| PNP 2013-042 April 23, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Otto W. Gustafson Licensing Manager Facility Operating License Appendix B, Section 5.4.1
| | ~Entergy Entergy Nuclear Operations, Inc. |
| | Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Otto W. Gustafson Licensing Manager PNP 2013-042 April 23, 2013 Facility Operating License Appendix B, Section 5.4.1 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 2012 Annual Non-radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20 | | 2012 Annual Non-radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP) Annual Non-radiological Environmental Operating Report for 2012. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix B, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1, 2012, through December 31, 2012. This letter contains no new commitments and no revisions to existing commitments. | | |
| Sincerely, OWG/bed | | Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP) |
| | Annual Non-radiological Environmental Operating Report for 2012. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix B, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1, 2012, through December 31, 2012. |
| | This letter contains no new commitments and no revisions to existing commitments. |
| | Sincerely, OWG/bed |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| : 1. 2012 Annual Non radiological Environmental Operating Report 2. Herbicide Treatments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ATTACHMENT 1 2012 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT | | : 1. 2012 Annual Non radiological Environmental Operating Report |
| | : 2. Herbicide Treatments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC |
|
| |
|
| ==1.0 BACKGROUND==
| | ATTACHMENT 1 2012 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT |
|
| |
|
| Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1,2012, through December 31,2012. The PNP operated for 6,770 hours and produced a net total of 5,178,213 MWHe during 2012. This represents 73.2% of the net demonstrated capacity of the design electric rating of 805 MWe. 2.0 ENVIRONMENTAL IMPACT EVALUATIONS Three engineering change documents were evaluated per Entergy Nuclear Operations, Inc. (ENO) procedure, EN-EV-115, "Environmental r Reviews and Evaluations," during 2012. Engineering Change (EC) EC29765 for a H2 Auto-Shutoff valve being installed was reviewed and approved. | | ==1.0 BACKGROUND== |
| | |
| | Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1,2012, through December 31,2012. |
| | The PNP operated for 6,770 hours and produced a net total of 5,178,213 MWHe during 2012. This represents 73.2% of the net demonstrated capacity of the design electric rating of 805 MWe. |
| | 2.0 ENVIRONMENTAL IMPACT EVALUATIONS Three engineering change documents were evaluated per Entergy Nuclear Operations, Inc. (ENO) procedure, EN-EV-115, "Environmental rReviews and Evaluations," during 2012. |
| | Engineering Change (EC) EC29765 for a H2 Auto-Shutoff valve being installed was reviewed and approved. |
| Engineering Change (EC), EC 39579 for the Erection of Permanent Building around 4160V Bus F (EA-23) & Bus G (EA-24) Switchgear House was reviewed and approved to allow construction of the building. | | Engineering Change (EC), EC 39579 for the Erection of Permanent Building around 4160V Bus F (EA-23) & Bus G (EA-24) Switchgear House was reviewed and approved to allow construction of the building. |
| Engineering Change (EC), EC 40702 which modifies the supply and return diesel fuel oil lines connecting the 1-3 Supplemental Diesel Generator (M-1005) and its stationary fuel oil tank (T -1001), was reviewed and approved. | | Engineering Change (EC), EC 40702 which modifies the supply and return diesel fuel oil lines connecting the 1-3 Supplemental Diesel Generator (M-1005) and its stationary fuel oil tank (T-1001), was reviewed and approved. |
| There were no changes, tests, or experiments that involved an unreviewed environmental question and no EPP changes were required. | | There were no changes, tests, or experiments that involved an unreviewed environmental question and no EPP changes were required. |
| 3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES The Alpha Cooling Tower was replaced. | | 3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES The Alpha Cooling Tower was replaced. A new drift study is being performed to allow for calculations related to the amount of water that the new tower disperses. |
| A new drift study is being performed to allow for calculations related to the amount of water that the new tower disperses. | | Page 1 of 2 |
| Page 1 of 2 4.0 UNUSUAL ENVIRONMENTAL EVENTS No unusual environmental events occurred during 2012. 5.0 ENVIRONMENTAL MONITORING Documentation of the effect of cooling tower operation on meteorological variables was required for two years following the conversion from the through cooling system to the cooling towers. Because the cooling towers have been in operation for 38 years, meteorological monitoring and other monitoring activities related to the cooling towers were not required during 2012. A new drift study is being performed for the new cooling tower placed in service in April 2012. Herbicides were not applied to the transmission line exit corridor in 2012. TruGreen treated other areas of the property for vegetation management during 2012. The application of herbicides is documented in Attachment | | |
| : 2. 6.0 NON-ROUTINE REPORTS During 2012, no non-routine reports were generated.
| | 4.0 UNUSUAL ENVIRONMENTAL EVENTS No unusual environmental events occurred during 2012. |
| Page 2 of 2 ATTACHMENT 2 HERBICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date of Treatment: | | 5.0 ENVIRONMENTAL MONITORING Documentation of the effect of cooling tower operation on meteorological variables was required for two years following the conversion from the once-through cooling system to the cooling towers. Because the cooling towers have been in operation for 38 years, meteorological monitoring and other monitoring activities related to the cooling towers were not required during 2012. A new drift study is being performed for the new cooling tower placed in service in April 2012. Herbicides were not applied to the transmission line exit corridor in 2012. |
| April 10, 2012 May 11, 2012 June 8, 2012 June 14,2012 July 23, 2012 August 28, 2012 August 30, 2012 October 27,2012 (120 gallons applied) (120 gallons applied) (300 gallons applied) (120 gallons applied) (300 pounds applied) (300 gallons applied) (120 gallons applied) (120 gallons applied) Commercial Names of Products in Solution: | | TruGreen treated other areas of the property for vegetation management during 2012. The application of herbicides is documented in Attachment 2. |
| Dimension, Merit, Tru Power 3 Polaris, Pendulum, Razor, Barricade, Tripower Chemical Names of Products: | | 6.0 NON-ROUTINE REPORTS During 2012, no non-routine reports were generated. |
| Dimension* | | Page 2 of 2 |
| Dimethyl 2-(difluoromethyl)-4-(2-methylpropyl)-6-(trifluoromethyl)-3, 5-pyridinedicarbothioate) | | |
| Merit-1-<<6-Chloro-3-pyridinyl) methyl)-N-nitro-imidazolidinimine Tru power 3-Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid Polaris-Isopropylamine of salt imazapyr: | | ATTACHMENT 2 HERBICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date of Treatment: April 10, 2012 (120 gallons applied) |
| (2-(4,5-Dihydro-4-Methyl-4-(1-methylethyl) oxo-1 H-imidozol-2-yl)-3 Pyridinecarbozylic acid) Pendulum-Pendimethalin: | | May 11, 2012 (120 gallons applied) |
| (1-ethylpicopial) | | June 8, 2012 (300 gallons applied) |
| -(3,4-Dimethyl-2,6 dinitrobenzenizimine) | | June 14,2012 (120 gallons applied) |
| Razor: -Glyphosate, N(phosphonomethly) glycine, in the form of its isoprophlamine salt Barricade: | | July 23, 2012 (300 pounds applied) |
| -Prodiamine Tripower: | | August 28, 2012 (300 gallons applied) |
| Dimethyliamine salt of 2-methyl4-chloicophenoxy acid, Dimethalyne salt of (+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid) Page 1 of 2 Concentration of Active Ingredient in Field Use Mix: One solution was mixed together that contained the following: | | August 30, 2012 (120 gallons applied) |
| | October 27,2012 (120 gallons applied) |
| | Commercial Names of Products in Solution: Dimension, Merit, Tru Power 3 Polaris, Pendulum, Razor, Barricade, Tripower Chemical Names of Products: |
| | Dimension* Dimethyl 2-(difluoromethyl)-4-(2-methylpropyl)-6-(trifluoromethyl)-3, 5-pyridinedicarbothioate) |
| | Merit- 1-<<6-Chloro-3-pyridinyl) methyl)-N-nitro-imidazolidinimine Tru power 3- Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid Polaris- Isopropylamine of salt imazapyr: (2-(4,5-Dihydro-4-Methyl-4-(1-methylethyl) oxo-1 H-imidozol-2-yl)-3 Pyridinecarbozylic acid) |
| | Pendulum-Pendimethalin: (1-ethylpicopial) -(3,4-Dimethyl-2,6 dinitrobenzenizimine) |
| | Razor: -Glyphosate, N(phosphonomethly) glycine, in the form of its isoprophlamine salt Barricade: - Prodiamine Tripower: Dimethyliamine salt of 2- methyl4-chloicophenoxy acid, Dimethalyne salt of |
| | (+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid) |
| | Page 1 of 2 |
| | |
| | Concentration of Active Ingredient in Field Use Mix: |
| | One solution was mixed together that contained the following: |
| 12 oz. per 50 gallons per acre (Merit) applied to 2.3 acres Two solutions were mixed together that contained the following: | | 12 oz. per 50 gallons per acre (Merit) applied to 2.3 acres Two solutions were mixed together that contained the following: |
| 25 oz. per 50 gallons per acre (Tru power 3) applied to 2.3 acres Diluting Substance: | | 25 oz. per 50 gallons per acre (Tru power 3) applied to 2.3 acres Diluting Substance: Water for wet applications No dilutions for dry applications Rate of Application: 50 gallons per acre liquid application (Merit, Tru power 3, Tripower, Barricade, Dimension) 87 gallons per acre liquid application (Razor, Pendulum, Polaris) 204 Ibs per acre applied of dry fertilizer Total Amount Used: 1200 Gallons total volume used for liquid treatment 300 Pounds total volume used for dry treatment Method of Application: Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, parking lots, Containment areas, substations, cooling towers, protected area, and microwave zones. |
| Water for wet applications No dilutions for dry applications Rate of Application: | | Purpose of Treatment: Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broad leaf vegetation Page 2 of 2}} |
| 50 gallons per acre liquid application (Merit, Tru power 3, Tripower, Barricade, Dimension) 87 gallons per acre liquid application (Razor, Pendulum, Polaris) 204 Ibs per acre applied of dry fertilizer Total Amount Used: 1200 Gallons total volume used for liquid treatment 300 Pounds total volume used for dry treatment Method of Application: | |
| Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application: | |
| Throughout the year as needed Location: | |
| Along and near roadways, fence lines, walkways, parking lots, Containment areas, substations, cooling towers, protected area, and microwave zones. Purpose of Treatment: | |
| Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broad leaf vegetation Page 2 of 2}} | |
|
---|
Category:Annual Operating Report
MONTHYEARML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-020, Submittal of Annual Report of Changes in Emergency Core Cooling System Models2019-04-0808 April 2019 Submittal of Annual Report of Changes in Emergency Core Cooling System Models ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2018-021, Submittal of 2017 Annual Non-Radiological Environmental Operating Report2018-04-20020 April 2018 Submittal of 2017 Annual Non-Radiological Environmental Operating Report PNP 2018-022, Annual Report of Changes in Emergency Core Cooling System Models2018-04-0909 April 2018 Annual Report of Changes in Emergency Core Cooling System Models ML18347B2982018-04-0303 April 2018 1997 Annual Non-Radiological Environment Operating Report ML18347B2992018-04-0303 April 2018 1996 Annual Non-Radiological Environmental Operating Report PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes2017-10-12012 October 2017 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2017-023, Annual Report of Changes in Emergency Core Cooling System Models2017-05-24024 May 2017 Annual Report of Changes in Emergency Core Cooling System Models PNP 2016-030, Annual Report of Changes in Emergency Core Cooling System Models2016-04-20020 April 2016 Annual Report of Changes in Emergency Core Cooling System Models PNP 2015-082, Report of Changes, Tests and Experiments and Summary of Commitment Changes2015-10-14014 October 2015 Report of Changes, Tests and Experiments and Summary of Commitment Changes CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-031, Report of Changes in Emergency Core Cooling System Models2013-04-11011 April 2013 Report of Changes in Emergency Core Cooling System Models CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0914002032009-05-20020 May 2009 Submittal of Annual Report of Changes in Emergency Core Cooling System Models and 30-Day Report for Large and Small Break LOCA ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0910602482009-04-15015 April 2009 Annual Non-Radiological Environmental Operating Report CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ML0810805412008-04-17017 April 2008 2007 Nonradiological Environmental Operating Report ML0809804222008-04-0707 April 2008 Generator Tube Inspection Report ML0617301082006-06-21021 June 2006 Annual Report of Changes in Emergency Core Cooling System Models ML0435102052004-12-0808 December 2004 Annual Report of Changes in Emergency Core Cooling System Models ML18347A5031995-09-11011 September 1995 1994 Annual Report of Facility Changes, Tests and Experiments. ML18347B1911986-04-15015 April 1986 1985 Radiological Environmental Monitoring Report 2022-04-14
[Table view] Category:Environmental Monitoring Report
MONTHYEARPNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report ML21111A1792021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report PNP 2020-017, 2019 Annual Non-Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Annual Non-Radiological Environmental Operating Report PNP 2020-012, 2019 Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Radiological Environmental Operating Report PNP 2019-016, & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report2019-04-24024 April 2019 & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2019-019, Annual Non-Radiological Environmental Operating Report2019-03-26026 March 2019 Annual Non-Radiological Environmental Operating Report PNP 2018-058, Independent Spent Fuel Storage Installation Radioactive Effluent Release2018-12-10010 December 2018 Independent Spent Fuel Storage Installation Radioactive Effluent Release ML18187A0302018-07-23023 July 2018 Cooling Tower Retrofit Is Feasible and Cost-Effective PNP 2017-029, Transmittal of 2016 Radiological Environmental Operating Report2017-05-10010 May 2017 Transmittal of 2016 Radiological Environmental Operating Report PNP 2017-027, Submittal of 2016 Annual Non-Radiological Environmental Operating Report2017-04-28028 April 2017 Submittal of 2016 Annual Non-Radiological Environmental Operating Report PNP 2017-009, Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report2017-04-28028 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2016-063, Mitigating Strategies Assessment for Flooding Submittal2016-12-19019 December 2016 Mitigating Strategies Assessment for Flooding Submittal ML16139A0492016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 1 of 4 ML16139A0532016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 4 of 4 PNP 2016-032, 2015 Radiological Environmental Operating Report. Part 2 of 42016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 2 of 4 ML16139A0522016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 3 of 4 PNP 2016-031, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report PNP 2016-024, Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report2016-04-25025 April 2016 Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2015-028, 2014 Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Radiological Environmental Operating Report PNP 2015-027, Submittal of 2014 Annual Non-Radiological Environmental Operating Report2015-04-27027 April 2015 Submittal of 2014 Annual Non-Radiological Environmental Operating Report PNP 2015-029, Annual Radioactive Effluent Release and Waste Disposal Report2015-04-27027 April 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-040, 2013 Radiological Environmental Operating Report2014-05-15015 May 2014 2013 Radiological Environmental Operating Report PNP 2014-044, & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report2014-04-30030 April 2014 & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-037, 2013 Personnel Exposure and Monitoring Report2014-04-10010 April 2014 2013 Personnel Exposure and Monitoring Report PNP 2013-043, Radiological Environmental Operating Report, January 1, 2012 Through December 31, 20122013-05-0606 May 2013 Radiological Environmental Operating Report, January 1, 2012 Through December 31, 2012 PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report ML12215A3362012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Attachment 4 Through End PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML12179A3022012-05-14014 May 2012 Radiological Environmental Operating Report for 2011 PNP 2012-032, & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report2012-04-26026 April 2012 & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report ML12121A0082012-04-26026 April 2012 Submittal of 2011 Annual Non-radiological Environmental Operating Report PNP 2011-038, 2010 Annual Radioactive Effluent Release and Waste Disposal Report2011-05-0202 May 2011 2010 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1015303032010-05-14014 May 2010 Submittal of 2009 Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0912006752009-04-29029 April 2009 Palisade - Submittal of 2008 Personnel Exposure and Monitoring Report ML0813002532008-04-29029 April 2008 2007 Annual Radioactive Effluent Release and Waste Disposal Report ML0714303492007-05-10010 May 2007 2006 Radiological Environmental Operating Report ML0712903512007-04-26026 April 2007 Submittal of 2006 Annual Radioactive Effluent Release and Waste Disposal Report ML0708608042007-03-27027 March 2007 Nonradiological Environmental Operating Report 2023-04-25
[Table view] Category:Letter type:PNP
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
~Entergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Otto W. Gustafson Licensing Manager PNP 2013-042 April 23, 2013 Facility Operating License Appendix B, Section 5.4.1 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
2012 Annual Non-radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP)
Annual Non-radiological Environmental Operating Report for 2012. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix B, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1, 2012, through December 31, 2012.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, OWG/bed
Attachment:
- 1. 2012 Annual Non radiological Environmental Operating Report
- 2. Herbicide Treatments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT 1 2012 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT
1.0 BACKGROUND
Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1,2012, through December 31,2012.
The PNP operated for 6,770 hours0.00891 days <br />0.214 hours <br />0.00127 weeks <br />2.92985e-4 months <br /> and produced a net total of 5,178,213 MWHe during 2012. This represents 73.2% of the net demonstrated capacity of the design electric rating of 805 MWe.
2.0 ENVIRONMENTAL IMPACT EVALUATIONS Three engineering change documents were evaluated per Entergy Nuclear Operations, Inc. (ENO) procedure, EN-EV-115, "Environmental rReviews and Evaluations," during 2012.
Engineering Change (EC) EC29765 for a H2 Auto-Shutoff valve being installed was reviewed and approved.
Engineering Change (EC), EC 39579 for the Erection of Permanent Building around 4160V Bus F (EA-23) & Bus G (EA-24) Switchgear House was reviewed and approved to allow construction of the building.
Engineering Change (EC), EC 40702 which modifies the supply and return diesel fuel oil lines connecting the 1-3 Supplemental Diesel Generator (M-1005) and its stationary fuel oil tank (T-1001), was reviewed and approved.
There were no changes, tests, or experiments that involved an unreviewed environmental question and no EPP changes were required.
3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES The Alpha Cooling Tower was replaced. A new drift study is being performed to allow for calculations related to the amount of water that the new tower disperses.
Page 1 of 2
4.0 UNUSUAL ENVIRONMENTAL EVENTS No unusual environmental events occurred during 2012.
5.0 ENVIRONMENTAL MONITORING Documentation of the effect of cooling tower operation on meteorological variables was required for two years following the conversion from the once-through cooling system to the cooling towers. Because the cooling towers have been in operation for 38 years, meteorological monitoring and other monitoring activities related to the cooling towers were not required during 2012. A new drift study is being performed for the new cooling tower placed in service in April 2012. Herbicides were not applied to the transmission line exit corridor in 2012.
TruGreen treated other areas of the property for vegetation management during 2012. The application of herbicides is documented in Attachment 2.
6.0 NON-ROUTINE REPORTS During 2012, no non-routine reports were generated.
Page 2 of 2
ATTACHMENT 2 HERBICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date of Treatment: April 10, 2012 (120 gallons applied)
May 11, 2012 (120 gallons applied)
June 8, 2012 (300 gallons applied)
June 14,2012 (120 gallons applied)
July 23, 2012 (300 pounds applied)
August 28, 2012 (300 gallons applied)
August 30, 2012 (120 gallons applied)
October 27,2012 (120 gallons applied)
Commercial Names of Products in Solution: Dimension, Merit, Tru Power 3 Polaris, Pendulum, Razor, Barricade, Tripower Chemical Names of Products:
Dimension* Dimethyl 2-(difluoromethyl)-4-(2-methylpropyl)-6-(trifluoromethyl)-3, 5-pyridinedicarbothioate)
Merit- 1-<<6-Chloro-3-pyridinyl) methyl)-N-nitro-imidazolidinimine Tru power 3- Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid Polaris- Isopropylamine of salt imazapyr: (2-(4,5-Dihydro-4-Methyl-4-(1-methylethyl) oxo-1 H-imidozol-2-yl)-3 Pyridinecarbozylic acid)
Pendulum-Pendimethalin: (1-ethylpicopial) -(3,4-Dimethyl-2,6 dinitrobenzenizimine)
Razor: -Glyphosate, N(phosphonomethly) glycine, in the form of its isoprophlamine salt Barricade: - Prodiamine Tripower: Dimethyliamine salt of 2- methyl4-chloicophenoxy acid, Dimethalyne salt of
(+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid)
Page 1 of 2
Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
12 oz. per 50 gallons per acre (Merit) applied to 2.3 acres Two solutions were mixed together that contained the following:
25 oz. per 50 gallons per acre (Tru power 3) applied to 2.3 acres Diluting Substance: Water for wet applications No dilutions for dry applications Rate of Application: 50 gallons per acre liquid application (Merit, Tru power 3, Tripower, Barricade, Dimension) 87 gallons per acre liquid application (Razor, Pendulum, Polaris) 204 Ibs per acre applied of dry fertilizer Total Amount Used: 1200 Gallons total volume used for liquid treatment 300 Pounds total volume used for dry treatment Method of Application: Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, parking lots, Containment areas, substations, cooling towers, protected area, and microwave zones.
Purpose of Treatment: Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broad leaf vegetation Page 2 of 2