ML110840037: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:0312312011 U.S. Nuclear Regulatory Commission Operations Center Event Report PagLI Part 21 (PAR)Event# 46692 Rep Org: AUTOMATIC VALVE Notification Date / Time: 03/23/2011 16:24 (EDT)Supplier: | {{#Wiki_filter:0312312011 U.S. Nuclear Regulatory Commission Operations Center Event Report PagLI Part 21 (PAR) Event# 46692 Rep Org: AUTOMATIC VALVE Notification Date / Time: 03/23/2011 16:24 (EDT) | ||
AUTOMATIC VALVE Event Date / Time: 03/22/2011 (EDT)Last Modification: | Supplier: AUTOMATIC VALVE Event Date / Time: 03/22/2011 (EDT) | ||
03/23/2011 Region: 3 Docket #: City: NOVI Agreement State: No County: License #: State: MI NRC Notified by: KEVIN ARMSTRONG Notifications: | Last Modification: 03/23/2011 Region: 3 Docket #: | ||
JOHN ROGGE R1 DO HQ Ops Officer: PETE SNYDER DANIEL RICH R2DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section: 21.21 UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION"Initial Concern: Valve, serial number 73386, does not consistently return to the closed position.""Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state."Number and Location of Components: "Model: U0204GBBR-AA Quantity: | City: NOVI Agreement State: No County: License #: | ||
32"Model: U0204GBBR-DEEL Quantity: | State: MI NRC Notified by: KEVIN ARMSTRONG Notifications: JOHN ROGGE R1 DO HQ Ops Officer: PETE SNYDER DANIEL RICH R2DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section: | ||
3("Model: U0204GBBR-DE Quantity: | 21.21 UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION "Initial Concern: Valve, serial number 73386, does not consistently return to the closed position." | ||
4"Model: U0204FBBR-DE Quantity: | "Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state. | ||
8"Model: U0204GBBR-DEL Quantity: | "Number and Location of Components: | ||
4"Model: U0204GBBR-DEP Quantity: | "Model: U0204GBBR-AA Quantity: 32 Customer: EXELON LIMERICK, "Model: U0204GBBR-DEEL Quantity: 3( 0 Customer: ALABAMA POWER FARLEY "Model: U0204GBBR-DE Quantity: 4 Customer: ALABAMA POWER FARLEY "Model: U0204FBBR-DE Quantity: 8 Customer: RALPH A. HILLER "Model: U0204GBBR-DEL Quantity: 4 Customer: DRESSER MASONEILAN "Model: U0204GBBR-DEP Quantity: 3 Customer: DRESSER MASONEILAN "Advice to Purchasers: | ||
3 Customer: | "Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve." | ||
6(9 | |||
Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 001 NRC Operations Center 301-816-5151 (FAX) 10 CFR PART 21 Notification: | |||
Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers: | |||
U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect: | |||
DRESSER MASONEILAN"Advice to Purchasers: "Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. | A dent in the plunger guide may prevent the valve from changing state. | ||
It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve." 6(9 Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 001 NRC Operations Center 301-816-5151 (FAX)10 CFR PART 21 Notification: | Number and Location of Components: | ||
Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers: U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state.Number and Location of Components: | Valve Model Quantitjy Customer | ||
Valve Model-U0204GBBR-AA U0204GBBR-DEEL | -U0204GBBR-AA 32 EXELON LIMERICK U0204GBBR-DEEL 30 ALABAMA POWER FARLEY | ||
-,-U0204GBBR-DE | -,-U0204GBBR-DE 4 ALABAMA POWER FARLEY | ||
--U0204FBBR-DE cU0204GBBR-DEL-U0204GBBR-DEP | -- U0204FBBR-DE 8 RALPH A. HILLER cU0204GBBR-DEL 4 DRESSER MASONEILAN | ||
Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. | -U0204GBBR-DEP 3 DRESSER MASONEILAN Corrective Action to Be Taken: | ||
It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve.Date the Evaluation of the Defect was Complete: | Please see attached report. | ||
03/2212011 MAR/23/201i!WED 04:53 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P. 002 AUTOMATIC VALVE NUMBER: D7174-003 Page 1 of 3 TITLE: CORRECTIVE ACTION LOCN: h:\WORD\DOCUMENT\D7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 REQUIREMENTS: | Advice to Purchasers: | ||
NUMBER: 522 Type of Problem: Part U0204GBBR-AA Procedure Date: 03-14-2011 Who found Problem: Supplier Distributor rI-Customer Company: Exelon Limerick Station Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA kevinborek@exeloncorp.com | Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve. | ||
: 1. Team Working on Problem: Leader: Tom Troy Members: Brian Blelat. Kelly Morris, Kevin Armstrong 2. Describe Problem (initial Concern and.Symptoms):. | Date the Evaluation of the Defect was Complete: 03/2212011 | ||
Valve, serial number 73386, does not consistently return to the closed position.Contain Symptom (Action): Return rebuilt unit to the customer. | |||
Notify affected customers of the problem and inspection required. | MAR/23/201i!WED 04:53 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P.002 AUTOMATIC VALVE NUMBER: D7174-003 Page 1 of 3 TITLE: CORRECTIVE ACTION LOCN: h:\WORD\DOCUMENT\D7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 REQUIREMENTS: | ||
See Illustration 1 and Photograph 1.Approved by: .Title: President Date: c-!. g -!.* //4. Root Causeis of Problem: 1D CFR Part 21 Report Required: | NUMBER: 522 Type of Problem: Part U0204GBBR-AA Procedure Date: 03-14-2011 Who found Problem: Supplier Distributor rI-Customer Company: Exelon Limerick Station Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA kevinborek@exeloncorp.com | ||
YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into % Inch NPTF ports.The adaptors are installed after the basic unit is built andtested. | : 1. Team Working on Problem: Leader: Tom Troy Members: | ||
The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor.The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed. | Brian Blelat. Kelly Morris, Kevin Armstrong | ||
The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the. valve will not return to Its closed position. | : 2. Describe Problem (initial Concern and.Symptoms):. | ||
If this occurs, the valve will fail to close.The failure was noted when Exelon staff tested the valve, prior to Installation. | Valve, serial number 73386, does not consistently return to the closed position. | ||
Approved by: Title President Date: dg* zs. ,, 5. Corrective Action: Install all fittings in the valve body prior to the Installation of the plunger guide into the body.Approved by: Title: President Date: 6. Implementation: | Contain Symptom (Action): | ||
CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body.Approved by: Title: President Date: r.?. //7. Corrective Action to System to .Prevent Recurrence: | Return rebuilt unit to the customer. Notify affected customers of the problem and inspection required. See Illustration 1 and Photograph 1. | ||
Approved by: . Title: President Date: c-!. g -!.* // | |||
: 4. Root Causeis of Problem: 1D CFR Part 21 Report Required: YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into %Inch NPTF ports. | |||
The adaptors are installed after the basic unit is built andtested. The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor. | |||
The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed. | |||
The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the.valve will not return to Its closed position. If this occurs, the valve will fail to close. | |||
The failure was noted when Exelon staff tested the valve, prior to Installation. | |||
Approved by: Title President Date: dg* zs. ,, | |||
: 5. Corrective Action: | |||
Install all fittings in the valve body prior to the Installation of the plunger guide into the body. | |||
Approved by: Title: President Date: | |||
: 6. Implementation: | |||
CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body. | |||
Approved by: | |||
* Title: President Date: r.?. // | |||
: 7. Corrective Action to System to .Prevent Recurrence: | |||
Action, as taken, is systematic. | Action, as taken, is systematic. | ||
Approved by: Title: President Date: , //B. Verification (Describe): | Approved by: Title: President Date: , // | ||
It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body.Approved by7 --Title: President Date: a 3.2 .11// | B. Verification (Describe): | ||
MAR/23/2011/WED | It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body. | ||
[14:54 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 003 AUTOMATIC VALVE NUMBER: D7174-003 Page 2 of 3 TITLE: CORRECTIVE ACTION LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted: 91 7 i A | Approved by7 - - Title: President Date: a 3.2 .11// | ||
MAR/23/2011/WED [14:54 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 003 AUTOMATIC VALVE NUMBER: D7174-003 Page 2 of 3 TITLE: CORRECTIVE ACTION LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted: | |||
91 7 i a | |||
A A 2 | |||
LJ~ | |||
41 | |||
MAl/23/2011/WED 04:25 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P,004 AUTOMATIC VALVE NUMBER: D7174-003 Page 3 of 3 TITLE:;" kkB.* YIvI M' i'I, .',rI i& i'L: I: vII AI r Li'I IA.U t If'HIi 1, I LI-: I -,IUle$ UX AULiJ: OjeideCI'IVL A415114!JN j YI L: I (Ji<M ULJ' I LUI : UUA (<LV: I -vriutRx Photograph 1 - Showing crimp in plunger guide. | |||
& | |||
1~}} |
Revision as of 01:44, 13 November 2019
ML110840037 | |
Person / Time | |
---|---|
Site: | Limerick, Farley |
Issue date: | 03/23/2011 |
From: | Kenneth Armstrong Automatic Valve |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML110840037 (5) | |
Text
0312312011 U.S. Nuclear Regulatory Commission Operations Center Event Report PagLI Part 21 (PAR) Event# 46692 Rep Org: AUTOMATIC VALVE Notification Date / Time: 03/23/2011 16:24 (EDT)
Supplier: AUTOMATIC VALVE Event Date / Time: 03/22/2011 (EDT)
Last Modification: 03/23/2011 Region: 3 Docket #:
City: NOVI Agreement State: No County: License #:
State: MI NRC Notified by: KEVIN ARMSTRONG Notifications: JOHN ROGGE R1 DO HQ Ops Officer: PETE SNYDER DANIEL RICH R2DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH VALVE PLUNGER GUIDE MALFUNCTION "Initial Concern: Valve, serial number 73386, does not consistently return to the closed position."
"Nature of the Defect: A dent in the plunger guide may prevent the valve from changing state.
"Number and Location of Components:
"Model: U0204GBBR-AA Quantity: 32 Customer: EXELON LIMERICK, "Model: U0204GBBR-DEEL Quantity: 3( 0 Customer: ALABAMA POWER FARLEY "Model: U0204GBBR-DE Quantity: 4 Customer: ALABAMA POWER FARLEY "Model: U0204FBBR-DE Quantity: 8 Customer: RALPH A. HILLER "Model: U0204GBBR-DEL Quantity: 4 Customer: DRESSER MASONEILAN "Model: U0204GBBR-DEP Quantity: 3 Customer: DRESSER MASONEILAN "Advice to Purchasers:
"Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve."
6(9
Received at: 03/23/2011 16:53 MAR/23/2011/WED 04:53 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 001 NRC Operations Center 301-816-5151 (FAX) 10 CFR PART 21 Notification:
Automatic Valve Company 41444 Vincenti Court, Novi MI 48375 Contact: Kevin Armstrong, President, 248-474-6700 ext. 170 Basic Component Model Numbers:
U0204GBBR-AA, U0204GBBR-DEEL, U0204GBBR-DE, U0204FBBR-DE, U0204GBBR-DEP, U0204GBBR-DEL, Nature of the Defect:
A dent in the plunger guide may prevent the valve from changing state.
Number and Location of Components:
Valve Model Quantitjy Customer
-U0204GBBR-AA 32 EXELON LIMERICK U0204GBBR-DEEL 30 ALABAMA POWER FARLEY
-,-U0204GBBR-DE 4 ALABAMA POWER FARLEY
-- U0204FBBR-DE 8 RALPH A. HILLER cU0204GBBR-DEL 4 DRESSER MASONEILAN
-U0204GBBR-DEP 3 DRESSER MASONEILAN Corrective Action to Be Taken:
Please see attached report.
Advice to Purchasers:
Any of the valves identified above may be inspected by removing the coil and checking the plunger guide for any defects. A dent which will prevent plunger movement is noticeable without magnification. It typically occurs approximately 0.10 inches from the base of the valve. Any valves thought to contain defects will be rebuilt or replaced by Automatic Valve.
Date the Evaluation of the Defect was Complete: 03/2212011
MAR/23/201i!WED 04:53 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P.002 AUTOMATIC VALVE NUMBER: D7174-003 Page 1 of 3 TITLE: CORRECTIVE ACTION LOCN: h:\WORD\DOCUMENT\D7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 REQUIREMENTS:
NUMBER: 522 Type of Problem: Part U0204GBBR-AA Procedure Date: 03-14-2011 Who found Problem: Supplier Distributor rI-Customer Company: Exelon Limerick Station Contact Name: Kevin Borek Address: 3146 Sanatoga Rd. Pottstown PA kevinborek@exeloncorp.com
- 1. Team Working on Problem: Leader: Tom Troy Members:
Brian Blelat. Kelly Morris, Kevin Armstrong
- 2. Describe Problem (initial Concern and.Symptoms):.
Valve, serial number 73386, does not consistently return to the closed position.
Contain Symptom (Action):
Return rebuilt unit to the customer. Notify affected customers of the problem and inspection required. See Illustration 1 and Photograph 1.
Approved by: . Title: President Date: c-!. g -!.* //
- 4. Root Causeis of Problem: 1D CFR Part 21 Report Required: YES U0204GBBR-AA is a valve constructed with 3/8 inch NPT adaptors inserted into %Inch NPTF ports.
The adaptors are installed after the basic unit is built andtested. The adaptors are then leak checked;.but the valve Is not functionally re-tested after the Installation of the adaptor.
The solenoid plunger guide was accidentally crimped when the adaptor fitting was installed.
The crimp in the plunger guide may Interfere with the movement of the plunger. If the interference prevents the plunger from completing Its full stroke, the.valve will not return to Its closed position. If this occurs, the valve will fail to close.
The failure was noted when Exelon staff tested the valve, prior to Installation.
Approved by: Title President Date: dg* zs. ,,
- 5. Corrective Action:
Install all fittings in the valve body prior to the Installation of the plunger guide into the body.
Approved by: Title: President Date:
- 6. Implementation:
CN 9780 specifies the assembly order of the fittings into the valve body and plunger guide. This is done prior to assembly of the plunger guide into the body.
Approved by:
- Title: President Date: r.?. //
- 7. Corrective Action to System to .Prevent Recurrence:
Action, as taken, is systematic.
Approved by: Title: President Date: , //
B. Verification (Describe):
It was not possible to re-create the dent in the plunger guide.when the fittings were installed prior to assembly of the plunger guide Into the valve body.
Approved by7 - - Title: President Date: a 3.2 .11//
MAR/23/2011/WED [14:54 PM AUTOMATIC VALVE CORP FAX No. 12484746732 P. 003 AUTOMATIC VALVE NUMBER: D7174-003 Page 2 of 3 TITLE: CORRECTIVE ACTION LOCN: l:\WORD\DOCUMENTD)7174003.DOC DATE: 10-21-1999 SUBJ: CORRECTIVE ACTION TYPE: FORM DEPT RESP: DQA REV: F-CN8020 Illustration 1: Pictorial of Valve showing Area where damage was noted:
91 7 i a
A A 2
LJ~
41
MAl/23/2011/WED 04:25 PM AUTOMATIC VALVE CORP FAX No, 12484746732 P,004 AUTOMATIC VALVE NUMBER: D7174-003 Page 3 of 3 TITLE:;" kkB.* YIvI M' i'I, .',rI i& i'L: I: vII AI r Li'I IA.U t If'HIi 1, I LI-: I -,IUle$ UX AULiJ: OjeideCI'IVL A415114!JN j YI L: I (Ji<M ULJ' I LUI : UUA (<LV: I -vriutRx Photograph 1 - Showing crimp in plunger guide.
&
1~