ML18046B091

From kanterella
Jump to navigation Jump to search
Proposed Changes to Tech Specs Table 4.2.2 Re Min Frequencies for Equipment Tests,To Permit Hydrostatic Testing of Svc Water Sys Critical Headers at Psig
ML18046B091
Person / Time
Site: Palisades 
Issue date: 11/17/1981
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046B089 List:
References
NUDOCS 8111240743
Download: ML18046B091 (1)


Text

TABLE 4.. 2.2 MINIMUM FREQUENCIES FOR EQUIPMENT TESTS Control Rods

2.

Control Rods 3,

Pressurizer Safety Valves

4.

Main Steam Safety Valves 5,

Refueling System Interlocks

6.

Service Water System Valve Actuation (SIS-CHP)

7.

Fire Protection Pumps and Power Supply

8.

Primary System Leakage 9,

Diesel Fuel Supply

10.

Critical Headers Service Water System

11.

Charcoal and Hi Effi-ciency Filters for Con-trol Room, Fuel Storage Building and Containment Purge System (Containment Post-Accident Filter)

(8111240743 '0111i7-;j i PDR ADOCK 050002'55

\\f P*DR Test Drop Times of All Full.;.

Length Rods.

Partial Movement of All Rods (Minimum of 6 In)

Set Point Set Point Functioning Functioning Functioning Evaluate Fuel Inventory 110 Psig Hydrostatic Test Charcoal Filters Checked ~ 99% Effi-ciency per Freon 112 test (ORNL) - HEPA Filters checked ~ 99%

Efficiency per ANSI NlOl.1-1972 4-15 Frequency Each Refuel-ing Shutdown Every Two Weeks As Required by Spec 4.3c As Required by Spec 4.3c Prior to Refueling Operations As Required by Spec 4.3c Monthly Daily*

Daily Every Five Years Each Refuel-ing Shutdown and at Any Time Work on Filters FSAR Section

'Reference 7.4.1.3 7,3,7 4.3.4 9.11. 3 9.1.2 9.6.2 4

Amend 15, i Ques 4. 3. 7 :

8.4.1 9.1.2 9.1.3.2 t

Amend 14, \\

  • Ques 14.19.-1, 6.5.1, 9.8~)

Could Alter Their Integrity PROPOSED