ML18046B090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:clsUMERs POWER COMPANY Docket 50-255 Request fo.r change to the Technical Specifications License DPR-20 For the reasons hereinaf'ter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:
{{#Wiki_filter:clsUMERs   POWER COMPANY Docket 50-255 Request fo.r change to the Technical Specifications License DPR-20 For the reasons hereinaf'ter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:
* I
* I*     Change ( s )
* Change ( s ) A. Change item ten (10) of Table 4.2.2 as follows: 10. Critical Headers Service Water System 110 Psig static Test Every Five Years 9.1.2, I 9,i.3.2: I II. Discussion The proposed change will reduce the test pressure from 150 Psig to.110 Psig: As stated in Section 9.1. 3. 2 of Palisades FSAR, tests are conducted in accordance with the ASME Boiler and Pressure Vessel Code, Section XI, Rules of In"'-service Inspection of Nuclear Power Plant Components, 1974 Edition, Addenda through: summer 1975. This edition, as well as subsequent editions of the not require a test pressure of 150 Psig but rather 1.10 times the syst*em design pressure of 100 Psig. Therefore, the required test pressure.need only be 110 Psig. ! III. Conclusion(s)
A. Change item ten (10) of Table 4.2.2 as follows:
Based on the foregoing,*
: 10. Critical Headers Service     110 Psig Hydro-  Every         9.1.2, I Water System                static Test      Five          9,i.3.2:I Years II. Discussion The proposed change will reduce the test pressure from 150 Psig to.110 Psig:
both the Palisades Plant Review Comnii ttee and the Safety and Audit Review Board have reviewed this change and find it acceptaple.
As stated in Section 9.1. 3. 2 of Palisades FSAR, tests are conducted in accordance with the ASME Boiler and Pressure Vessel Code, Section XI, Rules of In"'-service Inspection of Nuclear Power Plant Components, 1974 Edition, Addenda through:
CONSUMERS POWER COMPANY BY R B DeWitt, _Vi_c::e President Nuclear Operations Sworn and subscribed to before me this 17th Day of November 1981. ' He_le,n l)empski, Public Jackson Couiity, Michigan r. -* r, My con.unission*--*eipires December 14, 1983. .* 8111240738 8111117; PDR ADOCK 05000*255 P PDR J, (SEAL)}}
summer 1975. This edition, as well as subsequent editions of the ~ode, doe~
not require a test pressure of 150 Psig but rather 1.10 times the syst*em design pressure of 100 Psig. Therefore, the required test pressure.need only be 110 Psig.                                                                   !
III. Conclusion(s)
Based on the foregoing,* both the Palisades Plant Review Comnii ttee and the Safety and Audit Review Board have reviewed this change and find it acceptaple.
CONSUMERS POWER COMPANY BY R B DeWitt, _Vi_c::e President Nuclear Operations Sworn and subscribed to before me this 17th Day of November 1981.
          '
He_le,n   l)empski,           Public                                 (SEAL)
Jackson Couiity, Michigan r.
                      -* r, My con.unission*--*eipires December 14, 1983.
J,
.* 8111240738 8111117; PDR ADOCK 05000*255 P                     PDR}}

Revision as of 21:25, 21 October 2019

Application for Amend of License DPR-20,changing Tech Specs Table 4.2.2 to Permit Hydrostatic Testing of Svc Water Sys Critical Headers at 110 Psig
ML18046B090
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/14/1981
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046B089 List:
References
NUDOCS 8111240738
Download: ML18046B090 (1)


Text

clsUMERs POWER COMPANY Docket 50-255 Request fo.r change to the Technical Specifications License DPR-20 For the reasons hereinaf'ter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:

  • I* Change ( s )

A. Change item ten (10) of Table 4.2.2 as follows:

10. Critical Headers Service 110 Psig Hydro- Every 9.1.2, I Water System static Test Five 9,i.3.2:I Years II. Discussion The proposed change will reduce the test pressure from 150 Psig to.110 Psig:

As stated in Section 9.1. 3. 2 of Palisades FSAR, tests are conducted in accordance with the ASME Boiler and Pressure Vessel Code,Section XI, Rules of In"'-service Inspection of Nuclear Power Plant Components, 1974 Edition, Addenda through:

summer 1975. This edition, as well as subsequent editions of the ~ode, doe~

not require a test pressure of 150 Psig but rather 1.10 times the syst*em design pressure of 100 Psig. Therefore, the required test pressure.need only be 110 Psig.  !

III. Conclusion(s)

Based on the foregoing,* both the Palisades Plant Review Comnii ttee and the Safety and Audit Review Board have reviewed this change and find it acceptaple.

CONSUMERS POWER COMPANY BY R B DeWitt, _Vi_c::e President Nuclear Operations Sworn and subscribed to before me this 17th Day of November 1981.

'

He_le,n l)empski, Public (SEAL)

Jackson Couiity, Michigan r.

-* r, My con.unission*--*eipires December 14, 1983.

J,

.* 8111240738 8111117; PDR ADOCK 05000*255 P PDR