ML12324A201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/19/2012
| issue date = 11/19/2012
| title = Initial Operator Licensing Operating Test Approval (Salem Generating Station, Units 1 and 2)
| title = Initial Operator Licensing Operating Test Approval (Salem Generating Station, Units 1 and 2)
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Joyce T P
| addressee name = Joyce T
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| docket = 05000272, 05000311

Revision as of 13:18, 22 June 2019

Initial Operator Licensing Operating Test Approval (Salem Generating Station, Units 1 and 2)
ML12324A201
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/19/2012
From: Diane Jackson
Operations Branch I
To: Joyce T
Public Service Enterprise Group
Shared Package
ML12191A056 List:
References
Download: ML12324A201 (4)


Text

UNITED STATES NUGLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 November L9, 2012 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

lNlTlAL OPERATOR LICENSING OPERATING TEST APPROVAL (SALEM GENERATTNG STATlON, UNtrS 1 AND 2)

Dear Mr. Joyce:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Salem Generating Station. Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. E. Parker, Director of Training.

Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1 on November 14,2012. The NRC staff will administer the operating tests during the week of November 26,2012. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.

Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.

lf you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

T. Joyce Pfease contact your Chief Examiner, Mr. David Silk at (610) 337-5372,if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Operations Branch Division of Reactor Safety Docket Nos. 50-272: 50-311 License Nos. DPR-70: DPR-75 cc: M. Kafantaris, Training Director cc: Distribution via ListServ Sincerely, T. Joyce 2 Please contact your Chief Examiner, Mr. David Silk at (610) 337-5372,if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely,/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272: 50-311 License Nos. DPR-70; DPR-75 cc: M. Kafantaris, Training Director cc: Distribution via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY13-SAL Nov 12(U01859)\ExamApproval-O-Ltr.docx ADAMS PKG: ML 21914056 g suNstReview g Non-Sensitive n Sensitive V Publicly Available n Non-PubliclyAvailable OFFICE RI/DRS/OB RI/DRS/OB NAME DSiIK DJackson DATE 11115/12 11t19/12 D ACCESSION NU MBER: ML123244201 OFFICIAL RECOR T. Joyce Distribution: (viaE-mail)

W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS RIORAMAIL Resource)RIORAMA!L Resource)RIDRPMAlL Resource)RlDRPMail Resource)RlDRSMail Resource)RlDRSMail Resource)3 A. Burritt, DRP L. Cline, DRP A. Turilin, DRP D. Schroeder, DRP, SRI P, McKenna, DRP, Rl K. McKenzie, DRP, M C. Santos, Rl OEDO RidsNrrPMSalem Resource Rids N rrDo rlLpll -2 Resou rce ROPreports Resource D. Silk, Chief Examiner, DRS D. Jackson, DRS C. Bixler, DRS Master Exam File (with concurrences)