ML020420250
| ML020420250 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/14/2002 |
| From: | AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| 02P0009 | |
| Download: ML020420250 (11) | |
Text
CLINTON POWER STATION RECORDS/DOCUMENT MANAGEMENT Controlled Document Transmittal Transmittal No.:
02P0009 Transmittal Date:
01/14/02 Sheet 1 of 2 Document EMERCENGY PLAN IMPLEMENTING PROCEDURE The attached document is being transmitted for your use,
- 27.
- 64.
64A.
64B.
- 90.
110.
179.
202.
202C.(673) 255B(698).
262A(69A).
262C(69C).
262D(69D).
273.
273A(708).
467.
505.
542.
544.
CPS/RL CPS/TSC CPSrrSC CPS/TSC OPS SUPPORT MANAGER SUPV-CHEMISTRY CPS/OPS NTD/SIMULATOR SIMULATOR DOSIMETRY OFFICE MCR/HORSESHOE SHIFT SUPERVISOR REMOTE SHUTDOWN TRAINING REQUAL TRAINING REQUAL MEDICAL EMERGENCY PLANNING CAS SAS V-455 T-31 B T-31 B T-31 B V-1 30G T-31 C T-31 B V-922 V-922 T-31 H T-31 B T-31 B "T-31B V-922 V-922 V-374B V-922 T-31 M T-31 M REMOVE/DESTROY:
Emergency Plan Implementing Procedure (EPIP) Status Report EPIP EC-02, Rev. 6, page 14 of 19
- 3.
3A.
493.
493A(740).
493B(741).
493C(742).
493D(743).
493F(744).
493G(745).
493H(746).
- 76.
222 222A(679).
225.
225A(680) 234.
235.
238.
567.
CPS/BEOF CPS/BEOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF CPS/EOF D. V. PICKETT C. SANGSTER C. SANGSTER V-150 V-150 V-922 V-922 V-922 V-922 V-922 V-922 V-922 V-922 OS OS OS DOC. CONTROL DESK IDNS (M. SINCLAIR)
IDNS (M. SINCLAIR)
STATE EOC D. SHULL (DEWITT CO. ESDA)
M. SINCLAIR (IDNS)
J. FAIROW (RADIOLOGICAL EP MANAGER)
,x r' OS OS OS OS OS OS INSERT:
Same, dtd. 1/7/02 Same page (Noting ACN 7/5 DO NOT FILE ACN APPROVAL PAGE IN BOOK Any questions regarding this transmittal should be forwarded to L. Hegger, extension 4087.
Signature/Date Letter No.
p45
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
PAGE:
NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE ORGANIZATION &
PREPARATION OF CONTROLLED DOCUMENTS REVISIONS AND ADVANCE CHANGE NOTICES EMERGENCY RECORDS RETENTION EMERGENCY PREPAREDNESS TRAINING PROGRAM ALERT AND NOTIFICATION SYSTEM EMERGENCY FACILITY AND EQUIPMENT CHECKS EMERGENCY RESPONSE ORGANIZATION ASSIGNMENTS CPS EMERGENCY RESPONSE ORGANIZATION & STAFFING F-01 Interim Station Emergency Director F-02 Station Emergency Director (SED)
F-03 SED Administrative Support F-04 TSC Administrative Supervisor F-05 Technical Assessment Supervisor 7
05/16/01 n/a 16 07/03/01 17/1 4
01/12/96 5/1 02/03/99 12 11/08/01 n/a AP-01 AP-02 AP-03 AP-05 AP-07 AP-09 AP-10 9
5 5
2 4
1 06/15/01 n/a C
2' 0
10/16/01 n/a I-.
10/16/01 n/a 0
11/08/01 n/a 08/02/01 6/1 06/15/01 n/a 06/15/01 n/a 09/25/01 n/a 04/21/99 n/a 07-Jan-02 1 of 8 10/31/01 8
8 9
EC-01 O
9,0i 00 0ýz F-11/08/01
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
07-Jan-02 PAGE:
2 of 8 STATUS REPORT NUMBER EPIP TITLE F-06 Emergency Operations Supervisor F-07 TSC Radiological Supervisor F-08 OSC Supervisor F-09 Station Security Coordinator F-10 TSC Communicator F-11 TSC Records Management Coordinator F-12 TSC Electrical Engineer F-13 TSC Reactor Engineer F-14 TSC Chemist-Nuclear F-15 Operations Coordinator F-16 TSC Computer Operator F-17 Radiological Engineering Specialist F-19 RP (TSC) Communicator F-20 Status Board Keepers F-21 Radiological Controls Supervisor F-22 In-station Emergency Teams F-23 OSC Radiological Controls Coordinator F-24 Assistant OSC Radiological Controls Coordinator F-25 RP (OSC) Communicator F-26 Emergency Team Coordinator REVISION 1
1 1
0 4
0 1
1 2
1 5
1 0
0 0
0 0
0 1
07/28/92 n/a 07/28/92 10/18/93 n/a n/a DATE 04/21/99 09/25/01 08/26/99 07/28/92 08/23/01 07/28/92 04/21/99 04/21/99 04/21/99 04/21/99 02/28/00 11/23/93 07/28/92 07/28/92 07/28/92 07/28/92 04/11/01 n/a n/a 1/1 n/a n/a 06/29/00 ACN'S ACN DATE n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
07-Jan-02 PAGE:
3 of 8 STATUS REPORT NUMBER EPIP TITLE F-28 Emergency Manager F-30 EOF Director F-31 Executive Administrative Support F-32 Licensing Advisor F-33 EOF Emergency Advisor F-34 EOF Technical Advisor F-36 Technical Information Liaison F-37 Emergency Action Level/Protective Action Evaluator F-38 Security Supervisor F-39 Radiation Protection Supervisor F-40 EOF Administrative Supervisor F-41 EOF Engineering Supervisor F-42 RP (EOF) Communicator F-43 Dose Assessment Supervisor F-44 Dose Assessor F-45 Field Team Coordinator F-46 Field Teams F-47 Radiological Controls Coordinator F-49 EOF Monitor 07/25/00 n/a 07/28/92 07/28/92 12/01/93 07/28/92 11/08/01 07/28/92 11/08/01 1/1 n/a n/a n/a n/a n/a n/a 07/28/99 07/28/92 n/a REVISION 3
3 2
0 3
0 2
0 0
2 DATE 06/15/01 03/05/97 06/15/01 07/28/92 04/11/01 07/28/92 11/08/01 07/28/92 07/28/92 09/25/01 ACN'S ACN DATE n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2
0 0
1 0
3 0
2 0
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
07-Jan-02 PAGE:
4 of 8 STATUS REPORT ACN'S n/a NUMBER EPIP TITLE F-50 EOF Records Management Coordinator F-51 EOF Communicator F-53 Copy Clerk F-54 TSC Emergency Advisor F-55 Procurement Coordinator F-56 Word Processor F-57 EOF Computer Operator F-58 Mechanical/Nuclear Engineer F-59 EOF Electrical Engineer F-60 Core Damage Assessor F-61 Technical Advisor to State/Local Organizations F-62 EOF Administrative Support F-63 Fire Brigade Coordinator F-64 RAFT Liaison F-65 Warehouseman F-66 EOF Access Control Coordinator F-67 PASS Team Leader F-68 Fitness for Duty (FFD)
Coordinator F-69 HAZMAT Team Leader F-70 Assistant Emergency Team Coordinator ACN DATE REVISION 0
3 0
0 1
1 4
0 0
0 0
0 0
0 1
3 1
0 0
0 DATE 07/28/92 02/24/00 07/28/92 07/28/92 05/16/01 05/16/01 09/02/99 07/28/92 07/28/92 07/28/92 07/28/92 07/28/92 07/28/92 07/28/92 05/17/01 08/23/01 05/24/93 07/28/92 07/28/92 07/28/92 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
07-Jan-02 PAGE:
5 of 8 STATUS REPORT I5 I
I I
I E
DATE 07/28/92 10/05/93 07/27/99 ACN'S ACN DATE n/a n/a n/a NUMBER EPIP TITLE F-71 OSC Communicator F-72 OSC Support F-73 Mechanical Engineer EC-02 EMERGENCY CLASSIFICATIONS
-C-03 NOTIFICATION OF UNUSUAL EVENT
-C-04 ALERT EC-05 SITE AREA EMERGENCY C-06 GENERAL EMERGENCY EC-07 EMERGENCY PLAN NOTIFICATION F-01 State and NRC Notifications Checklist REVISION 0
0 0
6 7
7 7
7 14 2
11/08/01 n/a 11/08/01 11/08/01 11/08/01 01/03/02 n/a n/a n/a n/a 01/03/02 n/a NON-ESSENTIAL PERSONNEL EVACUATION SECURITY DURING EMERGENCIES PERSONNEL ACCOUNTABILITY REENTRY EMERGENCY TEAMS REACTOR CORE DAMAGE ESTIMATION 9
6 7
4 8
4 10/31/01 n/a 08/23/01 n/a 06/15/01 n/a 08/03/99 n/a 10/03/00 n/a 09/19/97 5/1, 5/2 EC-08 EC-09 EC-10 EC-11 EC-12 EC-13 12/01/97, 09/28/99 04/24/98 7/1, 7/2, 7/3, 7/4, 7/5 01/27/99, 12/13/99, 12/20/99, 12/15/01, 01/04/02
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
07-Jan-02 PAGE:
6of 8 STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE EC-14 RECOVERY 4
11/08/01 n/a F-01 Recovery Checklist 0
10/21/94 n/a FE-01 TSC OPERATIONS 8
08/23/01 n/a FE-02 OSC OPERATIONS 6
06/09/97 7/1, 7/2 07/23/99, 08/02/01 FE-03 EOF OPERATIONS 8
11/08/01 n/a FE-04 BEOF OPERATIONS 8
11/08/01 n/a FE-05 EMERGENCY EQUIPMENT &
11 05/26/97 n/a SUPPLIES F-02 OSC Emergency Equipment 4
05/16/01 n/a F-03 EOF Emergency Equipment 5
10/16/01 n/a F-04 BEOF Emergency Equipment 1
05/16/01 n/a F-06 Emergency Vehicle Kit 0
04/28/92 n/a F-07 Field Monitoring Kit 3
10/16/01 n/a F-08 Hospital Kit 2
05/16/01 n/a F-09 Decontamination Kit 2
10/16/94 n/a F-10 TSC Administrative Supplies 4
05/16/01 n/a F-11 OSC Administrative Supplies 1
05/16/01 n/a F-12 OSC Maintenance Tool Box 3
05/16/01 n/a F-13 First Aid Kit (Trauma Kit) 2 05/16/01 n/a F-14 EOF Administrative Supplies 2
05/16/01 n/a
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE STATUS REPORT NUMBER EPIP TITLE REVISION DATE ACN'S ACN DATE F-15 BEOF Administrative Supplies F-16 JPIC Administrative Supplies F-17 EOP Supply Kit F-18 EOP MCRToolBag EMERGENCY COMMUNICATIONS EQUIPMENT TRANSPORTATION ACCIDENTS NOTIFICATION OF NEXT OF KIN PROCESSING NRC & IDNS PERSONNEL DURING AN EMERGENCY PUBLIC INFORMATION &
EDUCATION MANUAL RADIOLOGICAL DOSE ASSESSMENT PROTECTIVE ACTION RECOMMENDATIONS RADIOLOGICAL EXPOSURE GUIDELINES PERSONNEL MONITORING &
DECONTAMINATION PERSONNEL PROTECTION STATION RADIOLOGICAL SURVEYS 1
2 05/16/01 n/a 04/11/01 n/a 09/30/99 n/a 05/16/01 n/a 11/07/00 n/a 10/13/97 5/1 02/01/00 11/08/01 n/a 06/06/00 n/a 06/15/01 n/a 08/20/99 7/1 11/29/99 09/25/01 n/a 10/13/97 n/a 08/03/99 n/a 02/24/00 n/a 06/03/96 n/a DATE:
PAGE:
07-Jan-02 7 of 8 FE-06 MS-01 MS-03 MS-04 PR-05 RA-01 RA-02 RA-03 RA-04 RA-05 RA-06
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE DATE:
PAGE:
NUMBER EPIP TITLE STATUS REPORT REVISION DATE ACN'S ACN DATE FIELD RADIOLOGICAL MONITORING POST ACCIDENT SAMPLING STACK EFFLUENT ANALYSIS &
SAMPLING DOSE RATE DETERMINATION BASED ON ENVIRONMENTAL AIR SAMPLES PREDICTIVE RELEASE RATES COMPUTERIZED RADIOLOGICAL DOSE ASSESSMENT RADIOLOGICAL CONTROL OF THE EOF 6
6 7
6 6
5 08/03/99 nra 10/12/94 7/1 08/27/00 n/a 12/14/99 n/a 02/18/98 n/a 08/03/99 n/a RA-07 RA-09 RA-1I RA-14 RA-15 RA-16 RA-17 n/a 07-Jan-02 8 of 8 9
5/16/01 06/19/97
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE:
AP-02 REVISION:
16 ATTACHMENT:
3 PAGE:
1 of 1 ADVANCE CHANGE NOTICE AUTHORIZATION PAGE Document:
EC-02 Emergency Classification ACN Number:
Summary of Change: Added to the note under Symptom 11.1 of EC-02 for the NOUE the following:
- 1.
A credible threat to the station reported by the NRC.
Reason for Change: As part of the gap analysis performed for security threats it was determined that this EAL could benefit from clarifying a security threat.
Replacement Pages:
Page 14 of 19 Originator:
Security Manager:
Concurrence:
Concurrence:
Concurrence:
Independent Reviewer Plant Operations Review Committee:
(Needed for Emergency Plan Only)
Manager-Clinton Power Station:
Signature OA OA Date I/21t7.-1 z_
I ' b/ lo2 I
/oZ NA I /-Af 2
7/5
CLINTON POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE
(
PROCEDURE:
REVISION:
ATTACHMENT PAGE:
EMERGENCY CLASSIFICATIONS GUIDE CATEGORY:
11.0 SECURITY SYMPTOM 11.1 Security Compromis ed
- NOTE:
UNUSUAL EVENT Security threat*, attempted entry or attempted sabotage.
ALERT Ongoing security compromise.
SITE AREA EMERGENCY Physical attack on the plant involving imminent occupation of one or more vital areas.
GENERAL EMERGENCY Adversaries occupy vital areas.
- 1. A credible threat to the station reported by the NRC.
- 2.
A 'Security Threat' meets the initiating conditions for an Unusual Event when it satisfies ALL of the following criteria:
0 A credible threat determined by an outside agency or security procedures.
AND Is specifically directed towards the station.
AND Is imminent (within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />).
EC-0(
6 2
14 of 19 ACN 7/4, 7/5