ML11293A076: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 10/21/2011 | | issue date = 10/21/2011 | ||
| title = Safety Evaluation for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | | title = Safety Evaluation for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | ||
| author name = Mozafari B | | author name = Mozafari B | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Jefferson W | | addressee name = Jefferson W | ||
Line 9: | Line 9: | ||
| docket = 05000400 | | docket = 05000400 | ||
| license number = NPF-063 | | license number = NPF-063 | ||
| contact person = Mozafari B | | contact person = Mozafari B | ||
| case reference number = TAC ME6998 | | case reference number = TAC ME6998 | ||
| document type = Letter, Safety Evaluation | | document type = Letter, Safety Evaluation | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 21, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16, 2011 (Agencywide Documents Access and Management System Accession No. | {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 21, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16, 2011 (Agencywide Documents Access and Management System Accession No. ML11235A730), Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life extended, while satisfying the requirements of Appendix H. "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation. | ||
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American Society for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed. | The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American Society for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed. | ||
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020. | If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020. | ||
Line 31: | Line 31: | ||
By letter dated August 16, 2011,1 Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel (RPV) surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life (EOL) extended, while satisfying the requirements of Appendix H, "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation 2.0 REGULATORY REQUIREMENTS The surveillance program for Harris was established in accordance with Appendix H to 10 CFR Part 50 that requires licensees to monitor changes in the toughness properties of ferritic materials in the RPV beltline region of light-water nuclear power reactors. | By letter dated August 16, 2011,1 Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel (RPV) surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life (EOL) extended, while satisfying the requirements of Appendix H, "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation 2.0 REGULATORY REQUIREMENTS The surveillance program for Harris was established in accordance with Appendix H to 10 CFR Part 50 that requires licensees to monitor changes in the toughness properties of ferritic materials in the RPV beltline region of light-water nuclear power reactors. | ||
Appendix H states that the design of the surveillance program and the WS must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) Standard E 185-82, "Standard Practice for Conducting Surveillance Test for Light-Water Cooled Nuclear Power Reactor Vessels," that was current on the issue date of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to which the RPV was purchased; however, the licensee may choose to use later editions through 1982 of the ASTM specification. | Appendix H states that the design of the surveillance program and the WS must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) Standard E 185-82, "Standard Practice for Conducting Surveillance Test for Light-Water Cooled Nuclear Power Reactor Vessels," that was current on the issue date of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to which the RPV was purchased; however, the licensee may choose to use later editions through 1982 of the ASTM specification. | ||
The current surveillance program at Harris has been developed in accordance with ASTM E185-82, as allowed by 10 CFR Part 50, Appendix H. 1 Request from licensee, August 16, 2011, Agencywide Documents and Access Management System (ADAMS) Accession No. | The current surveillance program at Harris has been developed in accordance with ASTM E185-82, as allowed by 10 CFR Part 50, Appendix H. 1 Request from licensee, August 16, 2011, Agencywide Documents and Access Management System (ADAMS) Accession No. ML11235A730. | ||
Enclosure | Enclosure | ||
-In December 2008, Harris was granted an extended license for operation. | -In December 2008, Harris was granted an extended license for operation. | ||
Line 42: | Line 42: | ||
Based on the NRC's staff's review of the licensee's August 15, 2011, submittal the NRC staff finds that the revised surveillance capsule WS and associated actions for Harris satisfy the requirements and recommendations of ASTM E185-82 and the GALL Report as pertinent to the application. | Based on the NRC's staff's review of the licensee's August 15, 2011, submittal the NRC staff finds that the revised surveillance capsule WS and associated actions for Harris satisfy the requirements and recommendations of ASTM E185-82 and the GALL Report as pertinent to the application. | ||
Therefore, the NRC staff concludes that the licensee's modified surveillance capsule WS for Harris is acceptable for implementation and satisfies the requirements of Appendix H to 10 CFR Part 50 for the 50-year extended license period. Principal Contributor: | Therefore, the NRC staff concludes that the licensee's modified surveillance capsule WS for Harris is acceptable for implementation and satisfies the requirements of Appendix H to 10 CFR Part 50 for the 50-year extended license period. Principal Contributor: | ||
Dan Widrevitz Date: October 21,2011 October 21,2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16,2011 (Agencywide Documents Access and Management System Accession No. | Dan Widrevitz Date: October 21,2011 October 21,2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16,2011 (Agencywide Documents Access and Management System Accession No. ML11235A730), Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life extended, while satisfying the requirements of Appendix H, "Reactor Vessel Material Surveillance Program Requirements," to Title 1 0 of the Code of Federal Regulations (10 CFR) Part 50. Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation. | ||
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American SOciety for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed. | The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American SOciety for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed. | ||
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020. | If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020. |
Revision as of 08:02, 29 June 2019
ML11293A076 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 10/21/2011 |
From: | Mozafari B Plant Licensing Branch II |
To: | Jefferson W Carolina Power & Light Co |
Mozafari B | |
References | |
TAC ME6998 | |
Download: ML11293A076 (6) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 21, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16, 2011 (Agencywide Documents Access and Management System Accession No. ML11235A730), Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life extended, while satisfying the requirements of Appendix H. "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation.
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American Society for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
Sincerely, Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
Safety Evaluation cc: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION RELATED TO THE REVISION OF THE REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 TAC NO. ME6998 DOCKET NO. 50-400
1.0 INTRODUCTION
By letter dated August 16, 2011,1 Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel (RPV) surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life (EOL) extended, while satisfying the requirements of Appendix H, "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation 2.0 REGULATORY REQUIREMENTS The surveillance program for Harris was established in accordance with Appendix H to 10 CFR Part 50 that requires licensees to monitor changes in the toughness properties of ferritic materials in the RPV beltline region of light-water nuclear power reactors.
Appendix H states that the design of the surveillance program and the WS must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) Standard E 185-82, "Standard Practice for Conducting Surveillance Test for Light-Water Cooled Nuclear Power Reactor Vessels," that was current on the issue date of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to which the RPV was purchased; however, the licensee may choose to use later editions through 1982 of the ASTM specification.
The current surveillance program at Harris has been developed in accordance with ASTM E185-82, as allowed by 10 CFR Part 50, Appendix H. 1 Request from licensee, August 16, 2011, Agencywide Documents and Access Management System (ADAMS) Accession No. ML11235A730.
Enclosure
-In December 2008, Harris was granted an extended license for operation.
2 NUREG-1801, Revision 2, "Generic Aging Lessons Learned Report, ..3 (GALL Report) provides additional guidance for the surveillance program during the extended period of operation, approximately an additional 20 years. This guidance is critical as the requirements found in ASTM E185-82 were designed based on 40-year operating periods. 3.0 TECHNICAL EVALUATION The basis for the Harris surveillance program is ASTM E 185-82 compliant with the requirements of Appendix H to 10 CFR Part 50. Table 1 of ASTM E185-82 requires that either a minimum of three, four, or five surveillance capsules be removed from each of the vessels, as based on the limiting amount of RT NOT shift (aRT NOT) that is projected to occur at the clad-vessel interface location of the RPV at the EOL. ASTM E185-82 establishes the following criteria for determining the minimum number of capsules that are to be removed in accordance with a WS and the number of capsules that are to be tested: For plants with projected aRT NOT less than 100 degrees Fahrenheit (F) (56 degrees Celsius (C>>, three capsules are required to be removed from the RPV and the first two capsules are required to be tested (for dosimetry, tensile-ductility, Charpy-V impact toughness, and alloying chemistry). For plants with projected aRT NOT between 100*F (56 .C) and 200*F (111 .C), four surveillance capsules are to be removed from the RPV and the first three capsules are required to be tested. For plants with projected aRT NOT above 200 OF (111°C), five surveillance capsules are required to be removed from the RPV and the first four capsules are required to be tested. For both the 40-year period and 60-year extended period of operation the Harris RPV has limiting aRT NOT values below 100 OF (56°C), Therefore, the licensee was required to remove a minimum of three capsules from Harris during the 40-year periods of operation, and must test an additional capsule for the 60-year extended period of operation to remain in compliance with ASTM E182-82, and license renewal commitments as described in the GALL Report: The plant-specific or integrated surveillance program shall have at least one capsule with a projected neutron fluence equal to or exceeding the 60-year peak reactor vessel wall neutron nuence prior to the end of the period of extended operation.
The program withdraws one capsule at an outage in which the capsule receives a neutron fluence of between one and two times the peak reactor vessel wall neutron fluence at the end of the period of extended operation and tests the capsule in accordance with the requirements of ASTM E185-82. Three capsules have already been withdrawn and tested from the reactor (representing a fluence received between 0,8 x 10 19 and 3.4 x 10 19 n/cm 2 , E> 1 MeV) covering the initial 2 License renewal at Harris, December 2008, ADAMS Accession No, ML082340952, 3 NUREG-1801, Rev. 2, "Generic Aging Lessons Learned Report, December 2010, ADAMS Accession No, ML011080726.
-3 40-year license period. The licensee has proposed an alternate WS for a capsule that will satisfy the ASTM E 185-82/GALL Report requirement for removing a capsule with fluence between one and two times the EOL estimated vessel fluence for the 60-year license period as recommended while providing test-data more useful in a fleet-wide context. The Nuclear Regulatory Commission (NRC) staff notes that under the proposed WS there will be one standby surveillance capsule remaining for Harris that has the potential of being removed for storage or used for future testing. The licensee's letter of August 16, 2011, provides the updated history of the RPV surveillance capsules for Harris. The pertinent information is summarized in Table 1 below. S ummary 0 fS urvel ance C apsue W*thd T a bl e 1 I I rawaI at H arns. 10 Withdrawal EFPY Withdrawal Neutron Fluence (E > 1.0 MeV) 0.55 X 10'l> n/cm£U 1 V 3 1.32 x 10 19 n/cm 2 X 9 3.25 x 10 19 n/cm 2 x 10'9 n/cm£W 18 27.2A Y 9.39 B X 10 19 n/cm 2 x 10'l> n/cm£Z 27.2'" A Proposed withdrawal date for either Y or Z, but not both B Estimated fluence value The licensee proposes to remove either Capsule Y or Z during their 21 st refueling outage, circa 2018, when the capsule will have been exposed to a total neutron fluence of 9.39 x 10 19 n/cm 2 (E > 1.0 MeV). Removing the capsule at this target fluence will provide valuable information in the higher fluence ranges, for which there is currently little experience or data. The staff reiterates the recommendation found in the GALL Report that either Capsule Y or Z be withdrawn and tested while the other is left in place and maintained in readiness should it become necessary at a future date. The staff compared the withdrawal conditions for Harris surveillance capsules U, V, X, W, Y, and Z with the criteria of ASTM E185-82 and the GALL Report for a required four capsule WS. The staff confirmed that the withdrawals were consistent with the criteria in ASTM E185-82 and the GALL Report for the proposed WS. Capsule W was withdrawn in the fall of 2010 when the neutron fluence on capsule W was expected to be roughly equal to the maximum neutron fluence on the clad-vessel interface at EOL, 55 effective full power years (EFPY). Capsule W is currently in storage, held ready for testing or reconstitution and reinsertion into the vessel in accordance with the Harris renewed license NPF-63, Condition 2.K. The staff finds that the proposed change in WS adequately addresses the requirements and recommendations of Appendix H, ASTM E185-82, and the GALL Report. Within this context, the testing of a Harris capsule with a higher fluence is both acceptable and prudent. The staff has further concluded that licensee has adequately addressed all concerns, limitations, and commitments related to this request.
4.0 CONCLUSION
Based on the NRC's staff's review of the licensee's August 15, 2011, submittal the NRC staff finds that the revised surveillance capsule WS and associated actions for Harris satisfy the requirements and recommendations of ASTM E185-82 and the GALL Report as pertinent to the application.
Therefore, the NRC staff concludes that the licensee's modified surveillance capsule WS for Harris is acceptable for implementation and satisfies the requirements of Appendix H to 10 CFR Part 50 for the 50-year extended license period. Principal Contributor:
Dan Widrevitz Date: October 21,2011 October 21,2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLANT -SAFETY EVALUATION FOR REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (TAC NO. ME6998) By letter dated August 16,2011 (Agencywide Documents Access and Management System Accession No. ML11235A730), Carolina Power & Light Company (the licensee) submitted for staff review a request for revising the withdrawal schedule (WS) for the reactor pressure vessel surveillance capsules for Shearon Harris Nuclear Power Plant (Harris), Unit No.1. The purpose of the licensee's submittal was to better align the WS with the projection of neutron fluence at the end-of-life extended, while satisfying the requirements of Appendix H, "Reactor Vessel Material Surveillance Program Requirements," to Title 1 0 of the Code of Federal Regulations (10 CFR) Part 50.Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation.
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittal and has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix H to Part 50; as well as American SOciety for Testing and Materials Standard E185-82, and the NRC technical report, NUREG-1801, Revision 2. The NRC staff evaluation of this proposal is enclosed.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.
Sincerely, IRA! Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
Safety Evaluation cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 RJF RidsNrrDorlLpl2-2 RidsNrrOciCvib RidsNrrLACSola RidsOgcRp RidsNrrPMShearonHarris RidsNrrDoriDpr RidsRgn2MaliCenter RidsAcrsAcnw
_MailCTR D. Widrevitz, NRR ADAMS A . N o. ML
- B lymemo ccesslon OFFICE LPL2-2/PM LPL2-2/LA DCI/CVIB/BC' LPL2-2BC LPL2-2/PM NAME BMozafari CSoia MMitchell (c. Fairbanks for) DBroaddus (FSaba for) BMozafari DATE 10/20/11 10/20/11 10/05/11 10/21111 10/21/11 OFFICIAL AGENCY RECORD