{{#Wiki_filter:1 WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                         Crouch, William D [wdcrouch@tva.gov]
Sent: Wednesday, May 18, 2011 5:06 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Bryan, Robert H Jr; Smith, James D; Smith, James D
Sent:                         Wednesday, May 18, 2011 5:06 PM To:                           Poole, Justin; Milano, Patrick; Campbell, Stephen Cc:                           Bryan, Robert H Jr; Smith, James D; Smith, James D


==Subject:==
==Subject:==
Commitments and SSER Open Items Attachments:
Commitments and SSER Open Items Attachments:                 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updated SSER 22-23 Open Items Plan.docx I had Tommy Elton search our commitment tracking database for commitments where we said we would submit something to NRC. The attached list resulted. It does not have the items for the last week (Tommy is behind since he is working on the Tech Spec revision) and it has some items where we have already made the submittal but have not closed the item in the database. I have someone working on cleaning these items up and documenting that they are complete.
05-17  -  OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updat ed SSER 22-23 Open Items Plan.docx IhadTommyEltonsearchourcommitmenttrackingdatabaseforcommitmentswherewesaidwewouldsubmitsomethingtoNRC.Theattachedlistresulted.Itdoesnothavetheitemsforthelastweek(TommyisbehindsinceheisworkingontheTechSpecrevision)andithassomeitemswherewehavealreadymadethesubmittalbuthavenotclosedtheiteminthedatabase.Ihavesomeoneworkingoncleaningtheseitemsupanddocumentingthattheyarecomplete.IhavealsoattachedourversionofSSER22/23AppendixHHOpenItems.TheduedatesshownarethedateswhenitemshavebeenpromisedtobeprovidedtoTVALicensing.Ingeneral,thedatetoyouwouldbewithinaboutoneweekofthatdate.Itemsshownas"Complete"meansthatTVALicensinghastheinputandwillincludetheiteminthenextclosureletter.WhenanitemhasbeensubmittedtoyouIremoveitfromthislist.Whentheorganizationishighlightedinyellow,theitemisaninspectionitemratherthanasubmittalitem.Forthese,apackagewillbeprovidedtotheappropriateNRCperson.
I have also attached our version of SSER 22/23 Appendix HH Open Items. The due dates shown are the dates when items have been promised to be provided to TVA Licensing. In general, the date to you would be within about one week of that date. Items shown as Complete means that TVA Licensing has the input and will include the item in the next closure letter. When an item has been submitted to you I remove it from this list. When the organization is highlighted in yellow, the item is an inspection item rather than a submittal item. For these, a package will be provided to the appropriate NRC person.
InthenearfutureweneedtostartstatusingtheselistsaswellastheBucketList.William D. (Bill) Crouch(423)365 2004WBN(256)777 7676Cell Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 386   Mail Envelope Properties   (B75BE6D61CDE4A468D264343045CAC4F08499DE4)
In the near future we need to start statusing these lists as well as the Bucket List.
William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1
 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           386 Mail Envelope Properties       (B75BE6D61CDE4A468D264343045CAC4F08499DE4)


==Subject:==
==Subject:==
Commitments and SSER Open Items Sent Date:   5/18/2011 5:05:52 PM Received Date: 5/18/2011 5:06:16 PM From:   Crouch, William D Created By:   wdcrouch@tva.gov Recipients:     "Bryan, Robert H Jr" <rhbryan@tva.gov>
Commitments and SSER Open Items Sent Date:               5/18/2011 5:05:52 PM Received Date:           5/18/2011 5:06:16 PM From:                   Crouch, William D Created By:             wdcrouch@tva.gov Recipients:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
"Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None  
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
 
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Post Office:   TVANUCXVS2.main.tva.gov Files     Size     Date & Time MESSAGE   1258     5/18/2011 5:06:16 PM 05-17  -  OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf   192905 Updated SSER 22-23 Open Items Plan.docx   32428
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
 
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                 Date & Time MESSAGE                         1258                 5/18/2011 5:06:16 PM 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf                         192905 Updated SSER 22-23 Open Items Plan.docx                     32428 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
OPEN COMMITMENTS  (ON MAXIMO)  -  NRR SUBMITTAL REQUIREDMAXIMO #REQUIRED ACTIONDUE  DATE
Recipients Received:
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111027893Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1).[Item 1 of Enclosure 2 of letter T02 100430 002]
    /    PRIOR to fuel loadEngineering - Civil IPEE----------------------------
NRR112145148NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.      (response to action item 33)[Item 2. of  Enclosure 4 of letter T02 110406 004]Engineering - ElectricalRAI Response  -  SSER22 Open Items----------------------------
NRR111900262The OM interface, however, creates an additional digital communications path to a non-safety-related system. During the design review, TVA commented that the path needed to be eliminated or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18]. [Item 22 of Enclosure 4 of letter T02 101005 001]01/31/2011Engineering - I and CRAI Response  - I and C----------------------------
NRR111901446The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December 22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA will submit the revised documents within two weeks of receipt from Westinghouse.(Item 5. of Enclosure 4 of T02 101222 006)Engineering - I and CRAI  Response  -  I and C----------------------------
NRR112116781Attachment 8 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.(Enclosure 4 of letter T02 110331 005)Engineering - I and CFSAR RAI-------------
NRR112177792TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt from GA-ESI. (Letter Item #2 [OI-346])[Item 4. of Enclosure 4 of letter T02 110415 001]Engineering - I and CFSAR RAI----------------------------
NRR111334414A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be submitted to the NRC by November 30, 2010.[Item 6. of Enclosure 2 of letter T02 100731 001]11/30/2010Engineering - I and C RAI Response  - FSAR----------------------------
NRRPage 1 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
MAXIMO #REQUIRED ACTIONDUE  DATE
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111620753Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].[Item 4. of Enclosure 4 of letter T02 101005 001]11/30/2010Engineering - I and CRAI Response  - I and C----------------------------
NRR111620928By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.[Item 1.f. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
NRR111331649Hardware details will be provided when the hardware drawings are updated to the as-built configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse.      (RAI Item Number 14 [Matrix Item 120])[Item 5. from Enclosure 2 of letter T02 100730 002)---------------
10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.03/11/2011Engineering - I and CRAI Response  - I and C----------------------------
 
NRR112250471The Westinghouse qualification report for the IITAs has not been completed. The proprietary and non-proprietary versions and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.    (Letter Item #14/375 [Item 3]) [Item 7 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR112177783The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])[Item 3. of Enclosure 4 of letter T02 110415 001]Engineering - I and CFSAR RAI----------------------------


NRR111620935By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.[Item 1.g. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response - I and C----------------------------
OPEN COMMITMENTS (ON MAXIMO) - NRR SUBMITTAL REQUIRED DUE DATE        PKG IPS                                              /        REC'D /
NRRPage 2 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                  REQUIRED ACTION Engineering -      111027893  IPEE                                /                    Prior to fuel load, a final report will be submitted following certain validation activities as described Civil                          ----------------------------  PRIOR to                  in the IPEEE Design Report (Enclosure 1).
MAXIMO #REQUIRED ACTIONDUE  DATE
NRR                            fuel load
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*10174938The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this survey to the NRC. The submittal will include a description of the methodologies and test equipment that were used to perform the survey, a comparison between on-site and factory EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."     /     PRIOR to fuel loadEngineering - I and CEagle-21 Process Protection System----------------------------
[Item 1 of Enclosure 2 of letter T02 100430 002]
Engineering -      112145148  RAI Response - SSER22                                    NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.
Electrical                      Open Items                                              (response to action item 33)
                                ----------------------------
NRR                                                      [Item 2. of Enclosure 4 of letter T02 110406 004]
Engineering - I    111900262  RAI Response - I and C      01/31/2011                  The OM interface, however, creates an additional digital communications path to a non-safety-and C                           ----------------------------                             related system. During the design review, TVA commented that the path needed to be eliminated NRR                                                      or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18].
[Item 22 of Enclosure 4 of letter T02 101005 001]
Engineering - I     111901446  RAI Response - I and C                                   The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December and C                          ----------------------------                             22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA NRR                                                      will submit the revised documents within two weeks of receipt from Westinghouse.
(Item 5. of Enclosure 4 of T02 101222 006)
Engineering - I    112116781  FSAR RAI                                                Attachment 8 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, and C                          -------------                                            Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original NRR                                                      release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.
(Enclosure 4 of letter T02 110331 005)
Engineering - I    112177792  FSAR RAI                                                TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-and C                          ----------------------------                            1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt NRR                                                      from GA-ESI.
(Letter Item #2 [OI-346])
[Item 4. of Enclosure 4 of letter T02 110415 001]
Engineering - I     111334414  RAI Response - FSAR          11/30/2010                  A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be and C                          ----------------------------                             submitted to the NRC by November 30, 2010.
NRR
[Item 6. of Enclosure 2 of letter T02 100731 001]
Page 1 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                              05/17/2011


NRR111334372The qualification for PAMS Cabinet and Components and Main Control Room Components will be submitted to the NRC by January 14, 2011.[Item 3. of Enclosure 2 of letter T02 100731 001]01/14/2011Engineering - I and C RAI Response - FSAR----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRR112177753TVA will perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed. (Letter Item #4 [OI-355])[Item 1. of Enclosure 4 of letter T02 110415 001]Engineering - I and CFSAR RAI----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    111620753  RAI Response - I and C      11/30/2010                Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific and C                          ----------------------------                            Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the NRR                                                    original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].
NRR112177768Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:GA-ESI procedure OP-7.3-240 revision: April 30, 2011(Letter Item #3 [OI-353])[Item 2. -  first part of Enclosure 4 of letter T02 110415 001]04/30/2011Engineering - I and CFSAR RAI----------------------------
[Item 4. of Enclosure 4 of letter T02 101005 001]
Engineering - I    111620928  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                           the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.
[Item 1.f. of Enclosure 2 of T02 101026 011]
Engineering - I    111331649  RAI Response - I and C      03/11/2011                Hardware details will be provided when the hardware drawings are updated to the as-built and C                          ----------------------------                           configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA NRR                                                    will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse.        (RAI Item Number 14 [Matrix Item 120])
[Item 5. from Enclosure 2 of letter T02 100730 002)
                                                                                        ---------------
10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.
Engineering - I    112250471  RAI                                                    The Westinghouse qualification report for the IITAs has not been completed. The proprietary and and C                          -----                                                  non-proprietary versions and the affidavit for withholding will be submitted within two weeks of NRR                                                    receipt from Westinghouse. (Letter Item #14/375 [Item 3])
[Item 7 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112177783  FSAR RAI                                                The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit and C                          ----------------------------                           for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])
NRR
[Item 3. of Enclosure 4 of letter T02 110415 001]
Engineering - I    111620935  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                           the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
[Item 1.g. of Enclosure 2 of T02 101026 011]
Page 2 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR111620882By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.[Item 1.a. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
DUE DATE        PKG IPS                                              /        REC'D /
NRR111620889By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.[Item 1.b. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response - I and C----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    10174938    Eagle-21 Process                    /                    The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this and C                          Protection System            PRIOR to                  survey to the NRC. The submittal will include a description of the methodologies and test
NRRPage 3 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
                                ----------------------------   fuel load                equipment that were used to perform the survey, a comparison between on-site and factory NRR                                                      EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."
MAXIMO #REQUIRED ACTIONDUE  DATE
Engineering - I     111334372  RAI Response - FSAR          01/14/2011                  The qualification for PAMS Cabinet and Components and Main Control Room Components will and C                           ----------------------------                             be submitted to the NRC by January 14, 2011.
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111620770Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66]. [Item 14. of Enclosure 4 of letter T02 101005 001]12/07/2010Engineering - I and CRAI Response  - I and C----------------------------
NRR
NRR111620967By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.[Item 1.k. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
[Item 3. of Enclosure 2 of letter T02 100731 001]
NRR111900179The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a more detailed description of the design process described in NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].[Item 17. of Enclosure 4 of letter T02 101005 001]10/29/2010Engineering - I and CRAI Response  - I and C----------------------------
Engineering - I     112177753  FSAR RAI                                                TVA will perform an EMI survey of the containment high range radiation monitors after they are and C                           ----------------------------                             installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being NRR                                                      completed. (Letter Item #4 [OI-355])
NRR111620959By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.[Item 1.j. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
[Item 1. of Enclosure 4 of letter T02 110415 001]
NRR111092634The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved for SER Approval List, as Item 128.[Item 6. of Enclosure 2 of letter T02 100621 001]12/03/2010Engineering - I and CRAI Response  - I AND C----------------------------
Engineering - I    112177768  FSAR RAI                    04/30/2011                 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C                           ----------------------------                             the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
NRR111620761The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F]. [Item 11. of Enclosure 4 of letter T02 101005 001]02/14/2011Engineering - I and CRAI Response - I and C----------------------------
NRR GA-ESI procedure OP-7.3-240 revision: April 30, 2011 (Letter Item #3 [OI-353])
NRRPage 4 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
[Item 2. - first part of Enclosure 4 of letter T02 110415 001]
MAXIMO #REQUIRED ACTIONDUE  DATE
Engineering - I     111620882  RAI Response - I and C       04/29/2011                 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                             the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                      be provided to NRC.
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112043571The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt from GA-ESI. [Cover Letter][Item 2. of Enclosure 4 of letter T02 110225 004]Engineering - I and CFSAR RAIs----------------------------
Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.
NRR111620949By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010[Item 1.h of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response - I and C----------------------------
[Item 1.a. of Enclosure 2 of T02 101026 011]
NRR111901406The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later than January 28, 2011.(Item 4. of Enclosure 4 of T02 101222 006)01/28/2011Engineering - I and CRAI  Response  -  I and C----------------------------
Engineering - I     111620889  RAI Response - I and C       04/29/2011                 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                             the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                      be provided to NRC.
NRR112058497WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.03/29/2011Engineering - I and CFSAR RAI----------------------------
Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
NRR10175684Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."10/31/2009Engineering - I and CRegulatory Framework----------------------------
[Item 1.b. of Enclosure 2 of T02 101026 011]
NRR111620955By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.[Item 1.i. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
Page 3 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
NRR111901209FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.(Item 3. of Enclosure 4 of T02 101222 006)Engineering - I and CRAI  Response  -  I and C----------------------------
NRRPage 5 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
MAXIMO #REQUIRED ACTIONDUE  DATE
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112177804An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, Hardware Description, will submitted within two weeks of receipt from Westinghouse.(Letter Item #7 [OI-360])
[Item 5. of Enclosure 4 of letter T02 110415 001]Engineering - I and CFSAR RAI----------------------------
NRR111620764Attachment 41 contains the proprietary version of the Common Q Software Requirements Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96]. [Item 16. of Enclosure 4 of letter T02 101005 001]04/08/2011Engineering - I and CRAI Response  - I and C----------------------------
NRR112177773Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011(Letter Item #3 [OI-353])[Item 2.  -  last part of Enclosure 4 of letter T02 110415 001]09/15/2011Engineering - I and CFSAR RAI----------------------------
NRR111902413The nonproprietary version of Enclosure 4 and the applications for withholding will be provided two weeks after receipt from Westinghouse.[RAI 15.0.0 - 1.b]
[Item 14. of Enclosure 6 of letter T02 101210 001]Engineering - I and CRAI  Response -  FSAR----------------------------
NRR111620766The next IV&V report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].[Item 20. of Enclosure 4 of letter T02 101005 001]02/11/2011Engineering - I and CRAI Response  - I and C----------------------------


NRR111620901By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT) Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.[Item 1.d. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRRPage 6 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    111620770  RAI Response - I and C      12/07/2010                Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of and C                          ----------------------------                            the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing NRR                                                    Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66].
MAXIMO #REQUIRED ACTIONDUE  DATE
[Item 14. of Enclosure 4 of letter T02 101005 001]
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111620894By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.[Item 1.c. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response - I and C----------------------------
Engineering - I    111620967  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
NRR111331664Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit this report by November 8, 2010, two weeks after receipt from Westinghouse.      (RAI Item Number 14 [Matrix Item 120][Item 6. from Enclosure 2 of letter T02 100730 002)---------------
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.02/25/2011Engineering - I and CRAI Response  - I and C----------------------------
[Item 1.k. of Enclosure 2 of T02 101026 011]
NRR111621260(Letter Item 9) - This item will be corrected by a design change based on the following:The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.(first part of Item 5. of Enclosure 4 of letter T02 101029 002)04/29/2011Engineering - I and CRAI Response  - I and C----------------------------
Engineering - I    111900179  RAI Response - I and C      10/29/2010                The scope of NABU-DP-00014-GEN includes the design and implementation processes for the and C                           ----------------------------                           application development. For a more detailed description of the design process described in NRR                                                    NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].
[Item 17. of Enclosure 4 of letter T02 101005 001]
Engineering - I    111620959  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.
[Item 1.j. of Enclosure 2 of T02 101026 011]
Engineering - I     111092634  RAI Response - I AND C      12/03/2010                The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later and C                           ----------------------------                           than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved NRR                                                    for SER Approval List, as Item 128.
[Item 6. of Enclosure 2 of letter T02 100621 001]
Engineering - I    111620761  RAI Response - I and C      02/14/2011                 The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 and C                           ----------------------------                           Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does NRR                                                    include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F].
[Item 11. of Enclosure 4 of letter T02 101005 001]
Page 4 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                            05/17/2011


NRR111334376A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be submitted to the NRC by November 30, 2010.[Item 4. of Enclosure 2 of letter T02 100731 001]11/30/2010Engineering - I and C RAI Response - FSAR----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    112043571  FSAR RAIs                                              The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-and C                          ----------------------------                            proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt NRR                                                    from GA-ESI. [Cover Letter]
[Item 2. of Enclosure 4 of letter T02 110225 004]
Engineering - I    111620949  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010
[Item 1.h of Enclosure 2 of T02 101026 011]
Engineering - I    111901406  RAI Response - I and C      01/28/2011                The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later and C                          ----------------------------                            than January 28, 2011.
NRR (Item 4. of Enclosure 4 of T02 101222 006)
Engineering - I    112058497  FSAR RAI                    03/29/2011                WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, and C                          ----------------------------                            Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
NRR Engineering - I    10175684    Regulatory Framework        10/31/2009                Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA and C                          ----------------------------                            provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."
NRR Engineering - I    111620955  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
[Item 1.i. of Enclosure 2 of T02 101026 011]
Engineering - I     111901209  RAI Response - I and C                                  FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a and C                          ----------------------------                           future FSAR amendment.
NRR (Item 3. of Enclosure 4 of T02 101222 006)
Page 5 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR111620922By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.[Item 1.e. of Enclosure 2 of T02 101026 011]04/29/2011Engineering - I and CRAI Response - I and C----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRRPage 7 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    112177804  FSAR RAI                                                An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore and C                          ----------------------------                            Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, NRR                                                    Hardware Description, will submitted within two weeks of receipt from Westinghouse.
MAXIMO #REQUIRED ACTIONDUE  DATE
(Letter Item #7 [OI-360])
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112249893Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS pressure to maintain sub-cooling margin such that natural circulation would not be adversely affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.      (Letter Item 33. [NRC Question RAI FPR III-7])(Item 8. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
[Item 5. of Enclosure 4 of letter T02 110415 001]
NRR111334367The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, 2010.[Item 2. of Enclosure 2 of letter T02 100731 001]11/30/2010Engineering - I and C RAI Response - FSAR----------------------------
Engineering - I     111620764  RAI Response - I and C       04/08/2011                Attachment 41 contains the proprietary version of the Common Q Software Requirements and C                          ----------------------------                           Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for NRR                                                    withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96].
NRR112249887It is TVAs position that only qualified personnel are allowed and required to make the decisions as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields.  (Letter Item 27. [NRC Question RAI FPR II-36])(Item 7. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
[Item 16. of Enclosure 4 of letter T02 101005 001]
NRR112249875The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section 14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load.    (Letter Item 24. [NRC Question (RAI FPR II-34)])(Item 6. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112177773  FSAR RAI                    09/15/2011                Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C                          ----------------------------                           the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
    /     PRIOR to fuel loadEngineering - I and CFSAR RAI--------------
NRR Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 (Letter Item #3 [OI-353])
NRR112249865A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and 47W920 series) has been performed to determine the correct identification number and fire resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.     (Letter Item 9. [NRC Question RAI FPR II-19])(Item 5. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
[Item 2. - last part of Enclosure 4 of letter T02 110415 001]
Engineering - I     111902413  RAI Response - FSAR                                     The nonproprietary version of Enclosure 4 and the applications for withholding will be provided and C                          ----------------------------                           two weeks after receipt from Westinghouse.
NRR
[RAI 15.0.0 - 1.b]
[Item 14. of Enclosure 6 of letter T02 101210 001]
Engineering - I    111620766  RAI Response - I and C      02/11/2011                The next IV&V report will include the Design Phase Requirements Traceability Matrix. The and C                          ----------------------------                           Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].
NRR
[Item 20. of Enclosure 4 of letter T02 101005 001]
Engineering - I     111620901  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                           the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT)
Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.
[Item 1.d. of Enclosure 2 of T02 101026 011]
Page 6 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR112249861Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.  (Letter Item 8.  [NRC Question RAI FPR II-18])(Item 4. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
DUE DATE      PKG IPS                                              /        REC'D /
NRRPage 8 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                  REQUIRED ACTION Engineering - I    111620894  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                           the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
MAXIMO #REQUIRED ACTIONDUE  DATE
Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112249919TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:[1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.[2] A review of the FPR revealed three other places where the discussion concerns both units:1. Table 14.3, item 14.3.c should read:  Unit 1 and 2 Containment Purge Air Exhaust Filters, .2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.3. Part III, section 4.7 is incorrect. The third paragraph should read:  The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.(Item 10. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
[Item 1.c. of Enclosure 2 of T02 101026 011]
NRR112249855Table 14.1 contains detectors that are for protection of components and areas required for fire safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])(Item 3. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
Engineering - I     111331664  RAI Response - I and C      02/25/2011                Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit and C                          ----------------------------                           this report by November 8, 2010, two weeks after receipt from Westinghouse.         (RAI Item NRR                                                    Number 14 [Matrix Item 120]
NRR112249904TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:[1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.[2] A review of the FPR revealed three other places where the discussion concerns both units:
[Item 6. from Enclosure 2 of letter T02 100730 002)
: 1. Table 14.3, item 14.3.c should read:  Unit 1 and 2 Containment Purge Air Exhaust Filters, .2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.(Item 9. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
                                                                                        ---------------
NRRPage 9 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.
MAXIMO #REQUIRED ACTIONDUE  DATE
Engineering - I     111621260  RAI Response - I and C      04/29/2011                (Letter Item 9) - This item will be corrected by a design change based on the following:
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112249845For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI FPR II-14])(Item 2. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
and C                           ----------------------------
NRR112249817TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:[1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.[2] A review of the FPR revealed three other places where the discussion concerns both units:1. Table 14.3, item 14.3.c should read  Unit 1 and 2 Containment Purge Air Exhaust Filters, .2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.(Item 1. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
NRR                                                    The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.
NRR111621250(Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.(Item 4. of Enclosure 4 of letter T02 101029 002)Engineering - I and CRAI Response  - I and C----------------------------
(first part of Item 5. of Enclosure 4 of letter T02 101029 002)
NRR111900989The qualification information on the LPMS softline cable and charge converter/preamplifier will be submitted by March 11, 2011.(Item 1. of Enclosure 4 of T02 101222 006)03/11/2011Engineering - I and CRAI  Response  - I and C----------------------------
Engineering - I    111334376  RAI Response - FSAR          11/30/2010                A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be and C                           ----------------------------                           submitted to the NRC by November 30, 2010.
NRR111334387A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the NRC by December 17, 2010.[Item 5. of Enclosure 2 of letter T02 100731 001]12/17/2010Engineering - I and C RAI Response - FSAR----------------------------
NRR
NRRNCO840165002Submit photographs of control panels 120 days after receipt of an operating license.
[Item 4. of Enclosure 2 of letter T02 100731 001]
    /    AFTER LICENSEDEngineering - I and CControl Room Design Review SP---------------------------------Generic Communications:  NUREG-0737, I.D.1---------------------------------Regulatory Framework----------------------------
Engineering - I     111620922  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                           the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
NRR 166Page 10 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.
MAXIMO #REQUIRED ACTIONDUE  DATE
[Item 1.e. of Enclosure 2 of T02 101026 011]
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112043595A FSAR change will be submitted in a future FSAR amendment to change the revision level for WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)][Item 4. of Enclosure 4 of letter T02 110225 004]Engineering - I and CFSAR RAIs----------------------------
Page 7 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
NRR111621236(Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.(Item 1. of Enclosure 4 of letter T02 101029 002)Engineering - I and CRAI Response  - I and C----------------------------


NRR111334419A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by November 15, 2010.[Item 7. of Enclosure 2 of letter T02 100731 001]11/15/2010Engineering - I and C RAI Response  - FSAR----------------------------
DUE DATE        PKG IPS                                              /        REC'D /
NRR111360873A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to provide consistency with the setpoint methodology changes provided in A100 and Technical Specification Tracking Form 493.[Item 1. of Enclosure 5 of letter T02 100901 002]Engineering - I and CFSAR - A100----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    112249893  FSAR RAI                                                Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS and C                          --------------                                          pressure to maintain sub-cooling margin such that natural circulation would not be adversely NRR                                                      affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.    (Letter Item
: 33. [NRC Question RAI FPR III-7])
(Item 8. of Enclosure 2. of letter T02 110506 001)
Engineering - I    111334367  RAI Response - FSAR          11/30/2010                  The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, and C                          ----------------------------                            2010.
NRR
[Item 2. of Enclosure 2 of letter T02 100731 001]
Engineering - I     112249887  FSAR RAI                                                It is TVAs position that only qualified personnel are allowed and required to make the decisions and C                           --------------                                           as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a NRR                                                      and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields. (Letter Item 27. [NRC Question RAI FPR II-36])
(Item 7. of Enclosure 2. of letter T02 110506 001)
Engineering - I    112249875  FSAR RAI                            /                    The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and and C                          --------------               PRIOR to                   the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section NRR                            fuel load                14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load. (Letter Item 24. [NRC Question (RAI FPR II-34)])
(Item 6. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249865  FSAR RAI                                                A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and and C                          --------------                                           47W920 series) has been performed to determine the correct identification number and fire NRR                                                      resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.        (Letter Item 9. [NRC Question RAI FPR II-19])
(Item 5. of Enclosure 2. of letter T02 110506 001)
Engineering - I    112249861  FSAR RAI                                                Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier and C                          --------------                                           separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into NRR                                                      the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 8. [NRC Question RAI FPR II-18])
(Item 4. of Enclosure 2. of letter T02 110506 001)
Page 8 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR111903557The nonproprietary versions of Westinghouse documents Post Accident Monitoring System (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.(Enclosure 3 of letter T02 101203 001)Engineering - I and CRAI Response  - I and C----------------------------
DUE DATE      PKG IPS                                    /        REC'D /
NRR112250468The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.     (Letter Item #14/375 [Item 3]) [Item 6 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----
RESPONSIBLE      #    MAXIMO #            SOURCE MILESTONE  CLOSED*                                                  REQUIRED ACTION Engineering - I     112249919  FSAR RAI                                    TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:
NRR112250459Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and IEEE 1020-1997. These references will be added to FSAR Table 7.1-1.    (Letter Item #11/370) [Item 5 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR111621243(Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.(Item 2. of Enclosure 4 of letter T02 101029 002)Engineering - I and CRAI Response  - I and C----------------------------
and C                           --------------
NRRPage 11 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
NRR                                          [1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
MAXIMO #REQUIRED ACTIONDUE  DATE
[2] A review of the FPR revealed three other places where the discussion concerns both units:
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111901163The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be corrected in Revision 3 of the document.(Item 2. of Enclosure 4 of T02 101222 006)Engineering - I and CRAI  Response  -  I and C----------------------------
: 1. Table 14.3, item 14.3.c should read:  Unit 1 and 2 Containment Purge Air Exhaust Filters,
NRR112249939As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 operator manual actions are preventative rather than reactive. That is, they are driven by procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor. This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision.     (Letter Item 43 [NRC Question RAI FPR V-11])(Item 11. of Enclosure 2. of letter T02 110506 001)Engineering - I and CFSAR RAI--------------
                                                                            .
NRR112250458The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-00508, Cyber Security Program.     (Letter Item #10/368)[Item 4 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR112250453The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG 1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect conformance.     (Letter Item #8/366)[Item 3 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR112250445FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.    (Letter Item #6/34 [Item 2])[Item 2 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR112250439The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR-33-WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.     (Letter Item #4/362 [Item 1])[Item 1 of Enclosure 4 of letter T02 110506 002]Engineering - I and C RAI-----NRR112145180Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping within the SGB System exists downstream of the safety-related containment isolation valves.     (response to action item 36)[Item 3. of Enclosure 4 of letter T02 110406 004]Engineering - MechanicalRAI Response  -  SSER22 Open Items----------------------------
: 2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
NRR112068570Response to RAI FPR V-2 will be provided by April 29, 2011.     [RAI FPR V-2] [Item 8. of Enclosure 2 of letter T02 110316 004]04/29/2011Engineering - MechanicalFSAR RAI----------------------------
: 3. Part III, section 4.7 is incorrect. The third paragraph should read: The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 10. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249855  FSAR RAI                                    Table 14.1 contains detectors that are for protection of components and areas required for fire and C                           --------------                               safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven NRR                                          Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])
(Item 3. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249904  FSAR RAI                                    TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:
and C                          --------------
NRR                                          [1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
[2] A review of the FPR revealed three other places where the discussion concerns both units:
: 1. Table 14.3, item 14.3.c should read:  Unit 1 and 2 Containment Purge Air Exhaust Filters,
                                                                            .
: 2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
: 3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 9. of Enclosure 2. of letter T02 110506 001)
Page 9 of 19                                                * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011


NRRPage 12 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
DUE DATE       PKG IPS                                                    /         REC'D /
MAXIMO #REQUIRED ACTIONDUE  DATE  
RESPONSIBLE      #    MAXIMO #              SOURCE                MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I      112249845    FSAR RAI                                                    For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be and C                            --------------                                              included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI NRR                                                          FPR II-14])
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111334428Once the date for issuance of an operating license becomes more certain, TVA will update the sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).[Item 9. of Enclosure 2 of letter T02 100731 001]Engineering - Mechanical RAI Response - FSAR----------------------------
(Item 2. of Enclosure 2. of letter T02 110506 001)
NRR112068464The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Part V, which will be provided by April 29, 2011.     [RAI FPR General - 2 Item A] [Item 1. of Enclosure 2 of letter T02 110316 004]-----------------------------This tracks the portion due 04/29/2011.04/29/2011Engineering - MechanicalFSAR RAI----------------------------
Engineering - I      112249817    FSAR RAI                                                    TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:
and C                            --------------
NRR                                                          [1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
[2] A review of the FPR revealed three other places where the discussion concerns both units:
: 1. Table 14.3, item 14.3.c should read  Unit 1 and 2 Containment Purge Air Exhaust Filters, .
: 2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
: 3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 1. of Enclosure 2. of letter T02 110506 001)
Engineering - I      111621250    RAI Response - I and C                                      (Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and and C                            ----------------------------                                 Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR                                                          after issuance of the EDCR.
(Item 4. of Enclosure 4 of letter T02 101029 002)
Engineering - I      111900989    RAI Response - I and C            03/11/2011                The qualification information on the LPMS softline cable and charge converter/preamplifier will be and C                            ----------------------------                                submitted by March 11, 2011.
NRR (Item 1. of Enclosure 4 of T02 101222 006)
Engineering - I      111334387    RAI Response - FSAR              12/17/2010                A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the and C                            ----------------------------                                NRC by December 17, 2010.
NRR
[Item 5. of Enclosure 2 of letter T02 100731 001]
Engineering - I 166  NCO840165002 Control Room Design                    /                    Submit photographs of control panels 120 days after receipt of an operating license.
and C                            Review SP                          AFTER
                                  --------------------------------- LICENSED Generic Communications:
NUREG-0737, I.D.1
                                  ---------------------------------
Regulatory Framework
                                  ----------------------------
NRR Page 10 of 19                                                                  * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR112068520Attachment 2 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection and suppression system drawings. These drawings will be annotated to reflect changes made to the figures and provided to NRC by March 16, 2011.    [RAI FPR General-4] [Item 5. of Enclosure 2 of letter T02 110316 004]03/16/2011Engineering - MechanicalFSAR RAI----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRR112046729FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the mission dose calculations. (Question 30.1.b)[Item 8. of Enclosure 4 of letter T02 110225 002]Engineering - MechanicalFSAR RAI----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Engineering - I    112043595  FSAR RAIs                                              A FSAR change will be submitted in a future FSAR amendment to change the revision level for and C                          ----------------------------                           WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)]
NRR112236712A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.[Item 1. of Enclosure 3 of letter T02 110429 003]Engineering - MechanicalFSAR RAI----------------------------
NRR
NRR111903011TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.(Item 1. of Enclosure 5 of letter T02 101218 001)10/01/2011Engineering - MechanicalFire Protection Report----------------------------
[Item 4. of Enclosure 4 of letter T02 110225 004]
NRRNCO080008033GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs  - Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License.    /    six months before receiving an Operating LicenseEngineering - MechanicalGeneric Communications:  GL 1989-04--------------------------------Regulatory Framework--------------------------------
Engineering - I    111621236  RAI Response - I and C                                  (Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and and C                          ----------------------------                            Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR                                                    after issuance of the EDCR.
NRR 200112236713A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.[Item 2. of Enclosure 3 of letter T02 110429 003]Engineering - MechanicalFSAR RAI----------------------------
(Item 1. of Enclosure 4 of letter T02 101029 002)
NRR10175682Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Solid Waste Management System and information on the Process Control Program on or before October 31, 2009."10/31/2009Engineering - MechanicalRegulatory Framework----------------------------
Engineering - I    111334419  RAI Response - FSAR          11/15/2010                A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for and C                          ----------------------------                           Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by NRR                                                    November 15, 2010.
[Item 7. of Enclosure 2 of letter T02 100731 001]
Engineering - I    111360873  FSAR - A100                                            A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to and C                          ----------------------------                           provide consistency with the setpoint methodology changes provided in A100 and Technical NRR                                                    Specification Tracking Form 493.
[Item 1. of Enclosure 5 of letter T02 100901 002]
Engineering - I     111903557  RAI Response - I and C                                  The nonproprietary versions of Westinghouse documents Post Accident Monitoring System and C                          ----------------------------                           (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test NRR                                                    (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.
(Enclosure 3 of letter T02 101203 001)
Engineering - I    112250468  RAI                                                    The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification and C                          -----                                                   Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the NRR                                                    affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.
(Letter Item #14/375 [Item 3])
[Item 6 of Enclosure 4 of letter T02 110506 002]
Engineering - I    112250459  RAI                                                     Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and and C                          -----                                                   IEEE 1020-1997. These references will be added to FSAR Table 7.1-1. (Letter Item #11/370)
NRR
[Item 5 of Enclosure 4 of letter T02 110506 002]
Engineering - I    111621243  RAI Response - I and C                                  (Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit and C                          ----------------------------                           Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after NRR                                                    issuance of the EDCR.
(Item 2. of Enclosure 4 of letter T02 101029 002)
Page 11 of 19                                                          * = Date Final Closure Package received by / closed by Licensing.                                          05/17/2011


NRRPage 13 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
DUE DATE       PKG IPS                                              /         REC'D /
MAXIMO #REQUIRED ACTIONDUE  DATE  
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                               REQUIRED ACTION Engineering - I    111901163  RAI Response - I and C                                  The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, and C                          ----------------------------                           Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be NRR                                                    corrected in Revision 3 of the document.
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112054436TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months of NRC approval of the Traveler.(item 1. of Enclosure 3 of letter T02 110311 005)    /    within 6 months of NRC approval of the TravelerEngineering - MechanicalGeneric Communications:GL 2008-01---------------------------------
(Item 2. of Enclosure 4 of T02 101222 006)
Regulatory Framework----------------------------
Engineering - I    112249939  FSAR RAI                                                As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 and C                          --------------                                         operator manual actions are preventative rather than reactive. That is, they are driven by NRR                                                     procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor.
NRR 213111895229TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation.      (RAI 4.c Response)[Item 8. of Enclosure 2 of T02 110131 001]Engineering - MechanicalRAI  - SAMA----------------------------
This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision.      (Letter Item 43 [NRC Question RAI FPR V-11])
NRR112046718TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)[Item 3. of Enclosure 4 of letter T02 110225 002]Engineering - MechanicalFSAR RAI----------------------------
(Item 11. of Enclosure 2. of letter T02 110506 001)
NRR112061258FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.[from Enclosure 5 of letter T02 110316 005]04/29/2011Engineering - MechanicalFire Protection Report-------------
Engineering - I    112250458  RAI                                                    The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear and C                          -----                                                   Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-NRR                                                    00508, Cyber Security Program. (Letter Item #10/368)
NRRPER 172598NCO840187004:  Submit cable separation drawings to NRC in conjunction with the detailed Appendix R reanalysis report.Engineering -
[Item 4 of Enclosure 4 of letter T02 110506 002]
MechanicalFire Protection CAP------------------------
Engineering - I    112250453  RAI                                                    The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG and C                          -----                                                   1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect NRR                                                    conformance. (Letter Item #8/366)
[Item 3 of Enclosure 4 of letter T02 110506 002]
Engineering - I    112250445  RAI                                                    FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.
and C                          -----                                                  (Letter Item #6/34 [Item 2])
NRR
[Item 2 of Enclosure 4 of letter T02 110506 002]
Engineering - I    112250439  RAI                                                    The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation and C                          -----                                                   of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR                                NRR                                                    WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #4/362 [Item 1])
[Item 1 of Enclosure 4 of letter T02 110506 002]
Engineering -       112145180  RAI Response - SSER22                                  Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping Mechanical                      Open Items                                              within the SGB System exists downstream of the safety-related containment isolation valves.
                                ----------------------------                            (response to action item 36)
NRR
[Item 3. of Enclosure 4 of letter T02 110406 004]
Engineering -      112068570  FSAR RAI                    04/29/2011                Response to RAI FPR V-2 will be provided by April 29, 2011.       [RAI FPR V-2]
Mechanical                      ----------------------------
NRR                                                    [Item 8. of Enclosure 2 of letter T02 110316 004]
Page 12 of 19                                                          * = Date Final Closure Package received by / closed by Licensing.                                          05/17/2011


NRR111029357TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to fuel load.
DUE DATE        PKG IPS                                                    /        REC'D /
     /    PRIOR to fuel loadEngineering - MechanicalGeneric Communications:  GL 2004-02--------------------------------Regulatory Framework----------------------------
RESPONSIBLE    #    MAXIMO #              SOURCE              MILESTONE     CLOSED*                                              REQUIRED ACTION Engineering -     111334428    RAI Response - FSAR                                          Once the date for issuance of an operating license becomes more certain, TVA will update the Mechanical                      ----------------------------                                 sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).
NRR 209112068737The FPR will be revised to clarify that this reduction only applies to areas and/or equipment affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit is in Modes 1 to 4 inclusive.     [RAI FPR II-8] [Item 11. of Enclosure 2 of letter T02 110316 004]Engineering - MechanicalFSAR RAI----------------------------
NRR
NRRPage 14 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
[Item 9. of Enclosure 2 of letter T02 100731 001]
MAXIMO #REQUIRED ACTIONDUE  DATE
Engineering -     112068464    FSAR RAI                          04/29/2011                  The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Mechanical                      ----------------------------                                 Part V, which will be provided by April 29, 2011. [RAI FPR General - 2 Item A]
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111091647TVA will provide information regarding how the model and the peer review process addressed the items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal flooding for which the NRC position was stated as Qualification.[Item . 1 of Enclosure 4 of T02 100608 001.]Engineering - Mechanical RAI Response  - IPE----------------------------
NRR
NRRNCO081006001Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a submittal consistent with the information requested in the GL 90 days prior to fuel load. The submittal will provide: a statement regarding which actions were completed, the schedule for completing the remaining actions, and the basis for that schedule."    /    90 days PRIOR to fuel loadEngineering - MechanicalGeneric Communications:GL 2008-01---------------------------------Regulatory Framework----------------------------
[Item 1. of Enclosure 2 of letter T02 110316 004]
NRR 213112068578Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, TVA will review the information and submit the results for NRC approval if they differ from the assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required.    [RAI FPR V-3] [Item 9. of Enclosure 2 of letter T02 110316 004]Engineering - MechanicalFSAR RAI----------------------------
                                                                                              -----------------------------
NRR112068531Figures representing the as-constructed plant configuration will be provided after construction completion.    [RAI FPR General - 4] [Item 6. of Enclosure 2 of letter T02 110316 004]Engineering - MechanicalFSAR RAI----------------------------
This tracks the portion due 04/29/2011.
NRRNCO080008038Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.    /    within 6 months after receiving an operating licenseInsp. ServicesRegulatory Framework----------------------------
Engineering -      112068520    FSAR RAI                          03/16/2011                  Attachment 2 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection Mechanical                     ----------------------------                                 and suppression system drawings. These drawings will be annotated to reflect changes made to NRR                                                          the figures and provided to NRC by March 16, 2011. [RAI FPR General-4]
NRR112047866An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior to commercial operation.[Enclosure 2 of T02 101012 001]    /    within 90 days following Unit 2 commercial operationInsp. ServicesASME  - Section III to Section XI----------------------------
[Item 5. of Enclosure 2 of letter T02 110316 004]
NRR112164522A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response to Section 9.2.1 - Question (f).(Item 1. of Enclosure 2 of letter T02 110413 001)
Engineering -      112046729    FSAR RAI                                                      FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the Mechanical                      ----------------------------                                 mission dose calculations. (Question 30.1.b)
Licensing - MechanicalFSAR RAI----------------------------
NRR
NRR112164540A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response to Section 9.2.2 - Question (d).(Item 2. of Enclosure 2 of letter T02 110413 001)
[Item 8. of Enclosure 4 of letter T02 110225 002]
Licensing - MechanicalFSAR RAI----------------------------
Engineering -     112236712    FSAR RAI                                                      A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.
Mechanical                      ----------------------------
NRR                                                           [Item 1. of Enclosure 3 of letter T02 110429 003]
Engineering -     111903011    Fire Protection Report            10/01/2011                  TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.
Mechanical                      ----------------------------
NRR                                                          (Item 1. of Enclosure 5 of letter T02 101218 001)
Engineering - 200  NCO080008033 Generic Communications:              / six                    GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs - Submit an Mechanical                      GL 1989-04                        months                    ASME Section XI Inservice Test Program for the first ten year interval six months before receiving
                                --------------------------------   before                    an Operating License.
Regulatory Framework            receiving an
                                -------------------------------- Operating NRR                                License Engineering -     112236713    FSAR RAI                                                      A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.
Mechanical                      ----------------------------
NRR                                                          [Item 2. of Enclosure 3 of letter T02 110429 003]
Engineering -     10175682    Regulatory Framework              10/31/2009                  Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA Mechanical                      ----------------------------                                 provisions for the Unit 2 Solid Waste Management System and information on the Process NRR                                                          Control Program on or before October 31, 2009."
Page 13 of 19                                                                * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRRPage 15 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
DUE DATE        PKG IPS                                                    /         REC'D /
MAXIMO #REQUIRED ACTIONDUE DATE
RESPONSIBLE    #    MAXIMO #             SOURCE                MILESTONE      CLOSED*                                                REQUIRED ACTION Engineering - 213 112054436  Generic Communications:              / within                  TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months Mechanical                    GL 2008-01                        6 months of                  of NRC approval of the Traveler.
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112179288In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN Unit 2.[Item 4. of Enclosure 2 of letter T02 110420 003]NGDFSAR RAI----------------------------
                              ---------------------------------     NRC Regulatory Framework              approval of                 (item 1. of Enclosure 3 of letter T02 110311 005)
NRR112179285TVA will report the results of the hydrology analysis without use of sand baskets or the seismic test of the sand baskets to the NRC by October 31, 2011.[Item 1. of Enclosure 2 of letter T02 110420 003]10/31/2011NGDFSAR RAI----------------------------
                              ----------------------------     the Traveler NRR Engineering -      111895229  RAI - SAMA                                                    TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a Mechanical                    ----------------------------                                   HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to NRR                                                            the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation.      (RAI 4.c Response)
NRR112179286TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis methodology following the completion of the finite element analyses by August 31, 2012.[Item 2. of Enclosure 2 of letter T02 110420 003]08/31/2011NGDFSAR RAI----------------------------
[Item 8. of Enclosure 2 of T02 110131 001]
NRR111906320The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been fabricated to date. The source capsule will be labeled with a unique serial number when fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.
Engineering -      112046718  FSAR RAI                                                      TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of Mechanical                    ----------------------------                                   values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The NRR                                                            correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)
    /    PRIOR to receipt of sourceNGDC LicensingRAI----------------------------
[Item 3. of Enclosure 4 of letter T02 110225 002]
NRR111880355TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor Owners Group prior to September 1, 2011 (SAMA 300).[Item 10. of Enclosure 2. of letter T02 101014 003]09/01/2011OperationsSAMA----------------------------
Engineering -      112061258  Fire Protection Report            04/29/2011                  FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to Mechanical                    -------------                                                 incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual NRR                                                            actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.
NRR110850749TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.SecurityRAI Response  - Physical Security Plan----------------------------
[from Enclosure 5 of letter T02 110316 005]
NRR112046612TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)[Item 7. of Enclosure 4 of letter T02 110225 002]Unit 1 Radiation ProtectionFSAR RAI----------------------------
Engineering -     PER 172598  Fire Protection CAP                                            NCO840187004: Submit cable separation drawings to NRC in conjunction with the detailed Mechanical                    ------------------------                                       Appendix R reanalysis report.
NRR Engineering - 209  111029357  Generic Communications:                  /                    TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to Mechanical                    GL 2004-02                        PRIOR to                    fuel load.
                              --------------------------------   fuel load Regulatory Framework
                              ----------------------------
NRR Engineering -      112068737  FSAR RAI                                                      The FPR will be revised to clarify that this reduction only applies to areas and/or equipment Mechanical                    ----------------------------                                   affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit NRR                                                            is in Modes 1 to 4 inclusive.    [RAI FPR II-8]
[Item 11. of Enclosure 2 of letter T02 110316 004]
Page 14 of 19                                                                * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR111364245Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.[Item 1. of Enclosure 3 of letter T02 100830 004]Unit 2 LicensingRAI Response  - FSAR----------------------------
DUE DATE          PKG IPS                                                        /        REC'D /
NRR111517786Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.[Item 1. of Enclosure 4 of letter # T02 101004 002]Unit 2 LicensingRAI Response  - FSAR----------------------------
RESPONSIBLE      #    MAXIMO #              SOURCE                MILESTONE      CLOSED*                                              REQUIRED ACTION Engineering -      111091647    RAI Response - IPE                                              TVA will provide information regarding how the model and the peer review process addressed the Mechanical                      ----------------------------                                    items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal NRR                                                            flooding for which the NRC position was stated as Qualification.
NRRPage 16 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
[Item . 1 of Enclosure 4 of T02 100608 001.]
MAXIMO #REQUIRED ACTIONDUE  DATE
Engineering -  213  NCO081006001 Generic Communications:                  / 90                  Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a Mechanical                      GL 2008-01                        days PRIOR                    submittal consistent with the information requested in the GL 90 days prior to fuel load. The
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*112046368Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 14)[Item 2. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
                                --------------------------------- to fuel load                submittal will provide: a statement regarding which actions were completed, the schedule for Regulatory Framework                                            completing the remaining actions, and the basis for that schedule."
NRR112046332In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively. These items will be corrected in FSAR Amendment 103.  (Question 9)[Item 1. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
                                ----------------------------
NRR111028208TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-0847 review topics as part of the construction completion and licensing of WBN Unit 2.Unit 2 LicensingRegulatory Framework----------------------------
NRR Engineering -       112068578    FSAR RAI                                                        Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, Mechanical                      ----------------------------                                   TVA will review the information and submit the results for NRC approval if they differ from the NRR                                                            assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required. [RAI FPR V-3]
NRR111033038TVA has revised the Security classification scheme to be consistent with changes being made to the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the use of the phrase "Other security events as determined from (site-specific) Safeguards Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme that reflects these changes for WBN Unit 2. [RAI Response 3.r of Enclosure 2. of T02 100427 001]08/06/2010Unit 2 LicensingRAI Response  - Radiological Emergency Plan----------------------------
[Item 9. of Enclosure 2 of letter T02 110316 004]
NRR111948132A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from the TS Bases for SR 3.8.1.14.(Item 2. Of Enclosure 5 of letter T02 110216 004)Unit 2 LicensingTS  -  TS Bases Supplemental Information----------------------------
Engineering -      112068531    FSAR RAI                                                       Figures representing the as-constructed plant configuration will be provided after construction Mechanical                      ----------------------------                                   completion. [RAI FPR General - 4]
NRR112046424TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error. The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)[Item 6. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
NRR
[Item 6. of Enclosure 2 of letter T02 110316 004]
Insp. Services      NCO080008038 Regulatory Framework                 / within                  Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.
                                ----------------------------       6 months NRR                                    after receiving an operating license Insp. Services      112047866    ASME - Section III to                 / within                  An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation Section XI                          90 days                    for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior
                                ----------------------------       following                  to commercial operation.
NRR                                    Unit 2 commercial                    [Enclosure 2 of T02 101012 001]
operation Licensing -         112164522    FSAR RAI                                                        A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response Mechanical                      ----------------------------                                   to Section 9.2.1 - Question (f).
NRR (Item 1. of Enclosure 2 of letter T02 110413 001)
Licensing -        112164540    FSAR RAI                                                        A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response Mechanical                      ----------------------------                                   to Section 9.2.2 - Question (d).
NRR (Item 2. of Enclosure 2 of letter T02 110413 001)
Page 15 of 19                                                                    * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR112053537If found acceptable by the staff, final Chapter 11 updates will be provided in A104.(last part of item 1. of Enclosure 5 of letter T02 110315 001)Unit 2 LicensingFSAR----------------------------
DUE DATE        PKG IPS                                              /        REC'D /
NRR111948124A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO 3.7.1, REQUIRED ACTION A.1 to "59%."(Item 1. Of Enclosure 5 of letter T02 110216 004)Unit 2 LicensingTS  - TS Bases Supplemental Information----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                  REQUIRED ACTION NGD                  112179288  FSAR RAI                                                In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased
NRRPage 17 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
                                ----------------------------                            height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN NRR                                                      Unit 2.
MAXIMO #REQUIRED ACTIONDUE  DATE
[Item 4. of Enclosure 2 of letter T02 110420 003]
/ MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*NCO080008102TVA plans to submit a waiver request to allow operators to hold a combined operating license for WBN Unit 1 and Unit 2 on or before October 23, 2009.10/23/2009Unit 2 LicensingRegulatory Framework----------------------------
NGD                  112179285  FSAR RAI                    10/31/2011                  TVA will report the results of the hydrology analysis without use of sand baskets or the seismic
NRR112046406Further, comparisons with other models determined that MESOPUFF II is not suitable for calculatinat WBN receptors, and that GELC adequately estimates for WBN receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)[Item 5. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
                                ----------------------------                             test of the sand baskets to the NRC by October 31, 2011.
NRR
[Item 1. of Enclosure 2 of letter T02 110420 003]
NGD                  112179286  FSAR RAI                    08/31/2011                  TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis
                                ----------------------------                            methodology following the completion of the finite element analyses by August 31, 2012.
NRR
[Item 2. of Enclosure 2 of letter T02 110420 003]
NGDC Licensing      111906320  RAI                                /                    The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been
                                ---------------------------- PRIOR to                  fabricated to date. The source capsule will be labeled with a unique serial number when NRR                          receipt of                fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA source                  will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.
Operations          111880355  SAMA                        09/01/2011                  TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor
                                ----------------------------                            Owners Group prior to September 1, 2011 (SAMA 300).
NRR
[Item 10. of Enclosure 2. of letter T02 101014 003]
Security            110850749  RAI Response - Physical                                  TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.
Security Plan
                                ----------------------------
NRR Unit 1 Radiation    112046612  FSAR RAI                                                TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)
Protection                      ----------------------------
NRR                                                      [Item 7. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing    111364245  RAI Response - FSAR                                      Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.
                                ----------------------------
NRR                                                      [Item 1. of Enclosure 3 of letter T02 100830 004]
Unit 2 Licensing    111517786  RAI Response - FSAR                                      Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the
                                ----------------------------                             following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 -
NRR                                                      13 - 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.
[Item 1. of Enclosure 4 of letter # T02 101004 002]
Page 16 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                                05/17/2011


NRR112046388FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to the critical organ from radioiodines, tritium, and particulates is calculated for real pathways existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)[Item 4. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRR112053527TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI questions in separate correspondence.(first part of item 1. of Enclosure 5 of letter T02 110315 001)Unit 2 LicensingFSAR----------------------------
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                REQUIRED ACTION Unit 2 Licensing    112046368  FSAR RAI                                                Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite
NRR111360889TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR after Unit 2 is licensed. [Item 2 of Enclosure 5 of letter T02 100901 002]
                                ----------------------------                           radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 NRR                                                    will be reflected in Amendment 103. (Question 14)
    /     AFTER LICENSEDUnit 2 LicensingFSAR - A100----------------------------
[Item 2. of Enclosure 4 of letter T02 110225 002]
NRR111877289If necessary, any revisions resulting from the above reviews will be provided in a later FSAR amendment.(Item 3. of Enclosure 3 of letter T02 110124 001)Unit 2 LicensingRAI----------------------------
Unit 2 Licensing    112046332  FSAR RAI                                               In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of
                                ----------------------------                           Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively.
NRR                                                    These items will be corrected in FSAR Amendment 103. (Question 9)
[Item 1. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing    111028208  Regulatory Framework                                    TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-
                                ----------------------------                           0847 review topics as part of the construction completion and licensing of WBN Unit 2.
NRR Unit 2 Licensing    111033038  RAI Response -               08/06/2010                TVA has revised the Security classification scheme to be consistent with changes being made to Radiological Emergency                                  the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the Plan                                                    use of the phrase "Other security events as determined from (site-specific) Safeguards
                                ----------------------------                            Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme NRR                                                    that reflects these changes for WBN Unit 2.
[RAI Response 3.r of Enclosure 2. of T02 100427 001]
Unit 2 Licensing    111948132  TS - TS Bases                                          A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of Supplemental Information                                this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for
                                ----------------------------                            performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from NRR                                                    the TS Bases for SR 3.8.1.14.
(Item 2. Of Enclosure 5 of letter T02 110216 004)
Unit 2 Licensing     112046424  FSAR RAI                                                TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error.
                                ----------------------------                           The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR NRR                                                    will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)
[Item 6. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing    112053537  FSAR                                                    If found acceptable by the staff, final Chapter 11 updates will be provided in A104.
                                ----------------------------
NRR                                                    (last part of item 1. of Enclosure 5 of letter T02 110315 001)
Unit 2 Licensing    111948124  TS - TS Bases                                          A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO Supplemental Information                                3.7.1, REQUIRED ACTION A.1 to "59%."
                                ----------------------------
NRR                                                    (Item 1. Of Enclosure 5 of letter T02 110216 004)
Page 17 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                        05/17/2011


NRR112145218Additional unit differences could emerge through field implementation. If significant unit differences emerge, then TVA will provide another updated list, if necessary, when field implementation is complete.[Item 1. of Enclosure 2 of letter T02 110406 005]Unit 2 LicensingList of Design Differences----------------------------
DUE DATE      PKG IPS                                              /        REC'D /
NRR111027916TVA will provide updates to the status of the Regulatory Framework and Generic Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due 07/30/2010]07/30/2010Unit 2 LicensingRegulatory Framework----------------------------
RESPONSIBLE      #    MAXIMO #              SOURCE          MILESTONE    CLOSED*                                                  REQUIRED ACTION Unit 2 Licensing    NCO080008102 Regulatory Framework        10/23/2009                TVA plans to submit a waiver request to allow operators to hold a combined operating license for
NRRPage 18 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
                                  ----------------------------                            WBN Unit 1 and Unit 2 on or before October 23, 2009.
MAXIMO #REQUIRED ACTIONDUE  DATE
NRR Unit 2 Licensing    112046406    FSAR RAI                                                Further, comparisons with other models determined that MESOPUFF II is not suitable for
/  MILESTONESOURCERESPONSIBLEIPS #PKG REC'D / CLOSED*111032952TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we submit the updated plan as committed to in these RAI responses. If changes are made after NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.[RAI Response 1. of Enclosure 2. of T02 100427 001]08/06/2010Unit 2 LicensingRAI Response  - Radiological Emergency Plan
                                  ----------------------------                            calculating /Q values at WBN receptors, and that GELC adequately estimates /Q for WBN NRR                                                    receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)
----------------------------
[Item 5. of Enclosure 4 of letter T02 110225 002]
NRR112046353The FSAR will be revised to eliminate the adjustment factors and use GELC results directly. Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a TritiumProducing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.(Enclosure 2 - Question 11.3.a)[Item 12. of Enclosure 4 of letter T02 110225 002]Unit 2 LicensingFSAR RAI----------------------------
Unit 2 Licensing    112046388    FSAR RAI                                                FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to
NRR 125TOTAL NUMBER OF OPEN ITEMS: Page 19 of 19 05/17/2011* = Date Final Closure Package received by / closed by Licensing.
                                  ----------------------------                           the critical organ from radioiodines, tritium, and particulates is calculated for real pathways NRR                                                    existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)
SSER 22/23 Open Item Plan Item Question/Issue Lead Action Plan (1) letter in folder Review evaluations and corrective actions associated with a power assisted cable pull. (NRC safety evaluation dated August
[Item 4. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing    112053527    FSAR                                                    TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI
                                  ----------------------------                           questions in separate correspondence.
NRR (first part of item 1. of Enclosure 5 of letter T02 110315 001)
Unit 2 Licensing    111360889    FSAR - A100                        /                   TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR
                                  ----------------------------  AFTER                    after Unit 2 is licensed.
NRR                          LICENSED
[Item 2 of Enclosure 5 of letter T02 100901 002]
Unit 2 Licensing    111877289    RAI                                                    If necessary, any revisions resulting from the above reviews will be provided in a later FSAR
                                  ----------------------------                           amendment.
NRR (Item 3. of Enclosure 3 of letter T02 110124 001)
Unit 2 Licensing    112145218    List of Design Differences                              Additional unit differences could emerge through field implementation. If significant unit
                                  ----------------------------                            differences emerge, then TVA will provide another updated list, if necessary, when field NRR                                                    implementation is complete.
[Item 1. of Enclosure 2 of letter T02 110406 005]
Unit 2 Licensing    111027916    Regulatory Framework        07/30/2010                TVA will provide updates to the status of the Regulatory Framework and Generic
                                  ----------------------------                           Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due NRR                                                    07/30/2010]
Page 18 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011


31, 2009, ADAMS Accession No.  
DUE DATE      PKG IPS                                              /        REC'D /
 
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                  REQUIRED ACTION Unit 2 Licensing    111032952  RAI Response -              08/06/2010                TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will Radiological Emergency                                  provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we Plan                                                    submit the updated plan as committed to in these RAI responses. If changes are made after
ML092151155) Const Complete - Addressed by Maximo Commitment Closure package
                                ----------------------------                           NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN NRR                                                    Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.
 
[RAI Response 1. of Enclosure 2. of T02 100427 001]
10181059
Unit 2 Licensing    112046353  FSAR RAI                                                The FSAR will be revised to eliminate the adjustment factors and use GELC results directly.
 
                                ----------------------------                            Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will NRR                                                    be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a Tritium Producing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.
(2) letter in folder Conduct appropriate inspection activities to verify cable lengths used in calculations and analysis match as-installed configuration. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155) Elec Provide NRC Residents access to as-constructed ICRDS database and associated calcs.  
(Enclosure 2 - Question 11.3.a)
 
[Item 12. of Enclosure 4 of letter T02 110225 002]
Due date:02/29/2012 (Khan)
TOTAL NUMBER OF OPEN ITEMS: 125 Page 19 of 19                                                            * = Date Final Closure Package received by / closed by Licensing.                                          05/17/2011


SSER 22/23 Open Item Plan Item  Question/Issue                              Lead                  Action Plan (1)  Review evaluations and corrective actions    Const Complete - Addressed by Maximo letter associated with a power assisted cable            Commitment Closure package in  pull. (NRC safety evaluation dated August          10181059 folder 31, 2009, ADAMS Accession No.
ML092151155)
(2)  Conduct appropriate inspection activities    Elec  Provide NRC Residents access to as-letter to verify cable lengths used in calculations      constructed ICRDS database and in  and analysis match as-installed                    associated calcs.
folder configuration. (NRC safety evaluation dated August 31, 2009, ADAMS                      Due date:02/29/2012 (Khan)
Accession No. ML092151155)
Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.
Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.
(4) letter in folder Conduct appropriate inspection activities to verify that TVA's maximum SWBP criteria for signal level and coaxial cables do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
(4) Conduct appropriate inspection activities   Elec/ Complete - Close to Inspection Report letter to verify that TVAs maximum SWBP           Const 20100604 in  criteria for signal level and coaxial cables folder do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
Elec/ Const Complete - Close to Inspection Report 20100604 (7) letter in folder Verify commitment completion and review electrical design calculations. (TVA letter dated October 9, 1990, ADAMS Accession No. ML073551056) Elec See commitments in TVA Letter.
(7) Verify commitment completion and review     Elec  See commitments in TVA Letter.
Provide NRC Residents a copy of related electrical calculation procedures
letter electrical design calculations. (TVA letter       Provide NRC Residents a copy of in  dated October 9, 1990, ADAMS Accession             related electrical calculation procedures folder No. ML073551056)                                   and provide NRC access to calculations Due date: 8/1/11 (Khan)
 
(9)  Confirm that education and experience of     Lic  Obtain education and experience pg  management and principal supervisory               information from WBN Human 13-2  positions down through the shift                   Resources and provide info to NRC supervisory level conform to Regulatory           Residents.
and provide NRC access to calculations Due date: 8/1/11 (Khan)
Guide 1.8. (Section 13.1.3)
(9)  pg 13-2 Confirm that education and experience of management and principal supervisory positions down through the shift supervisory level conform to Regulatory Guide 1.8. (Section 13.1.3)  
 
Lic Obtain education and experience information from WBN Human Resources and provide info to NRC Residents.
 
Due date: 7/15/11 (Elton)
Due date: 7/15/11 (Elton)
(10) pg 13-2 Confirm that TVA has an adequate number of licensed and non-licensed operators in the training pipeline to support the preoperational test program, fuel loading, and dual unit operation.
(10) Confirm that TVA has an adequate             Ops  Provide submittal that confirms we have pg  number of licensed and non-licensed               adequate personnel in the pipeline.
(Section 13.1.3)  
13-2  operators in the training pipeline to support the preoperational test program,           Due date: 7/15/11 (Wallace) fuel loading, and dual unit operation.
(Section 13.1.3)
(11)  The plant administrative procedures          Ops  Provide NRC Residents copy of pg  should clearly state that, when the                procedure that provides the controls of 13-2  Assistant Shift Engineer assumes his              this function.
duties as Fire Brigade Leader, his control room duties are temporarily assumed by            Due date: 7/15/11 (Wallace)


Ops Provide submittal that confirms we have adequate personnel in the pipeline.
the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)
Due date: 7/15/11 (Wallace)
(12) TVAs implementation of NGDC PP-20           LIC  Provide self assessment related PER pg  and EDCR Appendix J is subject to future           closure packages to Licensing for NRR 25-3 NRC audit and inspection. (Section 25.9)           review.
(11) pg 13-2 The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, his control
 
room duties are temporarily assumed by Ops Provide NRC Residents copy of procedure that provides the controls of this function.
 
Due date: 7/15/11 (Wallace) the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)
(12) pg  25-3 TVA's implementation of NGDC PP-20 and EDCR Appendix J is subject to future NRC audit and inspection. (Section 25.9) LIC Provide self assessment related PER closure packages to Licensing for NRR review.
Due date: 6/15/11 (Smith)
Due date: 6/15/11 (Smith)
(13) pg  3-11 TVA is expected to submit an IST program and specific relief requests for WBN Unit 2 nine months before the projected date of OL issuance. (Section 3.9.6) ISO Provide submittal addressing IST program and relief requests.
(13) TVA is expected to submit an IST program     ISO  Provide submittal addressing IST pg  and specific relief requests for WBN Unit 2       program and relief requests.
 
3-11 nine months before the projected date of OL issuance. (Section 3.9.6)                       Due date: 7/15/11 (Tinley)
Due date: 7/15/11 (Tinley)
(16) Based on the uniqueness of EQ, the NRC       Elec Provide NRC Residents copies of EQ pg  staff must perform a detailed inspection           documents as requested for the onsite 3-12 and evaluation prior to fuel load to               inspections.
(16) pg  3-12 3-13 Based on the uniqueness of EQ, the NRC staff must perform a detailed inspection and evaluation prior to fuel load to determine how the WBN Unit 2 EQ  
3-13 determine how the WBN Unit 2 EQ program complies with the requirements of         Due date: Ongoing Inspection (Khan) 10 CFR 50.49. (Section 3.11.2)
 
(17) The NRC staff should verify the accuracy     Elec Provide NRC Residents copies of EQ pg  of the WBN Unit 2 EQ list prior to fuel           documents as requested for the onsite 3-13 load. (Section 3.11.2.1)                           inspections.
program complies with the requirements of 10 CFR 50.49. (Section 3.11.2)  Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.
 
Due date: Ongoing Inspection (Khan)
(17) pg  3-13 The NRC staff should verify the accuracy of the WBN Unit 2 EQ list prior to fuel load. (Section 3.11.2.1) Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.
Due date: Ongoing Inspection (Khan)
Due date: Ongoing Inspection (Khan)
(19) pg  3-14 The NRC staff should complete its review of TVA's EQ Program procedures for  
(19) The NRC staff should complete its review     Elec Provide NRC Residents copies of EQ pg  of TVAs EQ Program procedures for                 documents as requested for the onsite 3-14 WBN Unit 2 prior to fuel load. (Section           inspection 3.11.2.2.1)
 
Complete - Expect NRC to close in next inspection report (21) The NRC staff should confirm that the         Elec Provide NRC Residents copies of EQ pg  Electrical Penetration Assemblies (EPAs)           documents as requested for the onsite 3-14 are installed in the tested configuration,         inspection and that the feedthrough module is manufactured by the same company and               Due date: 5/20/11 (Khan) is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1)
WBN Unit 2 prior to fuel load. (Section  
(25) Prior to the issuance of an operating         Lic Provide Insurance coverage submittal.
 
pg  license, TVA is required to provide 22-1 satisfactory documentation that it has             Due date: 10/1/11 (Smith) obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (Section 22.3)
3.11.2.2.1) Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection
 
Complete - Expect NRC to close in next inspection report (21) pg  3-14 The NRC staff should confirm that the Electrical Penetration Assemblies (EPAs) are installed in the tested configuration, and that the feedthrough module is manufactured by the same company and is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1) Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection
 
Due date: 5/20/11 (Khan)
(25) pg  22-1 Prior to the issuance of an operating license, TVA is required to provide satisfactory documentation that it has obtained the maximum secondary liability insurance coverage pursuant to 10 CFR  
 
140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the  
 
NRC staff has reviewed and approved the documentation. (Section 22.3) Lic Provide Insurance coverage submittal.
 
Due date: 10/1/11 (Smith)
(29) pg  8-8 Provide a detailed description of the transmission system grid conditions and the operating characteristics of the offsite power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the
 
Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards. The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)  Elec Provide response for submittal to NRR


Due date: 7/15/11 (Hilmes)
(29) Provide a detailed description of the        Elec  Provide response for submittal to NRR pg  transmission system grid conditions and 8-8 the operating characteristics of the offsite      Due date: 7/15/11 (Hilmes) power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards.
(30) pg  8-10 TVA should confirm that all other safety-related equipment (in addition to the Class 1E motors) will have adequate starting and running voltage at the most limiting safety related components (such as motor operated valves, contactors, solenoid valves or relays) at the degraded voltage  
The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)
(30) TVA should confirm that all other safety-   Elec  Provide response for submittal to NRR.
pg  related equipment (in addition to the Class 8-10 1E motors) will have adequate starting             Due date: 8/1/11 (Hilmes) and running voltage at the most limiting safety related components (such as motor           Note: This issue is with Corporate operated valves, contactors, solenoid             Licensing to resolve on Unit 1. Unit 2 valves or relays) at the degraded voltage         resolution will be the same as it is for relay setpoint dropout setting. TVA should        Unit 1.
also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)
(32) TVA should provide to the NRC staff the      Elec  Provide response for submittal to NRR.
pg  details of the administrative limits of EDG 8-14 voltage and speed range, and the basis            Due date: 8/1/11 (Hilmes) for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)
(35) TVA should provide information to the        Mech/ Complete - A104 Update received pg  NRC staff that the CCS will produce          Chem 10-9 feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section 10.4.6)


relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)   Elec Provide response for submittal to NRR.  
(37) The NRC staff will review the combined      REP Submit final Unit 1/2 REP to NRC pg  WBN Unit 1 and 2 Appendix C prior to 13-8 issuance of the Unit 2 OL to confirm (1)        Due date: October 1, 2011 that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement. (Section 13.3.2)
(38) The NRC staff will confirm the availability  REP The Emergency Response Data System pg  and operability of the ERDS for Unit 2          software has previously been modified 13-14 prior to issuance of the Unit 2 OL. (Section     and tested for the Watts Bar Unit 2 13.3.2.6)                                        addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.
Due date: 10/1/11 (39) The NRC staff will confirm the adequacy      REP Provide NRC Residents copies of pg  of the communications capability to              related documents as requested for the 13-14 support dual unit operations prior to            onsite inspection. This item is covered issuance of the Unit 2 OL. (Section              by the response to Item 38 13.3.2.6)
Due date: See Item 38 (40) The NRC staff will confirm the adequacy      REP Perform self assessment to verify pg  of the emergency facilities and equipment        processes and materials in main control 13-15 to support dual unit operations prior to        room, TSC, OSC, EOF and local issuance of the Unit 2 OL. (Section              recivery facility. Provide NRC Residents 13.3.2.8)                                        copies of self assessment documents


Due date: 8/1/11 (Hilmes)  
for the onsite inspection.
Due date: 10/1/11 (41) TVA committed to (1) update plant data      Computer 1) Provide demonstration of capability of pg  displays as necessary to include Unit 2,      Eng    SPDS, ICS and PEDS data system 13-16 and (2) to update dose assessment                    displays for Unit 2.
models to provide capabilities for assessing releases from both WBN units.              Due date:
The NRC staff will confirm the adequacy of these items prior to issuance of the      REP    2) Submit EPIP-13. Describe RED, Unit 2 OL. (Section 13.3.2.9)                        FRED and BRED data systems..
Due date: 10/1/11 (42) The NRC staff will confirm the adequacy    Computer Covered by Item 41 (1) pg  of the accident assessment capabilities to    Eng 13-16 support dual unit operations prior to                Due date: See Item 41(1) issuance of the Unit 2 OL. (Section 13.3.2.9)
(43) Section V of Appendix E to 10 CFR            REP    Submit Unit 1/2 REP implementing pg  Part 50 requires TVA to submit its detailed          procedures (EPIP-1 thru EPIP-17) to 13-23 implementing procedures for its                      NRC emergency plan no less than 180 days before the scheduled issuance of an                  Due date: October 1, 2011 operating license. Completion of this                (Detchemendy) requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)
(47) The NRC staff noted that TVAs changes        Lic  Complete - A104 Update received pg  to Section 6.2.6 in FSAR Amendment 97, 6-12 regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (Section 6.2.6)
(48) The NRC staff should verify that its          LIC    Complete - No TVA action pg  conclusions in the review of FSAR 6-15 Section 15.4.1 do not affect the                      Licensing to address in next SSER conclusions of the staff regarding the              update letter acceptability of Section 6.5.3. (Section


NoteThis issue is with Corporate Licensing to resolve on Unit 1. Unit 2 resolution will be the same as it is for  
6.5.3)
(49)  The NRC staff was unable to determine              Mech  Provide NRC Residents how the refurb letter how TVA linked the training qualification                training requirements are linked to the in  requirements of ANSI N45.2-1971 to TVA                    ANSI standard. Provide the training folder Procedure TI-119. Therefore, the                          records for refurb inspectors.
implementation of training and qualification for inspectors will be the                  Due date: June 15, 2011 (Moll) subject of future NRC staff inspections.
(NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)
(50) TVA stated that about 5 percent of the              Const Notify NRC Residents of anchor bolt pull letter anchor bolts for safety-related pipe                      tests.
in  supports do not have quality control folder documentation, because the pull tests                    Due date: July 1, 2011 (Adair) have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No.
ML101720050)
(51)  The implementation of TVA Procedure TI-            Mech  Provide NRC Residents the results of letter 119 will be the subject of NRC follow-up                  the refurb program.
in  inspection to determine if the construction folder refurbishment program requirements are                    Due date: Ongoing Inspection (Moll) being adequately implemented. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) 52    TVA should provide an update to the FSAR          I&C    Complete - A104 Update received draft  replacing Table 12.2-3 with the expected source strength values of the freshly irradiated IITAs. (Section 12.3) 53    TVA should provide an update to the FSAR          Rad Pro Provide update to FSAR based on draft  reflecting the information provided in its                10/4/10 letter to NRC.
letter dated October 4, 2010, regarding the WBN radiation protection design features,                Due Date: June 15, 2011 (Grim) including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section 12.4) 54    TVA should provide adequate technical            I&C    Provide requested info using correct draft  justification to the staff to relax the frequency        methodology of the radiation monitor channel quarterly operability tests. TVA should provide                    Due Date: June 30, 2011 (Hilmes) sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the


Unit 1.  (32) pg  8-14 TVA should provide to the NRC staff the details of the administrative limits of EDG voltage and speed range, and the basis for its conclusion that the impact is negligible, and describe how it accounts
staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55   TVA should provide sufficient information to   Lic  Complete - Info provided by Question draft the staff to demonstrate that the two area         27 of 2/25/11 letter radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4) 56   TVA should update the FSAR to reflect the     Lic Complete - TVA does not believe an draft information regarding the dose assessment          FSAR update is warranted. The info in program provided in its letter the NRC dated        the 6/3/10 letter is merely confirming June 3, 2010. (Section 12.5)                        that the WBN Unit 1/2 history meets the requirements of the FSAR.
 
57   TVA should update the FSAR to reflect the     Lic  Develop FSAR change from 10/4/10 draft qualification standards of the RPM as               submittal - Question 12-13.
for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)
provided in its letter to the NRC dated October 4, 2010. (Section 12.6)                     Due Date: 5/27/11 (Stockton) 58   The staff has insufficient information to     Lic  Discussion in progress with NRC draft conclude that TVA has taken appropriate             regarding this item versus Item 53 actions to reduce radiation levels and             (apparent contradiction in the increase the capability of operators to             questions).
Elec Provide response for submittal to NRR.
control and mitigate the consequences of an accident at WBN Unit 2, in accordance with         Provide requested info the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant         Due Date:
Due date: 8/1/11 (Hilmes)
operators within the requirements of GDC
(35) pg 10-9 TVA should provide information to the NRC staff that the CCS will produce feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section
: 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1) 59   The staff's evaluation of the compatibility of Mech Complete - Addressed by TVA letter draft the ESF system materials with containment           dated 3/4/11, question 3.o.1 sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4) 60   TVA should amend the FSAR description of       Lic  Complete - A103 provided update draft the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (Section 9.1.3) 61   TVA should provide information to the NRC     Lic  Complete - This will be addressed by a draft staff to demonstrate that PAD 4.0 can               License Condition conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model.
 
10.4.6)  Mech/ Chem Complete - A104 Update received (37) pg 13-8 The NRC staff will review the combined WBN Unit 1 and 2 Appendix C prior to issuance of the Unit 2 OL to confirm (1) that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staff's findings in this SER supplement. (Section 13.3.2)  REP Submit final Unit 1/2 REP to NRC 
 
Due date: October 1, 2011 (38) pg 13-14 The NRC staff will confirm the availability and operability of the ERDS for Unit 2 prior to issuance of the Unit 2 OL. (Section 13.3.2.6)  REP The Emergency Response Data System software has previously been modified and tested for the Watts Bar Unit 2 addition. This unit can be selected from the ERDS menu to send data to the
 
NRC at this time. In addition, the
 
software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been
 
completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit
 
cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been
 
received by the NRC, it would require
 
one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results. 
 
Due date: 10/1/11 (39) pg  13-14 The NRC staff will confirm the adequacy of the communications capability to support dual unit operations prior to issuance of the Unit 2 OL. (Section
 
13.3.2.6)  REP Provide NRC Residents copies of related documents as requested for the onsite inspection. This item is covered
 
by the response to Item 38
 
Due date: See Item 38 (40) pg  13-15 The NRC staff will confirm the adequacy of the emergency facilities and equipment to support dual unit operations prior to issuance of the Unit 2 OL. (Section
 
13.3.2.8)  REP Perform self assessment to verify processes and materials in main control room, TSC, OSC, EOF and local recivery facility. Provide NRC Residents copies of self assessment documents for the onsite inspection.
 
Due date: 10/1/11 (41) pg  13-16 TVA committed to (1) update plant data displays as necessary to include Unit 2, and (2) to update dose assessment models to provide capabilities for assessing releases from both WBN units. The NRC staff will confirm the adequacy of these items prior to issuance of the Unit 2 OL. (Section 13.3.2.9)
Computer Eng REP 1) Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2.
 
Due date:
: 2) Submit EPIP-13. Describe RED, FRED and BRED data systems..
 
Due date: 10/1/11 (42) pg  13-16 The NRC staff will confirm the adequacy of the accident assessment capabilities to support dual unit operations prior to issuance of the Unit 2 OL. (Section
 
13.3.2.9)
Computer Eng  Covered by Item 41 (1)
Due date: See Item 41(1)
(43) pg  13-23 Section V of Appendix E to 10 CFR Part 50 requires TVA to submit its detailed implementing procedures for its emergency plan no less than 180 days before the scheduled issuance of an
 
operating license. Completion of this requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)  REP Submit Unit 1/2 REP implementing procedures (EPIP-1 thru EPIP-17) to NRC  Due date: October 1, 2011 (Detchemendy)
(47) pg  6-12 The NRC staff noted that TVA's changes to Section 6.2.6 in FSAR Amendment 97, regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding
 
performing water-sealed valve leakage tests "as specified in 10 CFR [Part] 50, Appendix J."  With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these
 
requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water
 
testing requirements in a future FSAR amendment.  (Section 6.2.6) Lic Complete - A104 Update received (48) pg  6-15 The NRC staff should verify that its conclusions in the review of FSAR Section 15.4.1 do not affect the conclusions of the staff regarding the acceptability of Section 6.5.3. (Section LIC Complete - No TVA action Licensing to address in next SSER update letter 6.5.3)  (49) letter in folder The NRC staff was unable to determine how TVA linked the training qualification
 
requirements of ANSI N45.2-1971 to TVA
 
Procedure TI-119. Therefore, the implementation of training and qualification for inspectors will be the subject of future NRC staff inspections.
(NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) Mech Provide NRC Residents how the refurb training requirements are linked to the ANSI standard. Provide the training records for refurb inspectors.
 
Due date: June 15, 2011 (Moll)
(50) letter in folder TVA stated that about 5 percent of the anchor bolts for safety-related pipe supports do not have quality control documentation, because the pull tests have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement.  (NRC letter dated July 2, 2010, ADAMS Accession No.
 
ML101720050) Const Notify NRC Residents of anchor bolt pull tests.
Due date: July 1, 2011 (Adair)
(51) letter in folder The implementation of TVA Procedure TI-119 will be the subject of NRC follow-up inspection to determine if the construction
 
refurbishment program requirements are being adequately implemented.  (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) Mech Provide NRC Residents the results of the refurb program.
 
Due date: Ongoing Inspection (Moll) 52 draft TVA should provide an update to the FSAR replacing Table 12.2-3 with the expected source strength val ues of the freshly irradiated IITAs. (Section 12.3)
I&C Complete - A104 Update received
 
53 draft TVA should provide an update to the FSAR reflecting the information provided in its letter dated October 4, 2010, regarding the
 
WBN radiation protection design features, including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section
 
12.4) Rad Pro Provide update to FSAR based on 10/4/10 letter to NRC.
 
Due Date: June 15, 2011 (Grim) 54 draft TVA should provide adequate technical justification to the staff to relax the frequency of the radiation monitor channel quarterly operability tests. TVA should provide sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the I&C Provide requested info using correct methodology
 
Due Date: June 30, 2011 (Hilmes) staff to determine that the licensing or TVA program requirements for the calibration and operability testing of ar ea radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55 draft TVA should provide sufficient information to the staff to demonstr ate that the two area radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or  
 
stored. (Section 12.4)
Lic Complete - Info provided by Question 27 of 2/25/11 letter
 
56 draft TVA should update the FSAR to reflect the information regarding the dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)
Lic Complete - TVA does not believe an FSAR update is warranted. The info in the 6/3/10 letter is merely confirming that the WBN Unit 1/2 history meets the requirements of the FSAR.  
 
57 draft TVA should update the FSAR to reflect the qualification standards of the RPM as provided in its letter to the NRC dated October 4, 2010. (Section 12.6)
Lic Develop FSAR change from 10/4/10 submittal - Question 12-13.
 
Due Date: 5/27/11 (Stockton) 58 draft The staff has insufficient information to conclude that TVA has taken appropriate actions to reduce radiation levels and  
 
increase the capabilit y of operators to control and mitigate the consequences of an accident at WBN Unit 2, in accordance with the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant operators within the requirements of GDC 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is  
 
acceptable. (Section 12.7.1)
Lic Discussion in progress with NRC regarding this item versus Item 53 (apparent contradiction in the questions).
 
Provide requested info
 
Due Date:
59 draft The staff's evaluation of the compatibility of the ESF system materials with containment sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4)Mech Complete - Addressed by TVA letter dated 3/4/11, question 3.o.1 60 draft TVA should amend the FSAR description of the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December  
 
21, 2010, letter to the NRC. (Section 9.1.3) Lic Complete - A103 provided update 61 draft TVA should provide information to the NRC staff to demonstrate that PAD 4.0 can conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model. Lic Complete - This will be addressed by a License Condition (Section 4.2.2.1) 62 draft Confirm TVA's change to FSAR Section 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9) Lic Complete - A103 provided update 63 draft TVA should confirm to the NRC staff that testing prior to Unit 2 fuel load has demonstrated that two-way communications
 
is impossible with the Eagle 21 communications interfac
: e. (Section 7.2.1.1) I&C Provide requested info Due Date: 6/16/11 for plan 64 draft TVA stated that, "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load."    The issue is open pending NRC staff review of the testing results. (Section
 
7.2.1.1) I&C Provide requested info
 
Due Date: Need FDCN date from Westinghouse 65 draft TVA should provide justification to the staff regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and Unit 2. (Section 7.2.1.1) I&C Provide requested info
 
Due Date: 6/15/11 (Hilmes) 66 draft TVA should clarify FSAR Section 9.2.5 to add the capability of t he UHS to bring the non accident unit to cold shutdown within 72 hours. (Section 9.2.5) Lic Complete - A102 provided update to FSAR Section 9.2.2.4 to cover this question for both ERCW and CCS.
67 draft TVA should confirm, and the NRC staff should verify, that the component cooling booster pumps for Unit 2 are above PMF
 
level. (Section 9.2.2) Civil Provide EDCR closure documentation for installation of CCS thermal barrier booster pump dike.
 
Due Date:
68 draft TVA should clarify to the NRC staff how the CSS complies with GDC 5. (Section 9.2.2) Lic Complete - A102 provided update 69 draft The WBN Unit 2 RCS vent system is acceptable, pending verification that the
 
RCS vent system is installed. (Section 5.4.5) Mech Provide EDCR closure documentation for installation of ECCS vents. EDCR numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]
 
Due Date:  See above 70 draft TVA should provide the revised WBN Unit 2 PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER) ISO Provide requested info Due Date: 11/1/11 (Tinley) 71 draft TVA should confirm to the staff the replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut
 
of the cap screw he ad. (Section 3.9.5) Lic Complete - Letter issued 4/21/11 72 draft Based on its review, the staff asked TVA several questions regarding the ICC instrumentation. TVA responded to the staff questions by letter dated October 26, 2010 (ADAMS Accession No. ML103020322).
The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section
 
4.4.8) Lic Open pending NRC review 73 draft The NRC staff will inspect to confirm that TVA has completed the WBN Unit 2 EOPs
 
prior to fuel load. (Section 7.5.3) Ops Provide copies of EOPs for inspection.
Due Date:  (Wallace) 74 draft The NRC staff will verify installation of the acoustic-monitoring system for the power-operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.
(Section 7.8.1) I&C Provide EDCR closure documentation for installation of acoustic monitors.
 
Panels installed 5/18/11 Probes not installed


(Section 4.2.2.1) 62    Confirm TVA's change to FSAR Section            Lic  Complete - A103 provided update draft 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9) 63    TVA should confirm to the NRC staff that        I&C  Provide requested info draft testing prior to Unit 2 fuel load has demonstrated that two-way communications              Due Date: 6/16/11 for plan is impossible with the Eagle 21 communications interface. (Section 7.2.1.1) 64    TVA stated that, "Post modification testing    I&C  Provide requested info draft will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD              Due Date: Need FDCN date from accuracy issue prior to WBN Unit 2 fuel              Westinghouse load." The issue is open pending NRC staff review of the testing results. (Section 7.2.1.1) 65    TVA should provide justification to the staff  I&C  Provide requested info draft regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and                Due Date: 6/15/11 (Hilmes)
Unit 2. (Section 7.2.1.1) 66    TVA should clarify FSAR Section 9.2.5 to        Lic  Complete - A102 provided update to draft add the capability of the UHS to bring the            FSAR Section 9.2.2.4 to cover this non accident unit to cold shutdown within 72          question for both ERCW and CCS.
hours. (Section 9.2.5) 67    TVA should confirm, and the NRC staff          Civil Provide EDCR closure documentation draft should verify, that the component cooling            for installation of CCS thermal barrier booster pumps for Unit 2 are above PMF                booster pump dike.
level. (Section 9.2.2)
Due Date:
Due Date:
75 draft The NRC staff will verify that the test procedures and qualification testing for
68    TVA should clarify to the NRC staff how the     Lic  Complete - A102 provided update draft CSS complies with GDC 5. (Section 9.2.2) 69    The WBN Unit 2 RCS vent system is              Mech  Provide EDCR closure documentation draft acceptable, pending verification that the            for installation of ECCS vents. EDCR RCS vent system is installed. (Section 5.4.5)        numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]
 
Due Date: See above 70    TVA should provide the revised WBN Unit 2      ISO   Provide requested info draft PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include                Due Date: 11/1/11 (Tinley) numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER)
auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2 before fuel load. (Section 7.8.2) PreOp Provide copies of test procedures for inspection.  
 
Due Date:  (Olson) 76 draft The NRC staff will verify that the derivative time constant is set to zero in WBN Unit 2 before fuel load. (Section 7.8.3) I&C Provide EDCR closure documentation for setting of time constant.


71    TVA should confirm to the staff the            Lic  Complete - Letter issued 4/21/11 draft replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut of the cap screw head. (Section 3.9.5) 72    Based on its review, the staff asked TVA      Lic  Open pending NRC review draft several questions regarding the ICC instrumentation. TVA responded to the staff questions by letter dated October 26, 2010 (ADAMS Accession No. ML103020322).
The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section 4.4.8) 73    The NRC staff will inspect to confirm that    Ops  Provide copies of EOPs for inspection.
draft TVA has completed the WBN Unit 2 EOPs prior to fuel load. (Section 7.5.3)                  Due Date: (Wallace) 74    The NRC staff will verify installation of the  I&C  Provide EDCR closure documentation draft acoustic-monitoring system for the power-            for installation of acoustic monitors.
operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.          Panels installed 5/18/11 (Section 7.8.1)                                      Probes not installed Due Date:
75    The NRC staff will verify that the test        PreOp Provide copies of test procedures for draft procedures and qualification testing for            inspection.
auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2          Due Date: (Olson) before fuel load. (Section 7.8.2) 76    The NRC staff will verify that the derivative  I&C  Provide EDCR closure documentation draft time constant is set to zero in WBN Unit 2          for setting of time constant.
before fuel load. (Section 7.8.3)
Due Date:}}
Due Date:}}

Revision as of 18:39, 12 November 2019

2011/05/18 Watts Bar 2 OL - Commitments and Sser Open Items
ML11165A145
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/18/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11165A145 (30)


Text

WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]

Sent: Wednesday, May 18, 2011 5:06 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Bryan, Robert H Jr; Smith, James D; Smith, James D

Subject:

Commitments and SSER Open Items Attachments: 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updated SSER 22-23 Open Items Plan.docx I had Tommy Elton search our commitment tracking database for commitments where we said we would submit something to NRC. The attached list resulted. It does not have the items for the last week (Tommy is behind since he is working on the Tech Spec revision) and it has some items where we have already made the submittal but have not closed the item in the database. I have someone working on cleaning these items up and documenting that they are complete.

I have also attached our version of SSER 22/23 Appendix HH Open Items. The due dates shown are the dates when items have been promised to be provided to TVA Licensing. In general, the date to you would be within about one week of that date. Items shown as Complete means that TVA Licensing has the input and will include the item in the next closure letter. When an item has been submitted to you I remove it from this list. When the organization is highlighted in yellow, the item is an inspection item rather than a submittal item. For these, a package will be provided to the appropriate NRC person.

In the near future we need to start statusing these lists as well as the Bucket List.

William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 386 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F08499DE4)

Subject:

Commitments and SSER Open Items Sent Date: 5/18/2011 5:05:52 PM Received Date: 5/18/2011 5:06:16 PM From: Crouch, William D Created By: wdcrouch@tva.gov Recipients:

"Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 1258 5/18/2011 5:06:16 PM 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf 192905 Updated SSER 22-23 Open Items Plan.docx 32428 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

OPEN COMMITMENTS (ON MAXIMO) - NRR SUBMITTAL REQUIRED DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - 111027893 IPEE / Prior to fuel load, a final report will be submitted following certain validation activities as described Civil ---------------------------- PRIOR to in the IPEEE Design Report (Enclosure 1).

NRR fuel load

[Item 1 of Enclosure 2 of letter T02 100430 002]

Engineering - 112145148 RAI Response - SSER22 NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.

Electrical Open Items (response to action item 33)


NRR [Item 2. of Enclosure 4 of letter T02 110406 004]

Engineering - I 111900262 RAI Response - I and C 01/31/2011 The OM interface, however, creates an additional digital communications path to a non-safety-and C ---------------------------- related system. During the design review, TVA commented that the path needed to be eliminated NRR or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18].

[Item 22 of Enclosure 4 of letter T02 101005 001]

Engineering - I 111901446 RAI Response - I and C The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December and C ---------------------------- 22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA NRR will submit the revised documents within two weeks of receipt from Westinghouse.

(Item 5. of Enclosure 4 of T02 101222 006)

Engineering - I 112116781 FSAR RAI Attachment 8 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, and C ------------- Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original NRR release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.

(Enclosure 4 of letter T02 110331 005)

Engineering - I 112177792 FSAR RAI TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-and C ---------------------------- 1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt NRR from GA-ESI.

(Letter Item #2 [OI-346])

[Item 4. of Enclosure 4 of letter T02 110415 001]

Engineering - I 111334414 RAI Response - FSAR 11/30/2010 A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be and C ---------------------------- submitted to the NRC by November 30, 2010.

NRR

[Item 6. of Enclosure 2 of letter T02 100731 001]

Page 1 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 111620753 RAI Response - I and C 11/30/2010 Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific and C ---------------------------- Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the NRR original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].

[Item 4. of Enclosure 4 of letter T02 101005 001]

Engineering - I 111620928 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.

[Item 1.f. of Enclosure 2 of T02 101026 011]

Engineering - I 111331649 RAI Response - I and C 03/11/2011 Hardware details will be provided when the hardware drawings are updated to the as-built and C ---------------------------- configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA NRR will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse. (RAI Item Number 14 [Matrix Item 120])

[Item 5. from Enclosure 2 of letter T02 100730 002)


10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.

Engineering - I 112250471 RAI The Westinghouse qualification report for the IITAs has not been completed. The proprietary and and C ----- non-proprietary versions and the affidavit for withholding will be submitted within two weeks of NRR receipt from Westinghouse. (Letter Item #14/375 [Item 3])

[Item 7 of Enclosure 4 of letter T02 110506 002]

Engineering - I 112177783 FSAR RAI The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit and C ---------------------------- for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])

NRR

[Item 3. of Enclosure 4 of letter T02 110415 001]

Engineering - I 111620935 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.

[Item 1.g. of Enclosure 2 of T02 101026 011]

Page 2 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 10174938 Eagle-21 Process / The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this and C Protection System PRIOR to survey to the NRC. The submittal will include a description of the methodologies and test


fuel load equipment that were used to perform the survey, a comparison between on-site and factory NRR EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."

Engineering - I 111334372 RAI Response - FSAR 01/14/2011 The qualification for PAMS Cabinet and Components and Main Control Room Components will and C ---------------------------- be submitted to the NRC by January 14, 2011.

NRR

[Item 3. of Enclosure 2 of letter T02 100731 001]

Engineering - I 112177753 FSAR RAI TVA will perform an EMI survey of the containment high range radiation monitors after they are and C ---------------------------- installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being NRR completed. (Letter Item #4 [OI-355])

[Item 1. of Enclosure 4 of letter T02 110415 001]

Engineering - I 112177768 FSAR RAI 04/30/2011 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C ---------------------------- the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:

NRR GA-ESI procedure OP-7.3-240 revision: April 30, 2011 (Letter Item #3 [OI-353])

[Item 2. - first part of Enclosure 4 of letter T02 110415 001]

Engineering - I 111620882 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.

[Item 1.a. of Enclosure 2 of T02 101026 011]

Engineering - I 111620889 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.

[Item 1.b. of Enclosure 2 of T02 101026 011]

Page 3 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 111620770 RAI Response - I and C 12/07/2010 Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of and C ---------------------------- the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing NRR Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66].

[Item 14. of Enclosure 4 of letter T02 101005 001]

Engineering - I 111620967 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.

[Item 1.k. of Enclosure 2 of T02 101026 011]

Engineering - I 111900179 RAI Response - I and C 10/29/2010 The scope of NABU-DP-00014-GEN includes the design and implementation processes for the and C ---------------------------- application development. For a more detailed description of the design process described in NRR NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].

[Item 17. of Enclosure 4 of letter T02 101005 001]

Engineering - I 111620959 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.

[Item 1.j. of Enclosure 2 of T02 101026 011]

Engineering - I 111092634 RAI Response - I AND C 12/03/2010 The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later and C ---------------------------- than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved NRR for SER Approval List, as Item 128.

[Item 6. of Enclosure 2 of letter T02 100621 001]

Engineering - I 111620761 RAI Response - I and C 02/14/2011 The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 and C ---------------------------- Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does NRR include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F].

[Item 11. of Enclosure 4 of letter T02 101005 001]

Page 4 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112043571 FSAR RAIs The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-and C ---------------------------- proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt NRR from GA-ESI. [Cover Letter]

[Item 2. of Enclosure 4 of letter T02 110225 004]

Engineering - I 111620949 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010

[Item 1.h of Enclosure 2 of T02 101026 011]

Engineering - I 111901406 RAI Response - I and C 01/28/2011 The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later and C ---------------------------- than January 28, 2011.

NRR (Item 4. of Enclosure 4 of T02 101222 006)

Engineering - I 112058497 FSAR RAI 03/29/2011 WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, and C ---------------------------- Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.

NRR Engineering - I 10175684 Regulatory Framework 10/31/2009 Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA and C ---------------------------- provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."

NRR Engineering - I 111620955 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.

[Item 1.i. of Enclosure 2 of T02 101026 011]

Engineering - I 111901209 RAI Response - I and C FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a and C ---------------------------- future FSAR amendment.

NRR (Item 3. of Enclosure 4 of T02 101222 006)

Page 5 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112177804 FSAR RAI An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore and C ---------------------------- Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, NRR Hardware Description, will submitted within two weeks of receipt from Westinghouse.

(Letter Item #7 [OI-360])

[Item 5. of Enclosure 4 of letter T02 110415 001]

Engineering - I 111620764 RAI Response - I and C 04/08/2011 Attachment 41 contains the proprietary version of the Common Q Software Requirements and C ---------------------------- Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for NRR withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96].

[Item 16. of Enclosure 4 of letter T02 101005 001]

Engineering - I 112177773 FSAR RAI 09/15/2011 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C ---------------------------- the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:

NRR Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 (Letter Item #3 [OI-353])

[Item 2. - last part of Enclosure 4 of letter T02 110415 001]

Engineering - I 111902413 RAI Response - FSAR The nonproprietary version of Enclosure 4 and the applications for withholding will be provided and C ---------------------------- two weeks after receipt from Westinghouse.

NRR

[RAI 15.0.0 - 1.b]

[Item 14. of Enclosure 6 of letter T02 101210 001]

Engineering - I 111620766 RAI Response - I and C 02/11/2011 The next IV&V report will include the Design Phase Requirements Traceability Matrix. The and C ---------------------------- Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].

NRR

[Item 20. of Enclosure 4 of letter T02 101005 001]

Engineering - I 111620901 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT)

Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.

[Item 1.d. of Enclosure 2 of T02 101026 011]

Page 6 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 111620894 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.

[Item 1.c. of Enclosure 2 of T02 101026 011]

Engineering - I 111331664 RAI Response - I and C 02/25/2011 Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit and C ---------------------------- this report by November 8, 2010, two weeks after receipt from Westinghouse. (RAI Item NRR Number 14 [Matrix Item 120]

[Item 6. from Enclosure 2 of letter T02 100730 002)


10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.

Engineering - I 111621260 RAI Response - I and C 04/29/2011 (Letter Item 9) - This item will be corrected by a design change based on the following:

and C ----------------------------

NRR The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.

(first part of Item 5. of Enclosure 4 of letter T02 101029 002)

Engineering - I 111334376 RAI Response - FSAR 11/30/2010 A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be and C ---------------------------- submitted to the NRC by November 30, 2010.

NRR

[Item 4. of Enclosure 2 of letter T02 100731 001]

Engineering - I 111620922 RAI Response - I and C 04/29/2011 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C ---------------------------- the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR be provided to NRC.

Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.

[Item 1.e. of Enclosure 2 of T02 101026 011]

Page 7 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112249893 FSAR RAI Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS and C -------------- pressure to maintain sub-cooling margin such that natural circulation would not be adversely NRR affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item

33. [NRC Question RAI FPR III-7])

(Item 8. of Enclosure 2. of letter T02 110506 001)

Engineering - I 111334367 RAI Response - FSAR 11/30/2010 The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, and C ---------------------------- 2010.

NRR

[Item 2. of Enclosure 2 of letter T02 100731 001]

Engineering - I 112249887 FSAR RAI It is TVAs position that only qualified personnel are allowed and required to make the decisions and C -------------- as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a NRR and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields. (Letter Item 27. [NRC Question RAI FPR II-36])

(Item 7. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249875 FSAR RAI / The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and and C -------------- PRIOR to the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section NRR fuel load 14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load. (Letter Item 24. [NRC Question (RAI FPR II-34)])

(Item 6. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249865 FSAR RAI A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and and C -------------- 47W920 series) has been performed to determine the correct identification number and fire NRR resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 9. [NRC Question RAI FPR II-19])

(Item 5. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249861 FSAR RAI Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier and C -------------- separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into NRR the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 8. [NRC Question RAI FPR II-18])

(Item 4. of Enclosure 2. of letter T02 110506 001)

Page 8 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112249919 FSAR RAI TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:

and C --------------

NRR [1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,

.

2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
3. Part III, section 4.7 is incorrect. The third paragraph should read: The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 10. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249855 FSAR RAI Table 14.1 contains detectors that are for protection of components and areas required for fire and C -------------- safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven NRR Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])

(Item 3. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249904 FSAR RAI TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:

and C --------------

NRR [1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,

.

2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 9. of Enclosure 2. of letter T02 110506 001)

Page 9 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112249845 FSAR RAI For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be and C -------------- included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI NRR FPR II-14])

(Item 2. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112249817 FSAR RAI TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:

and C --------------

NRR [1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read Unit 1 and 2 Containment Purge Air Exhaust Filters, .
2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 1. of Enclosure 2. of letter T02 110506 001)

Engineering - I 111621250 RAI Response - I and C (Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and and C ---------------------------- Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR after issuance of the EDCR.

(Item 4. of Enclosure 4 of letter T02 101029 002)

Engineering - I 111900989 RAI Response - I and C 03/11/2011 The qualification information on the LPMS softline cable and charge converter/preamplifier will be and C ---------------------------- submitted by March 11, 2011.

NRR (Item 1. of Enclosure 4 of T02 101222 006)

Engineering - I 111334387 RAI Response - FSAR 12/17/2010 A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the and C ---------------------------- NRC by December 17, 2010.

NRR

[Item 5. of Enclosure 2 of letter T02 100731 001]

Engineering - I 166 NCO840165002 Control Room Design / Submit photographs of control panels 120 days after receipt of an operating license.

and C Review SP AFTER


LICENSED Generic Communications:

NUREG-0737, I.D.1


Regulatory Framework


NRR Page 10 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 112043595 FSAR RAIs A FSAR change will be submitted in a future FSAR amendment to change the revision level for and C ---------------------------- WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)]

NRR

[Item 4. of Enclosure 4 of letter T02 110225 004]

Engineering - I 111621236 RAI Response - I and C (Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and and C ---------------------------- Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR after issuance of the EDCR.

(Item 1. of Enclosure 4 of letter T02 101029 002)

Engineering - I 111334419 RAI Response - FSAR 11/15/2010 A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for and C ---------------------------- Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by NRR November 15, 2010.

[Item 7. of Enclosure 2 of letter T02 100731 001]

Engineering - I 111360873 FSAR - A100 A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to and C ---------------------------- provide consistency with the setpoint methodology changes provided in A100 and Technical NRR Specification Tracking Form 493.

[Item 1. of Enclosure 5 of letter T02 100901 002]

Engineering - I 111903557 RAI Response - I and C The nonproprietary versions of Westinghouse documents Post Accident Monitoring System and C ---------------------------- (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test NRR (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.

(Enclosure 3 of letter T02 101203 001)

Engineering - I 112250468 RAI The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification and C ----- Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the NRR affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.

(Letter Item #14/375 [Item 3])

[Item 6 of Enclosure 4 of letter T02 110506 002]

Engineering - I 112250459 RAI Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and and C ----- IEEE 1020-1997. These references will be added to FSAR Table 7.1-1. (Letter Item #11/370)

NRR

[Item 5 of Enclosure 4 of letter T02 110506 002]

Engineering - I 111621243 RAI Response - I and C (Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit and C ---------------------------- Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after NRR issuance of the EDCR.

(Item 2. of Enclosure 4 of letter T02 101029 002)

Page 11 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - I 111901163 RAI Response - I and C The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, and C ---------------------------- Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be NRR corrected in Revision 3 of the document.

(Item 2. of Enclosure 4 of T02 101222 006)

Engineering - I 112249939 FSAR RAI As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 and C -------------- operator manual actions are preventative rather than reactive. That is, they are driven by NRR procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor.

This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision. (Letter Item 43 [NRC Question RAI FPR V-11])

(Item 11. of Enclosure 2. of letter T02 110506 001)

Engineering - I 112250458 RAI The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear and C ----- Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-NRR 00508, Cyber Security Program. (Letter Item #10/368)

[Item 4 of Enclosure 4 of letter T02 110506 002]

Engineering - I 112250453 RAI The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG and C ----- 1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect NRR conformance. (Letter Item #8/366)

[Item 3 of Enclosure 4 of letter T02 110506 002]

Engineering - I 112250445 RAI FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.

and C ----- (Letter Item #6/34 [Item 2])

NRR

[Item 2 of Enclosure 4 of letter T02 110506 002]

Engineering - I 112250439 RAI The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation and C ----- of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR NRR WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #4/362 [Item 1])

[Item 1 of Enclosure 4 of letter T02 110506 002]

Engineering - 112145180 RAI Response - SSER22 Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping Mechanical Open Items within the SGB System exists downstream of the safety-related containment isolation valves.


(response to action item 36)

NRR

[Item 3. of Enclosure 4 of letter T02 110406 004]

Engineering - 112068570 FSAR RAI 04/29/2011 Response to RAI FPR V-2 will be provided by April 29, 2011. [RAI FPR V-2]

Mechanical ----------------------------

NRR [Item 8. of Enclosure 2 of letter T02 110316 004]

Page 12 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - 111334428 RAI Response - FSAR Once the date for issuance of an operating license becomes more certain, TVA will update the Mechanical ---------------------------- sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).

NRR

[Item 9. of Enclosure 2 of letter T02 100731 001]

Engineering - 112068464 FSAR RAI 04/29/2011 The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Mechanical ---------------------------- Part V, which will be provided by April 29, 2011. [RAI FPR General - 2 Item A]

NRR

[Item 1. of Enclosure 2 of letter T02 110316 004]


This tracks the portion due 04/29/2011.

Engineering - 112068520 FSAR RAI 03/16/2011 Attachment 2 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection Mechanical ---------------------------- and suppression system drawings. These drawings will be annotated to reflect changes made to NRR the figures and provided to NRC by March 16, 2011. [RAI FPR General-4]

[Item 5. of Enclosure 2 of letter T02 110316 004]

Engineering - 112046729 FSAR RAI FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the Mechanical ---------------------------- mission dose calculations. (Question 30.1.b)

NRR

[Item 8. of Enclosure 4 of letter T02 110225 002]

Engineering - 112236712 FSAR RAI A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.

Mechanical ----------------------------

NRR [Item 1. of Enclosure 3 of letter T02 110429 003]

Engineering - 111903011 Fire Protection Report 10/01/2011 TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.

Mechanical ----------------------------

NRR (Item 1. of Enclosure 5 of letter T02 101218 001)

Engineering - 200 NCO080008033 Generic Communications: / six GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs - Submit an Mechanical GL 1989-04 months ASME Section XI Inservice Test Program for the first ten year interval six months before receiving


before an Operating License.

Regulatory Framework receiving an


Operating NRR License Engineering - 112236713 FSAR RAI A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.

Mechanical ----------------------------

NRR [Item 2. of Enclosure 3 of letter T02 110429 003]

Engineering - 10175682 Regulatory Framework 10/31/2009 Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA Mechanical ---------------------------- provisions for the Unit 2 Solid Waste Management System and information on the Process NRR Control Program on or before October 31, 2009."

Page 13 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - 213 112054436 Generic Communications: / within TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months Mechanical GL 2008-01 6 months of of NRC approval of the Traveler.


NRC Regulatory Framework approval of (item 1. of Enclosure 3 of letter T02 110311 005)


the Traveler NRR Engineering - 111895229 RAI - SAMA TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a Mechanical ---------------------------- HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to NRR the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation. (RAI 4.c Response)

[Item 8. of Enclosure 2 of T02 110131 001]

Engineering - 112046718 FSAR RAI TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of Mechanical ---------------------------- values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The NRR correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)

[Item 3. of Enclosure 4 of letter T02 110225 002]

Engineering - 112061258 Fire Protection Report 04/29/2011 FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to Mechanical ------------- incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual NRR actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.

[from Enclosure 5 of letter T02 110316 005]

Engineering - PER 172598 Fire Protection CAP NCO840187004: Submit cable separation drawings to NRC in conjunction with the detailed Mechanical ------------------------ Appendix R reanalysis report.

NRR Engineering - 209 111029357 Generic Communications: / TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to Mechanical GL 2004-02 PRIOR to fuel load.


fuel load Regulatory Framework


NRR Engineering - 112068737 FSAR RAI The FPR will be revised to clarify that this reduction only applies to areas and/or equipment Mechanical ---------------------------- affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit NRR is in Modes 1 to 4 inclusive. [RAI FPR II-8]

[Item 11. of Enclosure 2 of letter T02 110316 004]

Page 14 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Engineering - 111091647 RAI Response - IPE TVA will provide information regarding how the model and the peer review process addressed the Mechanical ---------------------------- items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal NRR flooding for which the NRC position was stated as Qualification.

[Item . 1 of Enclosure 4 of T02 100608 001.]

Engineering - 213 NCO081006001 Generic Communications: / 90 Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a Mechanical GL 2008-01 days PRIOR submittal consistent with the information requested in the GL 90 days prior to fuel load. The


to fuel load submittal will provide: a statement regarding which actions were completed, the schedule for Regulatory Framework completing the remaining actions, and the basis for that schedule."


NRR Engineering - 112068578 FSAR RAI Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, Mechanical ---------------------------- TVA will review the information and submit the results for NRC approval if they differ from the NRR assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required. [RAI FPR V-3]

[Item 9. of Enclosure 2 of letter T02 110316 004]

Engineering - 112068531 FSAR RAI Figures representing the as-constructed plant configuration will be provided after construction Mechanical ---------------------------- completion. [RAI FPR General - 4]

NRR

[Item 6. of Enclosure 2 of letter T02 110316 004]

Insp. Services NCO080008038 Regulatory Framework / within Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.


6 months NRR after receiving an operating license Insp. Services 112047866 ASME - Section III to / within An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation Section XI 90 days for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior


following to commercial operation.

NRR Unit 2 commercial [Enclosure 2 of T02 101012 001]

operation Licensing - 112164522 FSAR RAI A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response Mechanical ---------------------------- to Section 9.2.1 - Question (f).

NRR (Item 1. of Enclosure 2 of letter T02 110413 001)

Licensing - 112164540 FSAR RAI A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response Mechanical ---------------------------- to Section 9.2.2 - Question (d).

NRR (Item 2. of Enclosure 2 of letter T02 110413 001)

Page 15 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION NGD 112179288 FSAR RAI In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased


height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN NRR Unit 2.

[Item 4. of Enclosure 2 of letter T02 110420 003]

NGD 112179285 FSAR RAI 10/31/2011 TVA will report the results of the hydrology analysis without use of sand baskets or the seismic


test of the sand baskets to the NRC by October 31, 2011.

NRR

[Item 1. of Enclosure 2 of letter T02 110420 003]

NGD 112179286 FSAR RAI 08/31/2011 TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis


methodology following the completion of the finite element analyses by August 31, 2012.

NRR

[Item 2. of Enclosure 2 of letter T02 110420 003]

NGDC Licensing 111906320 RAI / The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been


PRIOR to fabricated to date. The source capsule will be labeled with a unique serial number when NRR receipt of fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA source will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.

Operations 111880355 SAMA 09/01/2011 TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor


Owners Group prior to September 1, 2011 (SAMA 300).

NRR

[Item 10. of Enclosure 2. of letter T02 101014 003]

Security 110850749 RAI Response - Physical TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.

Security Plan


NRR Unit 1 Radiation 112046612 FSAR RAI TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)

Protection ----------------------------

NRR [Item 7. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 111364245 RAI Response - FSAR Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.


NRR [Item 1. of Enclosure 3 of letter T02 100830 004]

Unit 2 Licensing 111517786 RAI Response - FSAR Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the


following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 -

NRR 13 - 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.

[Item 1. of Enclosure 4 of letter # T02 101004 002]

Page 16 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Unit 2 Licensing 112046368 FSAR RAI Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite


radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 NRR will be reflected in Amendment 103. (Question 14)

[Item 2. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 112046332 FSAR RAI In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of


Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively.

NRR These items will be corrected in FSAR Amendment 103. (Question 9)

[Item 1. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 111028208 Regulatory Framework TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-


0847 review topics as part of the construction completion and licensing of WBN Unit 2.

NRR Unit 2 Licensing 111033038 RAI Response - 08/06/2010 TVA has revised the Security classification scheme to be consistent with changes being made to Radiological Emergency the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the Plan use of the phrase "Other security events as determined from (site-specific) Safeguards


Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme NRR that reflects these changes for WBN Unit 2.

[RAI Response 3.r of Enclosure 2. of T02 100427 001]

Unit 2 Licensing 111948132 TS - TS Bases A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of Supplemental Information this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for


performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from NRR the TS Bases for SR 3.8.1.14.

(Item 2. Of Enclosure 5 of letter T02 110216 004)

Unit 2 Licensing 112046424 FSAR RAI TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error.


The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR NRR will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)

[Item 6. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 112053537 FSAR If found acceptable by the staff, final Chapter 11 updates will be provided in A104.


NRR (last part of item 1. of Enclosure 5 of letter T02 110315 001)

Unit 2 Licensing 111948124 TS - TS Bases A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO Supplemental Information 3.7.1, REQUIRED ACTION A.1 to "59%."


NRR (Item 1. Of Enclosure 5 of letter T02 110216 004)

Page 17 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Unit 2 Licensing NCO080008102 Regulatory Framework 10/23/2009 TVA plans to submit a waiver request to allow operators to hold a combined operating license for


WBN Unit 1 and Unit 2 on or before October 23, 2009.

NRR Unit 2 Licensing 112046406 FSAR RAI Further, comparisons with other models determined that MESOPUFF II is not suitable for


calculating /Q values at WBN receptors, and that GELC adequately estimates /Q for WBN NRR receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)

[Item 5. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 112046388 FSAR RAI FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to


the critical organ from radioiodines, tritium, and particulates is calculated for real pathways NRR existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)

[Item 4. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing 112053527 FSAR TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI


questions in separate correspondence.

NRR (first part of item 1. of Enclosure 5 of letter T02 110315 001)

Unit 2 Licensing 111360889 FSAR - A100 / TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR


AFTER after Unit 2 is licensed.

NRR LICENSED

[Item 2 of Enclosure 5 of letter T02 100901 002]

Unit 2 Licensing 111877289 RAI If necessary, any revisions resulting from the above reviews will be provided in a later FSAR


amendment.

NRR (Item 3. of Enclosure 3 of letter T02 110124 001)

Unit 2 Licensing 112145218 List of Design Differences Additional unit differences could emerge through field implementation. If significant unit


differences emerge, then TVA will provide another updated list, if necessary, when field NRR implementation is complete.

[Item 1. of Enclosure 2 of letter T02 110406 005]

Unit 2 Licensing 111027916 Regulatory Framework 07/30/2010 TVA will provide updates to the status of the Regulatory Framework and Generic


Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due NRR 07/30/2010]

Page 18 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

DUE DATE PKG IPS / REC'D /

RESPONSIBLE # MAXIMO # SOURCE MILESTONE CLOSED* REQUIRED ACTION Unit 2 Licensing 111032952 RAI Response - 08/06/2010 TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will Radiological Emergency provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we Plan submit the updated plan as committed to in these RAI responses. If changes are made after


NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN NRR Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.

[RAI Response 1. of Enclosure 2. of T02 100427 001]

Unit 2 Licensing 112046353 FSAR RAI The FSAR will be revised to eliminate the adjustment factors and use GELC results directly.


Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will NRR be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a Tritium Producing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.

(Enclosure 2 - Question 11.3.a)

[Item 12. of Enclosure 4 of letter T02 110225 002]

TOTAL NUMBER OF OPEN ITEMS: 125 Page 19 of 19 * = Date Final Closure Package received by / closed by Licensing. 05/17/2011

SSER 22/23 Open Item Plan Item Question/Issue Lead Action Plan (1) Review evaluations and corrective actions Const Complete - Addressed by Maximo letter associated with a power assisted cable Commitment Closure package in pull. (NRC safety evaluation dated August 10181059 folder 31, 2009, ADAMS Accession No.

ML092151155)

(2) Conduct appropriate inspection activities Elec Provide NRC Residents access to as-letter to verify cable lengths used in calculations constructed ICRDS database and in and analysis match as-installed associated calcs.

folder configuration. (NRC safety evaluation dated August 31, 2009, ADAMS Due date:02/29/2012 (Khan)

Accession No. ML092151155)

Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.

(4) Conduct appropriate inspection activities Elec/ Complete - Close to Inspection Report letter to verify that TVAs maximum SWBP Const 20100604 in criteria for signal level and coaxial cables folder do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)

(7) Verify commitment completion and review Elec See commitments in TVA Letter.

letter electrical design calculations. (TVA letter Provide NRC Residents a copy of in dated October 9, 1990, ADAMS Accession related electrical calculation procedures folder No. ML073551056) and provide NRC access to calculations Due date: 8/1/11 (Khan)

(9) Confirm that education and experience of Lic Obtain education and experience pg management and principal supervisory information from WBN Human 13-2 positions down through the shift Resources and provide info to NRC supervisory level conform to Regulatory Residents.

Guide 1.8. (Section 13.1.3)

Due date: 7/15/11 (Elton)

(10) Confirm that TVA has an adequate Ops Provide submittal that confirms we have pg number of licensed and non-licensed adequate personnel in the pipeline.

13-2 operators in the training pipeline to support the preoperational test program, Due date: 7/15/11 (Wallace) fuel loading, and dual unit operation.

(Section 13.1.3)

(11) The plant administrative procedures Ops Provide NRC Residents copy of pg should clearly state that, when the procedure that provides the controls of 13-2 Assistant Shift Engineer assumes his this function.

duties as Fire Brigade Leader, his control room duties are temporarily assumed by Due date: 7/15/11 (Wallace)

the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)

(12) TVAs implementation of NGDC PP-20 LIC Provide self assessment related PER pg and EDCR Appendix J is subject to future closure packages to Licensing for NRR 25-3 NRC audit and inspection. (Section 25.9) review.

Due date: 6/15/11 (Smith)

(13) TVA is expected to submit an IST program ISO Provide submittal addressing IST pg and specific relief requests for WBN Unit 2 program and relief requests.

3-11 nine months before the projected date of OL issuance. (Section 3.9.6) Due date: 7/15/11 (Tinley)

(16) Based on the uniqueness of EQ, the NRC Elec Provide NRC Residents copies of EQ pg staff must perform a detailed inspection documents as requested for the onsite 3-12 and evaluation prior to fuel load to inspections.

3-13 determine how the WBN Unit 2 EQ program complies with the requirements of Due date: Ongoing Inspection (Khan) 10 CFR 50.49. (Section 3.11.2)

(17) The NRC staff should verify the accuracy Elec Provide NRC Residents copies of EQ pg of the WBN Unit 2 EQ list prior to fuel documents as requested for the onsite 3-13 load. (Section 3.11.2.1) inspections.

Due date: Ongoing Inspection (Khan)

(19) The NRC staff should complete its review Elec Provide NRC Residents copies of EQ pg of TVAs EQ Program procedures for documents as requested for the onsite 3-14 WBN Unit 2 prior to fuel load. (Section inspection 3.11.2.2.1)

Complete - Expect NRC to close in next inspection report (21) The NRC staff should confirm that the Elec Provide NRC Residents copies of EQ pg Electrical Penetration Assemblies (EPAs) documents as requested for the onsite 3-14 are installed in the tested configuration, inspection and that the feedthrough module is manufactured by the same company and Due date: 5/20/11 (Khan) is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1)

(25) Prior to the issuance of an operating Lic Provide Insurance coverage submittal.

pg license, TVA is required to provide 22-1 satisfactory documentation that it has Due date: 10/1/11 (Smith) obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (Section 22.3)

(29) Provide a detailed description of the Elec Provide response for submittal to NRR pg transmission system grid conditions and 8-8 the operating characteristics of the offsite Due date: 7/15/11 (Hilmes) power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards.

The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)

(30) TVA should confirm that all other safety- Elec Provide response for submittal to NRR.

pg related equipment (in addition to the Class 8-10 1E motors) will have adequate starting Due date: 8/1/11 (Hilmes) and running voltage at the most limiting safety related components (such as motor Note: This issue is with Corporate operated valves, contactors, solenoid Licensing to resolve on Unit 1. Unit 2 valves or relays) at the degraded voltage resolution will be the same as it is for relay setpoint dropout setting. TVA should Unit 1.

also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)

(32) TVA should provide to the NRC staff the Elec Provide response for submittal to NRR.

pg details of the administrative limits of EDG 8-14 voltage and speed range, and the basis Due date: 8/1/11 (Hilmes) for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)

(35) TVA should provide information to the Mech/ Complete - A104 Update received pg NRC staff that the CCS will produce Chem 10-9 feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section 10.4.6)

(37) The NRC staff will review the combined REP Submit final Unit 1/2 REP to NRC pg WBN Unit 1 and 2 Appendix C prior to 13-8 issuance of the Unit 2 OL to confirm (1) Due date: October 1, 2011 that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement. (Section 13.3.2)

(38) The NRC staff will confirm the availability REP The Emergency Response Data System pg and operability of the ERDS for Unit 2 software has previously been modified 13-14 prior to issuance of the Unit 2 OL. (Section and tested for the Watts Bar Unit 2 13.3.2.6) addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.

Due date: 10/1/11 (39) The NRC staff will confirm the adequacy REP Provide NRC Residents copies of pg of the communications capability to related documents as requested for the 13-14 support dual unit operations prior to onsite inspection. This item is covered issuance of the Unit 2 OL. (Section by the response to Item 38 13.3.2.6)

Due date: See Item 38 (40) The NRC staff will confirm the adequacy REP Perform self assessment to verify pg of the emergency facilities and equipment processes and materials in main control 13-15 to support dual unit operations prior to room, TSC, OSC, EOF and local issuance of the Unit 2 OL. (Section recivery facility. Provide NRC Residents 13.3.2.8) copies of self assessment documents

for the onsite inspection.

Due date: 10/1/11 (41) TVA committed to (1) update plant data Computer 1) Provide demonstration of capability of pg displays as necessary to include Unit 2, Eng SPDS, ICS and PEDS data system 13-16 and (2) to update dose assessment displays for Unit 2.

models to provide capabilities for assessing releases from both WBN units. Due date:

The NRC staff will confirm the adequacy of these items prior to issuance of the REP 2) Submit EPIP-13. Describe RED, Unit 2 OL. (Section 13.3.2.9) FRED and BRED data systems..

Due date: 10/1/11 (42) The NRC staff will confirm the adequacy Computer Covered by Item 41 (1) pg of the accident assessment capabilities to Eng 13-16 support dual unit operations prior to Due date: See Item 41(1) issuance of the Unit 2 OL. (Section 13.3.2.9)

(43)Section V of Appendix E to 10 CFR REP Submit Unit 1/2 REP implementing pg Part 50 requires TVA to submit its detailed procedures (EPIP-1 thru EPIP-17) to 13-23 implementing procedures for its NRC emergency plan no less than 180 days before the scheduled issuance of an Due date: October 1, 2011 operating license. Completion of this (Detchemendy) requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)

(47) The NRC staff noted that TVAs changes Lic Complete - A104 Update received pg to Section 6.2.6 in FSAR Amendment 97, 6-12 regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (Section 6.2.6)

(48) The NRC staff should verify that its LIC Complete - No TVA action pg conclusions in the review of FSAR 6-15 Section 15.4.1 do not affect the Licensing to address in next SSER conclusions of the staff regarding the update letter acceptability of Section 6.5.3. (Section

6.5.3)

(49) The NRC staff was unable to determine Mech Provide NRC Residents how the refurb letter how TVA linked the training qualification training requirements are linked to the in requirements of ANSI N45.2-1971 to TVA ANSI standard. Provide the training folder Procedure TI-119. Therefore, the records for refurb inspectors.

implementation of training and qualification for inspectors will be the Due date: June 15, 2011 (Moll) subject of future NRC staff inspections.

(NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)

(50) TVA stated that about 5 percent of the Const Notify NRC Residents of anchor bolt pull letter anchor bolts for safety-related pipe tests.

in supports do not have quality control folder documentation, because the pull tests Due date: July 1, 2011 (Adair) have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No.

ML101720050)

(51) The implementation of TVA Procedure TI- Mech Provide NRC Residents the results of letter 119 will be the subject of NRC follow-up the refurb program.

in inspection to determine if the construction folder refurbishment program requirements are Due date: Ongoing Inspection (Moll) being adequately implemented. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) 52 TVA should provide an update to the FSAR I&C Complete - A104 Update received draft replacing Table 12.2-3 with the expected source strength values of the freshly irradiated IITAs. (Section 12.3) 53 TVA should provide an update to the FSAR Rad Pro Provide update to FSAR based on draft reflecting the information provided in its 10/4/10 letter to NRC.

letter dated October 4, 2010, regarding the WBN radiation protection design features, Due Date: June 15, 2011 (Grim) including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section 12.4) 54 TVA should provide adequate technical I&C Provide requested info using correct draft justification to the staff to relax the frequency methodology of the radiation monitor channel quarterly operability tests. TVA should provide Due Date: June 30, 2011 (Hilmes) sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the

staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55 TVA should provide sufficient information to Lic Complete - Info provided by Question draft the staff to demonstrate that the two area 27 of 2/25/11 letter radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4) 56 TVA should update the FSAR to reflect the Lic Complete - TVA does not believe an draft information regarding the dose assessment FSAR update is warranted. The info in program provided in its letter the NRC dated the 6/3/10 letter is merely confirming June 3, 2010. (Section 12.5) that the WBN Unit 1/2 history meets the requirements of the FSAR.

57 TVA should update the FSAR to reflect the Lic Develop FSAR change from 10/4/10 draft qualification standards of the RPM as submittal - Question 12-13.

provided in its letter to the NRC dated October 4, 2010. (Section 12.6) Due Date: 5/27/11 (Stockton) 58 The staff has insufficient information to Lic Discussion in progress with NRC draft conclude that TVA has taken appropriate regarding this item versus Item 53 actions to reduce radiation levels and (apparent contradiction in the increase the capability of operators to questions).

control and mitigate the consequences of an accident at WBN Unit 2, in accordance with Provide requested info the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant Due Date:

operators within the requirements of GDC

19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1) 59 The staff's evaluation of the compatibility of Mech Complete - Addressed by TVA letter draft the ESF system materials with containment dated 3/4/11, question 3.o.1 sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4) 60 TVA should amend the FSAR description of Lic Complete - A103 provided update draft the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (Section 9.1.3) 61 TVA should provide information to the NRC Lic Complete - This will be addressed by a draft staff to demonstrate that PAD 4.0 can License Condition conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model.

(Section 4.2.2.1) 62 Confirm TVA's change to FSAR Section Lic Complete - A103 provided update draft 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9) 63 TVA should confirm to the NRC staff that I&C Provide requested info draft testing prior to Unit 2 fuel load has demonstrated that two-way communications Due Date: 6/16/11 for plan is impossible with the Eagle 21 communications interface. (Section 7.2.1.1) 64 TVA stated that, "Post modification testing I&C Provide requested info draft will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD Due Date: Need FDCN date from accuracy issue prior to WBN Unit 2 fuel Westinghouse load." The issue is open pending NRC staff review of the testing results. (Section 7.2.1.1) 65 TVA should provide justification to the staff I&C Provide requested info draft regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and Due Date: 6/15/11 (Hilmes)

Unit 2. (Section 7.2.1.1) 66 TVA should clarify FSAR Section 9.2.5 to Lic Complete - A102 provided update to draft add the capability of the UHS to bring the FSAR Section 9.2.2.4 to cover this non accident unit to cold shutdown within 72 question for both ERCW and CCS.

hours. (Section 9.2.5) 67 TVA should confirm, and the NRC staff Civil Provide EDCR closure documentation draft should verify, that the component cooling for installation of CCS thermal barrier booster pumps for Unit 2 are above PMF booster pump dike.

level. (Section 9.2.2)

Due Date:

68 TVA should clarify to the NRC staff how the Lic Complete - A102 provided update draft CSS complies with GDC 5. (Section 9.2.2) 69 The WBN Unit 2 RCS vent system is Mech Provide EDCR closure documentation draft acceptable, pending verification that the for installation of ECCS vents. EDCR RCS vent system is installed. (Section 5.4.5) numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]

Due Date: See above 70 TVA should provide the revised WBN Unit 2 ISO Provide requested info draft PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include Due Date: 11/1/11 (Tinley) numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER)

71 TVA should confirm to the staff the Lic Complete - Letter issued 4/21/11 draft replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut of the cap screw head. (Section 3.9.5) 72 Based on its review, the staff asked TVA Lic Open pending NRC review draft several questions regarding the ICC instrumentation. TVA responded to the staff questions by letter dated October 26, 2010 (ADAMS Accession No. ML103020322).

The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section 4.4.8) 73 The NRC staff will inspect to confirm that Ops Provide copies of EOPs for inspection.

draft TVA has completed the WBN Unit 2 EOPs prior to fuel load. (Section 7.5.3) Due Date: (Wallace) 74 The NRC staff will verify installation of the I&C Provide EDCR closure documentation draft acoustic-monitoring system for the power- for installation of acoustic monitors.

operated relief valve (PORV) position indication in WBN Unit 2 before fuel load. Panels installed 5/18/11 (Section 7.8.1) Probes not installed Due Date:

75 The NRC staff will verify that the test PreOp Provide copies of test procedures for draft procedures and qualification testing for inspection.

auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2 Due Date: (Olson) before fuel load. (Section 7.8.2) 76 The NRC staff will verify that the derivative I&C Provide EDCR closure documentation draft time constant is set to zero in WBN Unit 2 for setting of time constant.

before fuel load. (Section 7.8.3)

Due Date: