ML110840037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:0312312011 U.S. Nuclear Regulatory Commission Operations Center Event Report PagLI Part 21 (PAR)Event# 46692 Rep Org: AUTOMATIC VALVE Notification Date / Time: 03/23/2011 16:24 (EDT)Supplier:
{{#Wiki_filter:0312312011                   U.S. Nuclear Regulatory Commission Operations Center Event Report                     PagLI Part 21 (PAR)                                                                                   Event#       46692 Rep Org: AUTOMATIC VALVE                                     Notification Date / Time: 03/23/2011 16:24       (EDT)
AUTOMATIC VALVE Event Date / Time: 03/22/2011 (EDT)Last Modification:
Supplier: AUTOMATIC VALVE                                           Event Date / Time: 03/22/2011             (EDT)
03/23/2011 Region: 3 Docket #: City: NOVI Agreement State: No County: License #: State: MI NRC Notified by: KEVIN ARMSTRONG Notifications:
Last Modification: 03/23/2011 Region:   3                                               Docket #:
JOHN ROGGE R1 DO HQ Ops Officer: PETE SNYDER DANIEL RICH R2DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section: 21.21 UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION"Initial Concern: Valve, serial number 73386, does not consistently return to the closed position.""Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state."Number and Location of Components: "Model: U0204GBBR-AA Quantity:
City: NOVI                                   Agreement State:               No County:                                                   License #:
32"Model: U0204GBBR-DEEL Quantity:
State: MI NRC Notified by:   KEVIN ARMSTRONG                     Notifications:   JOHN ROGGE                         R1 DO HQ Ops Officer: PETE SNYDER                                           DANIEL RICH                       R2DO Emergency Class:   NON EMERGENCY                                         PART 21 GROUP                     EMAIL 10 CFR Section:
3("Model: U0204GBBR-DE Quantity:
21.21               UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION "Initial Concern: Valve, serial number 73386, does not consistently return to the closed position."
4"Model: U0204FBBR-DE Quantity:
"Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state.
8"Model: U0204GBBR-DEL Quantity:
"Number and Location of Components:
4"Model: U0204GBBR-DEP Quantity:
"Model: U0204GBBR-AA           Quantity: 32 Customer: EXELON LIMERICK, "Model: U0204GBBR-DEEL Quantity: 3( 0 Customer: ALABAMA POWER FARLEY "Model: U0204GBBR-DE           Quantity: 4 Customer: ALABAMA POWER FARLEY "Model: U0204FBBR-DE           Quantity: 8 Customer: RALPH A. HILLER "Model: U0204GBBR-DEL Quantity: 4 Customer: DRESSER MASONEILAN "Model: U0204GBBR-DEP Quantity: 3 Customer: DRESSER MASONEILAN "Advice to Purchasers:
3 Customer:
"Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve."
EXELON LIMERICK, 0 Customer:
6(9
ALABAMA POWER FARLEY Customer:
 
ALABAMA POWER FARLEY Customer:
Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM           AUTOMATIC VALVE CORP             FAX No. 12484746732                     P. 001 NRC Operations Center 301-816-5151 (FAX) 10 CFR PART 21 Notification:
RALPH A. HILLER Customer:
Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers:
DRESSER MASONEILAN Customer:
U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect:
DRESSER MASONEILAN"Advice to Purchasers: "Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification.
A dent in the plunger guide may prevent the valve from changing state.
It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve." 6(9 Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 001 NRC Operations Center 301-816-5151 (FAX)10 CFR PART 21 Notification:
Number and Location of Components:
Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers: U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state.Number and Location of Components:
Valve Model               Quantitjy  Customer
Valve Model-U0204GBBR-AA U0204GBBR-DEEL
                -U0204GBBR-AA                 32      EXELON LIMERICK U0204GBBR-DEEL               30      ALABAMA POWER FARLEY
-,-U0204GBBR-DE
              -,-U0204GBBR-DE                   4      ALABAMA POWER FARLEY
--U0204FBBR-DE cU0204GBBR-DEL-U0204GBBR-DEP Quantitjy 32 30 4 8 4 3 Customer EXELON LIMERICK ALABAMA POWER FARLEY ALABAMA POWER FARLEY RALPH A. HILLER DRESSER MASONEILAN DRESSER MASONEILAN Corrective Action to Be Taken: Please see attached report.Advice to Purchasers:
              -- U0204FBBR-DE                   8      RALPH A. HILLER cU0204GBBR-DEL                   4      DRESSER MASONEILAN
Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification.
                -U0204GBBR-DEP                 3       DRESSER MASONEILAN Corrective Action to Be Taken:
It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve.Date the Evaluation of the Defect was Complete:
Please see attached report.
03/2212011 MAR/23/201i!WED 04:53 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P. 002 AUTOMATIC VALVE NUMBER: D7174-003 Page 1 of 3 TITLE: CORRECTIVE ACTION LOCN: h:\WORD\DOCUMENT\D7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 REQUIREMENTS:
Advice to Purchasers:
NUMBER: 522 Type of Problem: Part U0204GBBR-AA Procedure Date: 03-14-2011 Who found Problem: Supplier Distributor rI-Customer Company: Exelon Limerick Station Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA kevinborek@exeloncorp.com
Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve.
: 1. Team Working on Problem: Leader: Tom Troy Members: Brian Blelat. Kelly Morris, Kevin Armstrong 2. Describe Problem (initial Concern and.Symptoms):.
Date the Evaluation of the Defect was Complete: 03/2212011
Valve, serial number 73386, does not consistently return to the closed position.Contain Symptom (Action): Return rebuilt unit to the customer.
 
Notify affected customers of the problem and inspection required.
MAR/23/201i!WED 04:53 PM                   AUTOMATIC VALVE CORP                         FAX No, 12484746732                                       P.002 AUTOMATIC VALVE                                         NUMBER: D7174-003                                             Page 1 of 3 TITLE: CORRECTIVE ACTION                                 LOCN: h:\WORD\DOCUMENT\D7174003.DOC                           DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION                                 TYPE: FORM                   DEPT RESP: DQA                 REV: F-CN8020 REQUIREMENTS:
See Illustration 1 and Photograph 1.Approved by: .Title: President Date: c-!. g -!.* //4. Root Causeis of Problem: 1D CFR Part 21 Report Required:
NUMBER: 522 Type of Problem:                 Part     U0204GBBR-AA                       Procedure                                 Date:       03-14-2011 Who found Problem:                                               Supplier                   Distributor                   rI-Customer Company: Exelon Limerick Station                                                       Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA                                                                   kevinborek@exeloncorp.com
YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into % Inch NPTF ports.The adaptors are installed after the basic unit is built andtested.
: 1. Team Working on Problem:                   Leader:       Tom Troy                                     Members:
The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor.The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed.
Brian Blelat. Kelly Morris, Kevin Armstrong
The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the. valve will not return to Its closed position.
: 2. Describe Problem (initial Concern and.Symptoms):.
If this occurs, the valve will fail to close.The failure was noted when Exelon staff tested the valve, prior to Installation.
Valve, serial number 73386, does not consistently return to the closed position.
Approved by: Title President Date: dg* zs. ,, 5. Corrective Action: Install all fittings in the valve body prior to the Installation of the plunger guide into the body.Approved by: Title: President Date: 6. Implementation:
Contain Symptom (Action):
CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body.Approved by: Title: President Date: r.?. //7. Corrective Action to System to .Prevent Recurrence:
Return rebuilt unit to the customer. Notify affected customers of the problem and inspection required. See Illustration 1 and Photograph 1.
Approved by: .                                     Title:     President                       Date:     c-!. g -!.* //
: 4. Root Causeis of Problem:                                             1D CFR Part 21 Report Required: YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into %Inch NPTF ports.
The adaptors are installed after the basic unit is built andtested. The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor.
The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed.
The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the.valve will not return to Its closed position. If this occurs, the valve will fail to close.
The failure was noted when Exelon staff tested the valve, prior to Installation.
Approved by:                                       Title       President                         Date:     dg*   zs.     ,,
: 5. Corrective Action:
Install all fittings in the valve body prior to the Installation of the plunger guide into the body.
Approved by:                                       Title:     President                       Date:
: 6. Implementation:
CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body.
Approved by:
* Title:     President                       Date:     r.?.         //
: 7. Corrective Action to System to .Prevent Recurrence:
Action, as taken, is systematic.
Action, as taken, is systematic.
Approved by: Title: President Date: , //B. Verification (Describe):
Approved by:                                       Title:     President                         Date:         ,       //
It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body.Approved by7 --Title: President Date: a 3.2 .11//
B. Verification (Describe):
MAR/23/2011/WED
It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body.
[14:54 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 003 AUTOMATIC VALVE NUMBER: D7174-003 Page 2 of 3 TITLE: CORRECTIVE ACTION LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted: 91 7 i A a A 2 LJ~2 41 MAl/23/2011/WED 04:25 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P, 004 AUTOMATIC VALVE NUMBER: D7174-003 Page 3 of 3 TITLE:;" YIvI M' i'I, .',rI i & i'L: I: vII AI r Li'I IA.U t If 'HIi 1, I LI-: I -,IUle$ UX AULiJ: OjeideCI'IVL A415114!JN j YI L: I (Ji<M ULJ' I LUI : UUA (<LV: I -vriutRx Photograph 1 -Showing crimp in plunger guide.&1~}}
Approved by7 -                 -                   Title:     President                         Date: a 3.2         .11//
 
MAR/23/2011/WED     [14:54   PM     AUTOMATIC VALVE CORP         FAX No. 12484746732               P. 003 AUTOMATIC VALVE                             NUMBER: D7174-003                   Page 2 of 3 TITLE: CORRECTIVE ACTION                   LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION                     TYPE: FORM         DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted:
91                       7                     i a
A                                                                                             A 2
LJ~
41
 
MAl/23/2011/WED 04:25 PM           AUTOMATIC VALVE CORP             FAX No, 12484746732                         P,004 AUTOMATIC VALVE                       NUMBER: D7174-003                           Page 3 of 3 TITLE:;" kkB.* YIvI M' i'I, .',rI     i&   i'L: I: vII   AI r Li'I   IA.U t If'HIi 1, I   LI-: I -,IUle$ UX AULiJ: OjeideCI'IVL A415114!JN         j YI L: I (Ji<M         ULJ' I LUI : UUA     (<LV: I -vriutRx Photograph 1 - Showing crimp in plunger guide.
                                                                                                                      &
1~}}

Revision as of 01:44, 13 November 2019

Notification of Potential Part 21 Report Concerning Valve Plunger Guide Malfunction
ML110840037
Person / Time
Site: Limerick, Farley  Southern Nuclear icon.png
Issue date: 03/23/2011
From: Kenneth Armstrong
Automatic Valve
To:
Office of Nuclear Reactor Regulation
References
Download: ML110840037 (5)


Text

0312312011 U.S. Nuclear Regulatory Commission Operations Center Event Report PagLI Part 21 (PAR) Event# 46692 Rep Org: AUTOMATIC VALVE Notification Date / Time: 03/23/2011 16:24 (EDT)

Supplier: AUTOMATIC VALVE Event Date / Time: 03/22/2011 (EDT)

Last Modification: 03/23/2011 Region: 3 Docket #:

City: NOVI Agreement State: No County: License #:

State: MI NRC Notified by: KEVIN ARMSTRONG Notifications: JOHN ROGGE R1 DO HQ Ops Officer: PETE SNYDER DANIEL RICH R2DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION "Initial Concern: Valve, serial number 73386, does not consistently return to the closed position."

"Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state.

"Number and Location of Components:

"Model: U0204GBBR-AA Quantity: 32 Customer: EXELON LIMERICK, "Model: U0204GBBR-DEEL Quantity: 3( 0 Customer: ALABAMA POWER FARLEY "Model: U0204GBBR-DE Quantity: 4 Customer: ALABAMA POWER FARLEY "Model: U0204FBBR-DE Quantity: 8 Customer: RALPH A. HILLER "Model: U0204GBBR-DEL Quantity: 4 Customer: DRESSER MASONEILAN "Model: U0204GBBR-DEP Quantity: 3 Customer: DRESSER MASONEILAN "Advice to Purchasers:

"Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve."

6(9

Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 001 NRC Operations Center 301-816-5151 (FAX) 10 CFR PART 21 Notification:

Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers:

U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect:

A dent in the plunger guide may prevent the valve from changing state.

Number and Location of Components:

Valve Model Quantitjy Customer

-U0204GBBR-AA 32 EXELON LIMERICK U0204GBBR-DEEL 30 ALABAMA POWER FARLEY

-,-U0204GBBR-DE 4 ALABAMA POWER FARLEY

-- U0204FBBR-DE 8 RALPH A. HILLER cU0204GBBR-DEL 4 DRESSER MASONEILAN

-U0204GBBR-DEP 3 DRESSER MASONEILAN Corrective Action to Be Taken:

Please see attached report.

Advice to Purchasers:

Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve.

Date the Evaluation of the Defect was Complete: 03/2212011

MAR/23/201i!WED 04:53 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P.002 AUTOMATIC VALVE NUMBER: D7174-003 Page 1 of 3 TITLE: CORRECTIVE ACTION LOCN: h:\WORD\DOCUMENT\D7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 REQUIREMENTS:

NUMBER: 522 Type of Problem: Part U0204GBBR-AA Procedure Date: 03-14-2011 Who found Problem: Supplier Distributor rI-Customer Company: Exelon Limerick Station Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA kevinborek@exeloncorp.com

1. Team Working on Problem: Leader: Tom Troy Members:

Brian Blelat. Kelly Morris, Kevin Armstrong

2. Describe Problem (initial Concern and.Symptoms):.

Valve, serial number 73386, does not consistently return to the closed position.

Contain Symptom (Action):

Return rebuilt unit to the customer. Notify affected customers of the problem and inspection required. See Illustration 1 and Photograph 1.

Approved by: . Title: President Date: c-!. g -!.* //

4. Root Causeis of Problem: 1D CFR Part 21 Report Required: YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into %Inch NPTF ports.

The adaptors are installed after the basic unit is built andtested. The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor.

The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed.

The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the.valve will not return to Its closed position. If this occurs, the valve will fail to close.

The failure was noted when Exelon staff tested the valve, prior to Installation.

Approved by: Title President Date: dg* zs. ,,

5. Corrective Action:

Install all fittings in the valve body prior to the Installation of the plunger guide into the body.

Approved by: Title: President Date:

6. Implementation:

CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body.

Approved by:

  • Title: President Date: r.?. //
7. Corrective Action to System to .Prevent Recurrence:

Action, as taken, is systematic.

Approved by: Title: President Date: , //

B. Verification (Describe):

It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body.

Approved by7 - - Title: President Date: a 3.2 .11//

MAR/23/2011/WED [14:54 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 003 AUTOMATIC VALVE NUMBER: D7174-003 Page 2 of 3 TITLE: CORRECTIVE ACTION LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted:

91 7 i a

A A 2

LJ~

41

MAl/23/2011/WED 04:25 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P,004 AUTOMATIC VALVE NUMBER: D7174-003 Page 3 of 3 TITLE:;" kkB.* YIvI M' i'I, .',rI i& i'L: I: vII AI r Li'I IA.U t If'HIi 1, I LI-: I -,IUle$ UX AULiJ: OjeideCI'IVL A415114!JN j YI L: I (Ji<M ULJ' I LUI : UUA (<LV: I -vriutRx Photograph 1 - Showing crimp in plunger guide.

&

1~