| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 | | {{#Wiki_filter:UNITED STATES anuary 22, 2015 |
|
| |
|
| KING OF PRUSSIA, PENNSYLVANIA 19406-2713 January 2 2, 2015 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC
| | ==SUBJECT:== |
| - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2
| | HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000354/2014403, 05000272/2014403 AND 05000311/2014403 |
| - NRC SECURITY INSPECTION REPORT 05000354/2014 403, 05000272/2014403 AND 05000311/2014403 Dear Mr. Joyce
| |
| :
| |
| On December 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and On December 19, 2014
| |
| , the NRC inspectors discussed the results of this inspection with Mr. Peter Tocci, Director of Security , and other members of your staf Inspectors documented the results of this inspection in the enclosed inspection repor NRC inspectors documented two finding s of very low security significance (Green) in this repor If you contest the findings, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington
| |
| , DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspector s at the Hope Creek Generating Station and Salem Nuclear Generating Station
| |
| .
| |
| Two cross-cutting aspect s were assigned to the findings in the area of Human Performanc Specifically, because PSEG Nuclear failed to implement appropriate error reduction tools (H.12), and failed to create and maintain complete, accurate and, up-to-date documentation (H.7). If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; and the NRC resident inspector s at the Hope Creek Generating Station and Salem Nuclear Generating Station
| |
| . Enclosure contains Sensitive Unclassified Non-Safeguards Informatio When separated from enclosure, the transmittal document is decontrolle T. Joyce 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) | | ==Dear Mr. Joyce:== |
| and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your respons | | On December 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2. On December 19, 2014, the NRC inspectors discussed the results of this inspection with Mr. Peter Tocci, Director of Security, and other members of your staff. |
| | |
| | Inspectors documented the results of this inspection in the enclosed inspection report. |
| | |
| | NRC inspectors documented two findings of very low security significance (Green) in this report. |
| | |
| | If you contest the findings, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station. |
| | |
| | Two cross-cutting aspects were assigned to the findings in the area of Human Performance. |
| | |
| | Specifically, because PSEG Nuclear failed to implement appropriate error reduction tools (H.12), and failed to create and maintain complete, accurate and, up-to-date documentation (H.7). If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station. |
| | |
| | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Anthony Dimitriadis | | /RA/ |
| , Chief Plant Support Branch 1 Division of Reactor Safety Docket No , 50-272 , and 50-311 License No NPF-57, DPR-70 , and DPR-75 Nonpublic Enclosure: | | Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-354, 50-272, and 50-311 License Nos. NPF-57, DPR-70, and DPR-75 Nonpublic Enclosure: |
| Inspection Report 05000 3 5 4/20 14 403, 05000 272/20 14 40 3 , and 05000311/2014403 w/Attachment: Supplemental Information (OU O-SRI) cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI: P. Davison, Vice President Hope Creek J. Perry, Vice President, Salem P. Tocci, Director Security P. Baldauf, Director, NJ Radiation Protection Programs F. Fisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health | | Inspection Report 05000354/2014403, 05000272/2014403, and 05000311/2014403 w/Attachment: Supplemental Information (OUO-SRI) |
| | | cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI: |
| ML15023A210 (Cover letter) | | P. Davison, Vice President Hope Creek J. Perry, Vice President, Salem P. Tocci, Director Security P. Baldauf, Director, NJ Radiation Protection Programs F. Fisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health ML15023A210 (Cover letter) |
| ADAMS ACCESSION NUMBER: | | ADAMS ACCESSION NUMBER: ML15023A215 (Cover letter w/enclosure) |
| ML15023A215 (Cover letter w/enclosure) | | Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JBream JCherubini GDentel ADimitriadis DATE 1/13/2015 1/21/2015 1/21/2015 1/21/2015 1/22/2015 Distribution w/o encl; w/o OUO-SRI: (via E-Mail) |
| Cover Letter | | D. Dorman, RA (R1ORAMAIL RESOURCE) |
| : SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS R I/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JBream JCherubini GDentel ADimitriadis DATE 1/13/2015 1/21/2015 1/21/2015 1/21/2015 1/22/2015 T. Joyce 3 Distribution w/o encl; w/o OUO-SRI: (via E-Mail) D. Dorman, RA (R1ORAMAIL RESOURCE) | |
| D. Lew, DRA (R1ORAMAIL RESOURCE) | | D. Lew, DRA (R1ORAMAIL RESOURCE) |
| H. Nieh, DRP (R1DRPMAIL RESOURCE) | | H. Nieh, DRP (R1DRPMAIL RESOURCE) |
Line 49: |
Line 54: |
| R. Lorson, DRS (R1DRSMAIL RESOURCE) | | R. Lorson, DRS (R1DRSMAIL RESOURCE) |
| J. Trapp, DRS (R1DRSMAIL RESOURCE) | | J. Trapp, DRS (R1DRSMAIL RESOURCE) |
| G. Dentel, DRP R. Barkley, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI S. Haney, DRP, RI A. Ziedonis, DRP, RI M. Draxton, DRP C. Highley, DRP C. O tt, DRP, AA K. MorganButler, RI OEDO RidsNrrPMSalem Resource RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Distribution w/encl; w/OUO-SRI: (via E-Mail) J. Cherubi ni, DRS A. Dimitriadis, DRS G. Dentel, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV | | G. Dentel, DRP R. Barkley, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI S. Haney, DRP, RI A. Ziedonis, DRP, RI M. Draxton, DRP C. Highley, DRP C. Ott, DRP, AA K. MorganButler, RI OEDO RidsNrrPMSalem Resource RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Distribution w/encl; w/OUO-SRI: (via E-Mail) |
| | J. Cherubini, DRS A. Dimitriadis, DRS G. Dentel, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment ML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24197A0552024-07-15015 July 2024 Requalification Program Inspection ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 2024-09-05
[Table view] |
Text
UNITED STATES anuary 22, 2015
SUBJECT:
HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000354/2014403, 05000272/2014403 AND 05000311/2014403
Dear Mr. Joyce:
On December 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2. On December 19, 2014, the NRC inspectors discussed the results of this inspection with Mr. Peter Tocci, Director of Security, and other members of your staff.
Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented two findings of very low security significance (Green) in this report.
If you contest the findings, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station.
Two cross-cutting aspects were assigned to the findings in the area of Human Performance.
Specifically, because PSEG Nuclear failed to implement appropriate error reduction tools (H.12), and failed to create and maintain complete, accurate and, up-to-date documentation (H.7). If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-354, 50-272, and 50-311 License Nos. NPF-57, DPR-70, and DPR-75 Nonpublic Enclosure:
Inspection Report 05000354/2014403, 05000272/2014403, and 05000311/2014403 w/Attachment: Supplemental Information (OUO-SRI)
cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:
P. Davison, Vice President Hope Creek J. Perry, Vice President, Salem P. Tocci, Director Security P. Baldauf, Director, NJ Radiation Protection Programs F. Fisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health ML15023A210 (Cover letter)
ADAMS ACCESSION NUMBER: ML15023A215 (Cover letter w/enclosure)
Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JBream JCherubini GDentel ADimitriadis DATE 1/13/2015 1/21/2015 1/21/2015 1/21/2015 1/22/2015 Distribution w/o encl; w/o OUO-SRI: (via E-Mail)
D. Dorman, RA (R1ORAMAIL RESOURCE)
D. Lew, DRA (R1ORAMAIL RESOURCE)
H. Nieh, DRP (R1DRPMAIL RESOURCE)
M. Scott, DRP (R1DRPMAIL RESOURCE)
R. Lorson, DRS (R1DRSMAIL RESOURCE)
J. Trapp, DRS (R1DRSMAIL RESOURCE)
G. Dentel, DRP R. Barkley, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI S. Haney, DRP, RI A. Ziedonis, DRP, RI M. Draxton, DRP C. Highley, DRP C. Ott, DRP, AA K. MorganButler, RI OEDO RidsNrrPMSalem Resource RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Distribution w/encl; w/OUO-SRI: (via E-Mail)
J. Cherubini, DRS A. Dimitriadis, DRS G. Dentel, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV