ML093521058: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/17/2009
| issue date = 12/17/2009
| title = Mip - University of Michigan Ford Nuclear Reactor-FY 2010
| title = Mip - University of Michigan Ford Nuclear Reactor-FY 2010
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS/DB
| author affiliation = NRC/RGN-III/DNMS/DB
| addressee name = Alexander T
| addressee name = Alexander T

Revision as of 14:26, 11 July 2019

Mip - University of Michigan Ford Nuclear Reactor-FY 2010
ML093521058
Person / Time
Site: University of Michigan
Issue date: 12/17/2009
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Alexander T
University of Michigan
References
Download: ML093521058 (3)


Text

December 17, 2009

Terry Alexander Executive Director Department of Occupation Safety & Environmental Health 1239 Kipke Drive University of Michigan Ann Arbor, MI 48109-1010

SUBJECT:

UNIVERSITY OF MICHIGAN FORD NUCLEAR REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2010

Dear Mr. Alexander:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, "Research and Test Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Ford Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for fiscal year (FY) 2010, which is from October 2009 through September 2010. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.

Because the FY 2010 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2010, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY 2010 MIP remains current, we request that you keep the Materials Control, ISFSI and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Ford Reactor FY 2010 MIP.

We currently project the region will conduct an inspection at the Ford Reactor during January 2010 to observe decommissioning activities associated with a drain line on the east side of the reactor building. A second inspection will be conducted during FY 2010 to observe final status surveys if they are under way. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors T. Alexander In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely, /RA/ Christine Lipa, Chief Materials Control, ISFSI and Decommissioning Branch Docket No. 050-00002 License No. R-28

cc: S. L. Ceccio, University of Michigan M. L. Driscoll, University of Michigan B. Skowronek, State of Michigan T. Alexander In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely, /RA/ Christine Lipa, Chief Materials Control, ISFSI and Decommissioning Branch Docket No. 050-00002 License No. R-28

cc: S. L. Ceccio, University of Michigan M. L. Driscoll, University of Michigan B. Skowronek, State of Michigan

DISTRIBUTION

Docket File A. Persinko, FSME K. Banovac, FSME N. Orlando, FSME C. Pederson, RIII S. Reynolds, RIII P. Louden, RIII A. Barker, RIII V. Mitlyng, RIII P. Chandrathil, RIII DOCUMENT NAME: MIP - University of Michigan Ford Nuclear Reactor FY2010.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII E RIII RIII NAME WGSnell:mb JTapp CLipa DATE 12/17/09 12/17/09 12/17/09 OFFICIAL RECORD COPY