RS-03-197, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures

From kanterella
Jump to navigation Jump to search
Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures
ML032940497
Person / Time
Site: Dresden, Byron, Braidwood, Clinton, Quad Cities, LaSalle  Constellation icon.png
Issue date: 10/14/2003
From: Jury K
AmerGen Energy Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-03-197
Download: ML032940497 (19)


Text

Am e r G en-1 SYExek¢nS An Exelon/British Energy Company AmerGen Energy Company, LLC

.200 Exelon Way Suite 345 Kennett Square, PA 19348 www.exeloncorp.com

. Nuclear Exelon Generation 4300 Winfield Road Warrenville, IL 60555 10 CFR 50, Appendix E RS-03-197 October 14, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Braidwood Station, Units 1 and 2 Facility Operating License NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units I and 2 Facility Operating License NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License NPF-62 NRC Docket Nos; STN 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure In accordance with 10 CFR 50, Appendix E, Section V, "Implementing Procedures," Exelon Generation Company, LLC (EGC) and AmerGen Energy Company (AmerGen) are submitting changes to Exelon procedure, EP-MW-114-100, "Midwest Region Offsite Notifications."

I Ivns

October 14, 2003 U. S. Nuclear Regulatory Commission Page 2 The procedure revision provides improved direction for notifications of event Termination and Recovery, and includes nomenclature changes to ensure consistency with related documents. This procedure change was implemented on September 16, 2003, and is being submitted within 30 days of implementation.

Should you have any questions concerning this letter, please contact Mr. T.W. Simpkin at 630-657-2821.

Respectfully, Keith R. Jury Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC cc:

Regional Administrator - NRC Region III (two copies)

NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector-Byron Station NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station Attachment A - Exelon Nuclear Procedure, EP-MW-114-100, "Midwest Region Offsite Notifications"

ATTACHMENT A EP-MW-114-100, MIDWEST REGION OFFSITE NOTIFICATIONS

Exek5n.

Nuclear EP-MW-114-100 Revision 3 Paged of 16 Level 2 - Reference Use MIDWEST REGION OFFSITE NOTIFICATIONS 1.

PURPOSE Provide prompt and accurate notification of nuclear station emergencies to local, state and federal agencies.

1.1.

Completing the NARS Form REFER to section 4.1 NARS Call Transmittal REFER to section 4.2 Receiving a NARS Call REFER to section 4.3 Follow-Up Notifications REFER to section 4.4 2.

2.1.

TERMS AND DEFINITIONS 3.

3.1.

3.2.

3.3.

3.4.

Nuclear Accident Reporting SVstem (NARS). is a telecommunication network used to transmit information to appropriate State and local agencies.

RESPONSIBILITIES The Emergency Director in the Emergency Response Facility (ERF) with Command and Control shall ensure that all required notifications and internal communications are performed accurately and in a timely manner.

Operations personnel on shift are responsible for transmitting the State/Local notification over the NARS when the Shift Emergency Director is in Command and Control.

The State/Local Communicator in the TSC is responsible for transmitting the State/Loca! notification over the NARS when the Station Emergency. Director is in Command and Control.

The State/Local Communicator in the EOF is responsible for transmitting the State/Local notification over the NARS when the Corporate Emergency Director is in Command and Control.

I

EP-MW-114-100 Revision 3 Page 2 of 16

4.

MAIN BODY 4.1.

COMPLETING THE NARS FORM 4.1.1.

Utility Messaae Number

1.

ENTER a Utility Message Number sequentially, starting with 1, for the event described.

2.

ENTER "N/A" if this is a State NARS Message.

4.1.2.

State Message Number

1.

ENTER the State Message Number when receiving a NARS Message from the State.

2.

ENTER "N/A" if this is a Utility NARS Message.

4.1.3.

Block 1, Status

1.

[A] "ACTUAL" - MARK this box to indicate a notification is being performed based on actual plant conditions.

2.

[B] "Drill/Exercise" - MARK this box to indicate a notification is being performed during exercises, drills, training sessions, or communications tests.

4.1.4.

Block 2, Station

[A] through [G] -MARK the appropriate box for the affected station.

4.1.5.

Block 3, Onsite Condition NOTE:

Onsite condition shall indicate the highest classification level for the site (all units).

[A] through [F] - MARK the box corresponding to the classification/condition.

EP-MW-1 14-1 00 Revision 3 Page of16 4.1.6.

Block 4. Accident Classified NOTE::

The time and date are specific to the current emergency. classification. When a new NARS form is issued for a change to another part of the form, such as PARS or release status, the time in this block still needs to reflect the declaration time and date of the current classification.

1.

If one of the four emergency event levels is being communicated as the Block #3 Onsite Condition, then ENTER the TIME & DATE that the event was declared and the corresponding EAL #.

2.

If entry into Recovery is being communicated as the onsite condition, then ENTER the TIME & DATE that Recovery was entered and N/A the EAL#.

3.

ENTER "N/A" next to TIME & DATE under ACCIDENT TERMINATED.

4.1.7.

Block 4. Accident Terminated

1.

ENTER the TIME & DATE that the accident condition was terminated.

2.

ENTER "N/A" next to TIME & DATE and EAL # under ACCIDENT CLASSIFIED.

4.1.8.

Block 5, Release Status NOTE:

A

'Release Occurring' is defined as ANY radioactive release that is a result of, or associated with, the emergency event.

1.

[A] "NONE" - MARK this block to indicate that no release is occurring.

2.

[B] "OCCURRING" - MARK this block to indicate that there is a release in progress.

3.

[C] 'TERMINATED" - MARK this block to indicate that a radioactive release that was OCCURRING has now ended.

4.1.9.

Block 6, TVPe Of Release

1.

If [A] "NONE", was selected in Block 5, then MARK [A] "NOT APPLICABLE".

ZI EP-MW-114-100 Revision 3 Page 4 of 16

2.

If [B] -OCCURRING", was selected in Block 5, then MARK the following as appropriate:

MARK [B] "GASEOUS" MARK [C] "LIQUID"

3.

If [C] "TERMINATED" was selected in Block 5, then MARK the following as appropriate:

- -MARK

[B] "GASEOUS" MARK [C] "LIQUID" NOTE:

REFER to EP-MW-110-1001 for a listing of PPDS meteorological data points.

NOTE:

Meteorological data shall be obtained from' the following sources in the order they are listed:

1.

PPDS data from the Effluent Release Parameters screen.

2.

Control Room meteorological indication.

3.

National Weather Service or contracted weather service (e.g. Murray and Trettel). (Numbers listed in the ERF Telephone Directory).

4.

Internet local weather.

5.

Estimation from direct observation.

4.1.10.

Block 7. Wind Direction

1.

ENTER the wind direction (from) in degrees using the appropriate level of the tower to match the expected release height.

4.1.11.

Block 8. Wind Speed NOTE:

Wind speed data is taken from the appropriate level of the tower to match the expected release height.

1.

MARK the box and enter the wind speed for either or both as follows:

[A]"METERS/SEC"

[ 1B] "MILES/HR" ua Cities MARK [A] and [B] and FILL IN both "METERS/SEC" and "MILES/HR".

I

EP-MW-1 14-100 Revision 3 Page of 16 4.1.12.

Block 9. Recommended Actions NOTE:

Do not delete subareas that have been previously identified in Block 9. Recommended subareas may be added, but not deleted by the utility.

1.

If [D] "General Emergency", was not selected in Block 3, then MARK,

[A] "NONE".

2.

If [D] "General Emergency", was selected in Block 3, then:

MARK boxes [B] and/or [C] for the affected state(s).

ENTER the Subareas to be evacuated on the appropriate state line from the PAR Flowcharts (EP-AA-1 11, Attachments 2 thru 7, as applicable) or as indicated by dose assessment.

3.

Boxes [D] through [I] are for State Use. They are completed only when Exelon personnel are receiving a notification transmission from the State.

4.1.13.

Block 10, Additional Information NOTE:

In situations where both units are affected by differing EALs, note the other EAL and applicable unit number in the Additional Information section.

1.

If this is the first NARS issued for the event, then ENTER 'None".

2.

If a subsequent NARS form is being issued because of a change in the classification level, then ENTER "None".

3.

If a subsequent NARS form is being issued because of a change in one of the conditions listed below but the classification level of the event remains the same, then briefly EXPLAIN the changed condition.

Change in Release Status Change in PARs Change in affected Subareas Corrections are being made to a previously issued NARS 4.1.14.

APPROVAL BLOCK

1.

COMPLETE the "Verified with" section when using'a peer check for accuracy (e.g. TSC or EOF Directors completing the NARS form for the Emergency Director), otherwise mark as N/A.

EP-MW-1 14-1 00 Revision 3 Page 6 of 16

2.

OBTAIN approval from the Emergency Director in Command & Control prior to transmission of the NARS form.

Control Room i

Shift Manager TSC i

Station Emergency Director EOF Corporate Emergency Director 4.1.15.

Blocks 11 and 12

1.

These blocks record name, organization, date and time of message transmission/receipt.

2.

These Blocks are not completed during the preparation of the NARS form. Completion of Blocks 11[A] and 121s performed by the Communicator when reading the message over the NARS telephone system.

3.

Blocks 11 [B] and [C] are completed by the Communicator when receiving a notification transmission from the State.

4.2.

NARS CALL TRANSMITTAL NOTE:

Dialing the NARS phone code activates a

conference bridge. A brief pause will occur prior to connection once the desired code has been entered. A "beep" will indicate when a party joins the bridge.

CAUTION:

Wait several seconds (approx. 5 sec) after hanging up the NARS phone prior to initiating another call or the conference bridge circuit will be blocked with a busy signal.

4.2.1.

Using the Roll Call Box for the affected station on Paae 2 of the NARS Form, DIAL the appropriate code on the NARS telephone.

1.

If the NARS call is successful, then go to step 4.2.2.

2.

IF a busy signal is received after dialing the code, DIAL 50 to enter the bridge. ANNOUNCE who you are and the reason for your call.

3.

IF the NARS network fails, THEN:

EP-MW-114-100 Revision 3 Page 7 of 16 NOTE:

Commercial telephone numbers for the State are listed on Page 2 of the NARS Form. Other contacted agencies are listed in Section (Tab) 10 of the ERF Telephone Directory.

A.

CONTACT the agencies that are noted as "Required to be Notified within 15 minutes". This is denoted next to the roll call listing for each NARS Code on the back of the NARS Form.

B.

CONTACT all other agencies that are a part of the roll call listing for the NARS call.

4.2.2.

Following a short pause and a 'beep' indicating you are connected to the bridge, READ the following message:

"This is the Exelon Nuclear [Station and Facility originating the call. Please standby for a NARS message."

NOTE:

State and local agency phone will ring after entering the NARS code. Once they receive a 'beep' they will identify themselves as on the line.

4.2.3.

As the agencies respond to the call, READ the following message:

"This is the Exelon Nuclear [Station and Facility originating the call]. Please standby to receive a NARS:message and respond as the roll is called."

4.2.4.

WAIT a short period of time to allow the appropriate agencies to join the bridge.

4.2.5.

CONDUCT an initial roll call for the agencies listed under the NARS code used on the back of the NARS form. CHECK them OFF as they respond to the roll call.

4.2.6.

NOTE any agencies that do not answer the roll. These agencies will need to be contacted separately after the completion of the NARS call.

4.2.7.

FILL IN the box in the center section of Page 2 of the NARS Form under the heading "INITIAL ROLL CALL COMPLETE".

The Time and Date entered in this box correspond to the completion of the initial roll call and the 15-minute clock for the NARS notification.

4.2.8.

READ the NARS message.

1.

READ the NARS message # ___

EP-MW-114-100 Revision 3 Page 8 of 16

2.

Read the blocks 1-10 one at a time; stating the number, the title, the letter (if appropriate) and the description.

4.2.9.

COMPLETE Sections 11 and 12 on the NARS form as you get to them.

Communicate the information you put into these blocks to the personnel on the NARS call.

1.

Section 11, MARK [A] Exelon. ENTER your name and an outside phone number that the state agencies can use to call back if necessary.

2.

Section 12, ASK for the name of the IEMA representative that received the NARS message, then ENTER this information on the NARS form.

4.2.10.

REPEAT the roll call for each agency listed under the NARS code used and:

1.

ASK if there are any questions about the information provided.

2.

CLARIFY NARS message data questions at this time.

4.2.11.

STATE UNARS communication is complete."

4.2.12.

If any agency does not answer the final roll-call, THEN CONTACT that agency via commercial telephone line.

1.

USE the ERF Telephone Directory to find the commercial telephone numbers needed.

2.

CALL any agency listed as REQUIRED TO BE NOTIFIED immediately.

3.

CALL any other agency that did not answer the NARS call.

4.

INFORM the Emergency Director of all non-contacts on the NARS network.

4.2.13.

STANDBY to receive NARS verification call backs from the affected state agencies.

4.2.14.

STANDBY to receive State NARS calls, initiated by IEMA (Instructions for receiving a NARS Message are found in section 4.3).

EP-MW-1 14-100 Revision 3 Page § of 16 4.3.

RECEIVING A NARS MESSAGE NOTE:

IF the phone is not answered within 45 seconds and stops ringing, DIAL' 50 to enter the bridge.

ANNOUNCE that you are on the bridge..

NOTE:

The State of Iowa receives the Utility NARS message but does not use this system to communicate back to their Local Counties and agencies.

4.3.1.

Following the issuance of a Utility NARS message, the State of llinois has two possible return calls they make back that could involve the affected site.

Confirmation Call - IEMA may call back to the Utility to confirm the authenticity of the Utility NARS message prior to their taking action on the message. This call should come into the number listed as the "Outside Phone Number" in Block 11 of the NARS form. When receiving this call, answer IEMA's questions pertaining to the-call.

State NARS Message - Following the issuance of a Utility NARS Message, the State of Illinois will use the NARS,.as necessary, to communicate the information provided by the Utility and their recommendations to the Local and County organizations in the affected area.

NOTE:

If the NARS line is not answered within 45 seconds for an incoming call, it will stop ringing.

4.3.2.

ANSWER the NARS phone when it rings.

1.

IF a busy signal is received, DIAL 50 to enter the bridge.

2.

ANNOUNCE who you are following the connect 'beep.'

4.3.3.

RESPOND to the Roll Call as read by the state communicator.

4.3.4.

DOCUMENT the information provided on the NARS form. Do not ask questions as the information is being provided, an opportunity-to ask questions will be provided at the end of the call.

4.3.5.

RESPOND to IEMA's query for an Exelon Nuclear representative in Block 12 of the NARS form.

4.3.6..

ASK questions of the state communicator when they indicate the opportunity to do so. Clarify information provided as needed and specifically any information that differed from the information that was provided by the Utility.

EP-MW-114-100 Revision 3 Page 10 of 16 4.3.7.

DISTRIBUTE the completed State NARS Message.

4.4.

FOLLOW-UP NOTIFICATIONS NOTE:

State Updates are required at the top of the hour, plus or minus ten minutes, starting in the second hour following a classification of Alert or higher.

State Updates are normally performed by personnel located in the EOF, regardless of which facility has Command and Control of the event. However, the facility in Command and Control is responsible for ensuring that the updates are completed.

Commercial telephone numbers for the State and all other contacted agencies are listed in Section (Tab) 10 of the ERF Telephone Directory.

4.4.1.

OBTAIN update data as required for:

1., "Management State Update Information (PWR)"
2., "Management State Update Information (BWR)"
3., "Radiological State Update Information" 4.4.2.

CONTACT State agency personnel (by the State Decision-Makers Hotline or from the numbers provided in the ERF Telephone Directory) and DISCUSS the event.

1.

For BW, BY, CL, DR or LS, use the IL State Decision-Makers Hotline or commercial line to contact the REAC Commander.

2.

For QC, use the QC State Decision-Makers Hotline or commercial line to contact the REAC Commander and the Iowa Emergency Operations Center simultaneously.

The Corporate Emergency Director should contact the State Official(s) and DISCUSS the information on EP-MW-114-1 00, or 3, as appropriate.

EP-MW-114-100 Revision 3 Page 1I 'of 16 4.4.3.

DIRECT the State Environmental Coordinator to contact the applicable state counterparts and discuss the information on EP-MW-114-1 00, Attachment 4.

1.

For BW, BY, CL, DR or LS,'contact the REAC Environmental Analyst, (call the number listed for REAC and ask for the Environmental Analyst).

2.

For QC, contact separately both the REAC Environmental Analyst and the IEMD Health Physics Hotline.

5.

DOCUMENTATION - None

6.

REFERENCES - None

7.

-ATTACHMENTS 7.1., Nuclear Accident Reporting System (NARS) Form 7.2., Management State Update Information (PWR) 7.3., Management State Update Information (BWR) 7.4., Radiological State 'Update Information

EP-MW-1 14-100 Revision 3 Page 12 of 16 ATTACHMENT I Nuclear Accident Reporting System (NARS)

Page I of 2 UTILITY MESSAGE NO.

'STATE MESSAGE NO.

1. STATUS
2. S

[A] ACTUAL

[p

[B] DRILL/EXERCISE

[E

3. ONSITE CONDITION

[A] UNUSUAL EVENT.

[B] ALERT

[C] SITE AREA EMERGENCY

[D] GENERAL EMERGENCY

[El RECOVERY

[F] TERMINATED TATION A] BRAIDWOOD

[C] CLINTON B] BYRON

[DI DRESDEN

4. ACCIDENT CLASSIFIED TIME (31A-E]):

DATE (3[A-EJ):

EAL#:

  • [E] LASALLE JFI QUAD CITIES.

[G] ZION ACCIDENT TERMINATED TIME:

DATE:.

l.

5. RELEASE STATUS
6. TYPE OF RELEASE

[A] NONE 4 -

4

[A] NOT APPLICABLE

[B] OCCURRING

..4I

[

[B] GASEOUS

[C] TERMINATED

[C] LIQUID

7. WIND DIR (DEGREES FROM)
8. WIND SPEED

[A] METERS/SEC.:

[B] MILES/HR.: _

9.

RECOMMENDED ACTIONS UTILITY RECOMMENDATION

[A] NONE (UE, Alert and SAE Only)

[B] EVACUATE ILLINOIS SUB-AREAS (GE Only):

[C] EVACUATE IOWA SUB-AREAS (GE Only):

STATE RECiOMMEN fDATION,,,, I.,,,,,i;,m

[0] NONE

[E] -SHELTER'SUB-AREAS:

i_________

[F] EVACUATESUB-AREAS:. ;i;'

I

[G] RECOMMEND POTASSIUM IODIDE '(Kl)'PER PROCEDURES:

.1-H] COMMENCE RETURN OF PUBLIC:

10. ADDITIONAL INFORMATION NAME ORGANIZATION Verified With:

Approved By:._._._._._._,_.,_.

11. TRANSMITTED BY:

[A] EXELON:

NAME PHONE NUMBER TIME/DATE

[B] STATE:,,

[C] COUNTY:______-_'

12. RECEIVED BY:

NAME ORGANIZATION TIME/DATE

EP-MW-114-100 Revision 3 Page 13 of 16 ATTACHMENT I Nuclear Accident Reporting System (NARS)

Page 2 of 2 F~~~

~~~~~~~~~~~~~~

I Braidwood (UE, Alert, Site Area and escalated Generals)

NARS Code 20 Initial Final E

.# Illinois EMA 0

El Illinois REAC 0

(Initial General Emergency Only)

NARS Code 38 Initial Final El

  1. Illinois EMA E

El

  1. Grundy Co. Sheriff El El # Kankakee Co. Sheriff El

[I # Will County Sheriff E

El Illinois REAC E

O3 Grundy Co. EMA E

M Kankakee Co. EOC 0

El Will Co. EOC E

Byron (UE, Alert, Site Area and escalated Generals)

NARS Code 20 Initial Final El # Illinois EMA El El Illinois REAC E

(Initial General Emergency Only)

NARS Code 37 Initial Final El # Illinois EMA El E #-I Ogle Co. Sheriff El El #-1 Rochelle Police E

El Illinois REAC O

El OgleCo. ESDA O

E Ogle Co. EOC O

ROLL CALL Initial Roll Call Complete:

It (time / date)I Clinton (UE, Alert, Site Area and escalated Generals)

NARS Code 98 Initial Final El

  1. Illinois EMA El El Illinois REAC El (Initial General Emergency Only)

NARS Code 36 Initial Final E

  1. Illinois EMA El E
  1. DeWitt Co. Sheriff E E

Illinois REAC O

El DeWitt Co. EOC E

Dresden (UE, Alert, Site Area and escalated Generals)

NARS Code 20 Initial Final El # Illinois EMA E

O Illinois REAC l

(Initial General Emergency Only)

NARS Code 22 LaSalle (UE, Alert, Site Area and escalated Generals)

NARS Code 20 Initial Final El

  1. Illinois EMA E1 El:

Illinois REAC E

(Initial General Emergency Only)

NARS Code 25 Initial Final O

  1. Illinois EMA El El # Grundy Co. Sheriff E]

E # LaSalle Co. Sheriff El E

Illinois REAC El E

Grundy Co. EMA 0

El LaSalle Co. ESDA O

E Quad Cities (UE, Alert, Site Area and escalated General Emergencies)

NARS Code 43 Initial Final EJ# Illinois EMA El El #Iowa EMD El El Illinois REAC E Scott Co. Sheriff El E Clinton Co. EOC E

(Initial General Emergency Only)

NARS Code 23 Initial Final El # Illinois EMA El El #IowaEMD El E # Clinton Co. EOC Ol O #Rock Island Co. Sheriff 'El El # Whiteside Co. Sheriff El El # Scott Co. Sheriff El El Whiteside Co. ESDA Ol El Rock Island ESDA E

E Illinois REAC E

1.

.I I

I I

I

.I I

I Initial El #Illinois EMA El #Grundy Co. Sheriff El #Kendall Co. Sheriff

[] #Will County Sheriff El Illinois REAC Ol Grundy Co. EMA E

O Kendall Co. EOC El Will Co. EOC Final 0

0 0

0 0

0 0

.0 Commercial numbers:

IEMA 217-782-7860 (QC only)

Iowa EMD 515-281-3231 NOTE: # Indicates that this agency is required to be notified within 15 minutes.

  1. -1, Only one needs to answer for notification

EP-MW-114-100 Revision 3

-Page 14 of 16 ATTACHMENT 2 Management State Update Information (PWR)

Page I of I

./

ITEM STATUSICOMMENTS.

Command & Control CR -

TSC - EOF Current EAL EAL Code Time Current PARs None / Evacuate_

Priorities 1.

2.

3.

4.

5.

Reactor Status:

Subcritical No Yes Time Core Cooling Average 10 highest CETC temperature OF RTM-96 (A. 1)

Temperature Trend Inc Dec Stable RVLIS Head Plenum Core COVERED / NOT COVERED I UNKNOWN Subcooling Margin Subcooled OF

/

Saturated RTM-96 (A.2)

If NOT Subcooled:

Estimated time to Clad Damage RTM-96 (A.3)

Estimated time to Core Damage -

________________Subcooling Margin Trend = Inc Dec /Stable Containment Rad RTM-96 (A.4)

Expected / Elevated R/hr Containment H2 RTM-96 (A.6)

Expected / Elevated Core Status Intact / Clad Damage I Fuel Damage Containment Sprays On I Off Release Status:

Current None / In Progress /Terminated I Monitored / Unmonitored I Filtered I Unfiltered Projected Release occurs in:

< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> / 2 - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> / > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Filtered / Unfiltered / Intentional Venting Point History ID Points:

Station Subcritical Vessel LvA CETC Subcool Cont Rad Hydrogen Sprays BRW 1 N0031, 2 LD0501-16 X0113 X0190 AM012 Y2021,22 BRW2 N0031. 2 LD0501-16 X0113 X0190 AM013 Y2021, 22 BYR I N0031,2 LD0501-16 X0113 X0190 AM012 Y2021,22 BYR 2 N0031, 2 LD0501-16 X0113 X0190 AM013 Y2021,22

EP-MW-114-100 Revision 3 Page 16 of 16 ATTACHMENT 3 Management State Update Information (BWR)

Page 1 of I

_/

ITEM STATUSICOMMENTS Command & Control CR - TSC -

EOF Current EAL EAL Code Time Current PARs None I Evacuate Priorities 1

2.

3.

4.

5.

Reactor Status:

Subcritical No Yes Time Core Cooling Vessel Level: >TOAF / >2/3 Core / <2/3 Core / UNKNOWN RTM-96 (A. 1)

Level Trend = Inc / Dec / Stable IF < TOAF Estimated time to Clad Damage RTM-96 (A.3)

Estimated time to Core Damage Drywell Rad Expected I Elevated R/hr RTM-96 (A.4)

Drywell H2 Expected I Elevated

%10 RTM-96 (A.6)

Core Status Intact I Clad Damage I Fuel Damage Containment Sprays On I Off Release Status:

Current None I In Progress / Terminated /

Monitored / Unmonitored / Filtered

/ Unfiltered Projected Release occurs in:

< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> / 2-12 hours / > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Filtered I Unfiltered I Intentional Venting Point History ID Points:

Station Subcritical Vessel LvI Cont Rad Hydrogen Sprays DRE 2 B272-5 D612 R205, R224 C250 DRE 3 8372-5 D712 R305, R324 C350 LAS 1 F476-9 C013 A814,A836 A810 LAS 2 F476-9 C013.

A814,A836 A810 QAD 1 B172-5 D612 R122,123 C167.

QAD 2 B272-5 D712 R222, 223 C267

EP-MW-114-100 Revision 3 Page 16 of 16 ATTACHMENT 4 Radiological State Update Information Page I of I ITEM STATUS/COMMENTS Command & Control CR - TSC -

EOF Current EAL EAL Code Time Current PARs None / Evacuate Release Status:

Current None / In Progress / Terminated Monitored Unmonitored /

Filtered Unfiltered Release occurs in: < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> / 2 - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> /> 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Projected Filtered I Unfiltered / Intentional Venting Dose Projection Calculation Data:

Magnitude uCi/sec Duration Minutes / Hours (Best Estimate)

% Removal

% Iodine I

% Particulate Reactor Sub-critical Time Release Start Estimated

/ Actual Core Status Intact / Clad Damage I Fuel Damage Containment Sprays On

/ Off Field Team Data Field Measurement Results Location time Field Measurement Results Location time Field Measurement Results

. Location time Current Location

_________________Team Location

_________________Team/ Location

_______________Team Location

.Team Location