ML092400634: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER:
{{#Wiki_filter:FACILITY NAME:       McGuire Nulear Plant                           Section 14 REPORTNUMBER: ____~O~5~OO~O~3~69~/~37~O~~~O~09~-~30~1~
____
                          ~O~5~OO~O~3~69~~~7~a~~~O~09~-~30~1~_____
____ _ GENERAL CORRESPONDENCE CONTENTS:
GENERAL CORRESPONDENCE CONTENTS:
Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS. Submitted By:
Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS.
______ Verified By1!ialJ if FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER:
Submitted By: ~~...p".f-
____
              ~~...p"f-_ ____  _  __  __  __    Verified  By1!ialJif ~
____ _ GENERAL CORRESPONDENCE CONTENTS:
Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS. Submitted By:
_____ _
A Duke rtl1Energy February 24, 2009 Mr. Luis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415


==Subject:==
BRUCE H HAMILTON A Duke                                                                          Vice President r'Energy rtl1Energy                                                                      McGuire Nuclear Station Duke Energy Corporation MG01VP MG01 VP /12700 Hagers Ferry Road Huntersville, NC Ne 28078 704-875-5333 704-875-4809 fax February 24, 2009                                                           bhhamilton@duke-energy.com A- Reyes Mr. Luis A.
Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP /12700 Hagers Ferry Road Huntersville, Ne 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is the outline for the McGuire licensed operator examinations to begin in May of 2009. . Specific items provided in response to this request: ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement ES 301-1, Administrative Topics Outline ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs D-l, Scenario Outlines (4) The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
Regional Administrator, Region II U_ S.
B. H. Hamilton www.duke-energy.com A Duke r'Energy February 24, 2009 Mr. Luis A-Reyes Regional Administrator, Region II U_ S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415  
U. S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos_ 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01VP /12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is the outline for the McGuire licensed operator examinations to begin in May of2009. Specific items provided in response to this request: ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E S 301-1, Administrative T opi cs Outline ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KJAs D-l, Scenario Outlines (4) The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
Duke Energy Carolinas, LLC (Duke)
R H. Hamilton www.duke-energy.com
McGuire Nuclear Station Nos_ 50-369, 50-370 Docket Nos.
Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.
This information is the outline for the McGuire licensed operator examinations to begin in May of  2009.
of2009.                                       .
Specific items provided in response to this request:
ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E
ESS 301-1, Administrative T opi cs Outline Topics ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs KJAs D-l, Scenario Outlines (4)
The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009.
Questions or comments should be directed to KayKay Crane at (704) 875-4306.
R B. H. Hamilton www.duke-energy.com
: u. S. Nuclear Regulatory Commission U.
February 24, 2009 Page 3 bxc:  RGC File EC050-ELL


U. S. Nuclear Regulatory Commission February 24, 2009 Page 3 bxc: RGC File EC050-ELL
February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
: u. S. Nuclear Regulatory Commission February 24, 2009 Page 3 bxc: RGC File EC050-ELL February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.
Steven L. Mosteller McGuire Operations Duke Energy March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415  
~~
<1!iiJL~
Steven L. Mosteller McGuire Operations
 
a Duke rtllEnergy BRUCE H HAMILTON Vice President Energy                                                                     McGuire Nuclear Station Duke Energy Corporation MG01 VP //12700 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com bhhamilton@duke-energycom March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP / 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energycom The enclosed information is provided in response to your request of December 16, 2008. This information is in support of the McGuire licensed operator examinations to begin in May of 2009. Specific items provided in response to this request:
Duke Energy Carolinas, LLC (Duke)
* Simulator Scenarios  
McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.
-(ES-D-1, Scenario Outline Forms in the book)
This information is in support of the McGuire licensed operator examinations to begin in May of 2009.
* Administrative Topics -(ES-301-1, Administrative Topics Outline Forms in the book)
Specific items provided in response to this request:
* Job Performance Measures -(ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book)
* Simulator Scenarios - (ES-D-1, Scenario Outline Forms in the book)
* Administrative Topics - (ES-301-1, Administrative Topics Outline Forms in the book)
* Job Performance Measures - (ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book)
* ES 201-2, Examination Outline Quality Checklist
* ES 201-2, Examination Outline Quality Checklist
* ES 201-3, Examination Security Agreement
* ES 201-3, Examination Security Agreement
Line 57: Line 66:
* ES-401-6, Written Examination Quality Checklist Form
* ES-401-6, Written Examination Quality Checklist Form
* Reactor Operator and Senior Reactor Operator Written Questions
* Reactor Operator and Senior Reactor Operator Written Questions
* Reference Materials www.duke-energy.com a Duke rtllEnergy March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
* Reference Materials www.duke-energy.com
 
Nuclear Regulatory Commission 16, 2009 March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009.
16,2009.
Questions or comments should be directed to Kay Crane at (704) 875-4306.
B. H. Hamilton


==Subject:==
Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303
Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP /12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is in support of the McGuire licensed operator examinations to begin in May of 2009. Specific items provided in response to this request:
 
* Simulator Scenarios
March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b     )(3), an authorized representative of the facility licensee 55.40(b)(3),
-(ES-D-1, Scenario Outline Forms in the book)
must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
* Administrative Topics -(ES-301-1, Administrative Topics Outline Forms in the book)
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.
* Job Performance Measures -(ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book)
~
* ES 201-2, Examination Outline Quality Checklist
Steven L. Mosteller McGuire Operations}}
* ES 201-3, Examination Security Agreement
* ES-301-3, Operating Test Quality Checklist Form
* ES-301-4, Simulator Scenario Quality Checklist Form
* ES 301-5, Transient and Event Checklist Form
* ES-301-6, Competencies Checklist Form
* ES-401-6, Written Examination Quality Checklist Form
* Reactor Operator and Senior Reactor Operator Written Questions
* Reference Materials www.duke-energy.com Nuclear Regulatory Commission March 16, 2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
B. H. Hamilton Nuclear Regulatory Commission March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
B. H. Hamilton Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations}}

Latest revision as of 03:48, 14 November 2019

Initial Exam 2009-301 General Correspondence Region Ii/Drs/Operator Licensing Branch/Initial Examinations/Mcguire/Exam 2009-301
ML092400634
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/16/2009
From: Brandi Hamilton
Duke Energy Corp
To: Reyes L
NRC/RGN-II
References
50-369/09-301, 50-370/09-301
Download: ML092400634 (9)


Text

FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER: ____~O~5~OO~O~3~69~/~37~O~~~O~09~-~30~1~

~O~5~OO~O~3~69~~~7~a~~~O~09~-~30~1~_____

GENERAL CORRESPONDENCE CONTENTS:

Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS.

Submitted By: ~~...p".f-

~~...p"f-_ ____ _ __ __ __ Verified By1!ialJif ~

BRUCE H HAMILTON A Duke Vice President r'Energy rtl1Energy McGuire Nuclear Station Duke Energy Corporation MG01VP MG01 VP /12700 Hagers Ferry Road Huntersville, NC Ne 28078 704-875-5333 704-875-4809 fax February 24, 2009 bhhamilton@duke-energy.com A- Reyes Mr. Luis A.

Regional Administrator, Region II U_ S.

U. S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415

Subject:

Duke Energy Carolinas, LLC (Duke)

McGuire Nuclear Station Nos_ 50-369, 50-370 Docket Nos.

Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.

This information is the outline for the McGuire licensed operator examinations to begin in May of 2009.

of2009. .

Specific items provided in response to this request:

ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E

ESS 301-1, Administrative T opi cs Outline Topics ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs KJAs D-l, Scenario Outlines (4)

The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009.

Questions or comments should be directed to KayKay Crane at (704) 875-4306.

R B. H. Hamilton www.duke-energy.com

u. S. Nuclear Regulatory Commission U.

February 24, 2009 Page 3 bxc: RGC File EC050-ELL

February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.

As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.

~~

<1!iiJL~

Steven L. Mosteller McGuire Operations

a Duke rtllEnergy BRUCE H HAMILTON Vice President Energy McGuire Nuclear Station Duke Energy Corporation MG01 VP //12700 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com bhhamilton@duke-energycom March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415

Subject:

Duke Energy Carolinas, LLC (Duke)

McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.

This information is in support of the McGuire licensed operator examinations to begin in May of 2009.

Specific items provided in response to this request:

  • Simulator Scenarios - (ES-D-1, Scenario Outline Forms in the book)
  • Administrative Topics - (ES-301-1, Administrative Topics Outline Forms in the book)
  • ES 201-2, Examination Outline Quality Checklist
  • ES 201-3, Examination Security Agreement
  • ES-301-3, Operating Test Quality Checklist Form
  • ES-301-4, Simulator Scenario Quality Checklist Form
  • ES-401-6, Written Examination Quality Checklist Form
  • Reactor Operator and Senior Reactor Operator Written Questions
  • Reference Materials www.duke-energy.com

Nuclear Regulatory Commission 16, 2009 March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009.

16,2009.

Questions or comments should be directed to Kay Crane at (704) 875-4306.

B. H. Hamilton

Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303

March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee 55.40(b)(3),

must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.

As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.

~

Steven L. Mosteller McGuire Operations