel 1H13-P826, Pen l(Blue) of recorder 1UR-EM016.
: 3. On-site Accident Classification: Circle the letter by the appropriate accident classification. This information is obtained from the person with command authority.
: 2) AR/PR Terminal, Channel 5 of 0UIX-PRO50.
: 4. Accident Classified:              Record the time and date the accident was classified and record the Emergency Action Level(EAL) number used for the classification. This information is obtained from the individual with command authority. For accident termination, record the date and time and N/A for the EAL.
: 3) If the MET Tower is non-functional, then use the B/U MET Tower information using 1UU-EM024 terminal located in the TSC. 4) When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.Downwind Sector: 8. Wind Speed: Record the ONE downwind sector using the wind direction and the chart on the back of the NARS form (ie. if the wind direction is 180 degrees then the downwind sector is A). Using block B only, record the wind speed in miles per hour (this is the 10 meter wind speed). NOTE Wind Speed is obtained from one of the following sources: 1) On Panel 1H13-P826, Pen 2(Red) of recorder, IUR-EM016.
: 5. Release to Environment:          Circle the letter by the appropriate release status.
: 2) AR/PR Terminal, Channel 4 of OUIX-PRO50.
: 6. Type of Release:                  Circle the letter by the appropriate type of release.
: 3) If the MET Tower is non-functional, then use the B/U MET Tower information using IUU-EM024 terminal, Located in the TSC. 4) When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.9. Recommended Actions: For a NOUE, ALERT, OR SITE AREA EMERGENCY.
: 7. Wind Direction:                  Record the direction(in degrees) from which the wind is blowing.
Circle A (NONE). For a GENERAL EMERGENCY, circle item C, Initiate Public Notification Procedure.
(This is the 10 meter wind direction).
In addition mark items D-K whichever is appropriate.
 
The default recommendation is. H. Evacuate 0-2 mile radius(circle H). J. Evacuate 2-5 miles (circle J) in the downwind sector recorded in block 7 and the two adjacent sectors (ie. if sector A is the downwind sector then the two adjacent sectors will be R and B). G. The remainder of the EPZ should be sheltered.
PROCEDURE:        EC-07 CLINTON POWER STATION                                                           REVISION:      2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                               FORM:     1 PAGE:     3 of 8 TITLE:      STATE AND NRC NOTIFICATIONS CHECKLIST NOTE Wind Direction is obtained from one of the following sources:
Document this by circling (G) and lining out the "5-10 miles for sectors" and writing in the" Remainder of the EPZ" in the space provided.
: 1)   On Panel 1H13-P826, Pen l(Blue) of recorder 1UR-EM016.
Items L-P are for State use only.EC-07 2 1 3 of 8 CIJINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
: 2)   AR/PR Terminal, Channel 5 of 0UIX-PRO50.
EC-07 REVISION:
: 3)           If the MET Tower is non-functional, then use the B/U MET Tower information using 1UU-EM024 terminal located in the TSC.
2 FORM: 1 PAGE: 4 of 8 STATE AND NRC NOTIFICATIONS CHECKLIST 10. Additional Information:
: 4)           When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.
: 11. Message Transmitted by: 12. Message Transmitted:
Downwind Sector:                   Record the ONE downwind sector using the wind direction and the chart on the back of the NARS form (ie. if the wind direction is 180 degrees then the downwind sector is A).
: 13. Message Received: This space should be used to write narrative information.
: 8. Wind Speed:                      Using block B only, record the wind speed in miles per hour (this is the 10 meter wind speed).
Record your name, CPS and outside phone numbers where you can be called back. The MCR direct line (1-217-935-9812) should be given to IEMA for callback verification if the call is initiated from the MCR. Record the date and time. The time should be recorded as the time the initial NARS roll call is complete.
NOTE Wind Speed is obtained from one of the following sources:
This time should also be within 15 minutes of the time recorded in block 4. Record the name and organization to whom you gave the information to.NOTE: All State notifications must be approved by the Individual with Command Authority.
: 1)   On Panel 1H13-P826, Pen 2(Red) of recorder, IUR-EM016.
This is accomplished by initialing and indicating the time approved in the lower left comer of the NARS form.
: 2)   AR/PR Terminal, Channel 4 of OUIX-PRO50.
* CLNTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
: 3)           If the MET Tower is non-functional, then use the B/U MET Tower information using IUU-EM024 terminal, Located in the TSC.
REVISION:
: 4)           When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.
FORM: PAGE: STATE AND NRC NOTIFICATIONS CHECKLIST Transmitting the NARS information Emergency Classification:
: 9. Recommended Actions:             For a NOUE, ALERT, OR SITE AREA EMERGENCY. Circle A (NONE).
For a GENERAL EMERGENCY, circle item C, Initiate Public Notification Procedure. In addition mark items D-K whichever is appropriate. The default recommendation is. H. Evacuate 0-2 mile radius(circle H). J. Evacuate 2-5 miles (circle J) in the downwind sector recorded in block 7 and the two adjacent sectors (ie. if sector A is the downwind sector then the two adjacent sectors will be R and B). G. The remainder of the EPZ should be sheltered. Document this by circling (G) and lining out the "5-10 miles for sectors" and writing in the" Remainder of the EPZ" in the space provided. Items L-P are for State use only.
 
PROCEDURE:        EC-07 CIJINTON POWER STATION                                                         REVISION:    2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                               FORM:     1 PAGE:   4 of 8 TITLE:        STATE AND NRC NOTIFICATIONS CHECKLIST
: 10. Additional Information:       This space should be used to write narrative information.
: 11. Message Transmitted by:        Record your name, CPS and outside phone numbers where you can be called back. The MCR direct line (1-217-935-9812) should be given to IEMA for callback verification if the call is initiated from the MCR.
: 12. Message Transmitted:          Record the date and time. The time should be recorded as the time the initial NARS roll call is complete. This time should also be within 15 minutes of the time recorded in block 4.
: 13. Message Received:              Record the name and organization to whom you gave the information to.
NOTE:   All State notifications must be approved by the Individual with Command Authority. This is accomplished by initialing and indicating the time approved in the lower left comer of the NARS form.
 
PROCEDURE: EC-07
* CLNTON POWER STATION                                                               REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                                 FORM: 1 PAGE: 5 of 8 TITLE:            STATE AND NRC NOTIFICATIONS CHECKLIST Transmitting the NARS information Initials Emergency Classification:
Date/Time Declared:
Date/Time Declared:
Individual with Command Authority 1. Have the Individual with Command Authority review the NARS form and initial prior to sending the information to the state.NOTE The following step is used only if a GENERAL EMERGENCY is declared first: 2. (If the first declaration was not a GENERAL EMERGENCY, N/A this step and move to step 4). If the first declaration is a GENERAL EMERGENCY, dial 36 using the (green) NARS phone. Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time: Initials"This is the Clinton Power Station, (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call .... I have a NARS notification; please standby for roll call .... Illinois Emergency Management Agency .... Illinois Department of Nuclear Safety. .... (DeWitt County Sheriff....DeWitt County ESDA [General Emergency as initial classification only])" IEMA IDNS DeWitt County Sheriff DeWitt County ESDA Coordinator (normal working hours only). Provide the information from the NARS form. A final roll call is not necessary.
Individual with Command Authority
EC-07 2 1 5 of 8 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: 3.PROCEDURE:
: 1. Have the Individual with Command Authority review the NARS form and initial prior to sending the information to the state.
REVISION:
NOTE The following step is used only if a GENERAL EMERGENCY is declared first:
FORM: PAGE: STATE AND NRC NOTIFICATIONS CHECKLIST If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860.
: 2.     (If the first declaration was not a GENERAL EMERGENCY, N/A this step and move to step 4).
Verify with IEMA that they (IEMA) will contact IDNS and DeWitt County personnel. "NA" this step of the NARS phone was used.5. If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860.
If the first declaration is a GENERAL EMERGENCY, dial 36 using the (green) NARS phone.
Verify with IEMA that they (IEMA) will contact IDNS. "NA" this step of the NARS phone was used.Section B: NRC Notification Requirements:
Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time:
NRC notification is required within 60 minutes when one of the following occur: 1) Initial emergency declaration (block 3). 2) Change in emergency classification (block 3). 3) Change in Protective Action Recommendations.
        "This is the Clinton Power Station,             (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call ....I have a NARS notification; please standby for roll call ....Illinois Emergency Management Agency ....Illinois Department of Nuclear Safety.....(DeWitt County Sheriff....DeWitt County ESDA [General Emergency as initial classification only])"
This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9).EC-07 2 1 6 of 8 4. If the first declaration is not a GENERAL EMERGENCY, dial 98 using the (green) NARS phone. Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time: "This is the Clinton Power Station, (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call .... I have a NARS notification; please standby for roll call .... Illinois Emergency Management Agency .... Illinois Department of Nuclear Safety....
IEMA IDNS DeWitt County Sheriff DeWitt County ESDA Coordinator (normal working hours only).
Provide the information from the NARS form. A final roll call is not necessary.
 
PROCEDURE: EC-07 CLINTON POWER STATION                                                               REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                                 FORM: 1 PAGE: 6 of 8 TITLE:            STATE AND NRC NOTIFICATIONS CHECKLIST I
: 3.      If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860. Verify with IEMA that they (IEMA) will contact IDNS and DeWitt County personnel. "NA" this step of the NARS phone was used.
: 4.     If the first declaration is not a GENERAL EMERGENCY, dial 98 using the (green) NARS phone.
Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time:
        "This is the Clinton Power Station,           (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call ....I have a NARS notification; please standby for roll call ....Illinois Emergency Management Agency ....Illinois Department of Nuclear Safety....
IEMA IDNS Provide the information from the NARS form. A final roll call is not necessary.
IEMA IDNS Provide the information from the NARS form. A final roll call is not necessary.
I PROCEDURE:
: 5. If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860. Verify with IEMA that they (IEMA) will contact IDNS. "NA" this step of the NARS phone was used.
EC-07 CINTON POWER STATION REVISION:
Section B:        NRC Notification Requirements:      NRC notification is required within 60 minutes when one of the following occur:
2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 7 of 8 ( TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST Emergency Classification:
: 1)        Initial emergency declaration (block 3).
: 2)        Change in emergency classification (block 3).
: 3)        Change in Protective Action Recommendations. This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9).
 
PROCEDURE:   EC-07 CINTON POWER STATION                                                         REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                             FORM: 1 PAGE: 7 of 8
( TITLE:         STATE AND NRC NOTIFICATIONS CHECKLIST Emergency Classification:
Date/Time Declared:
Date/Time Declared:
Individual with Command Authority 11. Complete a REACTOR PLANT EVENT NOTIFICATION WORKSHEET
Individual with Command Authority
: 2. Using the FTS 2001 phone, dial one of the following numbers: Primary phone number: 1-301-816-5100 Backup phone numbers: 1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT NOTIFICATION WORKSHEET.
: 11. Complete a REACTOR PLANT EVENT NOTIFICATION WORKSHEET
: 2. Using the FTS 2001 phone, dial one of the following numbers:
Primary phone number:     1-301-816-5100 Backup phone numbers:     1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT NOTIFICATION WORKSHEET.
: 3. If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if step 2 was performed.
: 3. If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if step 2 was performed.
Follow-up Notification to the NRC Requirements:
Follow-up Notification to the NRC Requirements:
: 1. Once each hour following the transmission of the last ENS message complete an REACTOR PLANT EVENT NOTIFICATION WORKSHEET. (If the NRC has requested continuous communications and an open line has been established, follow-up forms are not necessary as long as this has been documented in the logs).
: 1. Once each hour following the transmission of the last ENS message complete an REACTOR PLANT EVENT NOTIFICATION WORKSHEET. (If the NRC has requested continuous communications and an open line has been established, follow-up forms are not necessary as long as this has been documented in the logs).
PROCEDURE:
 
EC-07 CLINTON POWER STATION REVISION:
PROCEDURE: EC-07 CLINTON POWER STATION                                                       REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                           FORM: I PAGE: 8 of 8 "TITLE:       STATE AND NRC NOTIFICATIONS CHECKLIST
2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: I PAGE: 8 of 8 "TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST
: 2.     Using the FTS 2001 phone, dial one of the following numbers:
: 2. Using the FTS 2001 phone, dial one of the following numbers: Primary phone number: 1-301-816-5100 Backup phone numbers: 1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT EVENT NOTIFICATION WORKSHEET.
Primary phone number:     1-301-816-5100 Backup phone numbers:     1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT EVENT NOTIFICATION WORKSHEET.
: 3. If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if the FTS 2001 phone was used. 4. REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
: 3.     If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if the FTS 2001 phone was used.
: 5. REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
: 4.     REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
: 6. REACTOR PLANT EVENT NOFICATION WORKSHEET formr completed and information transmitted, date/time:
: 5.     REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
Performed by: /Performned by:
: 6.     REACTOR PLANT EVENT NOFICATION WORKSHEET formr completed and information transmitted, date/time:
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE:
Performned by: Performedby:                                                          /
FE-05 FORM: 3 REVISION:
 
5 PAGE: 1 of 4 TITLE: EOF EMERGENCY EQUIPMENT SCOPE OF REVISION:
PROCEDURE:     FE-05 CLINTON POWER STATION                                                           FORM:  3 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                       REVISION:   5 PAGE: 1 of 4 TITLE:       EOF EMERGENCY EQUIPMENT SCOPE OF REVISION:         Identified RP equipment to verify operational.
Identified RP equipment to verify operational.
DOCUMENT CONTROL OCT 2 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function                                   Signature                  Date Prepared by                                                     Greg Birk           I     10/9/01 Security Manager                                  V'A.*p
DOCUMENT CONTROL OCT 2 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function Prepared by Security Manager Concurrence Concurrence Concurrence Independent Reviewer Manager-Clinton Power Station Signature Greg Birk b 1L Sin;.I I I I Date 10/9/01 I o ri0 ,j/i CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
* b 1L  Sin;. I Io        ri0 Concurrence                                                                          I
FORM: REVISION:
                                                                                            ,j/i Concurrence                                                                          I Concurrence Independent Reviewer Manager-Clinton Power Station
PAGE: EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat RM-20/14 with (Due Date: 1 HP210/260 probe see comments) 7* E-120/E-520 with Serial No: 2 HP270 probe Due Date: 1I Serial No: 3 RO-2/RO-2A Due Date: 1* Serial No: 4 Air Sampler (110 vac) Due Date: I Pocket Dosimeter 5 (0-500 mR) Due Date: 75 Air Sampler Serial No: 6 (Battery Powered) Due Date: 1I Air Sampler (Due Date: 7 (12 VDC) see comments) 5 8 TLDs 150 9 Protective Clothing (set) 100 10 Respirators (N/P) 20 11 Expiration Thatf 9cG 12 Pocket Dosimeter Charger 1* 13 Form -TLD/PD Issue 5 Potassium Iodide Expiration 14 (14 tablets) Date: 75 15 Smear (box) 1 16 Bag, yellow (large) 6 17 Bag, yellow (small) 6*verify operational Comments: Serial No: Air Sampler Serial No.RM-20/14 Due Date (12 VDC) Due Date: Serial No: Air Sampler Serial No RM-20/14 Due Date (12 VDC) Due Date Serial No: Air Sampler Serial No RM-20/14 Due Date (12 VDC) Due Date Serial No: Serial No RM-20/14 Due Date RM-20/14 Due Date Air Sampler Serial No: Serial No (12 VDC) Due Date RM-20/14 Due Date Air Sampler Serial No Serial No (12 VDC) Due Date RM-20/14 Due Date FE-05 3 5 2 of 4
 
-CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
PROCEDURE:     FE-05 CLINTON POWER STATION                                                    FORM:     3 EMERGENCY PLAN IMPLEMENTING PROCEDURE                                  REVISION:   5 PAGE:   2 of 4 TITLE:          EOF EMERGENCY EQUIPMENT Item                         Item Description                 Qty       Condition No.                                                           Req'd     Sat/Unsat RM-20/14 with                       (Due Date:
FE-05 FORM: 3 REVISION:
1   HP210/260 probe                     see comments)     7*
5 PAGE: 3 of 4 EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat 18 Coin Envelope 50 19 Particulate Air Filter (box) 1 20 Source Check Plaque Cs-137 1 21 Rad Sign with Inserts 12 22 Rad Ribbon (roll) 1 23 Log Book 1 24 Step-Off Pad 2 25 Portable Radio 6* 26 Portable Radio Charger (1.2 unit) 1 27 Silver Zeolite Cartridge 20 28 Printer Paper (box) (NU000040) 2 29 Printer Transparency (box) (NU530020) 2 30 Printer Ribbon (NU520020) 2 31 Decontamination Kit 1 32 Field Monitoring Kit 5 33 First Aid Kit (trauma kit) 1 34 Chart Paper (roll) 1*verify operational Comments:  
E-120/E-520 with                     Serial No:
-CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
2     HP270 probe                         Due Date:         1I Serial No:
FE-05 FORM: 3 REVISION:
3     RO-2/RO-2A                           Due Date:         1*
5 PAGE: 4 of 4 EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat 35 CAM Filter Paper (box) 1 36 CAM Charcoal Cartridge 10 37 Fanfold 9 1/2 X 1I paper (box) 2 38 Tape (roll) 2 39 Tape, yellow (roll) 2 40 Tweezers 2 41 Herculite (roll) 1 42 Lap Top Computer 1_**1 1______ 1 .4- 4-______ .4-___________
Serial No:
+/-J ++ +4- -t.1. + t**verify operational by logging onto network Comments: Performed by: Reviewed by: Date: Date:
4     Air Sampler (110 vac)               Due Date:           I Pocket Dosimeter 5     (0-500 mR)                           Due Date:         75 Air Sampler                         Serial No:
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: FIELD MONITORING KIT SCOPE OF REVISION:
6     (Battery Powered)                   Due Date:         1I Air Sampler                         (Due Date:
Identified RP equipment to verify operational.
7     (12 VDC)                             see comments)       5 8     TLDs                                                   150 9     Protective Clothing (set)                             100 10     Respirators (N/P)                                     20 Expiration 11                                         Thatf             9cG 12     Pocket Dosimeter Charger                               1*
PROCEDURE:
13     Form - TLD/PD Issue                                     5 Potassium Iodide                     Expiration 14     (14 tablets)                       Date:             75 15     Smear (box)                                             1 16     Bag, yellow (large)                                     6 17     Bag, yellow (small)                                     6
FE-05 FORM: 7 REVISION:
*verify operational Serial No:           Air Sampler Serial No.
3 PAGE: 1 of 4 DOCUMENT CONTROL "O"" Z 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function Prepared by Security Manager Concurrence Concurrence Concurrence Independent Reviewer Manager-Clinton Power Station Signature Greg Birk .I-%/ ,L-.Date 10/9/01 6 /1, 1. ;1 I I I I CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
Comments:            RM-20/14       Due Date             (12 VDC)     Due Date:
FE-05 FORM: 7 REVISION:
Serial No:           Air Sampler Serial No RM-20/14       Due Date             (12 VDC)     Due Date Serial No:           Air Sampler Serial No RM-20/14       Due Date             (12 VDC)     Due Date Serial No:                       Serial No RM-20/14       Due Date             RM-20/14     Due Date Air Sampler     Serial No:                       Serial No (12 VDC)       Due Date             RM-20/14     Due Date Air Sampler     Serial No                       Serial No (12 VDC)         Due Date           RM-20/14     Due Date
3 PAGE: 2of4 FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat E-120/E-520 with Serial No: 1 HP270 probe Due Date: 1* Serial No: 2 RO-2/RO-2A Due Date: 1* 3 Protective Clothing (set) 2 4 Bootie, plastic (pair) 2 5 Hood 2 6 Glove, rubber (pair) 4 Potassium Iodide Expiration 7 (14 tablets) Date: 1 Pocket Dosimeter 8 (0-1500 mR) Due Date: 2 9 Pocket Dosimeter Charger 1I 10 Stopwatch 1* S11 Bag, yellow (small) 10 12 Bag, yellow (large) 3 13 Container, plastic (1 gal) 3 14 Scissors 1 15 Silver Zeolite Cartridge 12 16 Binder with pad of ruled paper 1 17 First Aid Kit 1 *verify operational Comments:
 
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
PROCEDURE:    FE-05 FORM:    3
FE-05 FORM: 7 REVISION:
- CLINTON POWER STATION REVISION:    5 EMERGENCY PLAN IMPLEMENTING PROCEDURE                             PAGE:     3 of 4 TITLE:          EOF EMERGENCY EQUIPMENT Item                         Item Description           Qty       Condition No.                                                   Req'd     Sat/Unsat 18   Coin Envelope                                   50 19   Particulate Air Filter (box)                     1 20     Source Check Plaque Cs-137                         1 21   Rad Sign with Inserts                             12 22   Rad Ribbon (roll)                                 1 23   Log Book                                           1 24     Step-Off Pad                                     2 25   Portable Radio                                   6*
3 PAGE: 3 of 4 FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat 18 Air Sample Label 15 19 Environmental Sample Label 15 20 Pen (black) 6 21 Battery ("D" cell) 8 22 Smear (box) (Blank) 1 23 Tape, (roll, 2 inch wide) 1 24 Particulate Air Filter (box) 1 25 Field Team Handbook 1 26 Map -10 mile 1 27 Map -Site 1 26 a lashlignt
26     Portable Radio Charger (1.2 unit)                 1 27     Silver Zeolite Cartridge                         20 28     Printer Paper (box)                 (NU000040)   2 29     Printer Transparency (box)         (NU530020)   2 30     Printer Ribbon                     (NU520020)   2 31     Decontamination Kit                               1 32     Field Monitoring Kit                             5 33   First Aid Kit (trauma kit)                         1 34   Chart Paper (roll)                                 1
_ -_29 Tag -Radioactive Material 12 30 Battery ( 9 volt) 4 31 Radioactive Check Source -Cs-137 1 32 Rain Gear 2 33 Bag, (small with Rad. Material Tag) 12 34 Lake and Recreation Area Keys 1*verify operational Comments:*verify operational Comments:
  *verify operational Comments:
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE TITLE: PROCEDURE:
 
FE-05 FORM: 7 REVISION:
PROCEDURE:      FE-05
3 PAGE: 4 of 4 FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat 35 Compass 1 36 Money -quarters $5 37 Tweezers 1 38 Hand Spade 1 39 Tape Measure 1 40 Ladle for Water Sampling 1 41 Funnel 1 42 Glove, disposal (pair) 10 43 Absorbent Material 5 44 Coin Envelope 20 AC"-) r01 11 -Field Ieiarn e..llg aii l_____t_ __, 46 Form -Personal Dosimeter Record Log 6 Form -Environmental 47 Survey/Sample Data 6 Form -Field Team 48 Exposure Rate measurements 6 49 Form -Contamination Surveys 6 50 Form -Air Sample Data Sheet 6 51 Form -Field Monitoring Kit Inventory 2 Comments: Performed by: Reviewed by: Date: Date: tq}}
-   CLINTON POWER STATION                                             FORM:    3 EMERGENCY PLAN IMPLEMENTING PROCEDURE                       REVISION:     5 PAGE:   4 of 4 TITLE:            EOF EMERGENCY EQUIPMENT Item                           Item Description     Qty         Condition No.                                                 Req'd       Sat/Unsat 35         CAM Filter Paper (box)                     1 36         CAM Charcoal Cartridge                   10 37         Fanfold 9 1/2 X 1I paper (box)             2 38       Tape (roll)                               2 39       Tape, yellow (roll)                       2 40       Tweezers                                   2 41       Herculite (roll)                           1 42       Lap Top Computer                         1_**
1           1
______      1                                      .4-         4-
                                                      +            +
J                                       +
4-                                                   -t
______      .4-
              .1.                                     +           t
___________  +/-
      **verify operational by logging onto network Comments:
Performed by:                                                   Date:
Reviewed by:                                                   Date:
 
PROCEDURE: FE-05 FORM: 7 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE                                           REVISION: 3 PAGE: 1 of 4 TITLE:       FIELD MONITORING KIT SCOPE OF REVISION:         Identified RP equipment to verify operational.
DOCUMENT CONTROL "O"" Z 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function                                   Signature                    Date Greg Birk                  10/9/01 Prepared by                                                                             I Security Manager                                                   . I-%/,L-.         I Concurrence Concurrence 6 /1, Concurrence                                                                              I Independent Reviewer                                                                    I
: 1. i* ;1 Manager-Clinton Power Station
 
PROCEDURE:    FE-05 CLINTON POWER STATION                                             FORM:    7 EMERGENCY PLAN IMPLEMENTING PROCEDURE                           REVISION:   3 PAGE:     2of4 TITLE:          FIELD MONITORING KIT Item                         Item Description           Qty     Condition 3 No.                                                   Req'd     Sat/Unsat E-120/E-520 with                   Serial No:
1     HP270 probe                         Due Date:   1*
Serial No:
2     RO-2/RO-2A                         Due Date:   1*
3     Protective Clothing (set)                       2 4     Bootie, plastic (pair)                           2 5     Hood                                             2 6     Glove, rubber (pair)                             4 Potassium Iodide                   Expiration 7     (14 tablets)                       Date:       1 Pocket Dosimeter 8     (0-1500 mR)                         Due Date:   2 9     Pocket Dosimeter Charger                         1I 10     Stopwatch                                       1*
S11   Bag, yellow (small)                             10 12     Bag, yellow (large)                             3 13     Container, plastic (1 gal)                       3 14     Scissors                                         1 15     Silver Zeolite Cartridge                         12 16     Binder with pad of ruled paper                   1 17     First Aid Kit                                     1
*verify operational Comments:
 
PROCEDURE:     FE-05 CLINTON POWER STATION                                        FORM:     7 EMERGENCY PLAN IMPLEMENTING PROCEDURE                    REVISION:   3 PAGE:     3 of 4 TITLE:          FIELD MONITORING KIT Item                         Item Description   Qty       Condition 3 No.                                             Req'd       Sat/Unsat 18 Air Sample Label                         15 19     Environmental operational      Sample Label           15 20     Pen (black)                               6 21     Battery ("D" cell)                       8 22     Smear (box) (Blank)                       1 23     Tape, (roll, 2 inch wide)                 1 24     Particulate Air Filter (box)             1 25     Field Team Handbook                       1 26     Map - 10 mile                             1 27     Map - Site                                 1 a
26     lashlignt                           _     -_
29    Tag - Radioactive Material               12 30     Battery ( 9 volt)                         4 31     Radioactive Check Source - Cs-137         1 32     Rain Gear                                 2 33     Bag, (small with Rad. Material Tag)       12 34
*verify Lake and Recreation Area Keys             1
*verify operational Comments:
Comments:
 
PROCEDURE:     FE-05 CLINTON POWER STATION                                      FORM:     7 EMERGENCY PLAN IMPLEMENTING PROCEDURE                  REVISION:   3 PAGE:     4 of 4 TITLE:          FIELD MONITORING KIT Item                         Item Description   Qty     Condition 3 No.                                           Req'd     Sat/Unsat 35     Compass                                   1 36     Money - quarters                         $5 37     Tweezers                                 1 38     Hand Spade                                 1 39   Tape Measure                               1 40   Ladle for Water Sampling                   1 41   Funnel                                     1 42   Glove, disposal (pair)                   10 43   Absorbent Material                         5 44   Coin Envelope                           20 AC tq
  "-)   r01 11 - Field Ieiarn           aii e..llgl_____t_                __,
46   Form - Personal Dosimeter Record Log       6 Form - Environmental 47   Survey/Sample Data                         6 Form - Field Team 48   Exposure Rate measurements                 6 49   Form - Contamination Surveys               6 50   Form - Air Sample Data Sheet               6 51   Form - Field Monitoring Kit Inventory     2 Comments:
Performed by:                                           Date:
Reviewed by:                                             Date:}}

Latest revision as of 05:34, 24 November 2019

Emergency Plan Implementing Procedure for Clinton Power Station Nuclear Station Engineering Dept
ML020070071
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/23/2001
From:
Illinois Power Co
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 01P0214
Download: ML020070071 (44)


Text

CLINTON POWER STATION NUCLEAR STA T3ON-ENGINEERING DEPT.

Controlled Dodument Transmittal

-" Transmittal No. 01 P0214 Transmittal Date 10/23/01 Sheet 1 of Letter No. Document EMERGENCY PLAN IMPLEMENTING PROCEDURE The attached documents are being transmitted for your use. -2

27. CPS/RL V-455 183. CPS/JPIC V-922
56. SDC/NRC OFFICE V-1 30A C/o A. Oleson
64. CPS/TSC T-31B 493. CPS/EOF V-922 64A. CPS/TSC T-31 B 493A(740). CPS/EOF V-922 64B. CPS/TSC T-31 B 493B(741). CPS/EOF V-922
90. OPS SUPPORT MANAGER V-1 30G 493C(742). CPS/EOF V-922 110. SUPV - CHEMISTRY T-31 C 493D(743). CPS/EOF V-922 179. CPS/OPS T-31 B 493F(744). CPS/EOF V-922 202. NTD/SIMULATOR V-922 493G(745). CPS/EOF V-922 202C(673). SIMULATOR V-922 493H(746). CPS/EOF V-922 255B(698). DOSIMETRY OFFICE. T-31H 262A(69A) MCR/HORSESHOE T-31 B 76. D. V. PICKETT OS 262C(69C). SHIFT SUPERVISOR T-31 B 222/(679) C. SANGSTER OS 262D(69D). REMOTE SHUTDOWN T-31 B 223. U.S. NRC OS 273. TRAINING REQUAL V-922 DOC. CONTROL DESK 273A(708). TRAINING REQUAL V-922 225/(680). IDNS (M. SINCLAIR) OS 467. MEDICAL V-374B 234. STATE EOC OS 505. EMERGENCY PLANNING V-922 235. D. Shull OS 542. CAS T-31 M (DEWITT CO. ESDA) 544. SAS T-31 M 238. M. Sinclair (IDNS) OS
3. CPS/BEOF V-150 567. J. FAIROW OS 3A. CPS/BEOF V-150 (RADIOLOGICAL EP MANAGER)

SEE PAGE 2 FOR UPDATING INSTRUCTIONS Please acknowledge receipt of the attached documents and return this signed transmittal to DOCUMENT CONTROL, V-150. NOTE: RETAIN A COPY OF THIS TRANSMITTAL FOR UPDATING INSTRUCTIONS, AS NEEDED.

Any questions regarding this transmittal should be forwarded to L. Hegger, extension 4087.

ý'W5 Signature/Date

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 1 oflO STATUS REPORT NT TMRF R EPIP TITLE REVISION DATE ACN'S ACN DATE ADMINISTRATIVE PROCEDURE (AP)

AP-01 ORGANIZATION & 7 05/16/01 n/a PREPARATION OF CONTROLLED DOCUMENTS AP-02 REVISIONS AND ADVANCE 16 07/03/01 n/a CHANGE NOTICES AP-03 EMERGENCY RECORDS 4 01/12/96 5/1 02/03/99 RETENTION AP-04 PREPARATION & CONDUCT OF 5 08/03/99 n/a EMERGENCY DRILLS &

EXERCISES AP-05 EMERGENCY PREPAREDNESS 11 08/03/01 n/a TRAINING PROGRAM AP-06 REVIEW OF EMERGENCY 6 08/23/01 n/a PREPAREDNESS PROGRAM AP-07 ALERT AND NOTIFICATION 8 06/15/01 n/a SYSTEM AP-09 EMERGENCY FACILITY AND 8 10/16/01 n/a EQUIPMENT CHECKS AP-10 EMERGENCY RESPONSE 9 10/16/01 n/a ORGANIZATION ASSIGNMENTS DOCUMENT CONTROL OCT 2 3 2001 CON4WL ED COPY CLINTON POWER STATION

CLINTON POWER STATION DATE: 18-Oct-01 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 2 of 10 STATUS REPORT REVISION DATE ACN'S ACN DATE NUMBER EPIP TITLE EMERGENCY CONTROL (EC)

CPS EMERGENCY RESPONSE 8 08/23/01 n/a EC-01 ORGANIZATION & STAFFING F-01 Interim Station Emergency 5 08/02/01 n/a Director 5 06/15/01 n/a F-02 Station Emergency Director (SED) 2 06/15/01 n/a F-03 SED Administrative Support 4 09/25/01 n/a F-04 TSC Administrative Supervisor F-05 Technical Assessment 04/21/99 n/a Supervisor 04/21/99 n/a F-06 Emergency Operations Supervisor 1 09/25/01 n/a F-07 TSC Radiological Supervisor 1

08/26/99 n/a F-08 OSC Supervisor 0 07/28/92 n/a F-09 Station Security Coordinator 4 08/23/01 n/a F- 10 TSC Communicator 0 07/28/92 n/a F-11 TSC Records Management Coordinator 2 04/21/99 n/a F- 12 TSC Electrical Engineer 1 04/21/99 n/a F- 13 TSC Reactor Engineer 2 04/21/99 n/a F- 14 TSC Chemist-Nuclear 04/21/99 n/a F- 15 Operations Coordinator 5 02/28/00 n/a F- 16 TSC Computer Operator

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 3 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACNWS ACN DATE F- 17 Radiological Engineering 1 11/23/93 n/a Specialist F- 19 RP (TSC) Communicator 0 07/28/92 n/a F-20 Status Board Keepers 0 07/28/92 n/a F-21 Radiological Controls 0 07/28/92 1/1 06/29/00 Supervisor F-22 In-station Emergency Teams 0 07/28/92 n/a F-23 OSC Radiological Controls 1 04/11/01 n/a Coordinator F-24 Assistant OSC Radiological 0 07/28/92 n/a Controls Coordinator F-25 RP (OSC) Communicator 0 07/28/92 n/a F-26 Emergency Team Coordinator 1 10/18/93 n/a F-28 Emergency Manager 3 06/15/01 n/a F-30 EOF Director 3 03/05/97 n/a F-31 Executive Administrative 2 06/15/01 n/a Support F-32 Licensing Advisor 0 07/28/92 n/a F-33 EOF Emergency Advisor 3 04/11/01 n/a F-34 EOF Technical Advisor 0 07/28/92 n/a F-36 Technical Information Liaison 1 01/22/97 n/a F-37 Emergency Action 0 07/28/92 n/a Level/Protective Action Evaluator F-38 Security Supervisor 0 07/28/92 n/a F-39 Radiation Protection 2 09/25/01 n/a Supervisor

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 4 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE F-40 EOF Administrative 2 07/25/00 n/a Supervisor F-41 EOF Engineering Supervisor 0 07/28/92 1/1 07/28/99 F-42 RP (EOF) Communicator 0 07/28/92 n/a F-43 Dose Assessment Supervisor 1 12/01/93 n/a F-44 Dose Assessor 0 07/28/92 n/a F-45 Field Team Coordinator 2 01/10/00 n/a F-46 Field Teams 0 07/28/92 n/a F-47 Radiological Controls 1 11/23/93 n/a Coordinator F-48 Environmental Lab 1 11/23/93 2/1 03/25/99 Coordinator F-49 EOF Monitor 0 07/28/92 n/a 0 07/28/92 n/a F-50 EOF Records Management Coordinator F-51 EOF Communicator 3 02/24/00 n/a F-53 Copy Clerk 0 07/28/92 n/a F-54 TSC Emergency Advisor 0 07/28/92 n/a F-55 Procurement Coordinator 1 05/16/01 n/a 1 05/16/01 n/a F-56 Word Processor F-57 EOF Computer Operator 4 09/02/99 n/a F-58 Mechanical/Nuclear Engineer 0 07/28/92 n/a F-59 EOF Electrical Engineer 0 07/28/92 n/a F-60 Core Damage Assessor 0 07/28/92 n/a

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 5 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE F-61 Technical Advisor to 0 07/28/92 n/a State/Local Organizations F-62 EOF Administrative Support 0 07/28/92 n/a F-63 Fire Brigade Coordinator 0 07/28/92 n/a F-64 RAFT Liaison 0 07/28/92 n/a F-65 Warehouseman 1 05/17/01 n/a F-66 EOF Access Control 3 08/23/01 n/a Coordinator F-67 PASS Team Leader 1 05/24/93 n/a F-68 Fitness for Duty (FFD) 0 07/28/92 n/a Coordinator F-69 HAZMAT Team Leader 0 07/28/92 n/a F-70 Assistant Emergency Team 0 07/28/92 n/a Coordinator F-71 OSC Communicator 0 07/28/92 n/a F-72 OSC Support 0 10/05/93 n/a F-73 Mechanical Engineer 0 07/27/99 n/a EC-02 EMERGENCY CLASSIFICATIONS 6 04/24/98 7/1, 01/27/99, 7/2, 7/3 12/13/99, 12/20/99 EC-03 NOTIFICATION OF UNUSUAL 6 06/15/01 n/a EVENT EC-04 ALERT 6 06/15/01 n/a EC-05 SITE AREA EMERGENCY 6 06/15/01 n/a EC-06 GENERAL EMERGENCY 6 06/15/01 n/a EC-07 EMERGENCY PLAN 13 09/25/01 n/a NOTIFICATION

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 6 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN1 S ACN DATE F-01 State and NRC Notifications 2 10/16/01 n/a Checklist EC-08 NON-ESSENTIAL PERSONNEL 8 07/23/00 n/a EVACUATION EC-09 SECURITY DURING 6 08/23/01 n/a EMERGENCIES EC-10 PERSONNEL ACCOUNTABILITY 7 06/15/01 n/a EC-11 REENTRY 4 08/03/99 n/a EC-12 EMERGENCY TEAMS 8 10/03/00 n/a EC-13 REACTOR CORE DAMAGE 4 09/19/97 5/1, 5/2 12/01/97, ESTIMATION 09/28/99 EC-14 RECOVERY 3 10/21/94 4/1, 02/08/96, 4/2, 4/3 02/03/99, 12/13/99 F-01 Recovery Checklist 0 10/21/94 n/a

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 7 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE FACILITIES AND EQUIPMENT (FE)

FE-01 TSC OPERATIONS 8 08/23/01 n/a FE-02 OSC OPERATIONS 6 06/09/97 7/1, 7/2 07/23/99, 08/02/01 FE-03 EOF OPERATIONS 7 08/23/01 n/a FE-04 BEOF OPERATIONS 7 08/23/01 n/a FE-05 EMERGENCY EQUIPMENT & 11 05/26/97 n/a SUPPLIES F-02 OSC Emergency Equipment 4 05/16/01 n/a F-03 EOF Emergency Equipment 5 10/16/01 n/a F-04 BEOF Emergency Equipment 1 05/16/01 n/a F-05 EOF Environmental Lab 0 04/28/92 n/a Equipment F-06 Emergency Vehicle Kit 0 04/28/92 n/a F-07 Field Monitoring Kit 3 10/16/01 n/a F-08 Hospital Kit 2 05/16/01 n/a F-09 Decontamination Kit 2 10/16/94 n/a F-10 TSC Administrative Supplies 4 05/16/01 n/a F-11 OSC Administrative Supplies 1 05/16/01 n/a F-12 OSC Maintenance Tool Box 3 05/16/01 n/a F-13 First Aid Kit (Trauma Kit) 2 05/16/01 n/a F-14 EOF Administrative Supplies 2 05/16/01 n/a F-15 BEOF Administrative 1 05/16/01 n/a Supplies

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 8 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE F- 16 JPIC Administrative Supplies 2 04/11/01 n/a F- 17 EOP Supply Kit 4 09/30/99 n/a F- 18 EOP MCR Tool Bag 1 05/16/01 n/a FE-06 EMERGENCY 5 11/07/00 n/a COMMUNICATIONS EQUIPMENT MISCELLANEOUS (MS)

MS-01 TRANSPORTATION ACCIDENTS 4 10/13/97 511 02/01/00 MS-03 NOTIFICATION OF NEXT OF KIN 4 01/12/96 5/1, 5/2 02/03/99, 12/13/99 MS-04 PROCESSING NRC & IDNS 4 06/06/00 n/a PERSONNEL DURING AN EMERGENCY

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 9 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE PUBLIC RELATIONS (PR)

PR-01 JOINT PUBLIC INFORMATION 08/23/01 n/a CENTER OPERATION AND STAFFING F-01 JPIC Administration 08/23/01 n/a Coordinator Checklist F-02 JPIC Audiovisual Support 02/06/97 n/a Checklist F-03 JPIC Director Checklist 08/23/01 n/a F-06 JPIC Graphic Support 07/28/92 n/a Checklist F-07 JPIC Public Information 04/11/01 n/a Officer Checklist F-08 JPIC Media Coordinator 08/24/01 n/a Checklist F-09 JPIC Media Monitoring 07/28/92 n/a Team Checklist F- 12 JPIC Technical Advisor 07/28/92 n/a Checklist F-13 JPIC Technical Information 07/28/92 n/a Coordinator Checklist F-14 Writer Checklist 07/28/92 n/a F- 18 JPIC Administrative Support 08/23/01 n/a Staff PR-03 PREPARATION AND 05/16/01 n/a DISSEMINATION OF EMERGENCY INFORMATION PR-05 PUBLIC INFORMATION & 06/15/01 n/a EDUCATION

CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE: 18-Oct-01 PAGE: 10 of 10 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE RADIOLOGICAL ASSESSMENT (RA)

RA-01 MANUAL RADIOLOGICAL 08/20/99 7/1 11/29/99 DOSE ASSESSMENT RA-02 PROTECTIVE ACTION 08/08/01 n/a RECOMMENDATIONS RA-03 RADIOLOGICAL EXPOSURE 10/13/97 n/a GUIDELINES RA-04 PERSONNEL MONITORING & 08/03/99 n/a DECONTAMINATION RA-05 PERSONNEL PROTECTION 02/24/00 n/a RA-06 STATION RADIOLOGICAL 06/03/96 n/a SURVEYS RA-07 FIELD RADIOLOGICAL 08/03/99 n/a MONITORING RA-09 POST ACCIDENT SAMPLING 10/12/94 7/1 06/19/97 RA-11 STACK EFFLUENT ANALYSIS & 08/27/00 n/a SAMPLING RA-14 DOSE RATE DETERMINATION 12/14/99 n/a BASED ON ENVIRONMENTAL AIR SAMPLES RA-15 PREDICTIVE RELEASE RATES 02/18/98 n/a RA-16 COMPUTERIZED 08/03/99 n/a RADIOLOGICAL DOSE ASSESSMENT RA-17 RADIOLOGICAL CONTROL OF 5/16/01 n/a THE EOF RA-18 EOF ENVIRONMENTAL LAB 08/03/99 n/a OPERATIONS

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 1 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS SCOPE OF REVISION: Made title changes as appropriate. Added verbage to Attachment 1 to ensure proper charging of battery powered equipment. Changed FTS-2000 phones to FTS-2001.

Authority Function Signature Date Prepared by GreR Birk I 10/9/01 Security Manager @

(.0 lo*10o yy q-....... . h- -, . , ]- I Concurrence Concurrence gu?

sO/A II J/4

  • j/4 Concurrence Independent Reviewer Manager-Clinton Power Station DOCUMENT CONTROL 0*2 001 CONTROLLED COPY CLINTON POWER STATION

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 2of6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS

1.0 INTRODUCTION

1.1 Purpose The purpose of this procedure is to ensure proper operation and availability of CPS emergency communications equipment on a periodic basis. This procedure also establishes a program to evaluate and document the readiness of emergency response facilities.

2.0 RESPONSIBILITY 2.1 Supervisor-Emergency Planning - is responsible for reviewing completed Facility Logs.

2.2 Security Manager - is responsible for the review and implementation of this procedure.

2.3 Manager-Clinton Power Station - is responsible for final approval of this procedure.

3.0 DEFINITIONS 3.1 Operable - the communication device transmits and/or receives clearly.

3.2 Communication Device - a communication device may include the following:

  • any telephone instrument, regardless of type, 0 any radio transmitter or receiver (i.e.; hand held radio, mobile vehicle radio or equivalent, remote control console, etc.),
  • pagers,
  • any facsimile transceiver, or
  • computerized notification system,
  • satellite phones may be temporarily placed in emergency facilities, these phones should be checked if available,
  • computers.

3.3 Emergency Response Facility Readiness - the capability of an emergency response facility to support emergency response organization functions and duties. The applicable emergency response facility operations procedure, listed as references to this procedure, may be referenced to establish required capabilities of each emergency response facility

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 3 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.0 INSTRUCTIONS 4.1 Communications Equipment Operability Checks 4.1.1 Operability checks of communication devices located in the Emergency Response Facilities shall be demonstrated at least monthly 4.1.2 Equipment in all of the emergency response facilities is to be tested 4.1.3 For telephone communication devices, operability should be demonstrated by calling another telephone, or the opposite end of the same circuit in the case of a ringdown phone, and verbally communicate. When performing any communications test, clearly state that you are conducting a test. If any telephone equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.

4.1.4 For two-way radio communication devices, actual two-way communication should be conducted to demonstrate operability. If any radio equipment fails to operate then the appropriate repair department should be contacted to initiate corrective maintenance.

4.1.5 For facsimile transceivers, operability should be demonstrated by transmitting and receiving a test copy. If a facsimile machine fails to operate then the applicable vendor or Document Control should be contacted to initiate corrective maintenance.

4.1.6 The OCA Notification System is tested by making a test announcement on the second Tuesday of each month and verifying operability on as many speakers as feasible. If the system fails to operate then notify security of the affected areas and contact the appropriate repair department to initiate corrective maintenance.

4.1.7 ERO Pagers are tested at least monthly. If a pager fails to activate troubleshoot the pager, and repair or replace as appropriate.

4.1.8 Check FTS 2001 circuits as described below. If an FTS telephone fails to operate then the NRC Operations Center in Rockville, Maryland should be contacted over the commercial telephone system to have the system returned to service.

a. Emergency Notification System (ENS) - Call NRC Operations Center.
b. All other circuits - perform an internal check by dialing 700 followed by its 7 digit phone number.

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 4 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.9 During the checks of the Nuclear Accident Report System (NARS), conduct a roll call with the State and local authorities from at least one of the Clinton NARS stations located in the:

  • Main Control Room (MCR)
  • Emergency Operations Facility (EOF)
  • Backup Emergency Operations Facility (BEOF)

The roll call should be conducted as follows:

a. Attempt to pre-position personnel at the TSC, EOF, Backup EOF, and simulator to participate in the roll call.
b. From your location, dial 36 on the NARS station and announce:

"This is the Clinton (location) . Please standby for a roll call."

c. Request acknowledgment from each of the parties on the Clinton NARS circuit other than your location. The parties on the Clinton circuit are:
  • DeWitt County ESDA
  • DeWitt County Sheriff
  • Main Control Room (MCR)
  • Emergency Operations Facility (EOF)
  • Backup Emergency Operations Facility (BEOF)

Thank each party for their participation after they answer the roll call.

4.1.10 Operability of the NARS telephones may also be verified by having the State conduct a roll call with personnel stationed at the NARS telephones.

4.1.11 If any of the NARS telephones fail to operate then IEMA should be contacted to initiate corrective maintenance.

4.1.12 For the ERO Notification System, operability shall be demonstrated by activating the system (usually for the monthly pager test). If the system fails to operate then notify Security that the system is inoperable and initiate appropriate actions to reestablish operability.

CLINTON POWER STATION PROCEDURE: AP-09 "EMERGENCYPLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 5 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.1.13 Computers should be checked by powering each system up and verifying operability.

4.2 Emergency Response Facility Inspections Inspections of the Emergency Response Facilities (ERFs) should be conducted monthly. The inspections should be conducted as follows:

4.2.1 Perform a walk-through of each emergency response facility noting the arrangement and condition of materials, equipment, and supplies. (NOTE: When facilities are eliminated through a change to the Emergency Plan, that facility may be marked "NA".)

4.2.2 Typical equipment associated with emergency response facilities which should be observed may include, but not be limited to, the following:

- MESOREM Computer

- Walkdown EOF HVAC

- Performance Monitoring System/Display Control System (PMS/DCS)

- Inspect external doors to EOF

- Area Radiation/Process Radiation Monitoring System (AR/PR)

- Meteorological Monitoring Systems

- Battery powered equipment

- EOF Particulate Iodine Noble Gas and Area Radiation Monitors (PING/ARM)

- EOF Environmental Lab Equipment

- Personnel Protective Equipment and Emergency Kits

- Un-interruptable power supplies 4.2.3 Ensure that the appropriate maintenance work request has been written for any equipment deficiencies noted.

4.3 Documentation 4.3.1 Attachment 1, FACILITY CHECK LOG, should be used to document communications and facility checks.

4.3.2 The completed FACILITY CHECK LOG shall be provided to the Supervisor Emergency Planning for review and approval.

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 PAGE: 6 of 6 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS 4.3.4 If some portion of the check cannot be performed, the circumstances and recommendations for deferral or rescheduling should be documented on the FACILITY CHECK LOG.

Similarly, it may be noted in the FACILITY CHECK LOG that a portion of the checks have been satisfied by actual use, e.g., during a drill or exercise or by recent or daily use.

4.3.5 Corrective actions to any deficiencies/discrepancies noted during readiness inspections which cannot be completed immediately should be added to the emergency planning tracking system.

4.3.6 If conditions warrant, a condition report shall be written by the individual performing the inspection in accordance with LS-AA-125, CORRECTIVE ACTION PROGRAM (CAP) PROCEDURES. The deficiencies/discrepancies shall also be reviewed for potential reportability in accordance with 10CFR50.72.

4.3.7 The Manager-Clinton Power Station and the Vice President should be informed of any emergency response facility found degraded to a point which would prohibit it from being activated.

4.3.8 Approved FACILITY CHECK LOGS shall be retained in accordance with Records Management Standards 2.04.

5.0 REFERENCES

1. CPS Emergency Plan, Sections 3.2.7, 5.3 and 5.4.5.1
2. 10CFR50, Appendix E, Section IV.E
3. NUREG-0654, Revision 1
4. Records Management Standards 2.04
5. NRC Information Notice 89-19
6. LS-AA-125, Corrective Action Program (CAP) Procedures 6.0 ATTACHMENTS
1. FACILITY CHECK LOG

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 ATTACHMENT: 1 PAGE: 1 of 2 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS Date(s) Check Performed:

Facility/Location Checked:

MCR EOF TSC OSC JPIC BEOF INITIALS

1. Regular Telephones (MERIDIAN, CENTREX, OTHER) demonstrated operable.
2. Nuclear Accident Reporting System demonstrated operable.
3. Emergency Automatic Ringdown (EAR) telephones demonstrated operable. (internal circuit checks)
4. FTS-2001 (one circuit only demonstrated operable by calling the NRC Headquarters).
5. Radios demonstrated operable (hand held, mobile vehicle radio or equivalent, remote control consoles).
6. Facsimile machines demonstrated operable.
7. OCA Notification System demonstrated operable.
8. ERO Notification System demonstrated operable.
9. ERO Pagers demonstrated operable. (OGH)

(NSB)

10. EOF HVAC equipment walked down.
11. UPS walkdown.
12. Inspect EOF external door seals for damage.
13. Inspect battery powered equipment for damage and to ensure proper charging.
14. Computer systems verified operable.

Deficiencies Noted, if any:

CLINTON POWER STATION PROCEDURE: AP-09 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 8 ATTACHMENT: 1 PAGE: 2 of 2 TITLE: EMERGENCY FACILITY AND EQUIPMENT CHECKS Corrective Actions Implemented:

Comments:

Corrective Action(s) added to Action Tracking if not completed?

Yes Tracking Number No Not Applicable Performed By:

Signature Date Reviewed and Approved By:

Supervisor-Emergency Planning Date

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 1 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS SCOPE OF REVISION: Revised to incorporate organizational title changes and remove reference to ERO badges. Changed the title of Security Screening to Security Badging.

Designated department managers as having the responsibility to notify Emergency Planning of employee terminations. Made other minor editorial changes. This also serves as the biennial review.

Authority Function Signature Date Prepared by Greg Birk I 9/21/01 Security Manager Concurrence I /

Concurrence

&/ I 0//I.

Concurrence Independent Reviewer ' AA Manager-Clinton Power Station DOCUMENT CONTROL OCT 4 3 2001 CONTROLLED COPY CLINTON POWER STATION

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 2 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS CONTENTS

1.0 INTRODUCTION

2.0 RESPONSIBILITY 3.0 DEFINITIONS 4.0 INSTRUCTIONS 4.1 Establishment of the Emergency Response Organization Roster 4.2 Changing the ERO Roster 4.3 Maintenance of the CPS Emergency Response Organization 4.4 Permanent Removal from the ERO 4.5 Changes in Employee Data

5.0 REFERENCES

6.0 ATTACHMENTS 7.0 FORMS

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 3 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS

1.0 INTRODUCTION

The purpose of this procedure is to provide instructions for maintaining and updating assignments of personnel to the Emergency Response Organization (ERO).

2.0 RESPONSIBILITY 2.1 Manager-Clinton Power Station is responsible for the approval of this procedure, for providing training to candidates assigned to the ERO and for resolving differences between Department Managers and the Security Manager over ERO assignments.

2.2 Security Manager is responsible for maintaining the Emergency Response Organization, by ensuring training is provided and positions are filled with qualified candidates.

2.3 Department Managers and Directors (designees) are responsible for recommending candidates to fill particular ERO positions, and for providing Emergency Planning information on employee terminations.

2.4 Security Badging is responsible for providing verification of fitness for duty requirements and security screening requirements for assigned ERO members are satisfied.

3.0 DEFINITIONS 3.1 Emergency Response Organization Roster - a list of individuals by position that are assigned to the CPS Emergency Response Organization, or are candidates in training to fill such a position.

4.0 INSTRUCTIONS 4.1 Establishment of the Emergency Response Organization Roster 4.1.1 Emergency Planning shall maintain the official roster of personnel assigned to the Emergency Response Organization (ERO). The data base should be maintained on a computer.

4.1.2 The roster should contain the names of individuals assigned to the various ERO positions, as well as other data such as the individual's department, telephone/extension numbers, and mail codes.

4.1.3 Individuals should only be assigned to one ERO position at a time.

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 4 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.1.4 The ERO roster may status individuals with regard to the completion of their initial training for their assigned ERO position. Status Code 0 is used to designate persons that have not completed their initial training and demonstration, as in the case of a newly assigned individual. Status Code 1 is used to designate persons who have successfully completed initial training for their ERO position and have also demonstrated this knowledge. These persons are considered actively participating in the ERO. Status Code 2 is used to designate persons who have been removed from active duty due to a temporary change or due to expiration of ERO Training.

4.1.5 The ERO roster maintained by Emergency Planning shall be the sole official source listing of ERO assignments. Training requirements should be in accordance with the most current ERO roster available.

4.1.6 The Security Manager may make changes to the roster as necessary in accordance with section 4.2 of this procedure.

4.1.7 The accuracy of the ERO roster should be verified quarterly.

4.1.8 Following the quarterly verification, copies of the updated ERO roster shall be provided to the Security Department. Copies may also be provided at other times, specifically if changes have been made.

4.2 Changing the ERO Roster 4.2.1 Additions 4.2.1.1 Additions may be made to the ERO roster at any time to fill vacancies.

4.2.1.2 Emergency Planning shall notify Security Badging if the individual has not been granted access to the protected area.

4.2.1.3 Emergency Planning should then enter the employee information into the computer data base and enter that individual as a status "0" until initial training is completed, fitness for duty and security screening requirements are verified, and a practical demonstration has been performed.

4.2.2 Deletions 4.2.2.1 Deletions (except for employee terminations) should be made only on the recommendation of the department responsible for the position and with the approval of the Security Manager.

4.2.2.2 Deletions (except for employee terminations) should not be made unless a replacement has been identified and added per this procedure.

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 5 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.3 Changes 4.2.3.1 Changes should only be made to the ERO roster during the quarterly update. Changes shall be made only on the recommendation of the responsible department and only with the approval of the Security Manager.

4.2.3.2 If a change creates a vacancy it shall be filled per section 4.2.1 of this procedure at the same time that the change is recommended.

4.2.3.3 A determination shall be made on a case-by-case basis as to the status of the individual after reviewing previous ERO training completed.

4.2.4 Temporary Changes 4.2.4.1 Temporary changes may be made to the ERO roster on the recommendation from the responsible department, with concurrence from the Security Manager.

4.2.4.2 Temporary changes may be made for:

  • Extended sick leave
  • Maternity leave
  • Extended travel outside of the area
  • Extended training, such as SRO training 4.2.4.3 Vacancies created by temporary changes will be filled on a case-by case basis as determined by the Security Manager with considerations given for:
  • Length of time for temporary change
  • Positions affected
  • Training requirements 4.2.4.4 "Qualified individuals" are to be used in ERO positions. Temporary exceptions are approved on a case by case basis by the Security Manager for personnel shortfall purposes.

In an actual emergency, "Unqualified Individuals" may be used on a temporary basis, to alleviate the emergency and protect the health and safety of employees or the public. Their use must be approved by the Emergency Planning Coordinator, Station Emergency Director, or Emergency Manager. These exceptions are approved per the ERO Assignment Change Form prior to their use, or during an emergency, as time permits.

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 6 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.5 Updating from Status 0 to Status 1 4.2.5.1 Emergency Planning should document when fitness for duty and security screening requirements are satisfied, and when course work is completed.

4.2.5.2 When all required classroom training has been successfully completed and documented, Emergency Planning will contact the individual(s) and arrange for a practical demonstration as required by the CPS Emergency Plan. The demonstration will be conducted by Emergency Planning or other appropriate individuals designated by Emergency Planning and will be appropriate for the individual's ERO assignment, and level of previous experience and training. Successful participation in a scheduled drill will satisfy this requirement, but if this is not feasible, a one-on-one walkthrough or demonstration may be conducted.

4.2.5.3 The successful practical demonstration shall be documented on the ERO Assignment Change Form by signing the appropriate blocks. The ERO roster shall be updated to show the individual as Status Code 1.

NOTE: A separate ERO Assignment Change Form should be used for the Primary and the Alternate (if applicable) position.

4.2.6 Updating From Status 2 to Status 1 4.2.6.1 When an individual is ready to be returned to duty, the ERO Roster should be updated to change the status from 2 to 1.

4.2.6.2 If the change to Status 2 was the result of a temporary change then Emergency Planning will determine if any additional training is needed prior to returning the individual to Status 1. This may include an interview with the individual to verify they are still familiar with their duties.

4.2.6.3 If the change to Status 2 resulted from expired ERO Training, the completed training date should be documented.

4.2.7 Overdue or Expired Annual ERO Training 4.2.7.1 Notices should be sent to Departmental Training Coordinators and ERO members to inform them of upcoming classroom training.

4.2.7.2 ERO members whose training becomes overdue shall be scheduled for makeup training before their ERO training expires.

4.2.7.3 Department Managers may be informed of ERO members whose training is overdue due to their failure to attend scheduled training.

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 7 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.2.7.4 Department Managers shall be informed of ERO members whose ERO training is expired.

4.2.7.5 The Vice President shall be informed of any expired training that has an immediate impact on the ERO.

4.2.7.6 A Condition Report shall be written documenting the expiration of ERO refresher training excluding access training, with the responsibility for resolving the Condition Report assigned to the individual's department.

NOTE Access training for ERO members such as Radworker or Respiratory Protection is covered in AP-05.

4.2.7.7 A Status "2" shall be entered in the ERO roster for expired ERO refresher training. The Status shall be returned to a 1 upon completion of the appropriate refresher training. When refresher training is completed the ERO roster is updated by changing the status to 1.

4.3 Maintenance of the Emergency Response Organization 4.3.1 Department Managers should provide Emergency Planning notification of employee terminations.

4.3.2 If ERO vacancies are identified, the Emergency Planning Department should evaluate the impact of the vacancy upon the ERO capability to respond to an emergency. If the impact is great, notify the responsible Department Manager immediately to recommend a replacement. If the impact is minor, replacement candidates may be identified during the next quarterly ERO roster update.

4.3.3 If necessary, Emergency Planning may rely on the Manager-Clinton Power Station to obtain a suitable replacement.

4.3.4 Vacancies created by employee terminations should be treated as changes to the ERO roster and should be handled in accordance with section 4.2 of this procedure.

4.3.5 CPS ERO members may be assigned to another work location other than CPS. When this happens the Department Manager is responsible for sending a copy of the Outprocessing Checklist to Emergency Planning for review.

PROCEDURE: AP-10

" CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 8 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS 4.3.6 Emergency Planning will review the ERO position and determine whether the individual will remain on the ERO, and will notify Security Badging as to the disposition of that individual in regards to remaining on the ERO.

4.3.7 ERO members who work at locations other than CPS but are assigned to the TSC, OSC or EOF shall remain in the CPS Fitness For Duty program.

4.4 Permanent Removal from the ERO 4.4.1 Permanent removal from the ERO should be requested in writing and submitted with justification and concurrence from the appropriate Department Manager. A replacement candidate should be identified. Each request will be reviewed on a case by case basis, with final approval coming from the Security Manager.

4.4.2 A replacement candidate should be qualified per this procedure prior to permanent ERO removal, if possible.

4.5 Changes in Employee Data 4.5.1 The ERO roster contains personal information on each member assigned to the ERO.

This information is needed for various reasons and will be held in strictest confidence. Uses for the data include:

. home telephone numbers are used to program the emergency response organization notification system

  • home telephone numbers are also used to call additional personnel when needed, or to call personnel who do not respond to their pager activation.
  • Social Security Numbers are used for tracking training progress and for implementing dosimetry logs.
  • CPS departments and mail codes are used to sort the roster for quarterly reviews and to ensure that mailing lists are accurate.

4.5.2 As noted above, it is important that the employee data be correct. Individuals assigned to an ERO position are encouraged to provide updated information to Emergency Planning whenever their personal data changes. Updated information may be provided by memo or telephone call to Emergency Planning.

PROCEDURE: AP-10 CLINTON POWER STATION REVISION: 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 9 of 9 TITLE: EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS

5.0 REFERENCES

1. CNP 4.03, Emergency Preparedness Program
2. CPS Emergency Plan, Sections 1.5.1 and 2.3, and Table 2-1
3. EC-01, CPS EMERGENCY RESPONSE ORGANIZATION AND STAFFING
5. PR-01, JOINT PUBLIC INFORMATION CENTER ORGANIZATION AND STAFFING
6. AP-05, EMERGENCY PREPAREDNESS TRAINING PROGRAM 6.0 ATTACHMENTS NONE 7.0 FORMS NONE

PROCEDURE: EC-07

  • rCLINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 1 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST SCOPE OF REVISION: Revised to add NARS Form approval note in section A, NARS Form Instructions. This revision also incorporates ACN 2/1.

DOCUMENT CONTROL 0c' 3 2001 CONTROLLED Copy CLINTON POWER STATION Authority Function Signature Date Prepared by Greg Birk-, I 9/25/01 Security Manager 1 jilo4 Concurrence Concurrence

,4I /

Concurrence Independent Reviewer Approval/Effective Date

PROCEDURE: EC-07 CIINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 2 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST Section A: STATE NOTIFICATION Requirements: State notification is required within 15 minutes when one of the following occur:

1) Initial emergency declaration (block 3).
2) Change in emergency classification (block 3).
3) Change in Protective Action Recommendations. This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9).

NARS Form Instructions:

Utility Message No. Sequential number (ie. 1,2,3,4). Enter N/A if this is a State NARS.

State Message No. Sequential number (ie. 1,2,3,4). Enter N/A if the NARS is being sent by CPS.

1. Status: Circle the letter by the appropriate status.

"*J' 2. Station: Circle the letter G. (Clinton)

3. On-site Accident Classification: Circle the letter by the appropriate accident classification. This information is obtained from the person with command authority.
4. Accident Classified: Record the time and date the accident was classified and record the Emergency Action Level(EAL) number used for the classification. This information is obtained from the individual with command authority. For accident termination, record the date and time and N/A for the EAL.
5. Release to Environment: Circle the letter by the appropriate release status.
6. Type of Release: Circle the letter by the appropriate type of release.
7. Wind Direction: Record the direction(in degrees) from which the wind is blowing.

(This is the 10 meter wind direction).

PROCEDURE: EC-07 CLINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 3 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST NOTE Wind Direction is obtained from one of the following sources:

1) On Panel 1H13-P826, Pen l(Blue) of recorder 1UR-EM016.
2) AR/PR Terminal, Channel 5 of 0UIX-PRO50.
3) If the MET Tower is non-functional, then use the B/U MET Tower information using 1UU-EM024 terminal located in the TSC.
4) When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.

Downwind Sector: Record the ONE downwind sector using the wind direction and the chart on the back of the NARS form (ie. if the wind direction is 180 degrees then the downwind sector is A).

8. Wind Speed: Using block B only, record the wind speed in miles per hour (this is the 10 meter wind speed).

NOTE Wind Speed is obtained from one of the following sources:

1) On Panel 1H13-P826, Pen 2(Red) of recorder, IUR-EM016.
2) AR/PR Terminal, Channel 4 of OUIX-PRO50.
3) If the MET Tower is non-functional, then use the B/U MET Tower information using IUU-EM024 terminal, Located in the TSC.
4) When the TSC/EOF is activated, the wind direction is obtained from the Radiation Protection group.
9. Recommended Actions: For a NOUE, ALERT, OR SITE AREA EMERGENCY. Circle A (NONE).

For a GENERAL EMERGENCY, circle item C, Initiate Public Notification Procedure. In addition mark items D-K whichever is appropriate. The default recommendation is. H. Evacuate 0-2 mile radius(circle H). J. Evacuate 2-5 miles (circle J) in the downwind sector recorded in block 7 and the two adjacent sectors (ie. if sector A is the downwind sector then the two adjacent sectors will be R and B). G. The remainder of the EPZ should be sheltered. Document this by circling (G) and lining out the "5-10 miles for sectors" and writing in the" Remainder of the EPZ" in the space provided. Items L-P are for State use only.

PROCEDURE: EC-07 CIJINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 4 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST

10. Additional Information: This space should be used to write narrative information.
11. Message Transmitted by: Record your name, CPS and outside phone numbers where you can be called back. The MCR direct line (1-217-935-9812) should be given to IEMA for callback verification if the call is initiated from the MCR.
12. Message Transmitted: Record the date and time. The time should be recorded as the time the initial NARS roll call is complete. This time should also be within 15 minutes of the time recorded in block 4.
13. Message Received: Record the name and organization to whom you gave the information to.

NOTE: All State notifications must be approved by the Individual with Command Authority. This is accomplished by initialing and indicating the time approved in the lower left comer of the NARS form.

PROCEDURE: EC-07

  • CLNTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 5 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST Transmitting the NARS information Initials Emergency Classification:

Date/Time Declared:

Individual with Command Authority

1. Have the Individual with Command Authority review the NARS form and initial prior to sending the information to the state.

NOTE The following step is used only if a GENERAL EMERGENCY is declared first:

2. (If the first declaration was not a GENERAL EMERGENCY, N/A this step and move to step 4).

If the first declaration is a GENERAL EMERGENCY, dial 36 using the (green) NARS phone.

Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time:

"This is the Clinton Power Station, (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call ....I have a NARS notification; please standby for roll call ....Illinois Emergency Management Agency ....Illinois Department of Nuclear Safety.....(DeWitt County Sheriff....DeWitt County ESDA [General Emergency as initial classification only])"

IEMA IDNS DeWitt County Sheriff DeWitt County ESDA Coordinator (normal working hours only).

Provide the information from the NARS form. A final roll call is not necessary.

PROCEDURE: EC-07 CLINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 6 of 8 TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST I

3. If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860. Verify with IEMA that they (IEMA) will contact IDNS and DeWitt County personnel. "NA" this step of the NARS phone was used.
4. If the first declaration is not a GENERAL EMERGENCY, dial 98 using the (green) NARS phone.

Perform a roll call of all expected parties as follows using individual judgment to determine acceptable waiting time:

"This is the Clinton Power Station, (location from which message is being sent, ie., MCR, EOF, or TSC), I have a NARS notification; please standby, for roll call ....I have a NARS notification; please standby for roll call ....Illinois Emergency Management Agency ....Illinois Department of Nuclear Safety....

IEMA IDNS Provide the information from the NARS form. A final roll call is not necessary.

5. If the NARS phone is not functioning, contact IEMA only, via commercial phone line at 1-800-782-7860 or 1-217-782-7860. Verify with IEMA that they (IEMA) will contact IDNS. "NA" this step of the NARS phone was used.

Section B: NRC Notification Requirements: NRC notification is required within 60 minutes when one of the following occur:

1) Initial emergency declaration (block 3).
2) Change in emergency classification (block 3).
3) Change in Protective Action Recommendations. This includes changes to the downwind sector which would cause a change in the Protective Action Recommendations (blocks 7 and 9).

PROCEDURE: EC-07 CINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: 1 PAGE: 7 of 8

( TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST Emergency Classification:

Date/Time Declared:

Individual with Command Authority

11. Complete a REACTOR PLANT EVENT NOTIFICATION WORKSHEET
2. Using the FTS 2001 phone, dial one of the following numbers:

Primary phone number: 1-301-816-5100 Backup phone numbers: 1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT NOTIFICATION WORKSHEET.

3. If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if step 2 was performed.

Follow-up Notification to the NRC Requirements:

1. Once each hour following the transmission of the last ENS message complete an REACTOR PLANT EVENT NOTIFICATION WORKSHEET. (If the NRC has requested continuous communications and an open line has been established, follow-up forms are not necessary as long as this has been documented in the logs).

PROCEDURE: EC-07 CLINTON POWER STATION REVISION: 2 EMERGENCY PLAN IMPLEMENTING PROCEDURE FORM: I PAGE: 8 of 8 "TITLE: STATE AND NRC NOTIFICATIONS CHECKLIST

2. Using the FTS 2001 phone, dial one of the following numbers:

Primary phone number: 1-301-816-5100 Backup phone numbers: 1-301-951-0550 1-301-415-0550 1-301-415-0553 Provide the information from the REACTOR PLANT EVENT NOTIFICATION WORKSHEET.

3. If the ENS phone is not functioning, contact the NRC via commercial phone line using one of the above numbers. "NA" this step if the FTS 2001 phone was used.
4. REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
5. REACTOR PLANT EVENT NOFICATION WORKSHEET form completed and information transmitted, date/time:
6. REACTOR PLANT EVENT NOFICATION WORKSHEET formr completed and information transmitted, date/time:

Performned by: Performedby: /

PROCEDURE: FE-05 CLINTON POWER STATION FORM: 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 5 PAGE: 1 of 4 TITLE: EOF EMERGENCY EQUIPMENT SCOPE OF REVISION: Identified RP equipment to verify operational.

DOCUMENT CONTROL OCT 2 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function Signature Date Prepared by Greg Birk I 10/9/01 Security Manager V'A.*p

  • b 1L Sin;. I Io ri0 Concurrence I

,j/i Concurrence I Concurrence Independent Reviewer Manager-Clinton Power Station

PROCEDURE: FE-05 CLINTON POWER STATION FORM: 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 5 PAGE: 2 of 4 TITLE: EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat RM-20/14 with (Due Date:

1 HP210/260 probe see comments) 7*

E-120/E-520 with Serial No:

2 HP270 probe Due Date: 1I Serial No:

3 RO-2/RO-2A Due Date: 1*

Serial No:

4 Air Sampler (110 vac) Due Date: I Pocket Dosimeter 5 (0-500 mR) Due Date: 75 Air Sampler Serial No:

6 (Battery Powered) Due Date: 1I Air Sampler (Due Date:

7 (12 VDC) see comments) 5 8 TLDs 150 9 Protective Clothing (set) 100 10 Respirators (N/P) 20 Expiration 11 Thatf 9cG 12 Pocket Dosimeter Charger 1*

13 Form - TLD/PD Issue 5 Potassium Iodide Expiration 14 (14 tablets) Date: 75 15 Smear (box) 1 16 Bag, yellow (large) 6 17 Bag, yellow (small) 6

  • verify operational Serial No: Air Sampler Serial No.

Comments: RM-20/14 Due Date (12 VDC) Due Date:

Serial No: Air Sampler Serial No RM-20/14 Due Date (12 VDC) Due Date Serial No: Air Sampler Serial No RM-20/14 Due Date (12 VDC) Due Date Serial No: Serial No RM-20/14 Due Date RM-20/14 Due Date Air Sampler Serial No: Serial No (12 VDC) Due Date RM-20/14 Due Date Air Sampler Serial No Serial No (12 VDC) Due Date RM-20/14 Due Date

PROCEDURE: FE-05 FORM: 3

- CLINTON POWER STATION REVISION: 5 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE: 3 of 4 TITLE: EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat 18 Coin Envelope 50 19 Particulate Air Filter (box) 1 20 Source Check Plaque Cs-137 1 21 Rad Sign with Inserts 12 22 Rad Ribbon (roll) 1 23 Log Book 1 24 Step-Off Pad 2 25 Portable Radio 6*

26 Portable Radio Charger (1.2 unit) 1 27 Silver Zeolite Cartridge 20 28 Printer Paper (box) (NU000040) 2 29 Printer Transparency (box) (NU530020) 2 30 Printer Ribbon (NU520020) 2 31 Decontamination Kit 1 32 Field Monitoring Kit 5 33 First Aid Kit (trauma kit) 1 34 Chart Paper (roll) 1

  • verify operational Comments:

PROCEDURE: FE-05

- CLINTON POWER STATION FORM: 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 5 PAGE: 4 of 4 TITLE: EOF EMERGENCY EQUIPMENT Item Item Description Qty Condition No. Req'd Sat/Unsat 35 CAM Filter Paper (box) 1 36 CAM Charcoal Cartridge 10 37 Fanfold 9 1/2 X 1I paper (box) 2 38 Tape (roll) 2 39 Tape, yellow (roll) 2 40 Tweezers 2 41 Herculite (roll) 1 42 Lap Top Computer 1_**

1 1

______ 1 .4- 4-

+ +

J +

4- -t

______ .4-

.1. + t

___________ +/-

    • verify operational by logging onto network Comments:

Performed by: Date:

Reviewed by: Date:

PROCEDURE: FE-05 FORM: 7 CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 3 PAGE: 1 of 4 TITLE: FIELD MONITORING KIT SCOPE OF REVISION: Identified RP equipment to verify operational.

DOCUMENT CONTROL "O"" Z 3 2001 CONTROLLED COPY CLINTON POWER STATION Authority Function Signature Date Greg Birk 10/9/01 Prepared by I Security Manager . I-%/,L-. I Concurrence Concurrence 6 /1, Concurrence I Independent Reviewer I

1. i* ;1 Manager-Clinton Power Station

PROCEDURE: FE-05 CLINTON POWER STATION FORM: 7 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 3 PAGE: 2of4 TITLE: FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat E-120/E-520 with Serial No:

1 HP270 probe Due Date: 1*

Serial No:

2 RO-2/RO-2A Due Date: 1*

3 Protective Clothing (set) 2 4 Bootie, plastic (pair) 2 5 Hood 2 6 Glove, rubber (pair) 4 Potassium Iodide Expiration 7 (14 tablets) Date: 1 Pocket Dosimeter 8 (0-1500 mR) Due Date: 2 9 Pocket Dosimeter Charger 1I 10 Stopwatch 1*

S11 Bag, yellow (small) 10 12 Bag, yellow (large) 3 13 Container, plastic (1 gal) 3 14 Scissors 1 15 Silver Zeolite Cartridge 12 16 Binder with pad of ruled paper 1 17 First Aid Kit 1

  • verify operational Comments:

PROCEDURE: FE-05 CLINTON POWER STATION FORM: 7 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 3 PAGE: 3 of 4 TITLE: FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat 18 Air Sample Label 15 19 Environmental operational Sample Label 15 20 Pen (black) 6 21 Battery ("D" cell) 8 22 Smear (box) (Blank) 1 23 Tape, (roll, 2 inch wide) 1 24 Particulate Air Filter (box) 1 25 Field Team Handbook 1 26 Map - 10 mile 1 27 Map - Site 1 a

26 lashlignt _ -_

29 Tag - Radioactive Material 12 30 Battery ( 9 volt) 4 31 Radioactive Check Source - Cs-137 1 32 Rain Gear 2 33 Bag, (small with Rad. Material Tag) 12 34

  • verify Lake and Recreation Area Keys 1
  • verify operational Comments:

Comments:

PROCEDURE: FE-05 CLINTON POWER STATION FORM: 7 EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION: 3 PAGE: 4 of 4 TITLE: FIELD MONITORING KIT Item Item Description Qty Condition 3 No. Req'd Sat/Unsat 35 Compass 1 36 Money - quarters $5 37 Tweezers 1 38 Hand Spade 1 39 Tape Measure 1 40 Ladle for Water Sampling 1 41 Funnel 1 42 Glove, disposal (pair) 10 43 Absorbent Material 5 44 Coin Envelope 20 AC tq

"-) r01 11 - Field Ieiarn aii e..llgl_____t_ __,

46 Form - Personal Dosimeter Record Log 6 Form - Environmental 47 Survey/Sample Data 6 Form - Field Team 48 Exposure Rate measurements 6 49 Form - Contamination Surveys 6 50 Form - Air Sample Data Sheet 6 51 Form - Field Monitoring Kit Inventory 2 Comments:

Performed by: Date:

Reviewed by: Date: