MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] |
Text
')
- 1 CONSUMERS POWER COMPANY
Dock:et- -so~2ss- ---------- ----
Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:
I. Changes A. Change Specification 3.0.4 to read as* follows:
"Entry into a reactor operating condition or other specified condition shall not be made when the conditions for the Limiting Conditions for Operation are not met and the associated action requires a shutdown if they are not met within a specified time interval. Entry into a reactor operating condition or other specified condition may be made in accordance with action requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This provision shall not prevent passage through or to reactor operating conditions as required to comply with action requirements. Exceptions to these requirements are stated in the individual specifications."
B. Add Note (g) to items 1 to 6 and 8 to 10 of Table 3.17.1.
"(g) Required *operable if any dutch power supply is energized."
C. Add Note (h) to item 7 of Tabl_e 3. 17. 1.
"(h) Automatically bypassed below 15% power."
D. Add new Specification 4.0.3 to read as follows:
"Failure to perform a Surveillance Requirement within the-allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the operability requirements for a Limiting Condition for Operation. The time limits of the action requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The action requirements may be delayed up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance, when the allowable outage time limits of the action requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performed on inoperable equipment."
E. Add new Specification 4.0.4 to read as follows:
_"Entry into a plant condition or other specified condition shall not
. '.
OC0588-0025-NL02-NL04 8904180334 __ ~~8~~55 PDR ADOCK 0 PDR p -
v
!2
______________bj!__lfill~~-t!_l}l~ss the Surveillance Requirement (s) associated with a Limiting condition--o"f-operation Iia_s_been--pei-f.oiiiie<fwHffln -thest:a-fe_d__ -- - - -
surveillance interval or as otherwise specified. This*provision shall not prevent passage through or to plant conditions as required to comply with action requirements."
F. Add new Specification 4.0.S to read as follows:
"Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:
- a. Inservice inspection of ASME Code Class 1, 2, and 3 '
components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda, as required by 10 CFR 50, Section 50.SSa(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR SO, Section S0.5Sa(g)(6)(i).
- b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Ve~sel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:
ASME Boiler and Pressure Vessei Required frequencies Code and applicable Addenda for performing inservice terminology for inservice inspection and testing inspection and testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days
- c. The provisions of Specification 4.0.2 are applicable to the above required frequencies for performing inservice inspection and testing activities.
- d-. Performance of the above inservice inspection aI).d testing activities shall be in addition to other specified Surveillance Requirements.
- e. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technical Specification."
OCOS88-0025-NL02-NL04
- 3 G. Add NOTE (7) to items l.a. and 13.a. of Table 4.1.1. and add note
- - - .-----------arenir-orfable~----- -- -- ------ -- --- ------ ------- - -- ------ ---------- --- --- ----- ---- -----
"(7) Required if the reactor is critical."
H. Add NOTE (8) to items 4.a. and 5.a. of Table 4.1.1. and add note at end of table.
"(8) Required when PCS is > 1500 psia."
I. Delete NOTE (4) for items lb and 2a of.Table 4.1.2, and add new NOTE (4) for item la (channel check, shift surveillance). Add Note at end of table. *
"(4) Required when PCS is > 1500 psia."
J. Revise Specification 4.3 as follows:
Delete items a, b, c, and d. Remove asterisk from items h and i and remove asterisk footnote.
K. Add new Basis statement for Specification 3.0 and 4.0 as shown on attached page changes.
II. Discussion The above proposed Techni_cal Specifications changes are re'quested in order to conform the Palisades Technical Specifications to Sections 3.0 and 4.0 of the Standard Technical Specifications, as revised by Generic Letter 87-09 dated June 4, 1987. The proposed changes follow the wording changes provided in 9eneric Letter 87-09 with the exception that the words "MODE" or' "OPERATIONAL MODE" are replaced with the words "reactor operating condition". The present Palisades Plant Technical
- Specifications do not use the word MODE (as defined in the Standard Technical Specifications) to describe plant operating status; therefore, this word modification is necessary to conform to the current
- description of reactor operational status provided in the Palisades PlantTechnical Specifications. Incorporation of "MODE" into the Palisades Technical Specifications will be accomplished in our submittal of the restructured Technical Specifications in early 1990. A further discussion of the individual proposed changes is provided below.
A. The current provisions of Palisades Plant Technical Specification 3.0.4 require that the plant shall not enter into ap operational cond~tion or other specified condition unless the requirements of the applicable Limiting Conditions for Operation (LCO) are met, regardless of the provisions of the Action Requirements of the LCO, even when conformance to the Action Requirements would permit continued operation of the plant. The proposed change to Specification 3.0.4 would modify this unduly restrictive statement to allow the continued operation of the plant when conformance to the LCO Action Requirements provides an acceptable level of safety for continued operation.
OC0588-0025-NL02-NL04
v
!'
- 4 B. The instrument operating requirements for the Reactor Protection
---.--- ------------ -----sy-s-tem--ao*-not-**c~ontarn App-1-:rcab11r*ty-requ1rements*--as in--standara ___ -
Technical Specifications. This addition is beneficial for defining when equipment is required to be operable and conversely when it is.
allowed to be out of service.
C. An automatic bypass of the loss of load trip has always existed at less than 15% power but not identified in the Technical Specification.
_D. The current Palisades Plant Technical Specifications do not contain Specification 4.0.3 or an equivalent statement. The addition of Specification 4.0.3 provides conformance to the Generic Letter 87-09 Standard Technical Specifications. In addition, this specification establishes a clear relationship between the Surveillance Requirements for a system and the operability requirements of the Limiting Conditions of Operation for that system.
. E. The current Palisades Plant Technical Specifications do not contain Specification 4.0.4 or an equivalent statement. The addition of Specification-4.0.4 provides conformance to the Standard Technical Specifications.
F. The current Palisades Plant Technical Specifications do not contain Specification 4.0.5, however, portions of Palisades Plant Technical Specifications Section 4.3 contain wording that is equivalent to.
the wording of Section .4.0.5 of the Standard Technical Specifications~ The-addition of Specification 4.0.5 would provide conformance of the Palisades Plant Technical Specifications to the Standard Technical Specifications and would clarify the definition of the frequencies of required surveillance tests.
The present Section 4.3c pertains only to inservice testing of*
Class 1, 2, and 3 pumps as approved in Amendment 53 (October 15, 1979). Consumers Power Company's application, at that time, included requirements for inservice testing of valves, but the NRC had not completed review of applicable valve testing relief request. The pump testing relief requests were approved. Both the pump and valve testing relief requests have since been resubmitted.
(Letters of January 18, 1989 and May 17, 1988.) The proposed **
change in this Technical Specification Change Request includes both pumps and valves. Consumers Power Company's expectation is that the pump arid valve testing relief requests will be acted upon concurrent with the review of this proposed Technical Specifications Change Request. If NRC staff approval of the relief request will not be forthcoming, we request deletion of the last sentence in_
4.0.5a and the last sentence in the Basis pertaining to 4.0.5.
G. The addition of NOTE (7) to items 1.a. and 13.a. of Table 4.1.1.
"Required if the reactor is critical," is made to identify when the surveillances are required.
H. The addition of NOTE (8) to items 4.a and 5.a of Table 4.1.1.,
"Required when PCS is > 1500 psia," is due to the pressurizer pressure instrument range being 1500 to 2500 psia.
OC0588-0025-NL02-NL04
" *
--.--------- --*-r=----EXisting Note ~t-0-rahfe -4;1.-2--1s -obSOiite--a-s --it- per-tainS *ro- a*--- - ------- -----
1981 refueling outage deferral and, therefore, can be removed.
As noted in H above, the pressurizer pressure instrument ranges are from 1500 psia to 2500 psia. A channel check is, therefore, not required below 1500 psia.
J. Proposed change E. would delete those items in the current Technical Specifications which are covered in proposed Specification 4.0.5, or are outdated. The items that are unique to the Palisades Plant surveillance program would be retained in Section 4.3.
K. Proposed change F. 'would add a Basis Statement for Sections 3.0 and 4.0 of the Palisades Technical Specifications. The current Sections 3.0.1 through 3.0.4 do not contain a Basis Statement. The addition of a Basis Statement would ensure that interpretation of Section 3.0 is in conformance with the intent of Specifications 3.0.1 through 3.0.4. The current Palisades Plant Technical Specifications also do not contain a Basis Statement for Sections 4.0.1 and 4.0.2. The addition of a Basis-Statement would ensure that the interpretation of Specifications 4.0.1 through 4.0.5 is in conformance with the intent of these specifications. The Basis for 4.0.3 (last sentence) was modified to indicate that a surveillance is not necessary to declare equipment operable unless the surveillance interval has expired.
Analysis of No Significant Hazards Consideration The changes proposed in this request follow recommendations from Generic Letter 87-09 which were developed to resolve specific problems identified with the general requirements on the applicability of Limiting Conditions for Operation and Surveillance Requirements in Sections 3.0 and 4.0 of the Standard Technical Specifications. The proposed changes to 3.0 and 4.0 also include improved bases statements.
Reactor Protection System (RPS) instrumentation operability requirements have been proposed that are consistent with the Standard Technical Specifications and applicable safety analysis. Exceptions to conditions when certain instrument surveillances are required to be performed have also been added. These latter two changes have been proposed due to
- 4. O. 4 requiring that all applicable surv.eillances be met before entry into an operational condition specified in the Applicability statement unless as otherwise stated. Since the present Technical Specifications do not address RPS applicability or identify when certain surveillances (channel checks) need not be performed, provisions were added to account for these conditions.
The proposed changes to the Technical Specifications do not involve physical changes to the plant. The changes do add requirements for Class 1, 2 and 3 valves which is presently an administratively controlled program at Palisades. Therefore, no additional surveillances are required. The addition of RPS instrumentation operability OC0588-0025-NL02-NL04
- 6 requirements and exceptions to when certain surveillance are required
- ----ar-e-c<:>nsistent-wnn *the pl-ant-- saf-ety-analysis-and -sta:ndar-a--Technica1--
Specifications. Therefore, there is no increase in the probability or consequences of a previously evaluated accident.
Because these proposed changes do not involve modification to the physical condition of the plant, or reduce the operability or applicability of the RPS instrumentation or the surveillance of certain instrumentation with respect to the safety analysis, they do not result in the creation of a new or different kind of accident from any previously evaluated.
The changes to Section 3.0 proposed by this request will permit continued operation of the Plant when conformance to the action requirements of a Specification provides an acceptable level of safety for continued operation. The addition of a Basis statement for Section 3.0 will ensure that interpretation of the Specifications of Section 3.0 is consistent with the intent of those Specifications. The addition of operability/applicability requirements for RPS instrumentation are consistent with safety analysis requirements. The changes to Section 4.0 will place the general requirements of the Surveillance Program as described by 10 CFR 50 together within Section 4.0, rather than in two sections (4.0 and 4.3) as in the current Palisades Technical Specifications. The addition of Specifications 4.0.3, 4.0.4, 4~0.5, and a Basis statement for Section 4.0 serves to increase the definition of the Palisades Plant Surveillance Program and will ensure that interpretation of the Specifications of Section 4.0 meets the intent of those Specifications. The proposed Section 4.0.5 includes inservice testing requirements.for both pumps and valves versus the present 4.3 requirements which are for pumps only. The revisions to Tables 4.1.1 and 4.1.2 allow surveiliances to be omitted when the equipment is not required to be operable. The additions to Sections 3.0 and 4.0 and changes to the instrument operability/applicability requirements, therefore, do not reduce the margin of safety as defined in the basis of the Technical Specifications.
OC0588-0025-NL02-NL04
- 7 III. Conclusion The Palisades Plant Review Committee has reviewed this Technical Specification Change Request and has determined that this change does not involve an unreviewed safety question and, therefore, involves no significant hazards consideration. This change has been reviewed by the Nuclear Safety Board. A copy of this Technical Specification Change Request has been sent to the State of Michigan official designated to receive such Amendments to the Operating License.
CONSUMERS POWER COMPANY By~~~ t:President Nuclear Operations Sworn and subscribed to before me this 3rd day of April, 1989.
Elaine E Buehrer, Notary Public Jackson County, Michigan My commission expires October 31, 1989 OC0588-0025-NL02-NL04